CN102353835A - Full-automatic test system for power of display equipment on production line and test method - Google Patents

Full-automatic test system for power of display equipment on production line and test method Download PDF

Info

Publication number
CN102353835A
CN102353835A CN201110285580XA CN201110285580A CN102353835A CN 102353835 A CN102353835 A CN 102353835A CN 201110285580X A CN201110285580X A CN 201110285580XA CN 201110285580 A CN201110285580 A CN 201110285580A CN 102353835 A CN102353835 A CN 102353835A
Authority
CN
China
Prior art keywords
power
computing machine
display device
production line
power meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110285580XA
Other languages
Chinese (zh)
Other versions
CN102353835B (en
Inventor
刘晔
李福栋
王浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TPV Display Technology China Co Ltd
Original Assignee
TPV Technology Beijing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TPV Technology Beijing Co Ltd filed Critical TPV Technology Beijing Co Ltd
Priority to CN201110285580XA priority Critical patent/CN102353835B/en
Publication of CN102353835A publication Critical patent/CN102353835A/en
Application granted granted Critical
Publication of CN102353835B publication Critical patent/CN102353835B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • General Factory Administration (AREA)

Abstract

The invention discloses a full-automatic test system for power of display equipment on a production line and a test method. The system comprises a computer, a power meter and an electromagnetic induction barcode reader. The system reads the barcode of the display equipment through the electromagnetic induction barcode reader, and takes the barcode as the information indicating that the display equipment arrives at the detection position to trigger the power detection; the power meter detects the power of the display equipment and judges whether the power is within the regulated range; and finally, the power meter sends the detection result to the computer for storage. By adopting the technical scheme of the invention, the system can be automatically operated without needing manual supervision, the automation degree and production efficiency are high, and wrong judgment caused by manual operation is reduced.

Description

A kind of power of display equipment on production line full-automatic test system and method for testing
Technical field
The present invention relates to a kind of power test system, relate in particular to a kind of power of display equipment on production line full-automatic test system and method for testing.
Background technology
Existing power of display equipment on production line test macro; General very important person is the setting value that power meter is set; Have relatively high expectations for the operator, can not obtain the bar code of test product automatically, and can not trigger as the display device information of putting in place with bar code information and begin to carry out full-automatic testing.
For example number of patent application is 201010301148.0; Patent name is in the patent of invention of " automatically testing power of display equipment on production line system and method "; Disclose a kind of automatically testing power of display equipment on production line system and method, this system comprises address card, main control computer, power meter, frequency converter and is located at the PLC controller on the production line.This system and method comes elastic calibration device that display device is carried out power test through the serial communication of main control computer; And the parallel port communication through computing machine, through address card and PLC controller to the robotization of display device enter the station detection, actions such as departures are controlled automatically.Though the traditional relatively method of this system and method can labor savings; Improve automaticity; But to having relatively high expectations of user of service; The a collection of display device of every test; All must artificial input display device machine and corresponding power bracket, if the setting value of artificial setting power meter again is artificial input error; Then can cause the testing result mistake, have the hidden danger of manual operation mistake.In this patent, main control computer is connected with power meter or address card through parallel or serial port, and wiring is complicated, and needs to use interface board, and cost is high; Power meter only has the simple function of power detection; This patent also need be provided with the special display device equipment such as trigger switch, address card that arrive at a station, and operation steps is more loaded down with trivial details, influences production efficiency.
Summary of the invention
In order to overcome the deficiency of prior art, the object of the present invention is to provide a kind of robotization and production efficiency high power of display equipment on production line full-automatic test system and method for testing.
Technical scheme of the present invention is: a kind of power of display equipment on production line full-automatic test system; It comprises computing machine and power meter; Computing machine and power meter are electrically connected; It is characterized in that: it comprises that also electromagnetic induction reads bar code device; Electromagnetic induction is read bar code device and is connected with computer-electrical; Be provided with the whether comparison judgment means of ultra scope of measured power in the power meter; This alarm switch contact that relatively dog catch moves on judgment means and the control production line is electrically connected, power meter also with production line on web joint be electrically connected; After display device was sent to test position, the power supply of display device was inserted on the said web joint, and power meter connects with display device mutually, and it is corresponding that display device barcode position and the electromagnetic induction of being located at production line one side are read bar code device.
Said computing machine is read bar code device by keyboard mouth or serial ports with electromagnetic induction and is electrically connected.
Said computing machine is electrically connected with power meter by the usb data line.
Be provided with the voltage detection module of testing voltage in the said power meter.
Be provided with the storer that stores display device machine name, corresponding power scope, time of fire alarming and operating voltage setting value in the said computing machine.
The method of testing of power of display equipment on production line full-automatic test system of the present invention, it may further comprise the steps:
1) the machine name of selection display device to be detected in the display interface of computing machine, computing machine calls the data in its storer, shows the time of fire alarming of power bracket, operating voltage and the power meter of corresponding display device at display interface; And power bracket and time of fire alarming sent to power meter, the sensing range and the time of fire alarming of power meter adjustment power;
2) the voltage detection module testing voltage in the power meter, and send detected value to computing machine, whether judgment task voltage was consistent with setting value after computing machine was received this detected value, and as if inconsistent, computing machine sends miscue; If consistent, wait for that then display device puts in place;
3) after display device to be measured was sent to the detection position, electromagnetic induction was read bar code device and is read bar code information, and bar code information is sent to computing machine;
4) after computing machine receives that electromagnetic induction is read the information of bar code device transmission, send the detection power order to power meter;
5) power of power meter test display device, the comparison judgment means in the power meter judge that the power test value is whether in setting range, if the power test value not in setting range, is then given the alarm switch contact alerting signal that transmission is not let pass; If the power test value sends the signal of letting pass in setting range, then for the alarm switch contact; Simultaneously power detection value and judged result are sent to computing machine;
6) if alerting signal of the not letting pass dog catch then controlled on the production line in alarm switch contact receive lifts the display device departures; If all-clear is received in the alarm switch contact, then to control dog catch and fall, display device is sent to the production line next stop;
7) computing machine is deposited storer with bar code, power detection value, the judged result received and is uploaded in the network data base, if the power detection value exceeds setting value, then on the display interface of computing machine, prompting message occurs.
Adopt technical scheme of the present invention, can select the computing machine of not being with the parallel port for use, need not detect and control through the parallel port of computing machine, computing machine adopts the usb data line to be connected with power meter, and wiring is simple, reduces cost; Adopt electromagnetic induction to read bar code device and read bar code and begin to carry out power detection, the special display device equipment such as trigger switch that arrive at a station need be set, practice thrift cost as judging that information that display device arrives the detection position triggers, more convenient to operate; Simultaneously; As long as select the machine name of display device on computers; The display interface of computing machine can show the power bracket of corresponding power bracket and automatic setting power meter automatically; Do not need workman's input power range; Can operate automatically; Need not manual work and keep an eye on, reduce the hidden danger that the manual operation mistake is brought; After power meter detected the power of display device, whether the power of directly differentiating display device was qualified, sends the signal of whether letting pass for then the alarm switch contact, saved operation steps, improved production efficiency.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is done further detailed explanation:
Fig. 1 is the structural representation of power of display equipment on production line full-automatic test system of the present invention.
Embodiment
As shown in Figure 1; The present invention includes computing machine 1 and power meter 2; Computing machine 1 is electrically connected with power meter 2; It comprises that also electromagnetic induction reads bar code device 3; Electromagnetic induction is read bar code device 3 and is electrically connected with computing machine 1; Be provided with the whether comparison judgment means 21 of ultra scope of measured power in the power meter 2, this alarm switch contact 22 that relatively dog catch 7 moves on judgment means 21 and the control production line 5 is electrically connected, power meter 2 also with production line 5 on web joint 6 be electrically connected; After display device 4 was sent to test position, the power supply of display device 4 was inserted on the said web joint 6, and power meter 2 connects with display device 4 mutually, and it is corresponding that display device 4 barcode positions and the electromagnetic induction of being located at production line 5 one sides are read bar code device 3.
Said computing machine 1 is read bar code device 3 by keyboard mouth or serial ports with electromagnetic induction and is electrically connected.
Said computing machine 1 is electrically connected with power meter 2 by the usb data line.
Be provided with the voltage detection module 22 of testing voltage in the said power meter 2; This module 22 can detect the supply voltage that current power meter 2 uses; And send detected value to computing machine 1; Whether judgment task voltage was consistent with setting value after computing machine 1 was received this detected value; If inconsistent, computing machine 1 sends miscue; If consistent, wait for that then display device 4 puts in place;
Be provided with the storer 11 that stores display device 4 machine names, corresponding power scope, time of fire alarming and operating voltage setting value in the said computing machine 1.
The method of testing of power of display equipment on production line full-automatic test system of the present invention, it may further comprise the steps:
1) the machine name of selection display device 4 to be detected in the display interface of computing machine 1, computing machine 1 calls the data in its storer 11, shows the time of fire alarming of power bracket, operating voltage and the power meter of corresponding display device 4 at display interface; And power bracket and time of fire alarming sent to power meter 2, the sensing range and the time of fire alarming of power meter 2 adjustment power;
2) the voltage detection module 22 testing voltages in the power meter 2, and send detected value to computing machine 1, whether judgment task voltage was consistent with setting value after computing machine 1 was received this detected value, and as if inconsistent, computing machine 1 sends miscue; If consistent, wait for that then display device 4 puts in place;
3) after display device 4 to be measured was sent to the detection position, electromagnetic induction was read bar code device 3 and is read bar code information, and bar code information is sent to computing machine 1;
4) after computing machine 1 receives that electromagnetic induction is read the information of bar code device 3 transmissions, send the detection power order to power meter 2;
5) power of power meter 2 test display devices 4, the comparison judgment means 21 in the power meter 2 judge that the power test value is whether in setting range, if the power test value not in setting range, is then given the alarm switch contact alerting signal that 23 transmissions are not let pass; If the power test value sends the signal of letting pass in setting range, then for alarm switch contact 23; Simultaneously power detection value and judged result are sent to computing machine 1;
6) alarm switch contact 23 is if receive that the dog catch 7 that the alerting signal of not letting pass is then controlled on the production line 5 lifts, and display device 4 sets off; If all-clear is received in alarm switch contact 23, then to control dog catch 7 and fall, display device passes 4 and delivers to production line 5 next stops;
7) computing machine 1 is deposited storer 11 with bar code, power detection value, the judged result received and is uploaded in the network data base, if the power detection value exceeds setting value, then on the display interface of computing machine 1, prompting message occurs.
Adopt technical scheme of the present invention, can select the computing machine 1 of not being with the parallel port for use, computing machine 1 adopts the usb data line to be connected with power meter 2, and wiring is simple, reduces cost; Adopt electromagnetic induction to read that bar code device 3 reads bar code and trigger to begin to carry out power detection, special display device 4 equipment such as trigger switch that arrive at a station need be set, practice thrift cost as the information of the arrival detection position of judging display device 4, more convenient to operate; Simultaneously; As long as on computing machine 1, select the machine name of display device 4; The display interface of computing machine 1 can show corresponding power bracket automatically and the power bracket of power meter 2 is set automatically, does not need workman's input power range, reduces the hidden danger that the manual operation mistake is brought; After power meter 2 detected the power of display device 4, whether the power of directly differentiating display device 4 was qualified, sends the signal of whether letting pass for then alarm switch contact 22, saved operation steps, improved production efficiency.

Claims (6)

1. power of display equipment on production line full-automatic test system; It comprises computing machine and power meter; Computing machine and power meter are electrically connected; It is characterized in that: it comprises that also electromagnetic induction reads bar code device; Electromagnetic induction is read bar code device and is connected with computer-electrical; Be provided with the whether comparison judgment means of ultra scope of measured power in the power meter, this alarm switch contact that relatively dog catch moves on judgment means and the control production line is electrically connected, power meter also with production line on web joint be electrically connected; After display device was sent to test position, the power supply of display device was inserted on the said web joint, and power meter connects with display device mutually, and it is corresponding that display device barcode position and the electromagnetic induction of being located at production line one side are read bar code device.
2. power of display equipment on production line full-automatic test system according to claim 1 is characterized in that: said computing machine is read bar code device by keyboard mouth or serial ports with electromagnetic induction and is electrically connected.
3. power of display equipment on production line full-automatic test system according to claim 1 is characterized in that: said computing machine is electrically connected with power meter by the usb data line.
4. power of display equipment on production line full-automatic test system according to claim 1 is characterized in that: the voltage detection module that is provided with testing voltage in the said power meter.
5. power of display equipment on production line full-automatic test system according to claim 1 is characterized in that: be provided with the storer that stores display device machine name, corresponding power scope, time of fire alarming and operating voltage setting value in the said computing machine.
6. according to the method for testing of the described power of display equipment on production line full-automatic test system of one of claim 1-5, it is characterized in that: said method of testing may further comprise the steps:
1) the machine name of selection display device to be detected in the display interface of computing machine, computing machine calls the data in its storer, shows the time of fire alarming of power bracket, operating voltage and the power meter of corresponding display device at display interface; And power bracket and time of fire alarming sent to power meter, the sensing range and the time of fire alarming of power meter adjustment power;
2) the voltage detection module testing voltage in the power meter, and send detected value to computing machine, whether judgment task voltage was consistent with setting value after computing machine was received this detected value, and as if inconsistent, computing machine sends miscue; If consistent, wait for that then display device puts in place;
3) after display device to be measured was sent to the detection position, electromagnetic induction was read bar code device and is read bar code information, and bar code information is sent to computing machine;
4) after computing machine receives that electromagnetic induction is read the information of bar code device transmission, send the detection power order to power meter;
5) power of power meter test display device, the comparison judgment means in the power meter judge that the power test value is whether in setting range, if the power test value not in setting range, is then given the alarm switch contact alerting signal that transmission is not let pass; If the power test value sends the signal of letting pass in setting range, then for the alarm switch contact; Simultaneously power detection value and judged result are sent to computing machine;
6) if alerting signal of the not letting pass dog catch then controlled on the production line in alarm switch contact receive lifts the display device departures; If all-clear is received in the alarm switch contact, then to control dog catch and fall, display device is sent to the production line next stop;
7) computing machine is deposited storer with bar code, power detection value, the judged result received and is uploaded in the network data base, if the power detection value exceeds setting value, then on the display interface of computing machine, prompting message occurs.
CN201110285580XA 2011-09-23 2011-09-23 Full-automatic test system for power of display equipment on production line and test method Active CN102353835B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110285580XA CN102353835B (en) 2011-09-23 2011-09-23 Full-automatic test system for power of display equipment on production line and test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110285580XA CN102353835B (en) 2011-09-23 2011-09-23 Full-automatic test system for power of display equipment on production line and test method

Publications (2)

Publication Number Publication Date
CN102353835A true CN102353835A (en) 2012-02-15
CN102353835B CN102353835B (en) 2013-12-04

Family

ID=45577435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110285580XA Active CN102353835B (en) 2011-09-23 2011-09-23 Full-automatic test system for power of display equipment on production line and test method

Country Status (1)

Country Link
CN (1) CN102353835B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102654542A (en) * 2012-05-09 2012-09-05 福建联迪商用设备有限公司 Method for realizing test automation by utilizing bar code
CN104345210A (en) * 2013-08-08 2015-02-11 李显斌 Tooling fixture for production line testing and air energy water heater testing method thereof
CN108072798A (en) * 2016-11-15 2018-05-25 佛山市顺德区美的电热电器制造有限公司 Household electrical appliances master control board detecting method and detecting system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002062919A (en) * 2000-08-21 2002-02-28 Ricoh Co Ltd Production control system, client in production control system, production control method, data input method in production control system, and computer-readable storage medium with program for executing the data input method stored therein
CN101577078A (en) * 2009-06-22 2009-11-11 福建捷联电子有限公司 Full automatic adjustment and test system for liquid crystal display
CN101581740A (en) * 2009-06-12 2009-11-18 福建捷联电子有限公司 Method for automatically allocating instruments for testing power, voltage withstanding and grounding
CN201463930U (en) * 2009-07-06 2010-05-12 杭州中粮包装有限公司 Online detection device by using characteristics of bar codes
CN101825658A (en) * 2010-02-03 2010-09-08 福建捷联电子有限公司 System and method for automatically testing power of display equipment on production line
CN102147607A (en) * 2010-02-09 2011-08-10 科博达技术有限公司 Flexible general production line and production method of electronic product
CN202267709U (en) * 2011-09-23 2012-06-06 冠捷科技(北京)有限公司 Automatic test system for power of display device on production line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002062919A (en) * 2000-08-21 2002-02-28 Ricoh Co Ltd Production control system, client in production control system, production control method, data input method in production control system, and computer-readable storage medium with program for executing the data input method stored therein
CN101581740A (en) * 2009-06-12 2009-11-18 福建捷联电子有限公司 Method for automatically allocating instruments for testing power, voltage withstanding and grounding
CN101577078A (en) * 2009-06-22 2009-11-11 福建捷联电子有限公司 Full automatic adjustment and test system for liquid crystal display
CN201463930U (en) * 2009-07-06 2010-05-12 杭州中粮包装有限公司 Online detection device by using characteristics of bar codes
CN101825658A (en) * 2010-02-03 2010-09-08 福建捷联电子有限公司 System and method for automatically testing power of display equipment on production line
CN102147607A (en) * 2010-02-09 2011-08-10 科博达技术有限公司 Flexible general production line and production method of electronic product
CN202267709U (en) * 2011-09-23 2012-06-06 冠捷科技(北京)有限公司 Automatic test system for power of display device on production line

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102654542A (en) * 2012-05-09 2012-09-05 福建联迪商用设备有限公司 Method for realizing test automation by utilizing bar code
CN102654542B (en) * 2012-05-09 2014-08-27 福建联迪商用设备有限公司 Method for realizing test automation by utilizing bar code
CN104345210A (en) * 2013-08-08 2015-02-11 李显斌 Tooling fixture for production line testing and air energy water heater testing method thereof
CN108072798A (en) * 2016-11-15 2018-05-25 佛山市顺德区美的电热电器制造有限公司 Household electrical appliances master control board detecting method and detecting system

Also Published As

Publication number Publication date
CN102353835B (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN202267709U (en) Automatic test system for power of display device on production line
CN103760515B (en) A kind of multi-epitope parameter Lookup protocol and detection method
CN105788227B (en) Fault diagnosis equipment for electricity consumption information acquisition system
CN105785199A (en) Multifunctional power distribution terminal integrated test system and operating method thereof
CN204925380U (en) Electric energy meter detecting system
CN103809151B (en) A kind of multi-epitope parameter Lookup protocol and checkout gear
CN102271177A (en) Method and system for calibrating proximity sensor of mobile phone
CN104216328A (en) Sensor automatic test system
CN109212460B (en) Communication unit detection tool and detection method
CN102353835B (en) Full-automatic test system for power of display equipment on production line and test method
CN105414057A (en) PCBA testing system
CN111752777A (en) Function test system and method of interface equipment
CN104237729A (en) Automatic joint debugging testing system for feeder line terminal
CN203149056U (en) Electronic equipment testing system
CN104614607B (en) A kind of method of testing and test system
CN218450122U (en) Wireless automatic detection system for whole assembly line
CN205450159U (en) Frequency converter test device
CN202656295U (en) Tubular pile pouring weighing and pumping leakage control system and concrete tubular pile production line
CN204347211U (en) A kind of many relay functions proving installation
CN109911595B (en) Full-automatic power distribution terminal detection system and method based on identity recognition
CN107682227B (en) Ammeter detection configuration method
CN203950006U (en) A kind of aircraft wire fault automatic detector based on microprocessor
CN205229351U (en) Outer machine ann rule automatic check out system of air conditioner
CN109870834A (en) A kind of liquid-crystalline glasses power-up detection system
CN205643556U (en) Multi -functional power distribution terminal integrated test system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: TPV DISPLAY TECHNOLOGY (CHINA) CO., LTD.

Free format text: FORMER OWNER: TPV TECHNOLOGY (BEIJING) CO., LTD.

Effective date: 20131126

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100015 CHAOYANG, BEIJING TO: 100176 DAXING, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131126

Address after: 100176, No. three, No. 106, Hai Lu, Beijing economic and Technological Development Zone, Beijing

Patentee after: AOC display technology (China) Co., Ltd.

Address before: 100015 Jiuxianqiao Road, Beijing, No. 10, No.

Patentee before: Guanjie Technology (Beijing) Co., Ltd.