CN102348221B - Minimization drive test measurement method and user equipment - Google Patents

Minimization drive test measurement method and user equipment Download PDF

Info

Publication number
CN102348221B
CN102348221B CN201010246436.0A CN201010246436A CN102348221B CN 102348221 B CN102348221 B CN 102348221B CN 201010246436 A CN201010246436 A CN 201010246436A CN 102348221 B CN102348221 B CN 102348221B
Authority
CN
China
Prior art keywords
mdt
configuration
measures
timer
geographic range
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010246436.0A
Other languages
Chinese (zh)
Other versions
CN102348221A (en
Inventor
彦楠
李海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
China Academy of Telecommunications Technology CATT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN201010246436.0A priority Critical patent/CN102348221B/en
Publication of CN102348221A publication Critical patent/CN102348221A/en
Application granted granted Critical
Publication of CN102348221B publication Critical patent/CN102348221B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a minimization drive test measurement method and user equipment. The method comprises that: the user equipment determines a configured area scope for minimization drive test measurement; and the user equipment stops acquiring a minimization drive test measurement result after leaving the configured area scope for the minimization drive test measurement. By the invention, user equipment behaviors after the user equipment leaves a currently designated minimization drive test measurement configuration area, the measurement behaviors of the user equipment are limited and unified user equipment behaviors are ensured.

Description

A kind of minimization drive test measurement method and subscriber equipment
Technical field
The present invention relates to wireless communication technology, particularly a kind of minimization drive test measurement method and subscriber equipment.
Background technology
One, MDT (minimization drive test, minimum road test) measures classification brief introduction.
Immediate MDT (instant MDT): the MDT carrying out at connected state measures and reports.Multiplexing RRM (Radio Resource Management, RRM) measurement mechanism, once meet report condition, immediately to eNB/RNC (evolution base station/radio network controller; RNC:Radio Network Controller, radio network controller) report.
Logged MDT (non-instant MDT): the MDT carrying out at Idle state measures, and reports at follow-up connected state.Once meet the trigger condition of configuration, will obtain measurement result and store (log), on follow-up suitable opportunity, report eNB/RNC.
Conventionally, for ease of statement, alleged log refers to that execution " obtains measurement result and store " resulting stored record after This move in the industry; Logging refers to that execution " obtains measurement result and store " This move.
Two, geographic range (area scope) configuration brief introduction.
MDT measurement is to have restriction in geographic range, is currently divided into 3 kinds of situations:
1) network does not have the geographic range that explicit configuration MDT measures, and UE carries out MDT log measurement by all communities in whole RPLMN (Registered Public Land Mobile Network, the public land mobile network of registration);
2) UE (User Equipment, subscriber equipment) also can, by the explicit configuration of network 30Ge community at the most, use CGI (Cell Global Identifier, Cell Global Identity) to identify, under this configuration, UE only carries out MDT log measurement in configuration Liao community;
3) UE also can be by the explicit configuration of network TA/LA/RA (Tracking Area/Location Area/Routing Area, tracking area/this area/Route Area) list, under this configuration, when UE is only resident in these TA/LA/RA Nei communities, just carry out MDT log measurement.
Three, the existing measurement introduction of MDT.
Following 7 UE measuring amount have been determined in existing MDT measurement:
1, Periodical downlink pilot measurements (cycle descending pilot frequency is measured);
2, Serving Cell becomes worse than threshold (it is poorer than setting thresholding that service district becomes);
3, Transmit power headroom becomes less than threshold (it is poorer than setting thresholding that PHR becomes);
4, Random access failure (random access failure);
5, Paging Channel Failure (paging channel takes defeat);
6, Broadcast Channel failure (broadcast channel takes defeat);
7, Radio link failure report (Radio Link Failure report).
Except above-mentioned 7 measuring amount, in follow-up standard process, do not get rid of the measuring amount that increases other, as the relevant measuring amount of the QoS of UE (QoS Quality of Service, service quality).If several in these measuring amount are during for the immediate MDT of connected state, when network has issued after the configuration of these measurements, UE will monitor at connected state, and after having event to be triggered, still multiplexing RRM measures the reporting message using and proceeds to reporting of network side.
The deficiencies in the prior art are: existing scheme, agreement have only stipulated to carry out the UE behavior of MDT measurement in area scope, in UE measuring process, if crossed over the border of measuring geographic range configuration, how this processes the problems such as MDT measurement configuration, timer also not have technical scheme to solve UE.
Summary of the invention
Technical problem solved by the invention is to provide a kind of minimization drive test measurement method and subscriber equipment, in order to solve the problem that in prior art, MDT exists in measuring when UE crosses over the border of measuring geographic range configuration.
A kind of MDT method of measurement is provided in the embodiment of the present invention, has comprised the steps:
UE determines the geographic range that the MDT of configuration measures;
After the geographic range that UE measures at the MDT that leaves configuration, stop obtaining MDT measurement result.
A kind of subscriber equipment is provided in the embodiment of the present invention, has comprised:
Geographic range determination module, for determining the geographic range of the MDT measurement configuring at UE;
Measurement module, for leaving at UE after the geographic range that the MDT of configuration measures, stops obtaining MDT measurement result.
Beneficial effect of the present invention is as follows:
The technical scheme that the embodiment of the present invention provides has provided UE and has left the behavior that current MDT measures UE behind configuration appointed area, and the measurement behavior of UE is limited, and guarantees unified UE behavior.
Accompanying drawing explanation
Fig. 1 is MDT method of measurement implementing procedure schematic diagram in the embodiment of the present invention;
Fig. 2 is that the MDT log measurement collection MDT of periodic triggers in the embodiment of the present invention processes implementing procedure schematic diagram;
Fig. 3 is user device architecture schematic diagram in the embodiment of the present invention.
Embodiment
In following mobile communication system, wish, by introducing the mechanism of network self-organization, to reduce the artificial participation of the network planning and Operation and Maintenance, by network based statistic Automatic Optimal parameter, reduce construction and the operation cost of network.In order to reduce the O&M cost of network, hope can be taked network configuration UE report method, reduces the work of artificial drive test.On the other hand, also wish to obtain the wireless measurement information in the region that common drive test cannot arrive.
In LTE (Long Term Evolution, Long Term Evolution), at R10 (version 10), set up the project and determined that MDT adopts the framework of chain of command (control plane) at present, the benefit of this framework is exactly that base station can be controlled UE accurately.The configuration and UE the reporting to network that adopt chain of command framework need to use RRC (Radio Resource Control, Radio Resource is controlled) signaling bear network to carry out UE.The geographic range area scope of network to a measurement of UE configuration, UE carries out normal MDT measurement within the scope of this.
But inventor notices: MDT Log only measures at UE and just carries out during in idle condition, network has configured MDT measured zone to UE, UE is according to autonomous path movement, between different districts, carry out gravity treatment, likely move to outside the measured zone (community/tracking area) of network configuration.But existing scheme, agreement have only stipulated to carry out the UE behavior of MDT measurement in area scope; And in UE measuring process, if crossed over the border of measuring geographic range configuration, how this processes the problems such as MDT measurement configuration, timer also not have technical scheme to solve UE.
Given this, the processing scheme that provides a kind of UE to cross over MDT configuring area in the embodiment of the present invention, in order to provide the solution of UE behavior after the geographic range that UE spanning network configuration MDT measures.Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described.
Fig. 1 is MDT method of measurement implementing procedure schematic diagram, as shown in the figure, crosses over MDT configuring area carry out when MDT measures comprising the steps: at UE
Step 101, UE determine the geographic range that the MDT of configuration measures;
After the geographic range that step 102, UE measure at the MDT that leaves configuration, stop obtaining MDT measurement result.
In concrete enforcement, network issues MDT in connection status to UE and measures configuration, and this configuration comprises the absolute time issuing, the time span timer (timer) that allows this MDT Log to measure, and possible Restriction of the Measuring region.Different according to the processing mode to timer, can be divided into three kinds of modes, respectively: one, timer is continued to timing; Two, delete timer; Three, pause timer timing, describes their embodiments below.
One, timer timer does not suspend, and UE is not logging, until come back to after the geographic range that the MDT of configuration measures.
That is, at UE, leaving after the geographic range that the MDT of configuration measures, can further include:
UE is kept for the timer continuation timing that MDT Log measures, and timer length is that the MDT that network issues to UE measures the timer length in configuration parameter.
In enforcement, can further include:
Before timer expiry, after the geographic range that UE measures at the MDT that gets back to configuration, the MDT issuing to UE by described network measures configuration and starts to obtain MDT Log measurement result and store.
Under which, behind the Restriction of the Measuring zone boundary that UE deviated from network limits, the timer timer of restriction MDT Log whole time of measurement works on and does not suspend, and UE also continues to retain MDT measurement configuration information, but UE does not carry out MDT log measurement, until timer expiry;
Before timer timer is overtime, if crossing over Measured Boundary again, gets back among measured zone UE, UE can, on the basis of measuring before, continue to use the MDT retaining to measure configuration and carry out log DATA REASONING and collection;
The benefit of which is: the triggering relative time stamp of each event of record can not produce error, and periodically the relative time stamp of logging record can not produce error yet.
Two, delete timer, UE deletes configuration.
That is,, after the geographic range that UE measures at the MDT that leaves configuration, can further include:
UE deletes the timer of measuring for MDT Log, and timer length is that the MDT that network issues to UE measures the timer length in configuration parameter.
In enforcement, at UE, deleting after the timer of measuring for MDT Log, can further include:
UE is retained in the MDT issuing to UE by network in the geographic range that the MDT of configuration measures and measures the MDT Log measurement result that configuration is obtained;
UE reports the MDT Log measurement result of reservation after entering connection status.
Further, in enforcement, at UE, leaving after the geographic range that the MDT of configuration measures, further comprising:
UE deletes the MDT Log measurement configuration that network issues to UE.
The benefit of which is: implement simple.Once the appointed area of UE deviated from network configuration, deletes all configurations that MDT log measures, and comprises timer and measured zone restriction, this MDT measures and finishes.But the log result data that UE has measured still retains, after entering connection status, wait reports again.
Three, suspend timer, retain configuration, UE is not logging, gets back to after the geographic range that the MDT of configuration measures, and recovers timer, continues logging.
That is, at UE, leaving after the geographic range that the MDT of configuration measures, can further include:
UE suspends the timer timing of measuring for MDT Log, and timer length is that the MDT that network issues to UE measures the timer length in configuration parameter.
In enforcement, can further include:
After the geographic range that UE measures at the MDT that gets back to configuration, recover timer timing, and the MDT issuing to UE by described network measurement configuration starts to obtain MDT Log measurement result and stores.
On the basis of aforesaid way, in enforcement, when UE suspends the timer timing of measuring for MDT Log, can further include:
UE is left to the time of the geographic range that the MDT of configuration measures and carry out timing.
In enforcement, can adopt timer to carry out timing.
In implementing, can further include:
When the duration leaving surpasses setting threshold, UE deletes the timer of measuring for MDT Log, and/or the MDT that deletion network issues to UE measures configuration.
In enforcement, can further include:
UE reports MDT Log measurement result, upper giving the correct time, determines the relative time stamp of event/periodic recording according to the timer suspending and the duration leaving.
Under which, in order to guarantee the Measuring Time of actual MDT Log in limited range, when UE leaves the measuring range of restriction, the time span timer timer that this MDT Log can be measured suspends, and measures configuration and hangs up, and measures and suspends.Also, UE suspends the timer timing of measuring for MDT Log.
UE left in a period of time of measuring behind localized area, and the probability that comes back to measurement localized area is larger.If UE gets back to and measures in localized area in a period of time, continue to open timer, use the measurement configuration of hanging up to carry out log collection.Also, UE, after the geographic range of MDT measurement of getting back to configuration, recovers timer timing, and the MDT measurement configuration that before suspending by measurement, network issues to UE starts to obtain MDT measurement result and stores.
After if UE is gone for a season, think that the possibility that UE gets back to Restriction of the Measuring region reduces greatly, can delete timer and MDT and measure configuration.Wherein " a period of time " can be to reopen the timer timer ' that an agreement provides, or realized and being settled a dispute by the parties concerned themselves by UE.Also, when the duration leaving surpasses setting threshold, UE deletes the timer of measuring for MDT Log, and/or the MDT that deletion network issues to UE measures configuration.
Fig. 2 is that the MDT log measurement collection MDT of periodic triggers processes implementing procedure schematic diagram, as shown in the figure, can comprise:
Step 201, UE carry out normal MDT measurement;
Suppose that UE moves to outside the Restriction of the Measuring region of network configuration, proceeds to step 202;
Step 202, time-out timer and measurement, measure configuration and hang up;
Step 203, open new timer timer ';
In this step, the object of new timer timer ' is that the time of UE being left to the geographic range that the MDT of configuration measures carries out timing;
Before step 204, Timer ' are overtime, judge that whether UE gets back to former Restriction of the Measuring region, is to proceed to step 205, otherwise proceeds to step 206;
Step 205, stop timer timer ', recover the configuration hung up, continue timer timer and measure with MDT, the relative time stamp of successor record is: the time that the timestamp+timer ' during timer time-out has recorded while stopping;
Step 206, deletion MDT measure configuration and timer, measure and stop.
For the MDT log measurement collection of periodic triggers, if the time-out of timer timer can have influence on the calculating of timestamp time stamp, can when timer suspends, reopen another timer timer ", for the calculating of time out; Or multiplexing above-mentioned timer timer '.Timer timer suspends during from the measured zone of UE deviated from network configuration, and timer ' opens during from the measured zone of UE deviated from network configuration.Above-mentioned timer ' or timer " all can carry out timing at timer pause stage, guarantee the accuracy that timestamp calculates:
Relative time stamp=timer+timer '/timer of event/periodic recording ".
Based on same inventive concept, a kind of subscriber equipment is also provided in the embodiment of the present invention, because the principle that this equipment is dealt with problems is similar to a kind of minimization drive test measurement method, so the enforcement of this equipment can, referring to the enforcement of method, repeat part and repeat no more.
Fig. 3 is user device architecture schematic diagram, as shown in the figure, in UE, can comprise:
Geographic range determination module 301, for determining the geographic range of the MDT measurement configuring at UE;
Measurement module 302, for leaving at UE after the geographic range that the MDT of configuration measures, stops obtaining MDT measurement result.
In enforcement, measurement module can also be further used for leaving after the geographic range that the MDT of configuration measures at UE, is kept for the timer that MDT measures and continues timing, and timer length is that the MDT that network issues to UE measures the timer length in configuration parameter.
In enforcement, measurement module can also be further used for before timer expiry, at UE, gets back to after the geographic range that the MDT of configuration measures, and the MDT issuing to UE by described network measures configuration and starts to obtain MDT measurement result and store.
In enforcement, measurement module can also be further used for leaving after the geographic range that the MDT of configuration measures at UE, deletes the timer of measuring for MDT, and timer length is that the MDT that network issues to UE measures the timer length in configuration parameter.
In enforcement, measurement module can also be further used for after deleting the timer of measuring for MDT, be retained in the MDT issuing to UE by network in the geographic range that the MDT of configuration measures and measure the MDT measurement result that configuration is obtained, and after UE enters connection status, report the MDT measurement result of reservation.
In enforcement, measurement module can also be further used for leaving after the geographic range that the MDT of configuration measures at UE, deletes the MDT that network issues to UE and measures configuration.
In enforcement, measurement module can also be further used for leaving after the geographic range that the MDT of configuration measures at UE, suspends the timer timing of measuring for MDT, and timer length is that the MDT that network issues to UE measures the timer length in configuration parameter.
In enforcement, measurement module can also be further used for getting back to after the geographic range that the MDT of configuration measures at UE, recovers timer timing, and the MDT issuing to UE by described network measures configuration and starts to obtain MDT measurement result and store.
In enforcement, in subscriber equipment, can further include:
Timer, when suspending the timer timing of measuring for MDT at UE, leaves the time of the geographic range that the MDT of configuration measures and carries out timing to UE.
In enforcement, measurement module can also be further used for, when the duration leaving of described timer timing surpasses setting threshold, deleting the timer of measuring for MDT, and/or the MDT that deletion network issues to UE measures configuration.
In enforcement, measurement module can also be further used for when reporting MDT measurement result, determines the relative time stamp of event/periodic recording according to the duration leaving of the timer suspending and described timer timing.
For convenience of description, the each several part of the above device is divided into various modules with function or unit is described respectively.Certainly, when enforcement is of the present invention, the function of each module or unit can be realized in same or a plurality of software or hardware.
From above-described embodiment, in the technical scheme that the embodiment of the present invention provides, can be when UE leave configuring area, timer does not suspend, and UE is not logging, until come back to after the geographic range that the MDT of configuration measures;
UE can also delete timer by UE, and UE deletes configuration;
UE can also suspend timer, retains configuration, and UE is not logging, gets back to after the geographic range that the MDT of configuration measures, and recovers timer, continues logging;
Visible, the technical scheme that the embodiment of the present invention provides has provided the processing scheme that UE crosses over MDT configuring area, provide UE and left the behavior that current MDT measures configuration appointed area and reenters rear UE, the measurement behavior of UE has been limited, guaranteed unified UE behavior.
Those skilled in the art should understand, embodiments of the invention can be provided as method, system or computer program.Therefore, the present invention can adopt complete hardware implementation example, implement software example or in conjunction with the form of the embodiment of software and hardware aspect completely.And the present invention can adopt the form that wherein includes the upper computer program of implementing of computer-usable storage medium (including but not limited to magnetic disc store, CD-ROM, optical memory etc.) of computer usable program code one or more.
The present invention is with reference to describing according to flow chart and/or the block diagram of the method for the embodiment of the present invention, equipment (system) and computer program.Should understand can be in computer program instructions realization flow figure and/or block diagram each flow process and/or the flow process in square frame and flow chart and/or block diagram and/or the combination of square frame.Can provide these computer program instructions to the processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing device to produce a machine, the instruction of carrying out by the processor of computer or other programmable data processing device is produced for realizing the device in the function of flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame appointments.
These computer program instructions also can be stored in energy vectoring computer or the computer-readable memory of other programmable data processing device with ad hoc fashion work, the instruction that makes to be stored in this computer-readable memory produces the manufacture that comprises command device, and this command device is realized the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame.
These computer program instructions also can be loaded in computer or other programmable data processing device, make to carry out sequence of operations step to produce computer implemented processing on computer or other programmable devices, thereby the instruction of carrying out is provided for realizing the step of the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame on computer or other programmable devices.
Although described the preferred embodiments of the present invention, once those skilled in the art obtain the basic creative concept of cicada, can make other change and modification to these embodiment.So claims are intended to all changes and the modification that are interpreted as comprising preferred embodiment and fall into the scope of the invention.
Obviously, those skilled in the art can carry out various changes and modification and not depart from the spirit and scope of the present invention the present invention.Like this, if within of the present invention these are revised and modification belongs to the scope of the claims in the present invention and equivalent technologies thereof, the present invention is also intended to comprise these changes and modification interior.

Claims (10)

1. a minimum road test MDT method of measurement, is characterized in that, comprises the steps:
User equipment (UE) is determined the geographic range that the MDT of configuration measures;
After the geographic range that UE measures at the MDT that leaves configuration, stop obtaining MDT measurement result;
Wherein, after the geographic range that UE measures at the MDT that leaves configuration, be kept for the timer continuation timing that MDT measures; Before timer expiry, after the geographic range that UE measures at the MDT that gets back to configuration, the MDT issuing to UE by network measures configuration and starts to obtain MDT measurement result and store, and timer length is that the MDT that network issues to UE measures the timer length in configuration parameter; Or,
After the geographic range that UE measures at the MDT that leaves configuration, delete the timer of measuring for MDT, timer length is that the MDT that issues to UE of network measures the timer length in configuration parameter, and UE is retained in the MDT issuing to UE by network in the geographic range that the MDT of configuration measures and measures the MDT measurement result that configuration is obtained; UE reports the MDT measurement result of reservation after entering connection status; Or,
After the geographic range that UE measures at the MDT that leaves configuration, suspend the timer timing of measuring for MDT, timer length is that the MDT that network issues to UE measures the timer length in configuration parameter; After the geographic range that UE measures at the MDT that gets back to configuration, recover timer timing, and the MDT issuing to UE by described network measurement configuration starts to obtain MDT measurement result and stores.
2. the method for claim 1, is characterized in that, after the geographic range that UE measures at the MDT that leaves configuration, further comprises:
UE deletes the MDT measurement configuration that network issues to UE.
3. the method for claim 1, is characterized in that, when UE suspends the timer timing of measuring for MDT, further comprises:
UE is left to the time of the geographic range that the MDT of configuration measures and carry out timing.
4. method as claimed in claim 3, is characterized in that, further comprises:
When the duration leaving surpasses setting threshold, UE deletes the timer of measuring for MDT, and/or the MDT that deletion network issues to UE measures configuration.
5. method as claimed in claim 3, is characterized in that, further comprises:
UE reports MDT measurement result, upper giving the correct time, determines the relative time stamp of event/periodic recording according to the timer suspending and the duration leaving.
6. a subscriber equipment, is characterized in that, comprising:
Geographic range determination module, for determining the geographic range of the MDT measurement configuring at UE;
Measurement module, for leaving at UE after the geographic range that the MDT of configuration measures, stops obtaining MDT measurement result;
Wherein, described measurement module is further used for leaving after the geographic range that the MDT of configuration measures at UE, is kept for the timer that MDT measures and continues timing, and timer length is that the MDT that network issues to UE measures the timer length in configuration parameter; Before timer expiry, at UE, get back to after the geographic range that the MDT of configuration measures, the MDT issuing to UE by described network measures configuration and starts to obtain MDT measurement result and store; Or,
Described measurement module is further used for leaving after the geographic range that the MDT of configuration measures at UE, deletes the timer of measuring for MDT, and timer length is that the MDT that network issues to UE measures the timer length in configuration parameter; Be retained in the MDT issuing to UE by network in the geographic range that the MDT of configuration measures and measure the MDT measurement result that configuration is obtained, and after UE enters connection status, report the MDT measurement result of reservation; Or,
Described measurement module is further used for leaving after the geographic range that the MDT of configuration measures at UE, suspends the timer timing of measuring for MDT, and timer length is that the MDT that network issues to UE measures the timer length in configuration parameter; At UE, get back to after the geographic range that the MDT of configuration measures, recover timer timing, and the MDT issuing to UE by described network measures configuration and starts to obtain MDT measurement result and store.
7. subscriber equipment as claimed in claim 6, is characterized in that, measurement module is further used for leaving after the geographic range that the MDT of configuration measures at UE, deletes the MDT that network issues to UE and measures configuration.
8. subscriber equipment as claimed in claim 6, is characterized in that, further comprises:
Timer, when suspending the timer timing of measuring for MDT at UE, leaves the time of the geographic range that the MDT of configuration measures and carries out timing to UE.
9. subscriber equipment as claimed in claim 8, it is characterized in that, measurement module is further used for, when the duration leaving of described timer timing surpasses setting threshold, deleting the timer of measuring for MDT, and/or the MDT that deletion network issues to UE measures configuration.
10. subscriber equipment as claimed in claim 8, is characterized in that, measurement module is further used for when reporting MDT measurement result, determines the relative time stamp of event/periodic recording according to the duration leaving of the timer suspending and described timer timing.
CN201010246436.0A 2010-08-05 2010-08-05 Minimization drive test measurement method and user equipment Active CN102348221B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010246436.0A CN102348221B (en) 2010-08-05 2010-08-05 Minimization drive test measurement method and user equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010246436.0A CN102348221B (en) 2010-08-05 2010-08-05 Minimization drive test measurement method and user equipment

Publications (2)

Publication Number Publication Date
CN102348221A CN102348221A (en) 2012-02-08
CN102348221B true CN102348221B (en) 2014-04-02

Family

ID=45546416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010246436.0A Active CN102348221B (en) 2010-08-05 2010-08-05 Minimization drive test measurement method and user equipment

Country Status (1)

Country Link
CN (1) CN102348221B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014019199A1 (en) 2012-08-02 2014-02-06 华为技术有限公司 Terminal, and processing method after access failure thereof
CN103945405B (en) * 2013-01-22 2018-10-30 电信科学技术研究院 A kind of management method and equipment of MDT trace sessions
CN109391933A (en) * 2017-08-04 2019-02-26 中兴通讯股份有限公司 Operation irregularity terminal processes, operation irregularity terminal identification method and device
WO2019148316A1 (en) * 2018-01-30 2019-08-08 北京小米移动软件有限公司 Measurement configuration method and apparatus

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101420711A (en) * 2007-10-22 2009-04-29 华为技术有限公司 Method, the Apparatus and system of metrical information, detection covering problem are provided
CN101772066A (en) * 2009-01-05 2010-07-07 鼎桥通信技术有限公司 Control method for periodic measurement

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101420711A (en) * 2007-10-22 2009-04-29 华为技术有限公司 Method, the Apparatus and system of metrical information, detection covering problem are provided
CN101772066A (en) * 2009-01-05 2010-07-07 鼎桥通信技术有限公司 Control method for periodic measurement

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"Handling coverage hole case for logged MDT";Samsung;《3GPP TSG RAN WG2 #70bis R2-103924》;20100702;第2节 *
Samsung."Handling coverage hole case for logged MDT".《3GPP TSG RAN WG2 #70bis R2-103924》.2010,

Also Published As

Publication number Publication date
CN102348221A (en) 2012-02-08

Similar Documents

Publication Publication Date Title
ES2389268T3 (en) Mobile terminal, network entity and related method
ES2900674T3 (en) Method and apparatus for transmitting and receiving measurement information in a mobile communication system
CN102083179B (en) Control processing method for energy-saving cell and base station
CN102711167B (en) Method for measuring reference signal between UE (user equipment) and base station and base station
JP2018142993A (en) Radio terminal, radio network, and communication method
CN102695188B (en) Automatic neighbor relation (ANR) measurement method and apparatus thereof
US20140128057A1 (en) Systems and methods for controlling logging and reporting under constraints
MX2014008658A (en) Wireless communication system, wireless station, wireless terminal, network operation management device, and communication quality confirmation method.
CN104244321A (en) Cell energy saving and awakening method and device
CN102547840A (en) Method and device for reporting MDT measurement result
CN104640148A (en) Measurement reporting method, device and system
CN103220695A (en) Processing method and processing device for network element states
WO2019231435A1 (en) SYSTEMS AND METHODS FOR INVESTIGATING AND ADDRESSING BATTERY LIFE DEGRADATION OF DEVICES, SUCH AS IoT DEVICES, IN A CELLULAR COMMUNICATIONS NETWORK
CN102348221B (en) Minimization drive test measurement method and user equipment
MX2012012070A (en) Method for controlling drive test measurement record, drive test system and user equipment.
CN102291751B (en) The optimization method that drive test measurement result reports, driver test system and drive test terminal
CN103650566B (en) Neighbouring relations are managed
JP2016529824A (en) Method, apparatus and system for determining connection state support parameters
EP2742762A1 (en) Method and apparatus for operating configuration adaptation for interruption of signal transmission
CN102291758A (en) Method and equipment for reporting and processing minimized measurement quantity of road test
WO2020151699A1 (en) Information reporting method and receiving method, apparatus and device
CN102215511A (en) Method, system and equipment for reporting MDT (Mean Down Time) measuring result
KR20150038569A (en) Providing mobility state data from user equipment to network control node
CN102457894B (en) Cell switching method, method of measurement, equipment and system
CN101925072A (en) Method and equipment for detecting coverage of reference mark channel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210602

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right