CN102346883A - Total life cycle management method for relay protection products - Google Patents

Total life cycle management method for relay protection products Download PDF

Info

Publication number
CN102346883A
CN102346883A CN2011102755229A CN201110275522A CN102346883A CN 102346883 A CN102346883 A CN 102346883A CN 2011102755229 A CN2011102755229 A CN 2011102755229A CN 201110275522 A CN201110275522 A CN 201110275522A CN 102346883 A CN102346883 A CN 102346883A
Authority
CN
China
Prior art keywords
relay protection
protection product
life cycle
management method
products
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102755229A
Other languages
Chinese (zh)
Inventor
周华良
吴文瑕
许捷
胡钰林
姜雷
丁志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
Original Assignee
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN2011102755229A priority Critical patent/CN102346883A/en
Publication of CN102346883A publication Critical patent/CN102346883A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a total life cycle management method for relay protection products, which comprises the following steps of: analyzing and evaluating the producing, processing, debugging, storing, transporting, running and maintaining processes of the relay protection products; setting different weights according to the time point and the running state of each process; classifying the relay protection products according to the type of the relay protection products; and calculating an expected set value of each relay protection product in a station level and a system level by synthesizing the information of the above steps, and establishing a relay protection product station-level management database and a relay protection product system-level management database. In the method, the producing, processing, debugging and maintaining processes, and the like of the products are watched and analyzed, and the total life cycle of the relay protection products is managed; moreover, the running state of the products is evaluated so as to ensure that the products can run reliably.

Description

A kind of full life cycle management method that is used for the relay protection product
Technical field
The present invention relates to a kind of method that the relay protection of power system product life cycle is managed, belong to the electrical equipment technical field.
Background technology
Relay protection is the important secondary device of electric system, must be reliably, rapidly, selectively fault element is excised from electric system, and make fault element avoid continuing to be destroyed, guarantee that other non-fault parts recover normal operation rapidly.The develop rapidly of the widespread usage of high-performance processor and large scale integrated circuit technology has greatly promoted the development of digital protective relay technology.Because the equipment of serving engineering site receives the influence of electromagnetic interference (EMI), high temperature wet environment easily; The hardware performance of the digital protective relay product of high volume applications exists the product life cycle rule, therefore must carry out the hardware longevity management to the relay protection product.
Hardware is intact to be an essential condition that guarantees the good operation of relay protection device.Hardware longevity management at present is a weak link, guarantee that the relay protection safe and reliable operation just must be to protecting the device hardware life-span manage.This managerial demand extends to the final user from manufacturer, and it is retired to extend to product from production.
Summary of the invention
The objective of the invention is the relay protection products-hardware is carried out lifecycle management, guarantee the product reliability service, can assess, analyze the product operation conditions simultaneously, for product provides the planning foundation in process links such as production, processing, debugging, maintenances.
In order to realize above-mentioned functions, the present invention provides following technical scheme:
The present technique scheme is to pay close attention to each main time point, and the relay protection products-hardware is carried out lifecycle management.
A kind of full life cycle management method that is used for the relay protection product is characterized in that, comprises following steps:
Step 1: relay protection production, processing, debugging, stock, transportation, operation, maintenance process are carried out analysis and evaluation;
Step 2: time point and operation conditions according to each process are provided with different weights;
Step 3: the type according to the relay protection product is classified it;
Step 4: the information of comprehensive above-mentioned steps, the life cycle calculations value of computer installation level, system-level interior each relay protection product is set up relay protection product station level, system-level management database.
The life cycle calculations value is calculated by following arithmetic expression:
X = Σ 0 k ( A k * T k ) , 0 ≤ A k ≤ 1 ;
A kThe expression weight is used for indicating various process to the products-hardware effect on service life, is provided with according to being operating experience, can adjust according to actual conditions;
T kRepresenting operation time, is unit with actual fate.
Through to the arithmetic expression accumulating operation, a life cycle calculations value and an expection setting value are compared, when the calculated value of certain relay protection product reaches the expection setting value, notify the user that the relay protection product is upgraded, safeguarded or changes.
Also comprise the retired time of relay protection product, reprocess the step that maintenance time is planned in advance.
Form prior notice user with report output.
Type according to the relay protection product is divided into conventional plug-in unit, rapid wear plug-in unit or alternative plug-in unit with it.
Principle of work of the present invention is following:
According to buying device time, the time of making the product, debug time, putting into operation the time, as node, different weights are set with each time point according to operation condition in site, the products-hardware life-span is managed.When certain device calculated value reached expection setting boundary, prior notice user changed or handles.
The beneficial effect that the present invention reached:
Products-hardware is carried out lifecycle management;
Prior notice, planning in advance;
Form product database, classification is safeguarded;
Guarantee the reliable and secure operation of relay protection product.
Description of drawings
The hardware longevity management block diagram of Fig. 1 relay protection product.
Embodiment
Below in conjunction with accompanying drawing the present invention is further described.Following examples only are used for technical scheme of the present invention more clearly is described, and can not limit protection scope of the present invention with this.
As shown in Figure 1, the relay protection products-hardware is carried out equipment control, retired from device buying, production processing beginning until product, every device of every block of plug-in unit, plug-in unit is carried out life cycle management.According to the difference of each time point, the difference of service condition, carry out different weight computings.
Life cycle calculations value arithmetic expression: X = Σ 0 k ( A k * T k )
Wherein: 0≤A k≤1;
A kThe expression weight is used for indicating various process to the products-hardware effect on service life, and it is operating experience that foundation is set, as the system weight parameter of setting up departments is following, can adjust according to actual conditions:
Production, processing link A k=0.5;
Debugging A k=0.2;
Stock A k=0.05;
Transportation A k=0.1;
Actual motion A k=1.0;
Safeguard A k=0.8;
T kRepresenting operation time, is unit with actual fate.
Through accumulating operation, a calculated value and an expection setting value are compared, system can point out and alarm.
Full station or total system relay protection products-hardware life-span are managed, conventional plug-in unit, rapid wear plug-in unit, alternative plug-in unit are classified, form station level, Complex Structural System management database.The relay protection products-hardware is upgraded and safeguard with report output form prior notice user.
The above only is a preferred implementation of the present invention; Should be pointed out that for those skilled in the art, under the prerequisite that does not break away from know-why of the present invention; Can also make some improvement and distortion, these improvement and distortion also should be regarded as protection scope of the present invention.

Claims (6)

1. a full life cycle management method that is used for the relay protection product is characterized in that, comprises following steps:
Step 1: relay protection production, processing, debugging, stock, transportation, operation, maintenance process are carried out analysis and evaluation;
Step 2: time point and operation conditions according to each process are provided with different weights;
Step 3: the type according to the relay protection product is classified it;
Step 4: the information of comprehensive above-mentioned steps, the life cycle calculations value of computer installation level, system-level interior each relay protection product is set up relay protection product station level, system-level management database.
2. a kind of full life cycle management method that is used for the relay protection product according to claim 1 is characterized in that the life cycle calculations value is calculated by following arithmetic expression:
X = Σ 0 k ( A k * T k ) , 0 ≤ A k ≤ 1 ;
A kThe expression weight is used for indicating various process to the products-hardware effect on service life, is provided with according to being operating experience, can adjust according to actual conditions;
T kRepresenting operation time, is unit with actual fate.
3. a kind of full life cycle management method that is used for the relay protection product according to claim 2; It is characterized in that; Through to the arithmetic expression accumulating operation; A life cycle calculations value and an expection setting value are compared, when the calculated value of certain relay protection product reaches the expection setting value, notify the user that the relay protection product is upgraded, safeguarded or changes.
4. a kind of full life cycle management method that is used for the relay protection product according to claim 3 is characterized in that, also comprises the retired time of relay protection product, reprocesses the step that maintenance time is planned in advance.
5. a kind of full life cycle management method that is used for the relay protection product according to claim 3 is characterized in that, with the form prior notice user of report output.
6. a kind of full life cycle management method that is used for the relay protection product according to claim 1 is characterized in that, according to the type of relay protection product it is divided into conventional plug-in unit, rapid wear plug-in unit or alternative plug-in unit.
CN2011102755229A 2011-09-16 2011-09-16 Total life cycle management method for relay protection products Pending CN102346883A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102755229A CN102346883A (en) 2011-09-16 2011-09-16 Total life cycle management method for relay protection products

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102755229A CN102346883A (en) 2011-09-16 2011-09-16 Total life cycle management method for relay protection products

Publications (1)

Publication Number Publication Date
CN102346883A true CN102346883A (en) 2012-02-08

Family

ID=45545534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102755229A Pending CN102346883A (en) 2011-09-16 2011-09-16 Total life cycle management method for relay protection products

Country Status (1)

Country Link
CN (1) CN102346883A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107925671A (en) * 2015-06-15 2018-04-17 相信环球有限公司 Universal remote life cycle management
CN110443385A (en) * 2019-08-01 2019-11-12 南京信业能源科技有限公司 A kind of waste incineration special equipment life cycle management and analysis method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107925671A (en) * 2015-06-15 2018-04-17 相信环球有限公司 Universal remote life cycle management
CN107925671B (en) * 2015-06-15 2021-06-25 相信环球有限公司 Universal remote device lifecycle management
CN110443385A (en) * 2019-08-01 2019-11-12 南京信业能源科技有限公司 A kind of waste incineration special equipment life cycle management and analysis method

Similar Documents

Publication Publication Date Title
Danilczyk et al. ANGEL: An intelligent digital twin framework for microgrid security
CN103197177B (en) A kind of transformer fault diagnosis analytical approach based on Bayesian network
CN104504525A (en) Method for realizing power-grid equipment failure prewarning through big data mining technology
CN102324068A (en) Power secondary equipment risk assessment method and system thereof
CN105023109A (en) Reliability evaluation method and system of nuclear power station system or equipment
CN103711645A (en) Wind generating set state evaluation method based on modeling parameter feature analysis
CN104616092A (en) Distributed log analysis based distributed mode handling method
CN110320893B (en) Thermal power generating unit equipment maintenance method based on RCM
CN104933477A (en) Method for optimizing maintenance strategy by using risk assessment of power transmission and transformation equipment
CN103914951A (en) Method for natural disaster data information mining and early warning response analysis based on GIS power grid
CN105184521A (en) Method, device and system for evaluating risk of power grid operation mode with equipment health state
CN105447657A (en) Risk-based operation and maintenance management system of 750KV power equipment
CN104346691A (en) Power enterprise field operation risk analysis method based on fault tree analysis
Vlasov et al. Technological platform for innovative social infrastructure development on basis of smart machines and principles of internet of things
CN113448763A (en) Dynamic expansion grouping alarm service method for full life cycle management
US20230060002A1 (en) Method for predictive maintenance of equipment via distribution chart
CN115826469A (en) Automatic valve control method and system
JP5621414B2 (en) Equipment management method
CN105958652A (en) Unattended operation transformer substation pre-warning system and method based on big data analysis
CN105334472A (en) Online remaining life prediction method for mining intrinsic safety power supply
CN102346883A (en) Total life cycle management method for relay protection products
Zhao et al. Battery safety: Fault diagnosis from laboratory to real world
CN103163402B (en) Relay protection device state monitoring apparatus based on secondary circuit and monitoring method
CN105404962A (en) Modification strategy of electric power system relay protection device and generation system thereof
CN104766183A (en) Power grid real time fault event flow management system and adopted management method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120208