CN102346080A - 水温自动测量系统 - Google Patents

水温自动测量系统 Download PDF

Info

Publication number
CN102346080A
CN102346080A CN2011102825325A CN201110282532A CN102346080A CN 102346080 A CN102346080 A CN 102346080A CN 2011102825325 A CN2011102825325 A CN 2011102825325A CN 201110282532 A CN201110282532 A CN 201110282532A CN 102346080 A CN102346080 A CN 102346080A
Authority
CN
China
Prior art keywords
distributed network
water temperature
measurement unit
temperature sensor
computer control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102825325A
Other languages
English (en)
Other versions
CN102346080B (zh
Inventor
于粟
陈守峰
王千
王湛
李明
黄琢
李耀军
张幼名
冯雁敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Northeast Electric Power Research Institute Co Ltd
Liaoning Dongke Electric Power Co Ltd
Original Assignee
LIAONING ELECTRIC POWER Co Ltd
Northeast Electric Power Research Institute Co Ltd
Liaoning Dongke Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING ELECTRIC POWER Co Ltd, Northeast Electric Power Research Institute Co Ltd, Liaoning Dongke Electric Power Co Ltd filed Critical LIAONING ELECTRIC POWER Co Ltd
Priority to CN201110282532.5A priority Critical patent/CN102346080B/zh
Publication of CN102346080A publication Critical patent/CN102346080A/zh
Application granted granted Critical
Publication of CN102346080B publication Critical patent/CN102346080B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

本发明涉及一种水温自动测量系统。包括温度传感器、分布式网络测量单元(MCU)及计算机控制系统;温度传感器与分布式网络测量单元通过传感器信号线连接,分布式网络测量单元与计算机控制系统通过串口、光纤、串口方式连接。本发明通过建立一套功能齐全、稳定可靠的水温自动测量系统,可以自动采集数据并添加到统一平台数据库。不但能够达到快速完成水库温度测量工作,同时也可降低现场工作人员工作强度,达到少人值守或无人值守。

Description

水温自动测量系统
技术领域
本发明涉及一种测量系统,尤其涉及一种水温自动测量系统,适用于各变电站及电厂,属于电力应用领域。
背景技术
随着当今科学技术的迅速发展及观测技术的不断创新,新的观测技术与新仪器已越来越多的应用在新建及改造的工程中,并且日趋成熟。随着现代计算机技术、网络技术、软件工程技术、水工监测和馈控技术均已在大坝安全监测领域中得到了成功的应用。通过建立一套功能齐全、稳定可靠、使用方便的库水温自动测量系统,不但可以满足电站的工程安全监测的需要,同时也可以提高电站工程安全监测人员的业务水平,促进电站以至全国工程安全监测技术水平的发展。依据《混凝土坝安全监测技术规范》在环境量监测应建立水温观测。目前东北电网所属的大坝都是采用人工测量,劳动强度较大,测试精度较差。
发明内容
本发明针对上述现有技术中存在的问题,提供了一种水温自动测量系统,解决了现有技术中人工测量劳动强度大、测试精度低的问题,而且本发明可靠性高。
本发明的技术方案如下:
包括温度传感器、分布式网络测量单元(MCU)及计算机控制系统;温度传感器与分布式网络测量单元通过传感器信号线连接,分布式网络测量单元与计算机控制系统通过串口、光纤、串口方式连接。
所述的温度传感器置于PPR管内,PPR管放置在钢管内,钢管底口用篦子封好。
所述的分布式网络测量单元采用北京基康的BGK-MICRO40分布式数据采集单元。
所述的计算机控制系统包括数据采集服务器、统一平台系统及统一平台数据服务器,数据采集服务器接收统一平台系统发出的指令,根据指令采集温度传感器数据,并将采集的数据通过以太网口按照统一的通信协议发送给统一平台数据服务器。
本发明的优点效果如下:
本发明通过建立一套功能齐全、稳定可靠的水温自动测量系统,可以自动采集数据并添加到统一平台数据库。不但能够达到快速完成水库温度测量工作,同时也可降低现场工作人员工作强度,达到少人值守或无人值守。
附图说明
图1为本发明的结构示意图。
图中,1、温度传感器,2、分布式网络测量单元,3、485串口通信线,4、光电转换器,5、光纤,6、光电转换器,7、485串口通信线,8、数据采集服务器,9、交换机,10、统一平台数据服务器。
具体实施方式
本发明参照附图,结合具体实施例,进行详细描述如下。
实施例
包括温度传感器、分布式网络测量单元(MCU)及计算机控制系统;温度传感器与分布式网络测量单元通过传感器信号线连接,分布式网络测量单元与计算机控制系统通过串口、光纤、串口方式连接。
所述的温度传感器为振弦式传感器,置于PPR管内,PPR管放置在钢管内,钢管底口用篦子封好。
所述的分布式网络测量单元采用北京基康的BGK-MICRO40分布式数据采集单元。
所述的计算机控制系统包括数据采集服务器、统一平台系统及统一平台数据服务器,数据采集服务器接收统一平台系统发出的指令,根据指令采集温度传感器数据,并将采集的数据通过以太网口按照统一的通信协议发送给统一平台数据服务器。
计算机控制系统采用RS485:9600,8,N,1通过串行接口与MCU通讯,采用TCP/IP与UDP协议通过以太网口与服务器端通讯。
分布式网络测量单元(MCU)通讯协议(1串口设置和连接:串口方式(RS232 or RS485):  9600,n,8,1, 无流控制。
连接:RS232方式,使用标准串口连接线或连接电缆将计算机串行端口与设备串行端口连接起来。RS485方式,北京基康系列MCU的RS485端口为半双工RS485A连接方式,因此当用PC与设备连接时需要用RS232-RS485A转换器。
本发明的保护范围以权力要求为准,不受具体实施例所限制。

Claims (4)

1.水温自动测量系统,其特征在于包括温度传感器、分布式网络测量单元(MCU)及计算机控制系统;温度传感器与分布式网络测量单元通过传感器信号线连接,分布式网络测量单元与计算机控制系统通过串口、光纤、串口方式连接。
2.根据权利要求1所述的水温自动测量系统,其特征在于所述的温度传感器置于PPR管内,PPR管放置在钢管内,钢管底口用篦子封好。
3.根据权利要求1所述的水温自动测量系统,其特征在于所述的分布式网络测量单元采用北京基康的BGK-MICRO40分布式数据采集单元。
4.根据权利要求1所述的水温自动测量系统,其特征在于所述的计算机控制系统包括数据采集服务器、统一平台系统及统一平台数据服务器,数据采集服务器接收统一平台系统发出的指令,根据指令采集温度传感器数据,并将采集的数据通过以太网口按照统一的通信协议发送给统一平台数据服务器。
CN201110282532.5A 2011-09-22 2011-09-22 水温自动测量系统 Active CN102346080B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110282532.5A CN102346080B (zh) 2011-09-22 2011-09-22 水温自动测量系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110282532.5A CN102346080B (zh) 2011-09-22 2011-09-22 水温自动测量系统

Publications (2)

Publication Number Publication Date
CN102346080A true CN102346080A (zh) 2012-02-08
CN102346080B CN102346080B (zh) 2014-05-07

Family

ID=45544959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110282532.5A Active CN102346080B (zh) 2011-09-22 2011-09-22 水温自动测量系统

Country Status (1)

Country Link
CN (1) CN102346080B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2400792Y (zh) * 1999-12-29 2000-10-11 中国科学院海洋研究所 遥测温度链
CN1804922A (zh) * 2006-01-24 2006-07-19 大连水产学院 一种基于gprs的海水温度自动监测系统
US20090043415A1 (en) * 2007-08-06 2009-02-12 Chevron U.S.A. Inc. System and Method for Distributed Control of a Plant Process
CN201413463Y (zh) * 2009-04-30 2010-02-24 北京木联能工程科技有限公司 一种分布式岩土工程的安全监测系统
CN201489348U (zh) * 2009-07-30 2010-05-26 上海隧道工程股份有限公司 工程降水智能化数据采集与远程监控系统
CN202305053U (zh) * 2011-09-22 2012-07-04 辽宁省电力有限公司 水温自动测量系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2400792Y (zh) * 1999-12-29 2000-10-11 中国科学院海洋研究所 遥测温度链
CN1804922A (zh) * 2006-01-24 2006-07-19 大连水产学院 一种基于gprs的海水温度自动监测系统
US20090043415A1 (en) * 2007-08-06 2009-02-12 Chevron U.S.A. Inc. System and Method for Distributed Control of a Plant Process
CN201413463Y (zh) * 2009-04-30 2010-02-24 北京木联能工程科技有限公司 一种分布式岩土工程的安全监测系统
CN201489348U (zh) * 2009-07-30 2010-05-26 上海隧道工程股份有限公司 工程降水智能化数据采集与远程监控系统
CN202305053U (zh) * 2011-09-22 2012-07-04 辽宁省电力有限公司 水温自动测量系统

Also Published As

Publication number Publication date
CN102346080B (zh) 2014-05-07

Similar Documents

Publication Publication Date Title
CN106814243B (zh) 城市电缆线路接地环流在线监测装置
CN202757987U (zh) 超高压输电线路在线智能综合监测系统
CN202305053U (zh) 水温自动测量系统
CN202231875U (zh) 一种输电线路监测基站及系统
CN104360138A (zh) 输电线路避雷器在线监测无线远传系统
CN203561865U (zh) 一种分布式综合预警的监控数据采集系统
CN102346080B (zh) 水温自动测量系统
CN110855779A (zh) 一种基于物联网的跨域现场调试系统及调试方法
CN104407226A (zh) 线路电缆接头接触电阻的带电测试方法
CN103439938A (zh) 小型水电站控制系统
CN207320949U (zh) 变电站设备重要性检测设备
CN108682137A (zh) 基于NB-IoT的水资源远程监测系统
CN106056301A (zh) 一种基于gprs远程通信的实时费控作业方法
CN115348250A (zh) 一种基于物联网的深海渔业养殖系统
CN205157663U (zh) 避雷器远程在线监测装置
CN205246753U (zh) 具有电表功能的设备
CN204887239U (zh) 一种油田井场用视频监控、无线传输一体化装置
CN204538813U (zh) 一种用电信息管理系统
CN204166355U (zh) 油井远程智能监控系统
CN205750411U (zh) 一种数据采集终端
CN202058029U (zh) 一种can总线传感器节点
CN209198556U (zh) 一种远程相序识别设备
CN201966956U (zh) 一种油田通用型功能可配置无线测控终端系统
CN208737266U (zh) 一种苗木栽培环境远程监控装置
CN203387531U (zh) 一种用于通信系统的odf终端的监控装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: NORTHEAST ELECTRIC POWER RESEARCH INSTITUTE CO., L

Free format text: FORMER OWNER: NORTHEAST ELECTRIC POWER RESEARCH INSTITUTE CO., LTD. LIAONING DONGKE ELECTRIC POWER CO., LTD.

Effective date: 20121009

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121009

Address after: 110006 dispatching communication center of Liaoning Electric Power Co., Ltd. Ningbo road 18, Heping District, Liaoning, Shenyang

Applicant after: Liaoning Electric Power Company Limited

Applicant after: Northeast Electric Power Research Institute Co., Ltd.

Applicant after: Liaoning Dongke Power Co., Ltd.

Applicant after: Liaoning Electric Power Co., Ltd.Electric Power Science Research Institute

Applicant after: State Grid Corporation of China

Address before: 110006 dispatching communication center of Liaoning Electric Power Co., Ltd. Ningbo road 18, Heping District, Liaoning, Shenyang

Applicant before: Liaoning Electric Power Company Limited

Applicant before: Northeast Electric Power Research Institute Co., Ltd.

Applicant before: Liaoning Dongke Power Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant