CN102345854A - Front arch and rear arch hanging device of supercritical W-shaped flame boiler and manufacturing method thereof - Google Patents

Front arch and rear arch hanging device of supercritical W-shaped flame boiler and manufacturing method thereof Download PDF

Info

Publication number
CN102345854A
CN102345854A CN2011100415951A CN201110041595A CN102345854A CN 102345854 A CN102345854 A CN 102345854A CN 2011100415951 A CN2011100415951 A CN 2011100415951A CN 201110041595 A CN201110041595 A CN 201110041595A CN 102345854 A CN102345854 A CN 102345854A
Authority
CN
China
Prior art keywords
arch
truss
connects
overhang
erecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100415951A
Other languages
Chinese (zh)
Other versions
CN102345854B (en
Inventor
张彦军
路野
董清梅
李剑冰
李金凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Boiler Co Ltd
Original Assignee
Harbin Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Boiler Co Ltd filed Critical Harbin Boiler Co Ltd
Priority to CN201110041595.1A priority Critical patent/CN102345854B/en
Publication of CN102345854A publication Critical patent/CN102345854A/en
Application granted granted Critical
Publication of CN102345854B publication Critical patent/CN102345854B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a front arch and rear arch hanging device of a supercritical W-shaped flame boiler and a manufacturing method thereof. The existing common hanging device can not meet the safe requirement because of the low relative position of the front arch and rear arch of the existing product, heavy load, great heat displacement, complex structure, poor rigidity, multiple accessories on a pipe screen and the like. The hanging device comprises a reinforcing beam in a flame folding corner region, a front arch handing device (2), and a rear arch hanging device (3), wherein the reinforcing beam in the flame folding corner region is connected with a water cooling wall (1); the front arch handing device (2) is connected with the front side of the water cooling wall; the rear arch hanging device (3) is connected with the rear side of the water cooling wall; the front arch hanging device comprises a front arch pipe screen which is connected with the water cooling wall, an L-shaped plate (5) and a T-shaped plate (7) of a bearing ear plate; the T-shaped plate is connected with a truss (9) at the bottom through a hanging rod (8); the bearing ear plate (8) is connected with a main hanging rod (11) through a U-shaped clip (10); and the main hanging rod is connected with a front support hanger (12) with a spring hanger (13). The hanging device provided by the invention is used for the manufacturing of the front arch and rear arch hanging device of the supercritical W-shaped flame boiler.

Description

The front and back arch erecting by overhang and the manufacturing approach of overcritical W flame boiler
Technical field
invention relates to a kind of erecting by overhang and manufacturing approach of front and back arch of overcritical W flame boiler.
Background technology
The relative position of arch is low before and after overcritical w flame boiler, and load is heavy, thermal walking is big, on self structure complicacy, poor rigidity, the tube panel annex how etc. reason cause existing common hanging structure can not satisfy safety requirements.
Summary of the invention
The purpose of invention provides a kind of compound suspending way that adopts the brand-new form of a cover, has both solved the deficiency that conventional in the past suspending way rigidity is big, load is uneven, has strengthened the rigidity of encircleing before and after the overcritical W flame boiler again.
Above-mentioned purpose realizes through following technical scheme:
The front and back arch erecting by overhang of overcritical W flame boiler; Its composition comprises: the furnace arch, furnace nose district buckstay that is connected with water-cooling wall; Described water-cooling wall front side connects the face arch erecting by overhang; Described water-cooling wall rear side connects the rear arch erecting by overhang; Described face arch erecting by overhang comprises the face arch tube panel that is connected with described water-cooling wall; Described face arch tube panel connects the L template; Described face arch tube panel connects load-bearing otic placode T template; Described T template connects the bottom truss by suspension rod; Described load-bearing otic placode connects main suspension rod by U type folder, and described main suspension rod connects the preceding suspension and support that has spring hanger.
The front and back arch erecting by overhang of described overcritical W flame boiler; Described rear arch erecting by overhang comprises bottom, back truss; Truss bottom, bottom, described back connects suspension rod down; Described suspension rod down connects back U type folder; Truss top, bottom, described back connects upper hanger; Described upper hanger connects the back suspension and support, and described back suspension and support connects the rear spring suspension bracket.
A kind of manufacturing approach of front and back arch erecting by overhang of overcritical W flame boiler; This hangar system is divided into two major parts, and the truss hanging structure double as that the bottom is used to hang front and back arch tube screen and increase the tube panel rigidity is that the truss and the top of hot bellows is used to suspend in midair the hanging structure that hangs the bottom truss;
Truss inboard, bottom is fixed on the front or rear water water-cooling wall of boiler; Conduction portion load is born by forward and backward water-cooling wall; Downside is through U type folder; T template, L template, load-bearing otic placode, be connected before and after on the arch tube screen, the outside is suspended by suspension rod then in midair to prop up hanging beam to the boiler top be to be the rear arch erecting by overhang on face arch erecting by overhang or the furnace arch, furnace nose district buckstay;
top is used to suspend in midair the hanging structure that hangs the bottom truss, is composed in parallel by suspension rod and constant force disc spring hanger; Through the various annex load on arch tube screen and the tube panel before and after the suspention of bottom truss structure; The downward thermal walking of arch tube screen before and after discharging.
Beneficial effect:
A compound suspending way that overlaps brand-new form has been adopted in 1. the present invention; Both solved the deficiency that conventional in the past suspending way rigidity is big, load is uneven; Strengthened the rigidity of overcritical W flame boiler front and back arch again; Be the special research and development of first the overcritical W flame boiler in the exploitation world; Have good security and market potential, be domestic initiation, product advanced in the world.
2. the invention solves before and after the overcritical W flame boiler in first of the world arch tube screen and hang that difficulty is big, load is uneven, and the difficult problem of tube panel poor rigidity can satisfy the requirement of arch suspention before and after the overcritical W flame boiler.
3. the present invention can strengthen overcritical W flame boiler front and back arch tubes screen rigidity, satisfy the requirement that tube panel thermal expansion displacement is big, load is uneven.
4. the present invention are divided into two major parts, and the truss hanging structure (double as is the truss of hot bellows) and the top of arch tube screen and increase tube panel rigidity were used to suspend in midair the hanging structure that hangs the bottom truss before and after the bottom was used to hang.
Before and after truss structure 5. of the present invention can discharge arch tube screen about, the thermal expansion of former and later two directions, prevent tube panel because thermal expansion destroys; The rigidity of arch tube screen before and after this truss structure can increase, the transient load that reasons such as quick-fried owing to boiler furnace in the arch tube screen before and after bearing, urgent blowing out produce prevents that tube panel is destroyed; The intrinsic frequency of arch tube screen made tube panel not produce resonance before and after this truss structure can change, and the arch tube screen produces destruction because of resonance before and after preventing; This truss structure can be used as the truss structure of hot bellows, has simplified boiler structure.
top 6. of the present invention is used to suspend in midair the hanging structure that hangs the bottom truss, is composed in parallel by suspension rod and spring hanger; Through the various annex load on arch tube screen and the tube panel before and after the suspention of bottom truss structure; The downward thermal walking of arch tube screen prevents tube panel because thermal expansion destroys before and after discharging; Reconcile the suffered load of each suspension rod, guarantee that the suffered load of each suspension rod is even under various operating modes, guarantee the safety of boiler operatiopn.
Description of drawings:
accompanying drawing 1 is mounted in the face arch erecting by overhang structural representation of this product on the water-cooling wall.
accompanying drawing 2 is mounted in the rear arch erecting by overhang structural representation of this product on the water-cooling wall.
The specific embodiment:
Embodiment 1:
The front and back arch erecting by overhang of a kind of overcritical W flame boiler; Its composition comprises: the furnace arch, furnace nose district buckstay that is connected with water-cooling wall 1; The water-cooling wall front side connects face arch erecting by overhang 2; The water-cooling wall rear side connects rear arch erecting by overhang 3; The face arch erecting by overhang comprises the face arch tube panel 4 that is connected with water-cooling wall; The face arch tube panel connects L template 5; The face arch tube panel connects load-bearing otic placode T template 7; The T template connects bottom truss 9 through suspension rod 8; Load-bearing otic placode 6 connects main suspension rod 11 through U type folder 10, and main suspension rod connects the preceding suspension and support 12 that has spring hanger 13.
Embodiment 2:
The front and back arch erecting by overhang of embodiment 1 described overcritical W flame boiler; Described rear arch erecting by overhang 3 comprises bottom, back truss 14; Truss 14 bottoms, bottom, described back connect suspension rod 15 down; Described suspension rod down 15 connects back U type folder 16; Truss 14 tops, bottom, described back connect upper hanger 17; Described upper hanger 17 connects back suspension and support 18, and described back suspension and support 18 connects the nonstandard spring hanger 19 in back.
Embodiment 3:
A kind of manufacturing approach of front and back arch erecting by overhang of overcritical W flame boiler; This hangar system is divided into two major parts, and the truss hanging structure double as that the bottom is used to hang front and back arch tube screen and increase the tube panel rigidity is that the truss and the top of hot bellows is used to suspend in midair the hanging structure that hangs the bottom truss;
Truss inboard, bottom is fixed on the front or rear water water-cooling wall of boiler; Conduction portion load is born by forward and backward water-cooling wall; Downside is through U type folder; T-shape plate, " L " template, load-bearing otic placode, be connected before and after on the arch tube screen, the outside is suspended by suspension rod then in midair to prop up hanging beam to the boiler top be to be the rear arch erecting by overhang on face arch erecting by overhang or the furnace arch, furnace nose district buckstay;
top is used to suspend in midair the hanging structure that hangs the bottom truss, is composed in parallel by suspension rod and nonstandard spring hanger; Through the various annex load on arch tube screen and the tube panel before and after the suspention of bottom truss structure; The downward thermal walking of arch tube screen before and after discharging.

Claims (3)

1. erecting by overhang is encircleed in the front and back of an overcritical W flame boiler; Its composition comprises: the furnace arch, furnace nose district buckstay that is connected with water-cooling wall; It is characterized in that: described water-cooling wall front side connects the face arch erecting by overhang; Described water-cooling wall rear side connects the rear arch erecting by overhang; Described face arch erecting by overhang comprises the face arch tube panel that is connected with described water-cooling wall; Described face arch tube panel connects the L template; Described face arch tube panel connects load-bearing otic placode T template; Described T template connects the bottom truss by suspension rod; Described load-bearing otic placode connects main suspension rod by U type folder, and described main suspension rod connects the preceding suspension and support that has spring hanger.
2. the front and back arch erecting by overhang of overcritical W flame boiler according to claim 1; It is characterized in that: described rear arch erecting by overhang comprises bottom, back truss; Truss bottom, bottom, described back connects suspension rod down; Described suspension rod down connects back U type folder; Truss top, bottom, described back connects upper hanger; Described upper hanger connects the back suspension and support, and described back suspension and support connects the rear spring suspension bracket.
3. the manufacturing approach of erecting by overhang is encircleed in the front and back of an overcritical W flame boiler; It is characterized in that: this hangar system is divided into two major parts, and the truss hanging structure double as that the bottom is used to hang front and back arch tube screen and increase the tube panel rigidity is that the truss and the top of hot bellows is used to suspend in midair the hanging structure that hangs the bottom truss;
Truss inboard, bottom is fixed on the front or rear water water-cooling wall of boiler; Conduction portion load is born by forward and backward water-cooling wall; Downside is through U type folder; T template, L template, load-bearing otic placode, be connected before and after on the arch tube screen, the outside is suspended by suspension rod then in midair to prop up hanging beam to the boiler top be to be the rear arch erecting by overhang on face arch erecting by overhang or the furnace arch, furnace nose district buckstay;
Top is used to suspend in midair the hanging structure that hangs the bottom truss, is composed in parallel by suspension rod and constant force disc spring hanger; Through the various annex load on arch tube screen and the tube panel before and after the suspention of bottom truss structure; The downward thermal walking of arch tube screen before and after discharging.
CN201110041595.1A 2011-02-21 2011-02-21 Front arch and rear arch hanging device of supercritical W-shaped flame boiler and manufacturing method thereof Active CN102345854B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110041595.1A CN102345854B (en) 2011-02-21 2011-02-21 Front arch and rear arch hanging device of supercritical W-shaped flame boiler and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110041595.1A CN102345854B (en) 2011-02-21 2011-02-21 Front arch and rear arch hanging device of supercritical W-shaped flame boiler and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN102345854A true CN102345854A (en) 2012-02-08
CN102345854B CN102345854B (en) 2015-03-11

Family

ID=45544779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110041595.1A Active CN102345854B (en) 2011-02-21 2011-02-21 Front arch and rear arch hanging device of supercritical W-shaped flame boiler and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN102345854B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105588116A (en) * 2016-03-02 2016-05-18 上海锅炉厂有限公司 Device for balanced suspension of dip angle burners with double constant-force spring hangers
CN106195992A (en) * 2016-08-30 2016-12-07 无锡华光锅炉股份有限公司 A kind of heating surface module derrick rig
CN109578970A (en) * 2018-12-26 2019-04-05 苏州海陆重工股份有限公司 The erecting by overhang of membrane wall heating surface

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4059075A (en) * 1976-11-08 1977-11-22 Combustion Engineering, Inc. Buckstay arrangement
US4721069A (en) * 1987-06-19 1988-01-26 The Babcock & Wilcox Company Termination for boiler casing expansion element
CN1079283A (en) * 1992-04-03 1993-12-08 巴布考克和威尔科斯公司 Be used for the boiler support system that the fin panel casing end connects
CN201331050Y (en) * 2008-12-30 2009-10-21 上海锅炉厂有限公司 Vertical stiffening bar support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4059075A (en) * 1976-11-08 1977-11-22 Combustion Engineering, Inc. Buckstay arrangement
US4721069A (en) * 1987-06-19 1988-01-26 The Babcock & Wilcox Company Termination for boiler casing expansion element
CN1079283A (en) * 1992-04-03 1993-12-08 巴布考克和威尔科斯公司 Be used for the boiler support system that the fin panel casing end connects
CN201331050Y (en) * 2008-12-30 2009-10-21 上海锅炉厂有限公司 Vertical stiffening bar support

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
哈尔滨电站设备成套设计研究所等: "锅炉刚性梁的设计与结构", 《电站系统工程》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105588116A (en) * 2016-03-02 2016-05-18 上海锅炉厂有限公司 Device for balanced suspension of dip angle burners with double constant-force spring hangers
CN105588116B (en) * 2016-03-02 2018-03-23 上海锅炉厂有限公司 A kind of device of double constant force spring hanging frame balance suspention inclination angle burners
CN106195992A (en) * 2016-08-30 2016-12-07 无锡华光锅炉股份有限公司 A kind of heating surface module derrick rig
CN106195992B (en) * 2016-08-30 2019-03-22 无锡华光锅炉股份有限公司 A kind of heating surface module derrick rig
CN109578970A (en) * 2018-12-26 2019-04-05 苏州海陆重工股份有限公司 The erecting by overhang of membrane wall heating surface

Also Published As

Publication number Publication date
CN102345854B (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN102345854A (en) Front arch and rear arch hanging device of supercritical W-shaped flame boiler and manufacturing method thereof
CN202008130U (en) Rear arch suspension device for supercritical W-flame boiler
CN104612296A (en) Installation structure used for large floor type decoration glass
CN103383104A (en) Hoisting installation method for quickly mounting economizer and super heater
CN202299044U (en) Unit stone curtain wall
CN202008131U (en) Front arch hanging device for supercritical W flame boiler
CN202559528U (en) Novel strong aseismatic steel structure
CN202581266U (en) Waste heat boiler suspender device
CN201662049U (en) Serpentine tube bank supporting and hanging structure
CN205579045U (en) High temperature tube way thermal insulation support and heat preservation heat -proof device
CN204165027U (en) Crane system is propped up in a kind of boiler wall of variable cross-section tower boiler
CN103994421B (en) The sealed support device at a kind of header place through walls
CN102384461B (en) Large steam generator
CN205714245U (en) A kind of folding hydraulically extensible support
CN205102102U (en) Coal saving device of boiler
CN209524163U (en) A kind of heavy fixed framework construction of pipeline beam column combination of horizontal Tile laying
CN208687101U (en) A kind of fixed bracket of pipe gallery heat supply pipeline
CN203797626U (en) Header supporting and limiting device in boiler
CN107218588B (en) A kind of cold tube panel flue of vapour and its hanging structure
CN207394344U (en) The horizontal insulated gas cylinder of anti-overfilling
CN210688175U (en) Steam drum supporting device for garbage incinerator
CN103147574A (en) Pump vehicle
CN205854203U (en) A kind of expanded perlite thermal-nsulation wrench moves pay-off
CN204267864U (en) Large-section rectangle smoke wind pipe fixed support
CN103912864B (en) Header supporting and limiting device in a kind of boiler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Yanjun

Inventor after: Zhang Dianjun

Inventor after: Dong Qingmei

Inventor after: Li Jianbing

Inventor after: Li Jinfeng

Inventor before: Zhang Yanjun

Inventor before: Lu Ye

Inventor before: Dong Qingmei

Inventor before: Li Jianbing

Inventor before: Li Jinfeng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG YANJUN LU YE DONG QINGMEI LI JIANBING LI JINFENG TO: ZHANG YANJUN ZHANG DIANJUN DONG QINGMEI LI JIANBING LI JINFENG

C14 Grant of patent or utility model
GR01 Patent grant