CN102345296A - Base of high-voltage power transmission line and communication tower - Google Patents

Base of high-voltage power transmission line and communication tower Download PDF

Info

Publication number
CN102345296A
CN102345296A CN2011102044918A CN201110204491A CN102345296A CN 102345296 A CN102345296 A CN 102345296A CN 2011102044918 A CN2011102044918 A CN 2011102044918A CN 201110204491 A CN201110204491 A CN 201110204491A CN 102345296 A CN102345296 A CN 102345296A
Authority
CN
China
Prior art keywords
base
steel strand
strand cable
high pressure
modified line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102044918A
Other languages
Chinese (zh)
Inventor
从卫民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011102044918A priority Critical patent/CN102345296A/en
Publication of CN102345296A publication Critical patent/CN102345296A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a base of a high-voltage power transmission line and a communication tower, comprising a base and a bearing platform surface arranged on the upper end surface of the base. The base is characterized in that steel stranded ropes are arranged in the base along the same axial direction; the upper ends of the steel stranded ropes are provided with tensioned fixed connecting pieces; the upper ends of the steel stranded ropes and the connecting pieces are positioned in the bearing platform surface; and bosses are arranged on the steel stranded ropes. In the base, since the base is internally provided with the prestressed steel stranded ropes, the bearing capability and the stability after long-time use of the base are greatly enhanced, simultaneously, the used amount of steel is reduced and the resource is saved.

Description

A kind of high pressure is failed modified line, communications tower base
Technical field
The present invention relates to reinforced concrete footing, be specifically related to the defeated modified line of a kind of high pressure, communications tower base.
Background technology
High pressure is failed modified line, communications tower in order to resist wind load and defeated line equipment is pullled, and prevents to topple, and needs firm and stocky base.Traditional tower base is a reinforced concrete structure, and its defective is: not only the base volume is big, and the steel material that need expend is many, and its bearing capacity is also not fully up to expectations, and the step-down of the stability of base meeting as time passes exists potential safety hazard.
Summary of the invention
The technical problem that the present invention will solve provides the defeated modified line of a kind of high pressure, communications tower base, and the base steel using amount is few, and bearing capacity is high, long service life.
The present invention realizes through following technical scheme:
A kind of high pressure is failed modified line, communications tower base; Comprise base, be arranged at the cushion cap face of base upper surface; Characteristics are coaxial prestress steel strand cables that are provided with in the base, and steel strand cable upper end is provided with the fixed connecting piece after the stretch-draw, and said steel strand cable upper end and connector thereof are positioned at the cushion cap face.
The further improvement project of the present invention is that described prestress steel strand cable is provided with convexity (in order to strengthen prestress steel strand cable and concrete adhesion stress).Described convexity is nut or extruding anchor or the concrete precast element that is fixedly connected on the prestress steel strand cable.
The present invention further improvement project is, said prestress steel strand cable along the base limit one week of portion etc. branch arrange.
The present invention further improvement project is that said prestress steel strand cable bottom is bonded in base (greatly
Cause 1/2nd following positions and be bonded in base), top is provided with sleeve pipe, and (the steel strand cable itself has sleeve pipe, and sliding agent is arranged in the sleeve pipe.If the steel strand cable is not established outer tube, then need add sleeve pipe and pipe in-lubricant in addition).Steel strand cable top is provided with sleeve pipe, and the steel strand cable of this part is in free state, is convenient to stretch-draw, forms stress.
The present invention compared with prior art has following advantage:
Therefore the present invention, makes the bearing capacity of base owing in base, be provided with the prestress steel strand cable, and the stability after long-time the use strengthened greatly, simultaneously, has reduced rolled steel dosage, has practiced thrift resource.
Description of drawings
Fig. 1 is the axial cross-sectional schematic of the present invention;
Fig. 2 overlooks enlarged diagram for Fig. 1.
The specific embodiment
As shown in Figure 1, the present invention includes base 3, be arranged at the cushion cap face 1 of base 3 upper surfaces, be embedded with the stone bolt 5 (also can preset bolt hole) of king-post on the base cushion cap face 1.Still as shown in Figure 1, the coaxial prestress steel strand cable 2 that is provided with in the base 3, said steel strand cable upper end is provided with the fixed connecting piece after the stretch-draw, and said steel strand cable upper end and connector thereof are positioned at the cushion cap face.In the present embodiment, connector is selected anchor clamp for use.Still as shown in Figure 1; Steel strand cable 2 is provided with two convexities 4, and described protruding 4 for being fixedly connected on the extruding anchor of steel strand cable 2, and said steel strand cable bottom is bonded in base 3 (in the present embodiment; Steel strand cable 1/4th following positions are bonded in base 3), top is provided with sleeve pipe 6.
As shown in Figure 2, steel strand cable 2 is arranged along branches such as base one weeks of 3 limit portions.
The present invention prepares process: when colligation base reinforcing cage; Set the steel strand cable on request and do corresponding connection; After the concrete strength of base and cushion cap face thereof reaches requirement; The steel strand cable is carried out stretch-draw; Behind the tensioning fixation; With concrete the stretch-draw hole on the cushion cap face is tamped again, steel strand cable and connector are embedded in the cushion cap face. ?

Claims (6)

1. a high pressure is failed modified line, communications tower base; Comprise base (3), be arranged at the cushion cap face (1) of base (3) upper surface; It is characterized in that: the coaxial prestress steel strand cable (2) that is provided with in the base (3); Said steel strand cable upper end is provided with the fixed connecting piece after the stretch-draw, and steel strand cable upper end and connector thereof are positioned at the cushion cap face.
2. a kind of high pressure as claimed in claim 1 is failed modified line, communications tower base, it is characterized in that: described prestress steel strand cable (2) is provided with convexity (4).
3. a kind of high pressure as claimed in claim 2 is failed modified line, communications tower base, it is characterized in that: nut or extruding anchor or the concrete precast element of described convexity (4) for being fixedly connected on prestress steel strand cable (2).
4. a kind of high pressure as claimed in claim 1 is failed modified line, communications tower base, it is characterized in that: said prestress steel strand cable (2) is arranged along branches such as base (3) one weeks of limit portion.
5. fail modified line, communications tower base like claim 1 or 2 or 4 described a kind of high pressure, it is characterized in that: prestress steel strand cable bottom is bonded in base (3), and top is provided with sleeve pipe (6).
6. a kind of high pressure as claimed in claim 1 is failed modified line, communications tower base, it is characterized in that: said connector is an anchor clamp.
CN2011102044918A 2011-07-21 2011-07-21 Base of high-voltage power transmission line and communication tower Pending CN102345296A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102044918A CN102345296A (en) 2011-07-21 2011-07-21 Base of high-voltage power transmission line and communication tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102044918A CN102345296A (en) 2011-07-21 2011-07-21 Base of high-voltage power transmission line and communication tower

Publications (1)

Publication Number Publication Date
CN102345296A true CN102345296A (en) 2012-02-08

Family

ID=45544339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102044918A Pending CN102345296A (en) 2011-07-21 2011-07-21 Base of high-voltage power transmission line and communication tower

Country Status (1)

Country Link
CN (1) CN102345296A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2374624A (en) * 1942-02-24 1945-04-24 Ethel F Schwendt Precast foundation
US4043133A (en) * 1976-07-21 1977-08-23 Yegge Lawrence R Structure and method of constructing and test-loading pile anchored foundations
US4228627A (en) * 1979-04-16 1980-10-21 Neill Joseph C O Reinforced foundation structure
JPS5910623A (en) * 1982-07-08 1984-01-20 Takenaka Komuten Co Ltd Foundation structure of selfsupported type stationary crane
JPS603320A (en) * 1983-06-20 1985-01-09 Kansai Electric Power Co Inc:The Composite foundation of structure
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation
US20020124502A1 (en) * 2000-09-27 2002-09-12 Henderson Allan P. Perimeter weighted foundation for wind turbines and the like
CN2675743Y (en) * 2003-07-30 2005-02-02 柳州欧维姆机械股份有限公司 Moveable extrusion sheath
CN101550703A (en) * 2009-05-06 2009-10-07 中国水电顾问集团西北勘测设计研究院 Method for designing reinforced concrete foundation or pile cap
CN202194425U (en) * 2011-07-21 2012-04-18 从卫民 Base for high-voltage transmission and transformation wire and communication tower

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2374624A (en) * 1942-02-24 1945-04-24 Ethel F Schwendt Precast foundation
US4043133A (en) * 1976-07-21 1977-08-23 Yegge Lawrence R Structure and method of constructing and test-loading pile anchored foundations
US4228627A (en) * 1979-04-16 1980-10-21 Neill Joseph C O Reinforced foundation structure
JPS5910623A (en) * 1982-07-08 1984-01-20 Takenaka Komuten Co Ltd Foundation structure of selfsupported type stationary crane
JPS603320A (en) * 1983-06-20 1985-01-09 Kansai Electric Power Co Inc:The Composite foundation of structure
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation
US20020124502A1 (en) * 2000-09-27 2002-09-12 Henderson Allan P. Perimeter weighted foundation for wind turbines and the like
CN2675743Y (en) * 2003-07-30 2005-02-02 柳州欧维姆机械股份有限公司 Moveable extrusion sheath
CN101550703A (en) * 2009-05-06 2009-10-07 中国水电顾问集团西北勘测设计研究院 Method for designing reinforced concrete foundation or pile cap
CN202194425U (en) * 2011-07-21 2012-04-18 从卫民 Base for high-voltage transmission and transformation wire and communication tower

Similar Documents

Publication Publication Date Title
CN102002911B (en) Carbon fiber cable strand inner sleeve conical bonded anchorage device
CN102926333B (en) External prestressed reinforcement structure for old bridge and construction method thereof
JP2008101325A (en) Connected concrete column
CN103357785B (en) A kind of pulling ling making device
CN202989918U (en) Intelligent bearing head capable of recovering pre-stressed anchor cables
CN101942812B (en) Bridge reinforcing method and uses of prestress reinforced steel wire net anchor in bridge reinforcement
CN202194425U (en) Base for high-voltage transmission and transformation wire and communication tower
CN111945724A (en) Anchor cable supporting structure with large-diameter reinforcement rod body and intelligent prestress application method
CN202194153U (en) High-voltage line iron tower base
KR101617247B1 (en) Steel Fiber Rreinforced Telegraph Pole And Production Method Thereof
CN102345407A (en) High-tension cable iron tower base
CN102312606A (en) Multi-prism cross arm
CN210117943U (en) Active unloading prestressed steel pipe column
CN102345296A (en) Base of high-voltage power transmission line and communication tower
CN103291110A (en) Electricity transmitting pole with functions of swinging and self-resetting
CN204024430U (en) Adopt the bamboo ladder stand of contiguous block overlapping
CN212294622U (en) Prefabricated building structure
CN204850639U (en) GFRP pipe reinforced concrete combined member multiloop transmission of electricity pole
CN212452594U (en) Prefabricated building structure
CN212294628U (en) Prefabricated building structure
CN210713525U (en) High-strength wear-resistant slow-bonding prestressed steel strand
CN203361736U (en) Temporary reinforcement device for electric pole
CN103334596A (en) Method of external prestressing and steel cover reinforced concrete pier column
CN202989758U (en) Steel wire rope support structure used on horizontal drawing cable bridge
CN202989786U (en) Old bridge external prestressing reinforced structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120208