CN102345296A - Base of high-voltage power transmission line and communication tower - Google Patents
Base of high-voltage power transmission line and communication tower Download PDFInfo
- Publication number
- CN102345296A CN102345296A CN2011102044918A CN201110204491A CN102345296A CN 102345296 A CN102345296 A CN 102345296A CN 2011102044918 A CN2011102044918 A CN 2011102044918A CN 201110204491 A CN201110204491 A CN 201110204491A CN 102345296 A CN102345296 A CN 102345296A
- Authority
- CN
- China
- Prior art keywords
- base
- steel strand
- strand cable
- high pressure
- modified line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The invention discloses a base of a high-voltage power transmission line and a communication tower, comprising a base and a bearing platform surface arranged on the upper end surface of the base. The base is characterized in that steel stranded ropes are arranged in the base along the same axial direction; the upper ends of the steel stranded ropes are provided with tensioned fixed connecting pieces; the upper ends of the steel stranded ropes and the connecting pieces are positioned in the bearing platform surface; and bosses are arranged on the steel stranded ropes. In the base, since the base is internally provided with the prestressed steel stranded ropes, the bearing capability and the stability after long-time use of the base are greatly enhanced, simultaneously, the used amount of steel is reduced and the resource is saved.
Description
Technical field
The present invention relates to reinforced concrete footing, be specifically related to the defeated modified line of a kind of high pressure, communications tower base.
Background technology
High pressure is failed modified line, communications tower in order to resist wind load and defeated line equipment is pullled, and prevents to topple, and needs firm and stocky base.Traditional tower base is a reinforced concrete structure, and its defective is: not only the base volume is big, and the steel material that need expend is many, and its bearing capacity is also not fully up to expectations, and the step-down of the stability of base meeting as time passes exists potential safety hazard.
Summary of the invention
The technical problem that the present invention will solve provides the defeated modified line of a kind of high pressure, communications tower base, and the base steel using amount is few, and bearing capacity is high, long service life.
The present invention realizes through following technical scheme:
A kind of high pressure is failed modified line, communications tower base; Comprise base, be arranged at the cushion cap face of base upper surface; Characteristics are coaxial prestress steel strand cables that are provided with in the base, and steel strand cable upper end is provided with the fixed connecting piece after the stretch-draw, and said steel strand cable upper end and connector thereof are positioned at the cushion cap face.
The further improvement project of the present invention is that described prestress steel strand cable is provided with convexity (in order to strengthen prestress steel strand cable and concrete adhesion stress).Described convexity is nut or extruding anchor or the concrete precast element that is fixedly connected on the prestress steel strand cable.
The present invention further improvement project is, said prestress steel strand cable along the base limit one week of portion etc. branch arrange.
The present invention further improvement project is that said prestress steel strand cable bottom is bonded in base (greatly
Cause 1/2nd following positions and be bonded in base), top is provided with sleeve pipe, and (the steel strand cable itself has sleeve pipe, and sliding agent is arranged in the sleeve pipe.If the steel strand cable is not established outer tube, then need add sleeve pipe and pipe in-lubricant in addition).Steel strand cable top is provided with sleeve pipe, and the steel strand cable of this part is in free state, is convenient to stretch-draw, forms stress.
The present invention compared with prior art has following advantage:
Therefore the present invention, makes the bearing capacity of base owing in base, be provided with the prestress steel strand cable, and the stability after long-time the use strengthened greatly, simultaneously, has reduced rolled steel dosage, has practiced thrift resource.
Description of drawings
Fig. 1 is the axial cross-sectional schematic of the present invention;
Fig. 2 overlooks enlarged diagram for Fig. 1.
The specific embodiment
As shown in Figure 1, the present invention includes base 3, be arranged at the cushion cap face 1 of base 3 upper surfaces, be embedded with the stone bolt 5 (also can preset bolt hole) of king-post on the base cushion cap face 1.Still as shown in Figure 1, the coaxial prestress steel strand cable 2 that is provided with in the base 3, said steel strand cable upper end is provided with the fixed connecting piece after the stretch-draw, and said steel strand cable upper end and connector thereof are positioned at the cushion cap face.In the present embodiment, connector is selected anchor clamp for use.Still as shown in Figure 1; Steel strand cable 2 is provided with two convexities 4, and described protruding 4 for being fixedly connected on the extruding anchor of steel strand cable 2, and said steel strand cable bottom is bonded in base 3 (in the present embodiment; Steel strand cable 1/4th following positions are bonded in base 3), top is provided with sleeve pipe 6.
As shown in Figure 2, steel strand cable 2 is arranged along branches such as base one weeks of 3 limit portions.
The present invention prepares process: when colligation base reinforcing cage; Set the steel strand cable on request and do corresponding connection; After the concrete strength of base and cushion cap face thereof reaches requirement; The steel strand cable is carried out stretch-draw; Behind the tensioning fixation; With concrete the stretch-draw hole on the cushion cap face is tamped again, steel strand cable and connector are embedded in the cushion cap face.
?
Claims (6)
1. a high pressure is failed modified line, communications tower base; Comprise base (3), be arranged at the cushion cap face (1) of base (3) upper surface; It is characterized in that: the coaxial prestress steel strand cable (2) that is provided with in the base (3); Said steel strand cable upper end is provided with the fixed connecting piece after the stretch-draw, and steel strand cable upper end and connector thereof are positioned at the cushion cap face.
2. a kind of high pressure as claimed in claim 1 is failed modified line, communications tower base, it is characterized in that: described prestress steel strand cable (2) is provided with convexity (4).
3. a kind of high pressure as claimed in claim 2 is failed modified line, communications tower base, it is characterized in that: nut or extruding anchor or the concrete precast element of described convexity (4) for being fixedly connected on prestress steel strand cable (2).
4. a kind of high pressure as claimed in claim 1 is failed modified line, communications tower base, it is characterized in that: said prestress steel strand cable (2) is arranged along branches such as base (3) one weeks of limit portion.
5. fail modified line, communications tower base like claim 1 or 2 or 4 described a kind of high pressure, it is characterized in that: prestress steel strand cable bottom is bonded in base (3), and top is provided with sleeve pipe (6).
6. a kind of high pressure as claimed in claim 1 is failed modified line, communications tower base, it is characterized in that: said connector is an anchor clamp.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102044918A CN102345296A (en) | 2011-07-21 | 2011-07-21 | Base of high-voltage power transmission line and communication tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102044918A CN102345296A (en) | 2011-07-21 | 2011-07-21 | Base of high-voltage power transmission line and communication tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102345296A true CN102345296A (en) | 2012-02-08 |
Family
ID=45544339
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102044918A Pending CN102345296A (en) | 2011-07-21 | 2011-07-21 | Base of high-voltage power transmission line and communication tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102345296A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2374624A (en) * | 1942-02-24 | 1945-04-24 | Ethel F Schwendt | Precast foundation |
US4043133A (en) * | 1976-07-21 | 1977-08-23 | Yegge Lawrence R | Structure and method of constructing and test-loading pile anchored foundations |
US4228627A (en) * | 1979-04-16 | 1980-10-21 | Neill Joseph C O | Reinforced foundation structure |
JPS5910623A (en) * | 1982-07-08 | 1984-01-20 | Takenaka Komuten Co Ltd | Foundation structure of selfsupported type stationary crane |
JPS603320A (en) * | 1983-06-20 | 1985-01-09 | Kansai Electric Power Co Inc:The | Composite foundation of structure |
US5586417A (en) * | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
US20020124502A1 (en) * | 2000-09-27 | 2002-09-12 | Henderson Allan P. | Perimeter weighted foundation for wind turbines and the like |
CN2675743Y (en) * | 2003-07-30 | 2005-02-02 | 柳州欧维姆机械股份有限公司 | Moveable extrusion sheath |
CN101550703A (en) * | 2009-05-06 | 2009-10-07 | 中国水电顾问集团西北勘测设计研究院 | Method for designing reinforced concrete foundation or pile cap |
CN202194425U (en) * | 2011-07-21 | 2012-04-18 | 从卫民 | Base for high-voltage transmission and transformation wire and communication tower |
-
2011
- 2011-07-21 CN CN2011102044918A patent/CN102345296A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2374624A (en) * | 1942-02-24 | 1945-04-24 | Ethel F Schwendt | Precast foundation |
US4043133A (en) * | 1976-07-21 | 1977-08-23 | Yegge Lawrence R | Structure and method of constructing and test-loading pile anchored foundations |
US4228627A (en) * | 1979-04-16 | 1980-10-21 | Neill Joseph C O | Reinforced foundation structure |
JPS5910623A (en) * | 1982-07-08 | 1984-01-20 | Takenaka Komuten Co Ltd | Foundation structure of selfsupported type stationary crane |
JPS603320A (en) * | 1983-06-20 | 1985-01-09 | Kansai Electric Power Co Inc:The | Composite foundation of structure |
US5586417A (en) * | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
US20020124502A1 (en) * | 2000-09-27 | 2002-09-12 | Henderson Allan P. | Perimeter weighted foundation for wind turbines and the like |
CN2675743Y (en) * | 2003-07-30 | 2005-02-02 | 柳州欧维姆机械股份有限公司 | Moveable extrusion sheath |
CN101550703A (en) * | 2009-05-06 | 2009-10-07 | 中国水电顾问集团西北勘测设计研究院 | Method for designing reinforced concrete foundation or pile cap |
CN202194425U (en) * | 2011-07-21 | 2012-04-18 | 从卫民 | Base for high-voltage transmission and transformation wire and communication tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102002911B (en) | Carbon fiber cable strand inner sleeve conical bonded anchorage device | |
CN102926333B (en) | External prestressed reinforcement structure for old bridge and construction method thereof | |
JP2008101325A (en) | Connected concrete column | |
CN103357785B (en) | A kind of pulling ling making device | |
CN202989918U (en) | Intelligent bearing head capable of recovering pre-stressed anchor cables | |
CN101942812B (en) | Bridge reinforcing method and uses of prestress reinforced steel wire net anchor in bridge reinforcement | |
CN202194425U (en) | Base for high-voltage transmission and transformation wire and communication tower | |
CN111945724A (en) | Anchor cable supporting structure with large-diameter reinforcement rod body and intelligent prestress application method | |
CN202194153U (en) | High-voltage line iron tower base | |
KR101617247B1 (en) | Steel Fiber Rreinforced Telegraph Pole And Production Method Thereof | |
CN102345407A (en) | High-tension cable iron tower base | |
CN102312606A (en) | Multi-prism cross arm | |
CN210117943U (en) | Active unloading prestressed steel pipe column | |
CN102345296A (en) | Base of high-voltage power transmission line and communication tower | |
CN103291110A (en) | Electricity transmitting pole with functions of swinging and self-resetting | |
CN204024430U (en) | Adopt the bamboo ladder stand of contiguous block overlapping | |
CN212294622U (en) | Prefabricated building structure | |
CN204850639U (en) | GFRP pipe reinforced concrete combined member multiloop transmission of electricity pole | |
CN212452594U (en) | Prefabricated building structure | |
CN212294628U (en) | Prefabricated building structure | |
CN210713525U (en) | High-strength wear-resistant slow-bonding prestressed steel strand | |
CN203361736U (en) | Temporary reinforcement device for electric pole | |
CN103334596A (en) | Method of external prestressing and steel cover reinforced concrete pier column | |
CN202989758U (en) | Steel wire rope support structure used on horizontal drawing cable bridge | |
CN202989786U (en) | Old bridge external prestressing reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120208 |