A kind of tea brewing devices
Technical field
The present invention relates to a kind of tea brewing devices.
Background technology
The consumer is familiar with insulating pot or making tea machine or instant-heating type electric kettle very much, and the common electrical kettle time to boil water needs 3~10 minutes, and the time to boil water is long partially, and boils the water more than needs, waste water resource; Making tea machine boils a kettle tea about 10~15 minutes used time, overlong time; Patent No. CN201085481Y instant-heating type electric kettle, its main heating element heater is an Electric radiant Heating Film, water sending device is an electromagnetic pump, though can go out boiling water in 3 seconds of time to boil water, this instant-heating type electric kettle complex structure, cost is high, and poor practicability can not satisfy consumer demand.
Summary of the invention
The objective of the invention is to solve existing long problem of Tea maker time to boil water, provide that a kind of instant heating, cost are low, simple in structure, the tea brewing devices of quantitative water supply.
For the technical scheme that reaches goal of the invention the present invention employing is:
A kind of tea brewing devices; Comprise main body; The upper end of said main body is equipped with the pot lid of band pot lid handgrip position; Said pot lid is connected with main body through the pot lid rotating shaft; The lower end of said main body is equipped with base; In the said base electrical power connection block is installed; Saidly go up electrical power connection block and be fixed on the following electrical power connection block cooperated power supply on the power supply base; It is characterized in that: be provided with cold water storage cistern in the said main body; Heating chamber; Brew chamber; Said heating chamber is connected through the boiling water conveying device with brew chamber; Said heating chamber is arranged on the below of cold water storage cistern, and said heating chamber is connected with body seal through the kettle body sealing ring;
Said heating chamber is the heating chamber of the quantitative volume of boiling water that is connected to form by heating chamber loam cake and heating chamber chassis; Said heating chamber tray bottom is welded with aluminium sheet; The bottom of said aluminium sheet is welded with heating element heater; Said heating element heater is connected with last electrical power connection block, and said base is provided with the switch of control heating element heater break-make electricity; Cover the heating chamber import that has the band check valve on the said heating chamber, the top of said heating chamber import is provided with the cooling water inlet that is communicated with cold water storage cistern; Be provided with outlet pipe in the said heating chamber; The lower end of said outlet pipe is the hot water inlet near the heating chamber chassis; Said hot water inlet is provided with the hot water inlet filter screen outward, and the upper end of said outlet pipe is connected with the boiling water efferent duct, and said boiling water efferent duct is connected with the boiling water conveying device;
The upper end of said brew chamber is provided with the brew chamber periphery, and said brew chamber periphery is placed on the main body top edge; Be provided with the brew chamber cavity volume in the said brew chamber; The tea lattice of band tea lattice handle are installed in the said brew chamber cavity volume; The border of said tea lattice is equipped with tea lattice filter screen; Be provided with the tealeaves cavity volume of placing tealeaves in the said tea lattice filter screen; The upper end of said tealeaves cavity volume is provided with the wounded in the battle gondola water faucet that spills the hole, and said gondola water faucet is rotating to be installed on the gondola water faucet fixed mount, and said gondola water faucet fixed mount is fixed on the main body; Be connected with pull bar on the said gondola water faucet, said pull bar is fixed on the pot lid through the pull bar fixed axis; Said gondola water faucet fixed mount is provided with the logical heart column that is communicated with gondola water faucet, and said logical heart column is communicated with the boiling water conveying device;
The bottom of said brew chamber is connected with faucet; Said faucet is provided with the faucet column; Be equipped with on the said faucet column and drive the up and down spring of faucet, on the said faucet column sealing gasket is installed, said sealing gasket blocks up in the brew chamber kerve that is located at the brew chamber bottom; The below of said brew chamber is provided with the teacup of placing teacup and places cavity, and the upper end of said teacup is equipped with the teacup lid of the band tank that cooperates water outlet with faucet.
Further, said heating chamber chassis is connected with the heating chamber loam cake through the stainless steel retainer plate, between said heating chamber chassis and heating chamber loam cake the heating chamber sealing ring is installed, and said stainless steel retainer plate is fixedly connected with the heating chamber loam cake through hold-down screw.
Further, said check valve is through check valve fixed mount location, and said check valve fixed mount is fixedly connected with the heating chamber loam cake through lock-screw, forms the positioning area that supplies check valve to fluctuate between said check valve fixed mount and the heating chamber loam cake.
Further, cover on the said heating chamber safety valve that decompression protection is used is installed.
Further, the teacup lid rotating shaft of said teacup lid through the one of which end is installed in the groove on the teacup and is connected with teacup, and said teacup is provided with the teacup handle.
Further, said brew chamber is located at the top of cold water storage cistern, and said cold water storage cistern and heating chamber are to be wholely set, and said cold water storage cistern directly is communicated with cooling water outlet, and said main body is provided with is convenient to get the Hu Zui of pouring and the kettle handle of being convenient to take.
Further, said boiling water output device is arranged in the kettle handle or is located at cold water storage cistern inside or outside.
Perhaps, said brew chamber and cold water storage cistern are set up in parallel, and said brew chamber is arranged on the front side of main body, and said cold water storage cistern is arranged on the rear side of main body, and said cold water storage cistern and heating chamber are that branch is arranged, and said cold water storage cistern is provided with the cold water case lid; Said cold water storage cistern is communicated with cooling water inlet through cold water pipe; The bottom of said cold water storage cistern is equipped with the cold water storage cistern top opening that is communicated with cold water pipe; Said cold water storage cistern top opening is provided with column; Said column is connected with radiator valve contact on being installed in cold water storage cistern; Be equipped with on the said radiator valve and drive its water tank spring that moves up and down; The tank seal pad is installed on the said radiator valve, and said tank seal pad is stifled to be located in the cold water opening of cold water storage cistern.
Further, in the said cold water storage cistern filter is installed.
Technical conceive of the present invention is the principle of boiling gauge water through single, to reach purpose to boil water fast, can obtain boiling water in a short period of time; And quantitatively provide, thereby for the consumer practices thrift the more time and the energy, and simple in structure; Cost is low, function admirable.
Use is filled water with cold water storage cistern earlier, quantitatively gets into the water in the cold water storage cistern in the heating chamber; Put into an amount of tealeaves in the tea lattice; Be positioned over again in the brew chamber,, teacup be placed on teacup place in the cavity the brew chamber main body of packing into; Pass through energized; Press switch, heating element heater is started working, and the cold water Fast Heating in the heating chamber forms boiling water; Boiling water in the heating chamber is delivered to gondola water faucet through pressure through the boiling water output device; Gondola water faucet forms tea with the leaf to be made tea in boiling water sprinkling and the tea lattice, and tea flows in the teacup for use by faucet.
Beneficial effect of the present invention: cost is low, simple in structure, quantitative water supply, to boil water, energy-conserving and environment-protective fast.
Description of drawings
Fig. 1 is the operation sketch map of the first embodiment of the present invention.
Fig. 2 is the cross-sectional view of the first embodiment of the present invention.
Fig. 3 is the heating chamber exploded view of the first embodiment of the present invention.
Fig. 4 is that the boiling water conveying device of the first embodiment of the present invention is provided with the cold water storage cistern interior view.
Fig. 5 is that the boiling water conveying device of the first embodiment of the present invention is provided with cold water storage cistern outside figure.
Fig. 6 is a second embodiment of the present invention operation sketch map.
Fig. 7 is a second embodiment of the present invention cross-sectional view.
The specific embodiment
Come the present invention is further specified below in conjunction with specific embodiment, but do not limit the invention to these specific embodiment.One skilled in the art would recognize that the present invention contained in claims scope all alternatives, improvement project and the equivalents that possibly comprise.
Embodiment one
With reference to Fig. 1-5; A kind of tea brewing devices; Comprise main body 12; The upper end of said main body 12 is equipped with the pot lid 5 of band pot lid handgrip position 27; Said pot lid 5 is connected with main body 12 through pot lid rotating shaft 18; The lower end of said main body 12 is equipped with base 13; In the said base 13 electrical power connection block 42 is installed; Saidly go up electrical power connection block 42 and be fixed on following electrical power connection block 14 cooperated power supplies on the power supply base 15; Be provided with cold water storage cistern 36 in the said main body 12; Heating chamber 41; Brew chamber 4; Said heating chamber 41 is connected through boiling water conveying device 43 with brew chamber 4; Said heating chamber 41 is arranged on the below of cold water storage cistern 36, and said heating chamber 41 is tightly connected through kettle body sealing ring 39 and main body 12;
Said heating chamber 41 is heating chambers of the quantitative volume of boiling water that is connected to form by heating chamber loam cake 45 and heating chamber chassis 53; 53 bottoms, said heating chamber chassis are welded with aluminium sheet 54; The bottom of said aluminium sheet 54 is welded with heating element heater 55; Said heating element heater 55 is connected with last electrical power connection block 42, and said base 13 is provided with the switch 21 of control heating element heater 55 break-makes electricity; Have the heating chamber import 38 of band check valve 48 on the said heating chamber loam cake 45, the top of said heating chamber import 38 is provided with the cooling water inlet 37 that is communicated with cold water storage cistern 36; Be provided with outlet pipe 46 in the said heating chamber 41; The lower end of said outlet pipe 46 is the hot water inlets 47 near heating chamber chassis 53; The said hot water inlet 47 outer hot water inlet filter screens 49 that are provided with; The upper end of said outlet pipe 46 is connected with boiling water efferent duct 44, and said boiling water efferent duct 44 is connected with boiling water conveying device 43;
The upper end of said brew chamber 4 is provided with brew chamber periphery 3, and said brew chamber peripheral 3 is placed on the main body top edge 10; Be provided with brew chamber cavity volume 30 in the said brew chamber 4; The tea lattice 2 of band tea lattice handle 1 are installed in the said brew chamber cavity volume 30; The border of said tea lattice 2 is equipped with tea lattice filter screen 29; Be provided with the tealeaves cavity volume 28 of placing tealeaves in the said tea lattice filter screen 29; The upper end of said tealeaves cavity volume 28 is provided with the wounded in the battle gondola water faucet 6 that spills hole 7; Said gondola water faucet 6 rotating being installed on the gondola water faucet fixed mount 8; Said gondola water faucet fixed mount 8 is fixed on the main body 12; Be connected with pull bar 17 on the said gondola water faucet 6, said pull bar 17 is fixed on the pot lid 5 through pull bar fixed axis 16; Said gondola water faucet fixed mount 8 is provided with the logical heart column that is communicated with gondola water faucet 6, and said logical heart column is communicated with boiling water conveying device 43;
The bottom of said brew chamber 4 is connected with faucet 33; Said faucet 33 is provided with faucet column 34; Be equipped with on the said faucet column 34 and drive the up and down spring 35 of faucet 33; On the said faucet column 34 sealing gasket 31 is installed, said sealing gasket 31 stifled being located in the brew chamber kerve of brew chamber 4 bottoms; The below of said brew chamber 4 is provided with the teacup of placing teacup 25 and places cavity 11, and the upper end of said teacup 25 is equipped with the teacup lid 22 that cooperates the band tank 20 of water outlet with faucet 33.
Said heating chamber chassis 53 is connected with heating chamber loam cake 45 through stainless steel retainer plate 56; 45 of said heating chamber chassis 53 and heating chamber loam cakes are equipped with heating chamber sealing ring 51, and said stainless steel retainer plate 56 is fixedly connected with heating chamber loam cake 45 through hold-down screw 57.
Said check valve 48 is through check valve fixed mount 50 location; Said check valve fixed mount 50 is fixedly connected with heating chamber loam cake 45 through lock-screw 52, and 45 of said check valve fixed mount 50 and heating chamber loam cake form the positioning area 40 that supplies check valve 48 to fluctuate.
The safety valve 58 that decompression protection is used is installed on the said heating chamber loam cake 45.
The teacup lid rotating shaft 23 of said teacup lid 22 through the one of which end is installed in the groove 24 on the teacup 25 and is connected with teacup 25, and said teacup 25 is provided with teacup handle 26.
Said brew chamber 4 is located at the top of cold water storage cistern 36, and said cold water storage cistern 36 is to be wholely set with heating chamber 41, and said cold water storage cistern 36 directly is communicated with cooling water outlet 37, and said main body 12 is provided with the kettle mouth 9 and the kettle handle of being convenient to take 19 of being convenient to get pouring.
Said boiling water output device 43 is arranged in the kettle handle 19 or is located at cold water storage cistern 36 inside or outside.
Technical conceive of the present invention is the principle of boiling gauge water through single, to reach purpose to boil water fast, can obtain boiling water in a short period of time; And quantitatively provide, thereby for the consumer practices thrift the more time and the energy, and simple in structure; Cost is low, function admirable.
Use is filled water with cold water storage cistern 36 earlier, and the water in the cold water storage cistern 36 is quantitatively got in the heating chamber 41; Put into an amount of tealeaves in the tea lattice 2; Be positioned over again in the brew chamber 4,, teacup 25 be placed on teacup place in the cavity 11 brew chamber 4 main body 12 of packing into; Pass through energized; Press switch 21, heating element heater 55 is started working, and the cold water Fast Heating in the heating chamber 41 forms boiling water; Boiling water in the heating chamber 41 is delivered to gondola water faucet 6 through pressure through boiling water output device 43; Gondola water faucet 6 forms tea with the leaf to be made tea in boiling water sprinkling and the tea lattice 2, and tea flows in the teacup 25 for use by faucet 33.
Embodiment two
Referring to Fig. 6, Fig. 7; The difference of present embodiment and embodiment one is saidly to brew 4 and be set up in parallel with cold water storage cistern 36; Said brew chamber 4 is arranged on the front side of main body 12; Said cold water storage cistern 36 is arranged on the rear side of main body; Said cold water storage cistern 36 is that branch is arranged with heating chamber 41, and said cold water storage cistern 36 is provided with cold water case lid 59; Said cold water storage cistern 36 is communicated with cooling water inlet 37 through cold water pipe 65; The bottom of said cold water storage cistern 36 is equipped with the cold water storage cistern top opening 64 that is communicated with cold water pipe 65; Said cold water storage cistern top opening 64 is provided with column; Said column is connected with radiator valve 63 contact on being installed in cold water storage cistern 36; Be equipped with on the said radiator valve 63 and drive its water tank spring 61 that moves up and down; On the said radiator valve 63 tank seal pad 62 is installed, said tank seal pad 62 stifled being located in the cold water opening of cold water storage cistern 36.In the said cold water storage cistern 36 filter 60 is installed, also filter can be set.All the other 26S Proteasome Structure and Functions are all identical.