CN102328186A - Production method of steel tube - Google Patents

Production method of steel tube Download PDF

Info

Publication number
CN102328186A
CN102328186A CN201110244499A CN201110244499A CN102328186A CN 102328186 A CN102328186 A CN 102328186A CN 201110244499 A CN201110244499 A CN 201110244499A CN 201110244499 A CN201110244499 A CN 201110244499A CN 102328186 A CN102328186 A CN 102328186A
Authority
CN
China
Prior art keywords
temperature
steel tube
heating
production method
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110244499A
Other languages
Chinese (zh)
Inventor
张明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Huaye Iron & Steel Co Ltd
Original Assignee
Wuxi Huaye Iron & Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Huaye Iron & Steel Co Ltd filed Critical Wuxi Huaye Iron & Steel Co Ltd
Priority to CN201110244499A priority Critical patent/CN102328186A/en
Publication of CN102328186A publication Critical patent/CN102328186A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a production method of a steel tube. The production method comprises the following steps: 1. making the tube: (1) centrifugally casting a hollow tube billet with the oxygen content of less than 30ppm; (2) machining the inner and outer surfaces of the hollow tube billet with the surface defect depth of not more than 0.2mm; (3) heating the machined hollow tube billet at the temperature of 1000-1350 DEG C; (4) jacking and rolling the heated tube billet to obtain a pipe fitting with the wall thickness of 80-160mm, the diameter of 500-1500mm and the length of 0.5-5m; and (5) cropping the top and end of the rolled pipe fitting and then finishing; and 2. after-treating the tube: (1) directly heating the steel tube without pretreatment at the heating rate in two stages: stage 1: heating the steel tube to 550-650 DEG C at the heating rate of 5-10 DEG C/min; and stage 2: heating the steel tube from 15-35 DEG C to complete austenitizing temperature of 35-40 DEG C (above A3); and performing heat preservation for 20-25 minutes, discharging and then cold-quenching; and (2) allowing the discharged steel tube to pass through a refrigerating gas area at the temperature of 10-25 DEG C within 10-20 minutes, then transferring the steel tube into a tempering furnace for heat preservation at the temperature of 260-350 DEG C for 50-80 minutes, then discharging the steel tube out of the furnace, and air-cooling to room temperature so as to finally obtain the steel tube with the grain size of 11-12 grade.

Description

A kind of steel tube producing method
Technical field
The present invention relates to a kind of steel tube producing method, belong to the control part manufacture field of steel.
Background technology
CN200910134664 discloses a kind of seamless pipe casting model frame, is made up of the sand mold of casting model frame, it is characterized in that: in the sand mold of casting model frame, be embedded with steel pipe.Advantage is: be employed in the sand mold of casting model frame and be embedded with steel pipe, during casting, sand mold is disintegrated, and steel pipe stays in foundry goods, forms the foundry goods oil circuit, has overcome original oil leakage phenomenon.
CN101538623 discloses the manufacturing process of the thin brilliant heat resisting steel steel pipe of a kind of T/P91.92, may further comprise the steps: 1) selected steel material; 2) blast furnace slightly refines: adopt top bottom blowing technology; 3) basic furnace takes off S, P; 4) electric furnace refining: the process of in electric furnace, smelting: application of vacuum, Argon stir, heat temperature control, microalloying; 5) vacuum drying oven outgases and oozes alloy part: vacuum deaeration in vacuum drying oven, decarburization, dehydrogenation, denitrogenation; 6) finish rolling: adopt continuous casting, steel ingot blocks is constantly rolled back and forth.The present invention can improve steel degree of purity, remove and harmfully to be mingled with, to make chemical composition indicators of trace elements to meet design requirement; Objectionable impurities such as S.P.N are effectively controlled; The grain size of steel reach 9 grades and more than; The impact flexibility of steel and creep rupture strength satisfy supercritical generating boiler design parameter request.
The crystal grain of above preparation method's gained is thick, and last handling process is single, can not effectively control crystal grain, and is simultaneously less demanding for blank, do not carry out anti-corrosion treatment, and workpiece is difficult to adapt to the harshness application of working condition.
Summary of the invention
To the deficiency of prior art, one of the object of the invention is to provide a kind of production technology of steel pipe.
Described production method does,
One, tubulation step: (1) centrifugal casting hollow bloom; Hollow bloom oxygen content be lower than 30ppm
(2) surfaces externally and internally to said hollow bloom carries out machined; The blemish degree of depth is smaller or equal to 0.2mm;
(3) the said hollow bloom after the machined is heated, heating-up temperature is 1000-1350 ℃; (4) the said pipe after the heating is carried out the rolling processing of push pipe, make the pipe fitting of wall thickness 80-160mm, diameter 500-1500mm and length 0.5-5m; (5) the said pipe fitting after the rolling processing of push pipe is carried out crop, back-end crop, finishing;
Two, steel pipe last handling process: (1) need not preliminary treatment; Directly steel pipe is heated to above 35-40 ℃ of complete austenitizing temperature A3, temperature retention time is 20-25 minute, the back water hardening of coming out of the stove; Wherein heating rate is the two-stage: phase I 5-10 degree/min; Be warmed up to 550-650 ℃, second stage 15-35 degree is warmed up to the above 35-40 of A3 ℃;
(2) come out of the stove after through 10-25 ℃ refrigerant gas zone, through the time be 10-20mi n, reenter the tempering furnace insulation then and handle, temperature is 260-350 ℃, temperature retention time is 50-80 minute, the air cooling of coming out of the stove then is to room temperature, grain size is the 11-12 level.
Described centrifugal casting is to be that the inclination angle is to carry out on the tilting centrifugal casting machine of 20-25 degree at the rotation of casting mold and horizontal sextant angle.
Also comprise anti-corrosion treatment.
Said anti-corrosion treatment is covered for applying anticorrosive coating or electrolytic coating or electroless plating.
The composition of said steel pipe is: C 0.2~0.25, Mo 1.0~1.5, Si 0.3~0.4, Ti 0.02~0.03, B 0.002~0.003, V 0.06~0.10,0.009<N≤0.013, surplus are Fe and unavoidable impurities.
The prepared steel pipe crystal grain of the present invention is tiny, and yield strength can reach 300-450Mpa, good corrosion resistance.
Outstanding advantage of the present invention is near general A 3 lines, not heat, but the interval of uniform temperature above that, thereby form more tiny crystal grain easily; Because crystal grain improves a rank; Technology own is very difficult, moreover does not just want to improve and improve, especially high grain size;
More outstanding advantage is not through general quenching, but realizes that through the air band of lower temperature region it helps industrialized continuous production and the general airborne exposure that prevents to get into quenching liquid.
The specific embodiment
Embodiment one
The composition of steel pipe is that (weight percentage): C 0.2, Mo 1.0, Si 0.3, Ti 0.02, B 0.002, V 0.06, N 0.013, surplus are Fe and unavoidable impurities.
Concrete technology is:
One, tubulation step: (1) is that the inclination angle is the tilting centrifugal casting machine centrifugal casting hollow bloom of 20-25 degree at the rotation and the horizontal sextant angle of casting mold; Hollow bloom oxygen content 29.5ppm (2) surfaces externally and internally of said hollow bloom is carried out machined; Blemish degree of depth 0.2mm; (3) the said hollow bloom after the machined is heated, heating-up temperature is 1000 ℃; (4) the said pipe after the heating is carried out the rolling processing of push pipe, make the pipe fitting of wall thickness 80mm, diameter 500mm and length 0.5m; (5) the said pipe fitting after the rolling processing of push pipe is carried out crop, back-end crop, finishing;
Two, steel pipe last handling process: (1) need not preliminary treatment; Directly steel pipe is heated to complete austenitizing temperature A 3 above 35 ℃, temperature retention time is 20 minutes, the back water hardening of coming out of the stove; Wherein heating rate is the two-stage: phase I 5 degree/min; Be warmed up to 550 ℃, second stage 15 degree are warmed up to above 35 ℃ of A3;
(2) come out of the stove after through 10 ℃ refrigerant gas zone, through the time be 10min, reenter the tempering furnace insulation then and handle, temperature is 260 ℃, temperature retention time is 50 minutes, the air cooling of coming out of the stove then is to room temperature, grain size is 11 grades.
Pipe fitting to gained carries out preservative treatment, and anti-corrosion treatment is covered for applying anticorrosive coating or electrolytic coating or electroless plating.
Example 2:
The composition of steel pipe is that (weight percentage): C 0.25, Mo 1.5, Si 0.4, Ti 0.03, B 0.003, V 0.10, N 0.009, surplus are Fe and unavoidable impurities.
One, tubulation step: (1) centrifugal casting hollow bloom; Hollow bloom oxygen content be lower than 30ppm (2) surfaces externally and internally of said hollow bloom carried out machined; The blemish degree of depth is smaller or equal to 0.2mm; (3) the said hollow bloom after the machined is heated, heating-up temperature is 1000-1350 ℃; (4) the said pipe after the heating is carried out the rolling processing of push pipe, make the pipe fitting of wall thickness 80-160mm, diameter 500-1500mm and length 0.5-5m; (5) the said pipe fitting after the rolling processing of push pipe is carried out crop, back-end crop, finishing;
Two, steel pipe last handling process: (1) need not preliminary treatment; Directly steel pipe is heated to above 35-40 ℃ of complete austenitizing temperature A3, temperature retention time is 20-25 minute, the back water hardening of coming out of the stove; Wherein heating rate is the two-stage: phase I 5-10 degree/min; Be warmed up to 550-650 ℃, second stage 15-35 degree is warmed up to the above 35-40 of A3 ℃;
(2) come out of the stove after through 10-25 ℃ refrigerant gas zone, through the time be 10-20min, reenter the tempering furnace insulation then and handle; Temperature is 260-350 ℃, and temperature retention time is 50-80 minute, and the air cooling of coming out of the stove then is to room temperature; Grain size is the 11-12 level, and yield strength can reach 300-450Mpa.
Described centrifugal casting is to be that the inclination angle is to carry out on the tilting centrifugal casting machine of 20-25 degree at the rotation of casting mold and horizontal sextant angle.
Also comprise anti-corrosion treatment, said anti-corrosion treatment is covered for applying anticorrosive coating or electrolytic coating or electroless plating, is metal level as applying sacrifices such as epoxy zinc-enriched paint or electro deposited zinc.
Applicant's statement; The present invention explains detailed process equipment of the present invention and technological process through the foregoing description; But the present invention is not limited to above-mentioned detailed process equipment and technological process, does not mean that promptly the present invention must rely on above-mentioned detailed process equipment and technological process could be implemented.The person of ordinary skill in the field should understand, and to any improvement of the present invention, to the interpolation of the equivalence replacement of each raw material of product of the present invention and auxiliary element, the selection of concrete mode etc., all drops within protection scope of the present invention and the open scope.

Claims (5)

1. steel tube producing method is characterized in that: described production method does,
One, tubulation step: (1) centrifugal casting hollow bloom; Hollow bloom oxygen content be lower than 30ppm (2) surfaces externally and internally of said hollow bloom carried out machined; The blemish degree of depth is smaller or equal to 0.2mm; (3) the said hollow bloom after the machined is heated, heating-up temperature is 1000-1350 ℃; (4) the said pipe after the heating is carried out the rolling processing of push pipe, make the pipe fitting of wall thickness 80-160mm, diameter 500-1500mm and length 0.5-5m; (5) the said pipe fitting after the rolling processing of push pipe is carried out crop, back-end crop, finishing;
Two, steel pipe last handling process: (1) need not preliminary treatment; Directly steel pipe is heated to above 35-40 ℃ of complete austenitizing temperature A3, temperature retention time is 20-25 minute, the back water hardening of coming out of the stove; Wherein heating rate is the two-stage: phase I 5-10 degree/min; Be warmed up to 550-650 ℃, second stage 15-35 degree is warmed up to the above 35-40 of A3 ℃;
(2) come out of the stove after through 10-25 ℃ refrigerant gas zone, through the time be 10-20min, reenter the tempering furnace insulation then and handle, temperature is 260-350 ℃, temperature retention time is 50-80 minute, the air cooling of coming out of the stove then is to room temperature, grain size is the 11-12 level.
2. production method according to claim 1 is characterized in that described centrifugal casting is is that the inclination angle is to carry out on the tilting centrifugal casting machine of 20-25 degree at the rotation of casting mold and horizontal sextant angle.
3. production method according to claim 2 is characterized in that also comprising anti-corrosion treatment.
4. production method according to claim 3 is characterized in that said anti-corrosion treatment is to apply anticorrosive coating or electrolytic coating or electroless plating to cover.
5. according to the described production method of claim 1-5, it is characterized in that the composition of said steel pipe is: C0.2~0.25, Mo 1.0~1.5, Si 0.3~0.4, Ti 0.02~0.03, B 0.002~0.003, V0.06~0.10,0.009<N≤0.013, surplus are Fe and unavoidable impurities.
CN201110244499A 2011-08-24 2011-08-24 Production method of steel tube Pending CN102328186A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110244499A CN102328186A (en) 2011-08-24 2011-08-24 Production method of steel tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110244499A CN102328186A (en) 2011-08-24 2011-08-24 Production method of steel tube

Publications (1)

Publication Number Publication Date
CN102328186A true CN102328186A (en) 2012-01-25

Family

ID=45480296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110244499A Pending CN102328186A (en) 2011-08-24 2011-08-24 Production method of steel tube

Country Status (1)

Country Link
CN (1) CN102328186A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108673148A (en) * 2018-05-28 2018-10-19 广东水电二局股份有限公司 The organisation of working and its processing method of inside and outside double layer anticorrosive fabricating drainpipe made from stainless steel
CN112453344A (en) * 2020-11-26 2021-03-09 江苏联峰能源装备有限公司 Production method of high-pressure boiler steel pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108673148A (en) * 2018-05-28 2018-10-19 广东水电二局股份有限公司 The organisation of working and its processing method of inside and outside double layer anticorrosive fabricating drainpipe made from stainless steel
CN112453344A (en) * 2020-11-26 2021-03-09 江苏联峰能源装备有限公司 Production method of high-pressure boiler steel pipe

Similar Documents

Publication Publication Date Title
CN103602888B (en) Manufacturing method for low-compression ratio hot-rolled 9Ni steel thick plate
CN103060542B (en) Manufacturing method for low expansion alloy wide and thick plate
CN103233162B (en) Process for producing IF steel by using medium sheet billet in continuous casting manner
CN108823440B (en) Preparation method and application of hypoeutectic aluminum-silicon alloy plate blank
CN104532102A (en) Novel manufacturing technology of large-sized carburized bearing steel G20Cr2Ni4A for wind electricity
CN108034895A (en) A kind of Valve Steel 50Cr21Mn9Ni4Nb2WN polishes the production method of bright as silver bar
CN103484766B (en) A kind of 600MPa level hydroelectric project modified high strength and low welding crack sensitivity steel plate and preparation method thereof
CN107794451B (en) A kind of plastic die steel 718 and its production technology
CN106282770B (en) A kind of high-strength corrosion-resistant steel HY800 slabs and production method
CN105779861B (en) A kind of wear-resisting high vanadium nitrogen high-speed steel shaped roll and its manufacture method
CN104480382A (en) Method for preparing centrifugal nodular cast iron pipe
CN102825236A (en) Method for removing transverse crack defects of continuous casting billet corner of boron steel
CN112281032B (en) Preparation method of aluminum alloy welding material
CN106756568A (en) Without niobium low cost S 355MC hot rolling acid-cleaning plates and its production method
CN105274429A (en) Production method for alloy filament
CN105132616B (en) Method for preventing surface of flange steel from cracking
CN104480381A (en) Industrial preparing method of water-cooling metal mold centrifugal nodular cast iron pipe
CN104004955B (en) The manufacture method of high performance jetting steel
CN106077539B (en) A kind of preparation process of aluminum alloy strip continuous casting and rolling
CN106222559B (en) A kind of offshore platform steel steel plate and its production method
CN108467989B (en) A kind of easily welding pre-hardening plastic steel plate for die and its production method
CN105274428A (en) Production method for alloy filament with zero defect on surface
CN105316575A (en) Cold-heading wire for resonance rod and production method thereof
CN105624540A (en) Control method of equiaxial crystal ratio of 30CrMo round pipe billet and steel casting blank
CN102328186A (en) Production method of steel tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120125