CN102323500B - 变电站双套母线差动保护动作不一致的解决方法及装置 - Google Patents
变电站双套母线差动保护动作不一致的解决方法及装置 Download PDFInfo
- Publication number
- CN102323500B CN102323500B CN201110190667.9A CN201110190667A CN102323500B CN 102323500 B CN102323500 B CN 102323500B CN 201110190667 A CN201110190667 A CN 201110190667A CN 102323500 B CN102323500 B CN 102323500B
- Authority
- CN
- China
- Prior art keywords
- bus differential
- cover
- time
- input point
- differential protecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
本发明公开了一种变电站双套母线差动保护动作不一致的解决方法,它包括以下步骤:a、分别对每套每套母线差动动作的时间的进行测试;测试方法为,以线路中的断路器保护装置的启动输入点接收到信号作为时间启点,母线差动保护装置的跳闸接点收到信号作为时间的终点,测算每套母线差动保护所用的时间;并做好备案记录;并将实际中出现的保护动作差与备案记录进行比较,对双套配置的保护出现动作行为不一致时,来快速的判断出问题所在,很好的解决了这一难题,对电站的稳定运行提供了有力的保障。
Description
技术领域
本发明及一种变电站双套母线差动保护动作不一致的解决方法及装置,属于电力系统保护技术领域。
背景技术
目前,在500kV变电站中的500kV母线差动保护按规程要求配置双套保护,现有的500kV母线差动保护有多个生产厂家,每个厂家的产品不尽相同,性能也有所区别,对于其中的失灵保护启动母差跳闸的逻辑也不同。在500kV变电站实际运行中发现,当某一条500kV线路失灵保护启动母差后,两套母线差动保护的动作行为不一致,仅有一套母线差动保护跳闸出口,而另一套保护不动作,未按照规程要求两套母差保护同时动作跳闸出口,这势必给运行维护人员造成误解,影响对两套母线差动保护动作行为的正确判断。所以必须对此问题做出快速正确的判断,并及时处理。
然而由于失灵保护启动母线差动保护跳闸的中间环节较多,要从源头逐一分析判断,需要花费大量的时间和精力,停电检查的时间也就必然增加,对电网的运行是非常不利的。上述问题的存在使得500kV变电站的双套母线差动保护处于带隐患运行,两套母线差动保护动作行为不一致,势必造成运行维护人员的错误判断,给运行维护带来不便,所以须采取措施予以解决。
发明内容
本发明要解决的技术问题是提供一种对双套配置的母线差动保护出现动作行为不一致时,能快速判断并解决问题的变电站双套母线差动保护动作不一致的解决方法及装置,可以克服现有技术的不足。
本发明的技术方案是:一种变电站双套母线差动保护动作不一致的解决方法,它包括以下步骤:
a、分别对每套每套母线差动动作的时间的进行测试;测试方法为,以线路中的断路器保护装置的启动输入点接收到信号作为时间启点,母线差动保护装置的跳闸接点收到信号作为时间的终点,测算每套母线差动保护所用的时间;
b、算出两套母线差动保护动作的时间差,并做好备案记录;
c、在实际运行过程中,如果两套母线差动保护动作的时间差在备案记录范围内则运行正常;如果两套母线差动保护动作的时间差不在备案记录范围之内,则需对线路进行检查。
所述的测试方法为:采用一台微机继电保护测试仪,通过微机继电保护测试仪与断路器保护装置的启动输入点连接,并上加入开入信号,并将母线差动保护的跳闸输出接点与微机继电保护测试仪连接,利用微机继电保护测试仪计算信号发出到接收所用去的时间。
备案记录的时间差为9-10.5毫秒。
变电站双套母线差动保护动作不一致的时间测算装置,它包括连接在线路上的断路器保护装置和母线差动保护装置,在断路器保护装置和母线差动保护装置上分别设有启动输入点In1和启动输入点In2,输出接点Out2和输出接点Out3,输出接点Out2与启动输入点In2连接,其特征在于:它还包括微机继电保护测试仪,在微机继电保护测试仪上设有输入点In3和输出接点Out1,输出接点Out1与启动输入点In1连接,输入点In3与输出接点Out3连接。
与现有技术比较,本发明通过测算出两套母线差动保护动作的时间差,并做好备案记录;并将实际中出现的保护动作差与备案记录进行比较,对双套配置的保护出现动作行为不一致时,来快速的判断出问题所在,很好的解决了这一难题,对电站的稳定运行提供了有力的保障。
附图说明
图1为本发明的结构示意图。
具体实施方式
实施例: 如图1所示, 以在500kV变电站为例,为解决双套母线差动保护动作不一致为题,申请人采用以下步骤进行判断:
a、分别对每套每套母线差动动作的时间的进行测试;测试方法为,以线路中的断路器保护装置的启动输入点接收到信号作为时间启点,母线差动保护装置的跳闸接点收到信号作为时间的终点,测算每套母线差动保护所用的时间;具体的测试方法为采用一台微机继电保护测试仪,通过微机继电保护测试仪与断路器保护装置的启动输入点连接,并上加入开入信号,并将母线差动保护的跳闸输出接点与微机继电保护测试仪连接,利用微机继电保护测试仪计算信号发出到接收所用去的时间。时间测算装置它包括连接在线路上的断路器保护装置1和母线差动保护装置2,在断路器保护装置1和母线差动保护装置2上分别设有启动输入点In1和启动输入点In2,输出接点Out2和输出接点Out3,输出接点Out2与启动输入点In2连接,其特征在于:它还包括微机继电保护测试仪3,在微机继电保护测试仪3上设有输入点In3和输出接点Out1,输出接点Out1与启动输入点In1连接,输入点In3与输出接点Out3连接。
b、算出两套母线差动保护动作的时间差,并做好备案记录;
c、在实际运行过程中,如果两套母线差动保护动作的时间差在备案记录范围内则运行正常;如果两套母线差动保护动作的时间差不在备案记录范围之内,则需对线路进行检查。通过对变电站内各种型号的母线差动保护装置进行测试,备案记录的时间差为9-10.5毫秒。
Claims (4)
1.一种变电站双套母线差动保护动作不一致的解决方法,其特征在于:它包括以下步骤:
a、分别对每套母线差动动作的时间进行测试;测试方法为,以线路中的断路器保护装置的启动输入点接收到信号作为时间启点,母线差动保护装置的跳闸接点收到信号作为时间的终点,测算每套母线差动保护所用的时间;
b、算出两套母线差动保护动作的时间差,并做好备案记录;
c、在实际运行过程中,如果两套母线差动保护动作的时间差在备案记录范围内则运行正常;如果两套母线差动保护动作的时间差不在备案记录范围之内,则需对线路进行检查。
2.根据权利要求1所述的变电站双套母线差动保护动作不一致的解决方法,其特征在于:所述的测试方法为:采用一台微机继电保护测试仪,通过微机继电保护测试仪与断路器保护装置的启动输入点连接,并加入开入信号,并将母线差动保护的跳闸输出接点与微机继电保护测试仪连接,利用微机继电保护测试仪计算信号发出到接收所用去的时间。
3.根据权利要求1所述的变电站双套母线差动保护动作不一致的解决方法,其特征在于:备案记录的时间差为9-10.5毫秒。
4.一种实现权利要求2所述方法的变电站双套母线差动保护动作不一致的时间测算装置,其特征在于:它包括连接在线路上的断路器保护装置(1)和母线差动保护装置(2),在断路器保护装置(1)和母线差动保护装置(2)上分别设有启动输入点In1和启动输入点In2、输出接点Out2和输出接点Out3,输出接点Out2与启动输入点In2连接,其特征在于:它还包括微机继电保护测试仪(3),在微机继电保护测试仪(3)上设有输入点In3和输出接点Out1,输出接点Out1与启动输入点In1连接,输入点In3与输出接点Out3连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110190667.9A CN102323500B (zh) | 2011-07-08 | 2011-07-08 | 变电站双套母线差动保护动作不一致的解决方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110190667.9A CN102323500B (zh) | 2011-07-08 | 2011-07-08 | 变电站双套母线差动保护动作不一致的解决方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102323500A CN102323500A (zh) | 2012-01-18 |
CN102323500B true CN102323500B (zh) | 2014-07-09 |
Family
ID=45451282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110190667.9A Active CN102323500B (zh) | 2011-07-08 | 2011-07-08 | 变电站双套母线差动保护动作不一致的解决方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102323500B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6011480A (en) * | 1997-07-23 | 2000-01-04 | Schweitzer Engineering Laboratories, Inc. | Protection quality capability for protective relays used in an electric power system |
CN101441242A (zh) * | 2008-12-23 | 2009-05-27 | 南京钢铁联合有限公司 | 电力系统发生故障时的故障电流切除时间的检测方法 |
CN101755373A (zh) * | 2007-07-24 | 2010-06-23 | 西门子公司 | 保护设备和用于驱动保护设备的方法 |
CN101800441A (zh) * | 2010-03-26 | 2010-08-11 | 河南省电力公司许昌供电公司 | 数字化变电站集中式保护装置边界信息缺失的处理方法 |
CN202210126U (zh) * | 2011-07-08 | 2012-05-02 | 贵州电力试验研究院 | 变电站双套母线差动保护动作不一致的时间测算装置 |
-
2011
- 2011-07-08 CN CN201110190667.9A patent/CN102323500B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6011480A (en) * | 1997-07-23 | 2000-01-04 | Schweitzer Engineering Laboratories, Inc. | Protection quality capability for protective relays used in an electric power system |
CN101755373A (zh) * | 2007-07-24 | 2010-06-23 | 西门子公司 | 保护设备和用于驱动保护设备的方法 |
CN101441242A (zh) * | 2008-12-23 | 2009-05-27 | 南京钢铁联合有限公司 | 电力系统发生故障时的故障电流切除时间的检测方法 |
CN101800441A (zh) * | 2010-03-26 | 2010-08-11 | 河南省电力公司许昌供电公司 | 数字化变电站集中式保护装置边界信息缺失的处理方法 |
CN202210126U (zh) * | 2011-07-08 | 2012-05-02 | 贵州电力试验研究院 | 变电站双套母线差动保护动作不一致的时间测算装置 |
Non-Patent Citations (2)
Title |
---|
双母线接线两套线路保护间的配合关系;李秀红等;《中国电力》;20100831;第43卷(第8期);73-76 * |
李秀红等.双母线接线两套线路保护间的配合关系.《中国电力》.2010,第43卷(第8期),73-76. |
Also Published As
Publication number | Publication date |
---|---|
CN102323500A (zh) | 2012-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103529418B (zh) | 电力系统同步相量测量装置动态测试方法及装置 | |
CN105093033A (zh) | 一种基于电网多源信息的故障综合分析系统及分析方法 | |
CN104166399A (zh) | 智能化变电站保护装置动模仿真测试系统及方法 | |
CN106771760B (zh) | 一种基于主站模拟的分布式fa功能诊断方法 | |
CN104020761A (zh) | 一种无须联网的馈线自动化测试系统 | |
CN106571688A (zh) | 一种直流系统运行方式及隔离开关运行状态监视的方法 | |
WO2014153764A1 (zh) | 智能变电站继电保护功能自动测试的方法及装置 | |
CN103346497B (zh) | 智能变电站电气虚回路隔离方法与系统 | |
CN106771730A (zh) | 智能变电站保护装置模拟量采样回路实时校验装置与方法 | |
CN110703029B (zh) | 智能变电站一、二次系统故障检测系统及方法 | |
CN104749487A (zh) | 一种线路不停电条件下检验保护装置及其回路的方法 | |
CN103235217A (zh) | 双重化保护动作一致性监测装置和监测方法 | |
CN101944727A (zh) | 带检测装置的浪涌保护器 | |
CN103163402B (zh) | 基于二次回路的继电保护设备状态监测装置及监测方法 | |
CN104317203A (zh) | 一种故障信息全过程仿真方法 | |
CN102323500B (zh) | 变电站双套母线差动保护动作不一致的解决方法及装置 | |
CN103558466A (zh) | 10kV保护装置在线整组逻辑校验方法 | |
CN103972986B (zh) | 一种智能变电站保护装置不停电传动方法 | |
CN202210126U (zh) | 变电站双套母线差动保护动作不一致的时间测算装置 | |
CN102830295B (zh) | 一种数字化变电站保护回路的检测系统及检测方法 | |
CN103253572B (zh) | 电梯停电应急电源的自动定时检测方法及装置 | |
CN204575769U (zh) | 变电站二次电流回路状态在线监测系统 | |
CN107611944B (zh) | 一种智能变电站二次保护设备安全隔离措施自动分析方法 | |
CN203870470U (zh) | 一种无须联网的馈线自动化测试系统 | |
CN106841862B (zh) | 安川变频器uv故障诊断方法及其自动检测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |