CN102322286A - Comprehensive dust falling method of coal mining comprehensive mechanized tunnel through return air suppression - Google Patents

Comprehensive dust falling method of coal mining comprehensive mechanized tunnel through return air suppression Download PDF

Info

Publication number
CN102322286A
CN102322286A CN201110244021A CN201110244021A CN102322286A CN 102322286 A CN102322286 A CN 102322286A CN 201110244021 A CN201110244021 A CN 201110244021A CN 201110244021 A CN201110244021 A CN 201110244021A CN 102322286 A CN102322286 A CN 102322286A
Authority
CN
China
Prior art keywords
air
tunnel
return air
dust
air outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110244021A
Other languages
Chinese (zh)
Inventor
孙威
周高明
余新其
沈国泉
张连顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MPH HANGZHOU CO Ltd
Original Assignee
MPH HANGZHOU CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MPH HANGZHOU CO Ltd filed Critical MPH HANGZHOU CO Ltd
Priority to CN201110244021A priority Critical patent/CN102322286A/en
Publication of CN102322286A publication Critical patent/CN102322286A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The invention relates to a comprehensive dust falling method of a coal mining comprehensive mechanized tunnel through return air suppression, which comprises the following steps of: arranging a pressed ventilation fan in the coal mining comprehensive mechanized tunnel to supply air and installing a dust collector on a tunneling machine to exhaust air; and uniformly distributing air with water mist on the whole cross section of a tunnel between an air outlet of the dust collector and an air supply outlet of the pressed ventilation fan, wherein the direction of the air with water mist is opposite to the tunnel return air generated by the pressed ventilation fan. Compared with the prior art, the method has the following beneficial effects that: the air with water mist and the tunnel return air are oppositely blown, because the pressure of the air with water mist is more than that of the tunnel return air, dust is prevented from flowing into the whole tunnel along with the tunnel return air, the tunnel return air can only be exhausted and filtered from one outlet (namely the air outlet of the dust collector), and the aim of dust falling is fulfilled.

Description

Pick tunnel return air compacting integrated dust-removing method is combined in a kind of colliery
Technical field
The present invention relates to a kind of colliery and combine pick tunnel return air compacting integrated dust-removing method, is a kind of method that is used for the mine depositing dust.
Background technology
Along with improving constantly of driving face production scene comprehensive mechanization degree, the dust-producing amount of production scene also sharply increases, the existence of a large amount of dust; Contaminated environment not only; The harm operating personnel is physically and mentally healthy, and because coal dust has explosivity, is having a strong impact on the safety in production of mine.Though external spraying or other measurements for reduction still had the especially trickle property of a lot of dust dust to come out with the air drift in the tunnel in development machine was provided with, these dust are easy to be sucked lung by human body and impair one's health.
Patent 200910256090.X " a kind of air curtain sealing dedusting system on fully-mechanized excavating face " is though the method for mentioning has the certain significance, and drawback need to be a huge blower fan outside the tunnel, and this is unpractical often; In addition, the suction air volume of dust absorption fan is difficult to adjust identically with the air inlet air quantity of pressing the wind air duct, and it is unsettled causing the air curtain wall, and dust-laying effect is unstable.In addition now each ore deposit except according to the rules relevant place being carried out also adopting the method for water curtain dust-separation the necessary atomizing de-dusting, but from practice effect, not very good.
Summary of the invention
The problem that the present invention will solve is: to the weak point of above-mentioned prior art, provide a kind of colliery to combine pick tunnel return air compacting integrated dust-removing method.
In order to solve the problems of the technologies described above, the present invention adopts following technical scheme:
Pick tunnel return air compacting integrated dust-removing method is combined in a kind of colliery, it is characterized in that this method may further comprise the steps:
1) in the pick tunnel is combined in the colliery, establishes the air-supply of forced ventilation machine, dust catcher is installed on development machine is carried out air-out;
2) on the whole section in tunnel between the air outlet of dust catcher air outlet and forced ventilation machine, evenly distribute and have the wind of water smoke, this contains tunnel return air in the opposite direction of direction and the generation of forced ventilation machine of the wind of water smoke.
Step 2 wherein) adopt following mode to realize: the drift section place between dust catcher air outlet and forced ventilation machine air outlet arranges that nozzle is covered by nozzle ejection water smoke is regional to guarantee whole section; These nozzles link to each other with a cover high pressure water system; Water under high pressure is through forming the thin water smoke vectored injection district with big kinetic energy behind the nozzle; These thin atomized water spray districts with big kinetic energy can drive its inside and ambient air blows to the tunnel end; Formation contains the wind of water smoke, and the blast that this wind that contains water smoke forms is greater than the blast of tunnel return air.
Step 2 wherein) adopt following mode to realize: the drift section place layout blower fan between dust catcher air outlet and forced ventilation machine air outlet; And the air outlet place at each blower fan is provided with the low-pressure water spraying system, and the blast that this blower fan forms is greater than the blast of tunnel return air.
The present invention compared with prior art has following beneficial effect: the wind and the tunnel return air that contain water smoke are to blowing; Because the water smoke blast is greater than the blast of tunnel return air; Suppressing dust flow in the whole tunnel with tunnel return air; Force tunnel return air to filter, reach the purpose of depositing dust from an outlet (being the dust catcher air outlet) air-out.
Description of drawings
Fig. 1 is dust pelletizing system of the present invention tunnel return air distinguished and admirable generation layout when not suppressing
Fig. 2 is a dust pelletizing system of the present invention tunnel return air compacting after wind stream layout
Fig. 3 is that the A-A of Fig. 2 is to schematic cross-section.
The specific embodiment
The invention provides a kind of colliery and combine pick tunnel return air compacting integrated dust-removing method, clearer, clear and definite in order to make the object of the invention, technology path, below in conjunction with accompanying drawing and embodiment, to further explain of the present invention.
Present embodiment is that pick tunnel return air compacting integrated dust-removing method is combined in a kind of colliery; Referring to Fig. 1; Present embodiment comprises tunnel 1, dust catcher (containing the dust-absorbing filtering layer) 2, forced ventilation machine 4, the development machine 5 that has the return air compacting; In the pick tunnel is combined in the colliery, establish 4 air-supplies of forced ventilation machine, dust catcher 2 (containing the dust-absorbing filtering layer) is installed on development machine 5 is carried out air-out; The relevant distinguished and admirable generation layout in tunnel is as shown in Figure 1, can know that from Fig. 1 the air-supply of forced ventilation machine hinders the return air that produces through tunnelling face and fails to be inhaled into fully dust catcher air intake 6, and dust flow in the whole tunnel with tunnel return air.
Referring to Fig. 2; The whole section (being the cross section) in tunnel is gone up and is excited the wind that has water smoke 3 that forms by high pressure nozzle or other between dust catcher air outlet 7 and forced ventilation machine air outlet 8; Evenly distribute on the whole section in tunnel and have the wind 3 of water smoke; Forced ventilation machine 4 is arranged in the development machine 5 another side tunnels, and the wind acting surface that has water smoke is arranged on the drift section between dust catcher air outlet and the forced ventilation machine air outlet; The air-supply of forced ventilation machine hinders through tunnelling face and produces return air; To blowing, this contains tunnel return air in the opposite direction of direction and the generation of forced ventilation machine of the wind of water smoke, referring to Fig. 3 with the wind 3 that contains water smoke and tunnel return air; The tunnel sectional view that Fig. 3 is; And be to look by the direction in the export-oriented tunnel, tunnel, so " X " symbology among Fig. 3 is the wind that has water smoke, ". " symbology among Fig. 3 be tunnel return air.Here to the mode of blowing multiple mode can be arranged, illustrate: 1) arrange that like the drift section place between dust catcher air outlet and forced ventilation machine air outlet nozzle is covered by nozzle ejection water smoke zone to guarantee whole section.These nozzles link to each other with a cover high pressure water system, and water under high pressure is through forming the thin water smoke vectored injection district with big kinetic energy behind the nozzle.These thin atomized water spray districts with big kinetic energy can drive its inside and ambient air blows to the tunnel end, form the wind that contains water smoke.The blast that this wind that contains water smoke forms is greater than the blast of tunnel return air; 2) arrange blower fan like the drift section place between dust catcher air outlet and forced ventilation machine air outlet, and the low-pressure water spraying system is set at the air outlet place of each blower fan.The blast that this blower fan forms is greater than the blast of tunnel return air.This implementation power consumption is relatively low.The high velocity air that blower fan blows out is through the low pressure water spray system time; With the disturbance hydrone and carry certain density hydrone and continue to keep inertia to move ahead; And the kinetic energy of tunnel return air air weakens owing to the absorption of having passed through development end, and promptly thin water smoke blast is greater than tunnel return air blast.Above-mentioned two kinds of implementations of giving an example all can suppress mine dust and flow in the whole tunnel with tunnel return air, force the tunnel return air can only be from a dust catcher (containing the dust-absorbing filtering layer) air-out, thereby reach the effect of depositing dust.
For feasibility and the validity of verifying technical scheme of the present invention, done following experiment respectively:
1) in September, 2010 in the Huaibei, Anhui driving face in coal mine test.What this work plane used is northern heavy industry EBZ200 type development machine, hydraulic shield support supporting.Ature of coal belongs to anthracite, hydrophily is poor.Cause the high concentrate dust that adopts general measurements for reduction can not reduce driving face effectively.For this reason, on this driving face, adopted the mentioned integrated dust-removing scheme of the present invention.The high pressure water system parameter is: hydraulic pressure 200bar, and discharge 50L/min, the nozzle number is 10.The forced ventilation machine adopts FBD series colliery with explosion-proof forced to the axial flow rotary booster.
In the survey, to development machine driver place and development machine return side 10m place, measured the total dust concentration that adopts integrated dust-removing scheme front and back respectively, test result is following:
Figure BDA0000085647980000041
2) in May, 2011 in the Yulin Newly-built Coal Mine digging laneway test.What used in this tunnel is 31 heavy industry EBZ260H type stone head development machines, hydraulic shield support supporting.Have certain rock stratum in the coal dust, so have certain rock dust granules in the dust, hydrophily is better.On this fully-mechanized mining working, adopted the mentioned integrated dust-removing scheme of the present invention.The high pressure water system parameter is: hydraulic pressure 90bar, and discharge 150L/min, the nozzle number is 15.The forced ventilation machine adopts YBT series colliery with the forced axial flow booster of flame-proof type.
In the survey, to development machine driver place and development machine return side 8m place, measured the total dust concentration that adopts integrated dust-removing scheme front and back respectively, test result is following:
Figure BDA0000085647980000051

Claims (3)

1. pick tunnel return air compacting integrated dust-removing method is combined in a colliery, it is characterized in that this method may further comprise the steps:
1) in the pick tunnel is combined in the colliery, establishes the air-supply of forced ventilation machine, dust catcher is installed on development machine is carried out air-out;
2) on the whole section in tunnel between the air outlet of dust catcher air outlet and forced ventilation machine, evenly distribute and have the wind of water smoke, this contains tunnel return air in the opposite direction of direction and the generation of forced ventilation machine of the wind of water smoke.
2. pick tunnel return air compacting integrated dust-removing method is combined in a kind of colliery as claimed in claim 1; It is characterized in that wherein step 2) adopt following mode to realize: the drift section place between dust catcher air outlet and forced ventilation machine air outlet arranges that nozzle is covered by nozzle ejection water smoke zone to guarantee whole section; These nozzles link to each other with a cover high pressure water system; Water under high pressure is through forming the thin water smoke vectored injection district with big kinetic energy behind the nozzle; These thin atomized water spray districts with big kinetic energy can drive its inside and ambient air blows to the tunnel end; Formation contains the wind of water smoke, and the blast that this wind that contains water smoke forms is greater than the blast of tunnel return air.
3. pick tunnel return air compacting integrated dust-removing method is combined in a kind of colliery as claimed in claim 1; It is characterized in that wherein step 2) adopt following mode to realize: the drift section place between dust catcher air outlet and forced ventilation machine air outlet arranges blower fan; And the air outlet place at each blower fan is provided with the low-pressure water spraying system, and the blast that this blower fan forms is greater than the blast of tunnel return air.
CN201110244021A 2011-08-24 2011-08-24 Comprehensive dust falling method of coal mining comprehensive mechanized tunnel through return air suppression Pending CN102322286A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110244021A CN102322286A (en) 2011-08-24 2011-08-24 Comprehensive dust falling method of coal mining comprehensive mechanized tunnel through return air suppression

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110244021A CN102322286A (en) 2011-08-24 2011-08-24 Comprehensive dust falling method of coal mining comprehensive mechanized tunnel through return air suppression

Publications (1)

Publication Number Publication Date
CN102322286A true CN102322286A (en) 2012-01-18

Family

ID=45450103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110244021A Pending CN102322286A (en) 2011-08-24 2011-08-24 Comprehensive dust falling method of coal mining comprehensive mechanized tunnel through return air suppression

Country Status (1)

Country Link
CN (1) CN102322286A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912277A (en) * 2014-04-01 2014-07-09 西安科技大学 High-efficiency dust fall device and method of underground coal mine fully-mechanized excavating tunnel
CN104196534A (en) * 2014-08-19 2014-12-10 山东科技大学 Three-dimensional multidirectional rotational flow air curtain dust settling device and method for fully-mechanized excavation face
RU2558068C1 (en) * 2014-06-27 2015-07-27 Дарья Анатольевна Трубицына Method of prevention of ignition of methane-air mixture
CN109113783A (en) * 2018-08-25 2019-01-01 许明 A kind of gas extraction device for an upper corner of a coal mining working face
CN112483084A (en) * 2020-11-10 2021-03-12 山东科技大学 Fully-closed air curtain dust control method for fully-mechanized coal mining face
CN112879068A (en) * 2021-03-23 2021-06-01 山东科技大学 Fully-mechanized excavating face large vortex dust collection-cyclone wind distribution domain division system and domain division ventilation dust control method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4305620A (en) * 1980-02-20 1981-12-15 Hart Gwyn G Pneumatic separating system for continuous mining machine
GB2096205A (en) * 1980-08-25 1982-10-13 B & J Mfg Co Coal mine dust control method and apparatus
CN201129186Y (en) * 2007-12-28 2008-10-08 山西焦煤集团有限责任公司 Large lane automatic spraying device
CN201351508Y (en) * 2009-02-14 2009-11-25 山东金科星机电有限公司 Mining dust exhaust fan

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4305620A (en) * 1980-02-20 1981-12-15 Hart Gwyn G Pneumatic separating system for continuous mining machine
GB2096205A (en) * 1980-08-25 1982-10-13 B & J Mfg Co Coal mine dust control method and apparatus
CN201129186Y (en) * 2007-12-28 2008-10-08 山西焦煤集团有限责任公司 Large lane automatic spraying device
CN201351508Y (en) * 2009-02-14 2009-11-25 山东金科星机电有限公司 Mining dust exhaust fan

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姚国芳等: "煤矿巷道掘进的综合降尘与防尘", 《煤炭技术》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912277A (en) * 2014-04-01 2014-07-09 西安科技大学 High-efficiency dust fall device and method of underground coal mine fully-mechanized excavating tunnel
RU2558068C1 (en) * 2014-06-27 2015-07-27 Дарья Анатольевна Трубицына Method of prevention of ignition of methane-air mixture
CN104196534A (en) * 2014-08-19 2014-12-10 山东科技大学 Three-dimensional multidirectional rotational flow air curtain dust settling device and method for fully-mechanized excavation face
CN104196534B (en) * 2014-08-19 2016-05-18 山东科技大学 A kind of 3 D multi-directional eddy flow air curtain device for reducing dust and method for fully mechanized workface
CN109113783A (en) * 2018-08-25 2019-01-01 许明 A kind of gas extraction device for an upper corner of a coal mining working face
CN112483084A (en) * 2020-11-10 2021-03-12 山东科技大学 Fully-closed air curtain dust control method for fully-mechanized coal mining face
CN112879068A (en) * 2021-03-23 2021-06-01 山东科技大学 Fully-mechanized excavating face large vortex dust collection-cyclone wind distribution domain division system and domain division ventilation dust control method
CN112879068B (en) * 2021-03-23 2022-10-04 山东科技大学 Fully-mechanized excavating face large vortex dust collection-cyclone wind distribution domain division system and domain division ventilation dust control method

Similar Documents

Publication Publication Date Title
CN102322286A (en) Comprehensive dust falling method of coal mining comprehensive mechanized tunnel through return air suppression
CN102191935B (en) Water vapor rotating jet dust settling device for comprehensive driving working face
CN101324191B (en) Dust removal method and apparatus of common drivage working surface
CN102536236B (en) Settling, isolating and removing integrated dust prevention method of fully mechanized excavation face
US8979212B2 (en) Water sprays for dust control on mining machines
CN203022802U (en) Dust absorption nozzle device for dust remover
CN102080565B (en) Bracket spraying dust fall device used for fully mechanized caving coal mine working face
CN107355252A (en) A kind of fully mechanized workface air curtain dust-collecting dedusting system
CN102296955A (en) Dedusting method with closed excavating working face and system thereof
CN101892858A (en) Wet type dust collector for crag lane or half coal crag lane
CN102787862A (en) Wet vibrating string curtain type dust extraction fan used in coal mine and application method thereof
CN104453979B (en) The remodeling method of underground coal mine negative pressure-pumping dust collecting process
CN202611703U (en) Dust suppress device for heading machine
CN103742187B (en) Excavation face in coal mine short distance combined dust-eliminating method
CN105971602A (en) Integrated excavator mounted dust collection device
CN208934691U (en) A kind of airborne spray dust remover of development machine
CN201351508Y (en) Mining dust exhaust fan
CN103527236B (en) A kind of gas tunnel compound ventilation method
CN207093088U (en) A kind of digging laneway dust goes out except device
CN204691815U (en) Mining wet precipitator
CN201924956U (en) Novel support spraying dust suppression device
CN201738943U (en) Rock lane and mixed coal rock lane wet type dust remover
CN2640611Y (en) High pressure airflow injection spraying dust removing appts.
CN108798741A (en) A kind of gold mine mine air-supply air exhausting device
CN201050370Y (en) Common heading face dust arrester

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120118