CN102320443A - Pipe storage rack device - Google Patents

Pipe storage rack device Download PDF

Info

Publication number
CN102320443A
CN102320443A CN201110158606A CN201110158606A CN102320443A CN 102320443 A CN102320443 A CN 102320443A CN 201110158606 A CN201110158606 A CN 201110158606A CN 201110158606 A CN201110158606 A CN 201110158606A CN 102320443 A CN102320443 A CN 102320443A
Authority
CN
China
Prior art keywords
turnover bracket
pipe material
turnover
articulated
stop mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110158606A
Other languages
Chinese (zh)
Inventor
杨念记
李秀成
沈奇
龚国华
周怡
周洪根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Hualian Science and Technology Group Co Ltd
Original Assignee
Wuxi Hualian Science and Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Hualian Science and Technology Group Co Ltd filed Critical Wuxi Hualian Science and Technology Group Co Ltd
Priority to CN201110158606A priority Critical patent/CN102320443A/en
Publication of CN102320443A publication Critical patent/CN102320443A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a pipe storage rack device. A pipe slippage passage is formed by arranging at least two storage brackets in parallel, and the storage brackets pass through at least two supports of different heights to form a high-low slope; a turnover stop mechanism is arranged at the front part of the pipe slippage passage, the stop mechanism is arranged between the two adjacent storage brackets, and the stop mechanism is a turnover bracket, the bottom of which is articulated to a bottom mounting seat; and the turnover bracket realizes turnover through a hydraulic cylinder. A large amount of pipes are put into the storage brackets, the turnover bracket is lowered, and the pipes are sequentially arranged on the turnover bracket and machined by subsequent processes; and the device can greatly reduce the labor intensity of workers, and has high automation degree, reasonable structure and high work efficiency.

Description

Pipe material storage rack device
Technical field
The present invention relates to pipe material Fabricating machinery, specifically is that a kind of pipe material stores the bin device.
Background technology
In the prior art, processing adopts artificial single lifting to put usually to the pipe material, or the single lifting job of driving a vehicle, and this mode work efficiency is extremely low, labor strength is big, needs a large amount of production times could satisfy production, and degree of automation is extremely low.
Summary of the invention
The objective of the invention is to overcome the deficiency that exists in the prior art, a kind of pipe material storage rack device is provided, only need once a large amount of pipe material to be placed in the storage rack, reduce highly will manage through turnover bracket and expect to be emitted on the support, supply later process processing.
A kind of pipe material stores the bin device, and pipe material slippage passage is made up of at least two storing support arrangement in parallels, low slope, high back before the storing support forms through at least two highly different bearings; Be provided with the upset stock stop in pipe material slippage passage front portion, stock stop is arranged between adjacent two storing supports, and for the bottom is articulated in the turnover bracket of bottom surface mount pad, turnover bracket is realized upset through hydraulic actuating cylinder.
It is further characterized in that: said hydraulic actuating cylinder one end is articulated in and turns on the support, and an end is articulated on the Connection Block of ground.
The top of said turnover bracket is the inclined-plane.
The present invention is placed on a large amount of pipe material in the storage rack earlier, reduces highly will manage through turnover bracket then and expects to be emitted on successively on the support, supplies later process processing; Can reduce labor strength greatly, degree of automation is high, and is rational in infrastructure, high efficiency.
Description of drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a birds-eye view of the present invention.
The specific embodiment
Below in conjunction with concrete accompanying drawing and embodiment the present invention is described further.
To shown in Figure 2, the present invention mainly is made up of storing support 1, mount pad 2, axle bed 3, turning cylinder 4, turnover bracket 5, hydraulic actuating cylinder 6, Connection Block 7, trip shaft 8, bearing pin 9, steel pipe 10, bearing 11 etc. like Fig. 1.The present invention adopts more than 1 on storing support to be installed on the ground side by side; A plurality of mount pads 2 are fixed on the storing support 1 inboard ground simultaneously; Turnover bracket 5 is fixed on the upset moving axis 8; Trip shaft 8 is fixed on the mount pad 2 through axle bed 3, and hydraulic actuating cylinder 6 articulates through turning cylinder 4 and turnover bracket 5, and hydraulic actuating cylinder 6 links to each other in Connection Block 7 through bearing pin 9.
Working process of the present invention is following: at first turnover bracket 5 is dug, turnover bracket 5 forms storage bin with storing support 1, once a large amount of pipe material 10 is hung in storage bin with shop traveller; Primer fluid cylinder pressure 6 is lowerd turnover bracket 5 highly; Pipe material 10 rolls on the storing support slope by root on the inclined-plane, top through turnover bracket under the effect of gravity, and marshalling supplies later process processing in order; After last pipe material taken away, reach was to be processed automatically for a back pipe material by gravity.After putting into pipe material on the support and having got, restart hydraulic actuating cylinder 6 and rise, put into second batch of pipe material through driving, repeat above-mentioned working process.

Claims (3)

1. a pipe material stores the bin device, it is characterized in that: pipe material slippage passage is made up of at least two storing support arrangement in parallels, low slope, high back before the storing support forms through at least two highly different bearings; Be provided with the upset stock stop in pipe material slippage passage front portion, stock stop is arranged between adjacent two storing supports, and for the bottom is articulated in the turnover bracket of bottom surface mount pad, turnover bracket is realized upset through hydraulic actuating cylinder.
2. store the bin device according to the described pipe material of claim 1, it is characterized in that: said hydraulic actuating cylinder one end is articulated in and turns on the support, and an end is articulated on the Connection Block of ground.
3. store the bin device according to the described pipe material of claim 1, it is characterized in that: the top of said turnover bracket is the inclined-plane.
CN201110158606A 2011-06-14 2011-06-14 Pipe storage rack device Pending CN102320443A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110158606A CN102320443A (en) 2011-06-14 2011-06-14 Pipe storage rack device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110158606A CN102320443A (en) 2011-06-14 2011-06-14 Pipe storage rack device

Publications (1)

Publication Number Publication Date
CN102320443A true CN102320443A (en) 2012-01-18

Family

ID=45448328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110158606A Pending CN102320443A (en) 2011-06-14 2011-06-14 Pipe storage rack device

Country Status (1)

Country Link
CN (1) CN102320443A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105154629A (en) * 2015-07-27 2015-12-16 浙江尚鼎工业炉有限公司 Frame-type storing shelf
CN106743245A (en) * 2016-12-20 2017-05-31 合肥中辰轻工机械有限公司 It is a kind of with the empty bottle pipeline for stablizing overlaying function
CN109205239A (en) * 2018-07-30 2019-01-15 江苏亚奥精密机械有限公司 Automatic pipe cutter feeding device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5552813A (en) * 1978-10-12 1980-04-17 Mitsubishi Heavy Ind Ltd Method and apparatus for unpacking pipe
CN2811061Y (en) * 2005-12-09 2006-08-30 大庆石油管理局 Multifunctional freight wagon
CN201304418Y (en) * 2008-12-11 2009-09-09 中冶东方工程技术有限公司 A reversal stepping cold bed hydraulic synchronization control device
CN201318184Y (en) * 2008-12-19 2009-09-30 程谦 Barrel type hydraulic support
CN201530842U (en) * 2009-09-10 2010-07-21 湖州航达工业炉制造有限公司 Steel bottle output and turnover device of steel bottle quenching and tempering heat treatment production line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5552813A (en) * 1978-10-12 1980-04-17 Mitsubishi Heavy Ind Ltd Method and apparatus for unpacking pipe
CN2811061Y (en) * 2005-12-09 2006-08-30 大庆石油管理局 Multifunctional freight wagon
CN201304418Y (en) * 2008-12-11 2009-09-09 中冶东方工程技术有限公司 A reversal stepping cold bed hydraulic synchronization control device
CN201318184Y (en) * 2008-12-19 2009-09-30 程谦 Barrel type hydraulic support
CN201530842U (en) * 2009-09-10 2010-07-21 湖州航达工业炉制造有限公司 Steel bottle output and turnover device of steel bottle quenching and tempering heat treatment production line

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105154629A (en) * 2015-07-27 2015-12-16 浙江尚鼎工业炉有限公司 Frame-type storing shelf
CN106743245A (en) * 2016-12-20 2017-05-31 合肥中辰轻工机械有限公司 It is a kind of with the empty bottle pipeline for stablizing overlaying function
CN109205239A (en) * 2018-07-30 2019-01-15 江苏亚奥精密机械有限公司 Automatic pipe cutter feeding device

Similar Documents

Publication Publication Date Title
CN102320443A (en) Pipe storage rack device
CN204454430U (en) Hydraulic pressure four post lifting machine
CN101279350B (en) Horizontal type machine for rolling ring of flange
CN201129550Y (en) Pipe support frame
CN202115953U (en) Tube material storing frame device
CN204505298U (en) A kind of transfer robot upper rotary bascule
CN203918339U (en) A kind of hydraulic pressure belt original position turning device
CN202155750U (en) Automatic aligning and clamping device for pipes
CN201220236Y (en) Large-sized roller loader
CN202607506U (en) Shot blasting lifting appliance for production of ring pieces
CN202322203U (en) Steel pipe feeding device
CN201646790U (en) Turnover panel concertina type workpiece loading and transporting vehicle
CN203266041U (en) Device for mounting or dismounting slide shoe bearing bushes
CN203305077U (en) Steel pipe conveying system device
CN202607593U (en) Quick dismounting device of bearing
CN201729179U (en) Oil tank transfer car
CN102506270A (en) Load ground rail structure
CN207524392U (en) A kind of steel pipe discharge mechanism
CN202490857U (en) Steel pipe coiling bracket
CN204842476U (en) Automatic cold pilger mill who packs
CN104164879B (en) A kind of wall base and pattern foundation pit supporting structure remove device
CN204703531U (en) For the slipping-shoe device of Construction of Steel Structure
CN202144433U (en) Pallet lift device
CN203380569U (en) Disassembly device for bearing block of axle suspension bearing box
CN214003938U (en) Drag for steel machine lifter side guiding mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120118