CN102315642B - Environmental impact assessment method of power grid planning scheme - Google Patents

Environmental impact assessment method of power grid planning scheme Download PDF

Info

Publication number
CN102315642B
CN102315642B CN 201110174821 CN201110174821A CN102315642B CN 102315642 B CN102315642 B CN 102315642B CN 201110174821 CN201110174821 CN 201110174821 CN 201110174821 A CN201110174821 A CN 201110174821A CN 102315642 B CN102315642 B CN 102315642B
Authority
CN
China
Prior art keywords
lead
electric field
electric
power grid
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110174821
Other languages
Chinese (zh)
Other versions
CN102315642A (en
Inventor
杨慎全
麻常辉
牛新生
薛万磊
贾善杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201110174821 priority Critical patent/CN102315642B/en
Publication of CN102315642A publication Critical patent/CN102315642A/en
Application granted granted Critical
Publication of CN102315642B publication Critical patent/CN102315642B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses an assessment method of a power grid planning scheme. A powder frequency electric field takes a vertical component of the strength of the electric field with 1.5m away from the ground as an assessment value; a powder frequency magnetic field takes vertical components and horizontal components of the strengths of the magnetic fields on the ground and with a certain distance away from the ground as assessment values; the effective value of a new added line utilizes the utilization ratio of a land resource to evaluate the power grid planning scheme; finally the degree of coordination between each planning line and an urban landscape is predicted for various landscape real pictures in a planning range by utilizing a graph overlay method. According to the assessment method of the power grid planning scheme in the invention, the environmental impact assessment on a power grid plan can be carried out by utilizing the technical indexes above, the influences of a plurality of planning schemes to be selected on ecological environment quality, environment sensitivity points, human body health and the like during implementation can be comprehensively compared, the disadvantages of the power grid planning scheme are identified, a recommended scheme is determined, countermeasures and measures for preventing or reducing the environmental influences are obtained, and the coordination of the power grid plan and the requirements of nature and society is guaranteed.

Description

A kind of method for evaluating environmental effect of Electric Power Network Planning scheme
Technical field
The present invention relates to a kind of method for evaluating environmental effect of Electric Power Network Planning scheme.
Background technology
In the world, a large-scale market-oriented reform is being carried out in electric power system, whether the economy of electric power transmission network is reasonable, and whether fail safe meets the demands, and whether transmission capacity, grid structure reach the most excellent vital interests that all are related to different main market players.Along with China's interconnected network scale enlarges day by day, that " separates the factory and network; surf the Net at a competitive price " and reform progressively gos deep into, the uncertain factor of operation of power networks increases, the Transmission Expansion Planning in Electric work of China also is faced with great challenge, Transmission Expansion Planning in Electric not only will be considered the coordination of economy and reliability, also at electric network security, load adaptability, aspects such as operational flexibility face higher requirement, while is along with the raising of entire society's environmental consciousness, especially along with the raising of electric pressure, people are to transmission line electromagnetic environment along the line, acoustic environment, the ecological balance is more and more paid close attention to, therefore to consider more that environmental problem that Transmission Expansion Planning in Electric brings is to the influence of social production life, how is quantitative each programme of analysis to the satisfaction degree of every requirement? which more can satisfy the demand of electrical network and society in a plurality of mutual competitive schemes? this just need carry out the integrated decision-making analysis to programme by means of the multiattribute comprehensive evaluation theory, and therefore the Transmission Expansion Planning in Electric scheme is carried out Comprehensive Appraisal Study important practical sense.
Along with development of electric power industry, the high voltage power transmission of China, extra high voltage network construction scale constantly enlarge, and each big electrical network of the whole nation is key rack with the 500kV circuit all basically, based on the 220kV circuit, and form the interconnected power system that is mutually related.This is favourable to distributing rationally of nationwide electric power resource, but meanwhile intensive day by day electrical network has also caused people's extensive concern, especially China is populous, load is concentrated, high pressure even extra high voltage network inevitably will enter densely inhabited district, whether project of transmitting and converting electricity can produce adverse effect to health and daily life to the electromagnetic interference that influence and the ultra-high-tension power transmission line of natural, ecologicals such as water source, soil causes, cause that people pay close attention to greatly.Therefore need carry out comprehensive and careful assessment to the influence of environment to project of transmitting and converting electricity in the Electric Power Network Planning stage.
The Fifth Plenary Session of the Sixteenth Central Committee of party proposes, and accelerate to build a resource-conserving and environment-friendly society, and power network development is had higher requirement.The further proposition of State Grid Corporation of China and Southern Power Grid Company will be built " amphitypy " electrical network of " resource-conserving, environmentally friendly ".For a long time; power network development is followed the objective technology of electric power system and economic law; formed with fail safe, reliability and economy is the appraisement system of core; " amphitypy " electrical network then need be on the basis of satisfying conventional fail safe, reliability and economy; strict execution environment influences evaluation system, strengthens the ecological protection to natural resourcess such as water source, soil, forests, takes to reduce the measure of ecological pollution and electromagnetic pollution; satisfy economizing on resources, with the requirement of environment harmonious development.
" the Environmental Impact Assessment Law of the PRC " implemented on September 1st, 2003, and the power planning environmental impact assessment of China is also progressively launching, and estimates emphasis and mainly comprises: electromagnetic radiation environment (comprising: power frequency electric field, power frequency magnetic field, radio interference); The sensitive area acoustic environment; The sensitive area biological environment.Carry out the environmental impact assessment work of Electric Power Network Planning, comprehensively more a plurality of programmes to be selected in implementation process to the influence of eco-environmental quality, environment sensitive point, health etc., the deficiency that identification Electric Power Network Planning scheme exists, and definite suggested design and draw prevention or the countermeasure and the measure that alleviate environmental impact, guarantee that Electric Power Network Planning and nature, social requirement are harmonious.
Summary of the invention
For remedying the deficiencies in the prior art, the invention provides a kind of method for evaluating environmental effect of Electric Power Network Planning scheme.
For achieving the above object, the present invention adopts following technical scheme:
A kind of method for evaluating environmental effect of Electric Power Network Planning scheme, the evaluation procedure of this method is as follows:
1) in transmission line, the size of power frequency electric field that transmission line produces is returned several relevant with phase conductor radical factor with electric pressure, lead distance to the ground, arrangements of conductors mode, circuit, the method of simulation analogy and the method that theoretical calculating combines are adopted in the evaluation of power frequency electric field, according to actual measurement and the just power frequency electric field influence of measurable circuit yet to be built of theoretical result calculated to the close working line of condition;
2) vertical component of the magnetic field intensity of power frequency magnetic field that transmission line produces employing ground surface place and liftoff certain distance and horizontal component are as evaluation amount;
3) adopt land resources utilization efficient to weigh the effective value of newly-increased circuit in the Electric Power Network Planning scheme, its computing formula is:
Figure BDA0000071436040000021
In: n is the number in newly-increased circuit corridor;
4) last, various types of view outdoor scene photos in the planned range are carried out stochastical sampling, choose representational view as the sample material of estimating, to the sample material of choosing, adopt folded figure method to predict the coordination degree of respectively planning circuit and urban look.
Simulation class ratio method is as follows in the described step 1): the ground subpoint with span centre drift sag maximum wire center is the test initial point, along carrying out perpendicular to line direction, the measuring point spacing is 5m, end at order survey 50m place to the subpoint of phase conductor ground, limit, measures the electric field strength vertical component at liftoff 1.5m place.
Theoretical calculation method is as follows in the described step 1): the electric Field Calculation under the transmission line adopts equivalent charge method, it mainly contains two parts and forms, the one, the equivalent electric charge on the unit of account length lead, the 2nd, calculate the electric field by these charge generation, simplified condition in the calculating is: the power frequency alternating electric field is quasi-static electric field, the electric field that power transmission line produces is the parallel plane field, and extra high voltage network often adopts bundle conductor, and the equivalent redius of bundle conductor is:
r eq = R · nr R n
In the formula: the radius of every lead of r-;
The radical of n-bundle conductor;
The geometric radius of R-bundle conductor;
In order to calculate the equivalent electric charge on the lead in the multiple conductor line, list following matrix equation:
U 1 U 2 · · · U n = λ 11 λ 12 · · · λ 1 n λ 21 λ 22 · · · λ 2 n · · · λ n 1 λ n 2 · · · λ nn Q 1 Q 2 · · · Q n
In the formula: the one-column matrix of [U]-each lead voltage to earth;
The n rank square formation that the some potential coefficient of [λ]-each lead is formed, n is the lead number;
The one-column matrix of equivalent electric charge on [Q]-each lead;
After the quantity of electric charge of unit length was obtained, electric field strength was calculated with Gauss theorem, and the electric field strength of any point calculates according to principle of stacking in the space, at (x, electric field strength horizontal component E y) xWith vertical component E yCan be expressed as:
E x = 1 2 πϵ 0 Σ i = 1 m Q i ( x - x i L i 2 - x - x i ( L i ′ ) 2 )
E y = 1 2 πϵ 0 Σ i = 1 m Q i ( y - y i L i 2 - y - y i ( L i ′ ) 2 )
In the formula: x i, y iThe coordinate of-lead i, (i=1,2 ... m); M-lead radical; L i, L ' i-lead i and be mirrored to the distance of calculation level.
Described step 2) vertical component of the magnetic field intensity at power frequency magnetic field employing ground surface place and liftoff 1.5m place and horizontal component are as evaluation amount in, and the magnetic field intensity at space A point place when flowing through electric current I in the lead is:
H = I 2 π h 2 + L 2
In the formula: the current value among the I-lead i;
The h-A point is apart from the vertical height of lead;
The L-A point is apart from the horizontal range of lead.
Beneficial effect: the present invention utilizes the coordination degree of power frequency electric field, power frequency magnetic field, land resources utilization efficient and urban look, carry out the environmental impact assessment work of Electric Power Network Planning, according to above technical indicator comprehensively more a plurality of programmes to be selected in implementation process to the influence of eco-environmental quality, environment sensitive point, health etc., the deficiency that identification Electric Power Network Planning scheme exists, and definite suggested design and draw prevention or the countermeasure and the measure that alleviate environmental impact, guarantee that Electric Power Network Planning and nature, social requirement are harmonious.
Description of drawings
Fig. 1 is for calculating the schematic diagram of the coefficient of potential;
Fig. 2 is garver-6 system original net shelf structure schematic diagram;
Fig. 3 is the grid structure schematic diagram of the feasible programme 1 of garver-6 system;
Fig. 4 is the grid structure schematic diagram of the feasible programme 2 of garver-6 system;
Fig. 5 is the grid structure schematic diagram of the feasible programme 3 of garver-6 system;
Fig. 6 is the grid structure schematic diagram of the feasible programme 4 of garver-6 system;
Fig. 7 is the grid structure schematic diagram of the feasible programme 5 of garver-6 system;
Fig. 8 is the electric field strength that the 50m each point is respectively extended at 1.5 places to both sides apart from ground under the 200kV circuit;
Fig. 9 is the electric field strength that the 50m each point is respectively extended at 1.5 places to both sides apart from ground under the 500kV circuit;
Figure 10 be under the various arrangements of conductors modes during 0.45kA apart from the magnetic field distribution of ground 1.5m place each point.
Embodiment
The invention will be further described below in conjunction with drawings and Examples:
This paper chooses four of power frequency electric field, power frequency magnetic field, land resources utilization efficient and urban look degrees of coordination as the environmental evaluation index according to the Transmission Expansion Planning in Electric circuit to the actual conditions of environmental impact and the complexity of obtaining data.
(1) power frequency electric field
The power frequency electric field of three-phase alternating current transmission line is the coefficient result of three-phase conducting wire electric charge, and the time dependent track of space electric field strength vector is an ellipse.For electric field, the earth can be similar to regards conductor as, perpendicular to the ground substantially in the electric field strength direction of ground surface.Near the square 1.5m, the horizontal component of electric field strength is very little on the ground, the component approximately equal of the maximum of electric field strength and vertical ground.So in environmental impact assessment, adopt the vertical component of liftoff 1.5m place electric field strength as evaluation amount usually.
" 500kV superhigh pressure transmission and transformation engineering electromagnetic radiation environment influences the assessment technique standard " that national environmental protection is promulgated (HJ/T24-1998) recommended temporarily with 4kV/m as residential block power frequency electric field evaluation criterion.
The size of power frequency magnetic field that transmission line produces is returned multiple factors such as number, phase conductor radical with electric pressure, lead distance to the ground, arrangements of conductors mode, circuit relevant, generally can adopt method and the theoretical method that combines of calculating of simulation analogy to the evaluation of power frequency electric field.
A) the simulation analogy is measured
Other that adopts similar project construction scale, electric pressure, stringing pattern, arrangements of conductors moved the actual measurement that transmission line carries out power frequency electric field, is used for this project is built up the prediction of back electromagnetic environment quantitative effect.Method of measurement is: the ground subpoint with the vertical maximum wire center of span centre drift fox is the test initial point, along carrying out perpendicular to line direction, the measuring point spacing is 5m, and end at order survey 50m place to the subpoint of phase conductor ground, limit, measures the electric field strength vertical component at liftoff 1.5m place.
B) theoretical calculating
Electric Field Calculation under the transmission line generally adopts equivalent charge method, and it mainly contains two parts forms, and the one, the equivalent electric charge on the unit of account length lead, the 2nd, calculate the electric field by these charge generation, the simplified condition in the calculating is:
1. because the frequency of power frequency electric field is lower, visual power frequency alternating electric field is quasi-static electric field.
2. looking power transmission line is the straight lead parallel to the ground of endless, and getting the maximum sag minimum point of transmission pressure is the terrain clearance of lead, so the electric field of its generation is the parallel plane field.
3. extra high voltage network often adopts bundle conductor, and the equivalent redius of bundle conductor is:
r eq = R · nr R n - - - ( 1 )
In the formula: the radius of every lead of r-;
The radical of n-bundle conductor;
The geometric radius of R-bundle conductor.
In order to calculate the equivalent electric charge on the lead in the multiple conductor line, can list following matrix equation:
U 1 U 2 · · · U n = λ 11 λ 12 · · · λ 1 n λ 21 λ 22 · · · λ 2 n · · · λ n 1 λ n 2 · · · λ nn Q 1 Q 2 · · · Q n - - - ( 2 )
In the formula: the one-column matrix of [U]-each lead voltage to earth;
The n rank square formation (n is the lead number) that the some potential coefficient of [λ]-each lead is formed;
The one-column matrix of equivalent electric charge on [Q]-each lead.
According to image theory, wherein the calculating of the coefficient of potential can be written as:
λ ii = 1 2 π ϵ 0 ln 2 h i r i - - - ( 3 )
λ ij = 1 2 πϵ 0 ln D ij ′ D ij - - - ( 4 )
Each variable implication as shown in Figure 1 in the formula.
After the quantity of electric charge of unit length was obtained, electric field strength can be calculated with Gauss theorem, and the electric field strength of any point can calculate according to principle of stacking in the space, at (x, electric field strength horizontal component E y) xWith vertical component E yCan be expressed as:
E x = 1 2 πϵ 0 Σ i = 1 m Q i ( x - x i L i 2 - x - x i ( L i ′ ) 2 ) - - - ( 5 )
E y = 1 2 πϵ 0 Σ i = 1 m Q i ( y - y i L i 2 - y - y i ( L i ′ ) 2 ) - - - ( 6 )
In the formula: x i, y iThe coordinate of-lead i (i=1,2 ... m);
M-lead radical;
L i, L ' i-lead i and be mirrored to the distance of calculation level
According to actual measurement and the just power frequency electric field influence of measurable circuit yet to be built of theoretical result calculated to the close working line of condition.
(2) power frequency magnetic field
The power frequency magnetic field of three-phase alternating current transmission line is the coefficient result of three-phase conducting wire electric current, and magnetic flux density vector time dependent track in space also is an ellipse.Under the power frequency condition, the magnetic field of circuit only has electric current to produce, and can directly use Ampere circuit law and calculate the magnetic field that every current in wire produces respectively, again with the result of calculation stack, draws lead magnetic field intensity on every side.
At present, most countries does not propose the power frequency magnetic field standard as yet.China's state environment protecting standard " 500kV superhigh pressure transmission and transformation engineering electromagnetic radiation environment influences the assessment technique standard " is recommended temporarily the evaluation criterion as magnetic flux density with the power frequency limit value 0.1mT of international anti-radiation protection association (ICNIRP) about to the radiation of the public's whole day time.
Identical with the power frequency electric field evaluation method, power frequency magnetic field also normally adopts simulation analogy measurement and theoretical Calculation Method to predict the size of circuit power frequency magnetic field yet to be built.
The magnetic field intensity of transmission line is only relevant with size of current, and and independent from voltage, so the selection of analogy circuit need be considered the current strength factor of circuit.
Current in wire all can theory calculate in the magnetic field intensity of the every some generation in space.In environmental impact assessment, adopt the vertical component of magnetic field intensity at ground surface place and liftoff 1.5m place and horizontal component as evaluation amount usually, the magnetic field intensity at space A point place when flowing through electric current I in the lead is:
H = I 2 π h 2 + L 2 - - - ( 7 )
In the formula: the current value among the I-lead i
The h-A point is apart from the vertical height of lead
The L-A point is apart from the horizontal range of lead
(3) land resources utilization efficient
The Transmission Expansion Planning in Electric engineering can take farmland along the line, forest land and residential building, obviously the scheme that resource occupation is more few is more superior, the transmission line that takies same area simultaneously carries that electric weight is more big to illustrate that then the utilization of this circuit is more abundant, therefore adopt land resources utilization efficient to weigh the effective value of the newly-increased circuit of programme, its computing formula is:
In the formula: n is the number in newly-increased circuit corridor.
Can find out also that from this formula for identical circuit width of corridor, the common-tower double-return circuit can be carried the transmission line capability of single back line twice, therefore, single back line adopts to have environmental benefit preferably with many loop lines of tower road relatively.
(4) urban look degrees of coordination
The urban look degrees of coordination is mainly reflected in the visual impact aspect, and visual impact comprises subjective feeling factors such as vision U.S. and psychological comfort.It is that various types of view outdoor scene photos in the planned range are carried out stochastical sampling that landscape impact is estimated adoptable main method, choose representational view at last as the sample material of estimating, to the sample material of choosing, adopt folded figure method to predict the coordination degree of respectively planning circuit and urban look.Because subjective judgement is depended in this evaluation to a great extent, therefore can adopt Specialist Research method (Delphi) method, this is a kind of method of investigation and study of sending a letter, consulting on to the expert, invite a plurality of experts to estimate according to evaluation objective and evaluation object, with the investigation result statistical disposition, draw evaluation conclusion then.
Embodiment:
This paper adopts the garver-6 system to come, and its original net shelf structure as shown in Figure 2.The grid structure of 5 feasible programmes of this system is respectively shown in Fig. 3~7.
The in-site measurement data of power frequency electric field, power frequency magnetic field are collected relatively difficulty in the environmental index, so only suppose that canonical parameter carries out theory and calculates.The size of power frequency electric field is relevant with voltage swing, and the canonical parameter that adopts is as shown in table 1.
Table 1 Theory of Electromagnetic Field computational scheme parameter
Electric pressure (kV) Wire type Solid conductor radius (mm) Wire diameter (diameter) (mm)
220 2*LGJ-400/35 26.82 400
500 4*LGJ-400/35 26.82 450
Different arrangements of conductors modes varies in size with the electromagnetic field that different distance to the ground produces, the arrangements of conductors mode is got respectively vertically, level, equilateral triangle, four kinds of arrangement modes of del are carried out calculation check, distance to the ground is according to DL/T5092-1999, verification is carried out in " 110~500kV aerial power transmission line designing technique rules " middle residential block minimum safe distance over the ground, this distance refers to the sag minimum point distance to the ground of transmission pressure, and its value is as shown in table 2:
Table 2 residential block lead is to the ground minimum safe distance
Electric pressure (kV) 110 220 330 500
Distance to the ground 7.0 7.5 8.5 14
Write the matlab program, carry out emulation according to aforementioned theoretical calculation method, wherein calculating voltage is got 1.05 times rated voltage, obtains the vertical component of liftoff 1.5m place electric field strength under 220kV and the 500kV line respectively, as Fig. 8 and shown in Figure 9,
" 500kV superhigh pressure transmission and transformation engineering electromagnetic radiation environment influences the assessment technique standard " that national environmental protection is promulgated (HJ/T24-1998) recommended temporarily with 4kV/m as residential block power frequency electric field evaluation criterion; as can be seen from the figure; when distance circuit central point 10m place; electric field strength value under the various situations all meets the demands; but comparatively speaking; the electric field ratio vertical arrangement of the lead of equilateral triangle arrangement and del spread pattern and horizontal electric field strength are low, therefore recommend the arrangements of conductors mode of these two kinds of patterns.All to compose according to the comment value be 1 to each scheme electric field strength in this example, is fine.
Therefore the size of field strength values and current related is got the roll off the production line maximum of road trend of each scheme and is tested, and wire type, arrangement mode, distance to the ground are identical with electric field strength calculating.Each scheme lowest high-current value is respectively: 0.43kA, 0.45kA, 0.42kA, 0.43kA, 0.34kA, maximum current 0.45kA is carried out theory calculate, can get the composite value of horizontal component and vertical component under four kinds of arrangements of conductors modes, as seen from Figure 10,0.45kA following each point magnitude of field intensity is much smaller than limit value 0.1mT, therefore, each scheme magnetic field intensity comment value is fine, and assignment is 1.
According to DL/T5092-1999, " 110~500kV aerial power transmission line designing technique rules ", the distance between power transmission line roadside lead and the building, under max calculation windage yaw situation, should be less than the listed numerical value of table 3.
Minimum range between table 3 limit lead and the building
Figure BDA0000071436040000081
Suppose that distance is 5m between two phase conductors, then the width in circuit corridor is at least 20m under the 220kV, according to the bar number in each programme circuit corridor of ga rver-6 system, sets circuit width of corridor shown in the table 4.
Circuit width of corridor in each programme of table 4garver-6 system
The number of lines 1 2 3 4 5
Width of corridor (m) 20 25 30 35 40
According to the conveying quantity of each bar circuit, carry out the calculating of land resources utilization efficient according to formula (8), calculate each scheme efficiency value successively and be: 10.1667,8.1071,7.8321,8.6071,9.8571.
The urban look degrees of coordination gives comment for well for respectively each scheme at this, and [good, fine], [poor, in], [in, good], in, the comment value is followed successively by 0.75,0.9, and 0.45,0.6,0.5.
It is as shown in table 5 to calculate each evaluation index value more than the foundation.
Each programme desired value of table 5garver-6 example
Figure BDA0000071436040000091

Claims (3)

1. the method for evaluating environmental effect of an Electric Power Network Planning scheme is characterized in that, the evaluation procedure of this method is as follows:
1) in transmission line, the size of power frequency electric field that transmission line produces is returned several relevant with phase conductor radical factor with electric pressure, lead distance to the ground, arrangements of conductors mode, circuit, the method of simulation analogy and the method that theoretical calculating combines are adopted in the evaluation of power frequency electric field, according to actual measurement and the just power frequency electric field influence of measurable circuit yet to be built of theoretical result calculated to the close working line of condition;
Described theoretical calculation method is as follows: the electric Field Calculation under the transmission line adopts equivalent charge method, it mainly contains two parts and forms, the one, the equivalent electric charge on the unit of account length lead, the 2nd, calculate the electric field by these charge generation, simplified condition in the calculating is: the power frequency alternating electric field is quasi-static electric field, the electric field that power transmission line produces is the parallel plane field, and extra high voltage network often adopts bundle conductor, and the equivalent redius of bundle conductor is:
r eq = R · n nr R
In the formula: the radius of r-every lead;
The radical of n-bundle conductor;
The geometric radius of R-bundle conductor;
In order to calculate the equivalent electric charge on the lead in the multiple conductor line, list following matrix equation:
Figure FDA00003222741200012
In the formula: the one-column matrix of [U]-each lead voltage to earth;
The n rank square formation that the some potential coefficient of [λ]-each lead is formed, n is the lead number;
The one-column matrix of equivalent electric charge on [Q]-each lead;
After the quantity of electric charge of unit length was obtained, electric field strength was calculated with Gauss theorem, and the electric field strength of any point calculates according to principle of stacking in the space, at (x, electric field strength horizontal component E y) xWith vertical component E yCan be expressed as:
E x = 1 2 πϵ 0 Σ i = 1 m Q i ( x - x i L i 2 - x - x i ( L i ′ ) 2 )
E y = 1 2 πϵ 0 Σ i = 1 m Q i ( y - y i L i 2 - y - y i ( L i ′ ) 2 )
In the formula: x i, y iThe coordinate of-lead i, (i=1,2 ... m); M-lead radical; L i, L' i-lead i and be mirrored to the distance of calculation level;
2) vertical component of the magnetic field intensity of power frequency magnetic field that transmission line produces employing ground surface place and liftoff certain distance and horizontal component are as evaluation amount;
3) adopt land resources utilization efficient to weigh the effective value of newly-increased circuit in the Electric Power Network Planning scheme, its computing formula is:
Figure FDA00003222741200021
In: n is the number in newly-increased circuit corridor;
4) last, various types of view outdoor scene photos in the planned range are carried out stochastical sampling, choose representational view as the sample material of estimating, to the sample material of choosing, adopt folded figure method to predict the coordination degree of respectively planning circuit and urban look.
2. the method for evaluating environmental effect of a kind of Electric Power Network Planning scheme as claimed in claim 1, it is characterized in that, simulation class ratio method is as follows in the described step 1): the ground subpoint with span centre drift sag maximum wire center is the test initial point, along carrying out perpendicular to line direction, the measuring point spacing is 5m, end at order survey 50m place to the subpoint of phase conductor ground, limit, measures the electric field strength vertical component at liftoff 1.5m place.
3. the method for evaluating environmental effect of a kind of Electric Power Network Planning scheme as claimed in claim 1, it is characterized in that, described step 2) vertical component of the magnetic field intensity at power frequency magnetic field employing ground surface place and liftoff 1.5m place and horizontal component are as evaluation amount in, and the magnetic field intensity at space A point place when flowing through electric current I in the lead is:
H = I 2 π h 2 + L 2
In the formula: the current value among I-lead i;
H-A point is apart from the vertical height of lead;
L-A point is apart from the horizontal range of lead.
CN 201110174821 2011-06-27 2011-06-27 Environmental impact assessment method of power grid planning scheme Active CN102315642B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110174821 CN102315642B (en) 2011-06-27 2011-06-27 Environmental impact assessment method of power grid planning scheme

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110174821 CN102315642B (en) 2011-06-27 2011-06-27 Environmental impact assessment method of power grid planning scheme

Publications (2)

Publication Number Publication Date
CN102315642A CN102315642A (en) 2012-01-11
CN102315642B true CN102315642B (en) 2013-08-07

Family

ID=45428544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110174821 Active CN102315642B (en) 2011-06-27 2011-06-27 Environmental impact assessment method of power grid planning scheme

Country Status (1)

Country Link
CN (1) CN102315642B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102590686B (en) * 2012-03-08 2015-10-28 中国南方电网有限责任公司超高压输电公司检修试验中心 A kind of method for determining radio interference of bipolar direct current transmission line
CN106570789A (en) * 2016-11-09 2017-04-19 国电环境保护研究院 Method for recognizing ecologically sensitive region in power grid planning based on GIS (Geographic Information System)
CN107480319B (en) * 2017-06-21 2021-09-28 中国电力科学研究院 Optimized arrangement method and system for high-voltage direct-current transmission split conductor
CN108009312B (en) * 2017-11-01 2022-12-02 中国电力科学研究院有限公司 Conductor configuration method and system for reducing surface electric field of high-voltage direct-current split conductor
CN109615245A (en) * 2018-12-14 2019-04-12 国网山东省电力公司经济技术研究院 A kind of method of pair of Electric Power Network Planning total evaluation
CN109376967B (en) * 2018-12-14 2021-09-14 国网山东省电力公司经济技术研究院 Method for evaluating environmental protection characteristics of power grid planning
CN114910118B (en) * 2021-11-17 2024-07-05 中国电力科学研究院有限公司 Method and system for observing electromagnetic environment of alternating current transmission line

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930563A (en) * 2010-07-23 2010-12-29 中国电力科学研究院 Block supply-based distribution network planning design method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930563A (en) * 2010-07-23 2010-12-29 中国电力科学研究院 Block supply-based distribution network planning design method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李晓琴.电网规划环境影响评价研究——以山东电网"十一五"规划为例.《中国优秀硕士学位论文全文数据库 工程科技I辑》.中国学术期刊(光盘版)电子杂志社,2008,论文第16-18、43、47-48、50-51页.
电网规划环境影响评价研究——以山东电网"十一五"规划为例;李晓琴;《中国优秀硕士学位论文全文数据库 工程科技I辑》;中国学术期刊(光盘版)电子杂志社;20080915;论文第16-18、43、47-48、50-51页 *

Also Published As

Publication number Publication date
CN102315642A (en) 2012-01-11

Similar Documents

Publication Publication Date Title
CN102315642B (en) Environmental impact assessment method of power grid planning scheme
CN103177395B (en) A kind of intelligent distribution network energy-saving and emission-reduction integrated evaluating method based on social expectation
Babu et al. Multi-objective optimal allocation of electric vehicle charging stations in radial distribution system using teaching learning based optimization
CN103036230A (en) Dynamic equivalence method of alternating-current-direct-current serial-parallel large power system based on engineering application
CN102208807A (en) Medium and low voltage distribution network energy efficiency evaluation method based on accurate load measurement data
CN103984997A (en) Transmission project site and line selecting method based on GIS space information
CN103337864A (en) Dynamic reactive compensation mounting point optimization method for multi-direct-current centralized infeed receiving end power grid
CN103926491A (en) Transformer state evaluation method with influence of direct-current magnetic bias taken into account
CN112487659A (en) Optimal design method and system for offshore wind farm current collection system
CN107462802B (en) State evaluation method for 500kV underground substation grounding system
Xu et al. Robust faulted line identification in power distribution networks via hybrid state estimator
CN104102954B (en) Optimal configuration method of distributed comprehensive energy supply system considering black start function
CN102254091A (en) Method for estimating 20-kilovolt medium-voltage distribution scheme
CN103996147A (en) Comprehensive evaluation method for power distribution network
CN104598725A (en) Evaluation method for power distribution network adaptability of distributed power supply after grid connection
Xia et al. Slope stability analysis based on group decision theory and fuzzy comprehensive evaluation
CN103116812A (en) Novel converting station stationing method
CN104036364A (en) Evaluation method for network structure level of power distribution network
Meng et al. A stochastic multi-objective optimization model for renewable energy structure adjustment management–A case study for the city of Dalian, China
CN106208099A (en) A kind of Method for Reactive Power Optimization in Power based on bi-level programming and application thereof
CN106557618A (en) A kind of transformer station's electric field appraisal procedure
Cao et al. A Review of Data‐Driven Short‐Term Voltage Stability Assessment of Power Systems: Concept, Principle, and Challenges
CN103207953B (en) A kind of determination method planning to build substation site selection line investment contour and application mode
CN107196313A (en) A kind of extra-high-voltage alternating current power network high voltage reactor Optimal Configuration Method
Zhu et al. On-site energy consumption technologies and prosumer marketing for distributed poverty alleviation photovoltaic linked to agricultural loads in china

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121227

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121227

Address after: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Applicant after: SHANDONG ELECTRIC POWER Research Institute

Applicant after: State Grid Corporation of China

Address before: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Applicant before: SHANDONG ELECTRIC POWER Research Institute

C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: Shandong Electric Power Research Institute

Patentee after: State Grid Corporation of China

Address before: 250002, No. 500, South Second Ring Road, Shizhong District, Shandong, Ji'nan

Patentee before: Shandong Electric Power Research Institute

Patentee before: State Grid Corporation of China

CP02 Change in the address of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: SHANDONG ELECTRIC POWER Research Institute

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee before: SHANDONG ELECTRIC POWER Research Institute

Patentee before: State Grid Corporation of China

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20220125

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee before: SHANDONG ELECTRIC POWER Research Institute

Patentee before: STATE GRID CORPORATION OF CHINA

TR01 Transfer of patent right