CN102314573A - Project management system - Google Patents

Project management system Download PDF

Info

Publication number
CN102314573A
CN102314573A CN2010102199596A CN201010219959A CN102314573A CN 102314573 A CN102314573 A CN 102314573A CN 2010102199596 A CN2010102199596 A CN 2010102199596A CN 201010219959 A CN201010219959 A CN 201010219959A CN 102314573 A CN102314573 A CN 102314573A
Authority
CN
China
Prior art keywords
authority
those
system operator
user
client
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102199596A
Other languages
Chinese (zh)
Inventor
黄文吉
刘宏宬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inventec Corp
Original Assignee
Inventec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inventec Corp filed Critical Inventec Corp
Priority to CN2010102199596A priority Critical patent/CN102314573A/en
Publication of CN102314573A publication Critical patent/CN102314573A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a project management system, which comprises a database and a processing module, which are electrically connected with each other. The database is provided with identification data of a plurality of persons, user authorities and files of a plurality of projects. The user authority of each person is one of a plurality of selective authorities, and the selective authorities comprise a system manager authority. When receiving an identification message of a client end from the client end, the processing module inquires the database so as to obtain the user authority of the client end from the database. When the user authority of the client end is the system manager authority and a system manager transferring order is received, the processing module changes the user authority of the client end to a non-system manager authority in the selective authority, and the identification information of the accept system manager in the user authority of the person is modified to the system manager authority.

Description

Project management system
Technical field
The invention relates to a kind of project management system.
Background technology
Project management is the subject of a management branch, is meant special knowledge, technical ability, the tool and method of utilization in project activity, makes project under the limited resources qualifications, realize or to surpass the demand and the expectation of setting.Project management is the integral body to some activities relevant with successfully reaching a series of targets (such as task).This comprises the progress of the activity of planning, schedule and maintenance composition project.In other words, project management be exactly one in the project life cycle, remain to as far as possible minimum subject to the risk of failure.Therefore, in enterprise development now, project management is inseparable with the development of business organization, and effectively project management can be enterprise provides competitive power.
Modern rapidly in computing machine development, project management also be digitized.Wherein, Gantt chart (Gantt chart) is a kind of popular type of bar graph, and the internal relation of the system evolves of display items display, progress and other and time correlation is along with the situation of time progress.Therefore, Gantt chart often is used as the foundation of organizational system numericitem management system.Altered arbitrarily for fear of project management system, generally only have system operator tool authority can compile project management system.Wherein, when system operator joins, need to set in system by former system operator earlier the administration authority of newly appointed system operator, after logining by newly appointed system operator again, the authority of using its administration authority to delete former system operator.Yet before newly appointed system operator is deleted the authority of former system operator, project management system will have the risk that destroyed by former system operator.
Summary of the invention
Therefore; The objective of the invention is is providing a kind of project management system; In order to receiving system operator when instruction handing-over, successor's authority is made as the system operator authority, and will produces system operator and join instruction person's authority and be revised as nonsystematic supvr authority.
To achieve these goals, the present invention provides a kind of project management system, comprises a database and a processing components of mutual electric connection.Database has several personnel's recognition data, user's authority of personnel and the file of several projects, and user's authority of each personnel is one of them of several optional authorities.Wherein, optional authority comprises a system operator authority.Processing components comprises an identifying information receiver module, an authority obtains module, an access module and a system operator module.The identifying information receiver module receives the identifying information of client from a client.Authority obtains the identifying information Query Database of module according to client, obtains user's authority of client with the user's authority from personnel.Access module provides the authority of client access database according to user's authority of client.The system operator module is carried out when user's authority of client is the system operator authority.The system operator module comprises a handing-over command receiver and a system operator phallus.The handing-over command receiver receives system operator handing-over instruction from client.Wherein, system operator handing-over instruction comprises the identifying information of taking over system operator.The system operator phallus is revised as nonsystematic supvr authority person in the optional authority with user's authority of client, and with the corresponding identifying information person who takes over system operator in user's authority of personnel, is revised as the system operator authority.
According to one embodiment of the invention, database also has the rights of using of the file and the above-mentioned functions page of several function pages, and the system operator module also can comprise an authority setting device, in order to the rights of using of the set-up function page.Wherein, its user's authority meets the rights of using person of function pages among the personnel, the authority of the file of the tool access facility page.In one embodiment, optional authority is by high and low ordering one by one, and its user's authority is higher than the rights of using person of function pages among the personnel, is regarded as the rights of using that meet function pages.In another embodiment, the identical person of rights of using of its user's authority and function pages is regarded as the rights of using that meet function pages among the personnel.
According to another embodiment of the present invention, database also has the project maintenance authority, and processing components also comprises a project maintenance module, in order to the file of Maintenance Significant Items.Wherein, its user's authority meets project maintenance authority person among the personnel, the authority of the file of tool Maintenance Significant Items.
According to another embodiment of the present invention, processing components also comprises an enquiry module, in order to when receiving a query statement that comprises a querying condition from client, according to the querying condition Query Database, produces a Query Result that meets querying condition.Wherein, enquiry module can comprise a Gantt chart generator, in order to produce a Gantt chart of corresponding Query Result.
According to another embodiment of the present invention, project management system also comprises a network card that electrically connects processing components, in order to connect with a network.Wherein, project management system connects through network and client.
According to another embodiment of the present invention, the system operator module also comprises a project and increases and repair device, in order to increase the file of repairing the project that is stored in database.
Can know by the invention described above embodiment, use the present invention and have advantage.Project management system is being received system operator when instruction handing-over, and user's authority of client is revised as nonsystematic supvr authority, need not wait until and take over the authority that system operator is revised former system operator.Thus, the authority of former system operator is not just had an authority of system operator after handing-over, thereby can avoid joining before the former system operator in back do not delete its authority as yet the risk that project management system is destroyed by former system operator.
Description of drawings
For letting above and other objects of the present invention, characteristic, advantage and the embodiment can be more obviously understandable, the explanation of appended accompanying drawing be following:
Fig. 1 illustrates the functional block diagram according to a kind of project management system of an embodiment of the present invention.
[primary clustering symbol description]
100: project management system 127: the authority setting device
110: database 128: project increases repaiies device
120: processing components 129: the project maintenance module
121: identifying information receiver module 130: enquiry module
122: authority obtains module 131: the Gantt chart generator
123: access module 140: network card
124: system operator module 200: network
125: handing-over command receiver 300: client
126: the system operator phallus
Embodiment
Below will clearly demonstrate spirit of the present invention with accompanying drawing and detailed description; Has common knowledge the knowledgeable under any in the technical field after understanding preferred embodiment of the present invention; When can be by the technology of teachings of the present invention, change and modification, it does not break away from spirit of the present invention and scope.
Please with reference to Fig. 1, it illustrates the functional block diagram according to a kind of project management system of an embodiment of the present invention.Project management system 100 is being received system operator when instruction handing-over, and successor's authority is made as the system operator authority, and will produce system operator and join instruction person's authority and be revised as nonsystematic supvr authority.
Project management system 100 comprises a database 110 and a processing components 120 of mutual electric connection.Database 110 has several personnel's recognition data, user's authority of each personnel and the file of several projects.User's authority of each personnel is one of them of several optional authorities, and optional authority comprises a system operator authority at least.In addition, in one embodiment of this invention, optional authority still can comprise manager, product manager (Product Manager, PM), the person in charge, sector member or other academic title.Yet in other embodiments, available other authority naming method is not limited to present embodiment as optional authority.
Processing components 120 comprises an identifying information receiver module 121, an authority obtains module 122, an access module 123 and a system operator module 124.Identifying information receiver module 121 receives the identifying information of client 300 from a client 300.Wherein, project management system 100 can comprise a network card 140 that electrically connects with processing components 120, connects with client 300 in order to see through the network 200 that it connected.Thus, identifying information receiver module 121 can see through network 200, receives its identifying information from client 300.
Authority obtains the identifying information Query Database 110 of module 122 according to client 300, with user's authority of the personnel that are stored in database 110 certainly, obtains user's authority of client 300.Access module 123 provides the authority of client 300 access databases 110 according to user's authority of client 300.
System operator module 124 is carried out when user's authority of client 300 is the system operator authority.In project management system 100, system operator can directly be joined by old system operator gives newly appointed system operator, so system operator module 124 comprises a handing-over command receiver 125 and a system operator phallus.Handing-over command receiver 125 receives system operator handing-over instruction from client 300.Wherein, system operator handing-over instruction comprises the identifying information of taking over system operator.System operator phallus 126 is revised as nonsystematic supvr authority person in the optional authority with user's authority of client 300, and with the corresponding identifying information person who takes over system operator in user's authority of personnel, is revised as the system operator authority.Thus, project management system 100 is being received system operator when instruction handing-over, and user's authority of client 300 is revised as nonsystematic supvr authority, need not wait until and take over the authority that system operator is revised former system operator.So the authority of former system operator is not just had an authority of system operator after handing-over, before the former system operator in back of avoiding joining is not deleted its authority as yet, the risk that project management system 100 is destroyed by former system operator.
In addition, database 110 also can have the rights of using of the file and the above-mentioned functions page of several function pages.Therefore, system operator module 124 also can comprise an authority setting device 127, in order to the rights of using of the set-up function page.Wherein, user's authority meets the personnel of the rights of using of function pages, the authority of the file of the tool access facility page.In one embodiment, optional authority is by high and low ordering one by one, and user's authority is higher than the personnel of the rights of using of function pages, is regarded as the rights of using that meet function pages.In another embodiment, the personnel that user's authority is identical with the rights of using of function pages are regarded as the rights of using that meet function pages.In addition, can set a field in addition, the rights of using that meet function pages in order to record are meant personnel's what person who is higher than or is same as the rights of using of function pages.
In addition, database 110 also can have the authority of safeguarding of projects, and processing components 120 also comprises a project maintenance module 129.Project maintenance module 129 is safeguarded the file of projects.Wherein, its user's authority meets project maintenance authority person (as be higher than or be same as project maintenance authority person), the authority of the file of tool Maintenance Significant Items among the personnel.In addition, the system operator module can comprise a project and increase and repair device 128, in order to increase the file of repairing the project that is stored in database 110.
Project management system 100 can have the inquiry function.Therefore, processing components 120 can comprise an enquiry module 130.Enquiry module 130 according to querying condition Query Database 110, produces a Query Result that meets querying condition when receiving a query statement that comprises a querying condition from client 300.Wherein, Query Result can be represented with Gantt chart.Therefore, enquiry module 130 can comprise a Gantt chart generator 131, in order to produce a Gantt chart of corresponding Query Result.
Can know by the invention described above embodiment, use the present invention and have advantage.Project management system is being received system operator when instruction handing-over, and user's authority of client is revised as nonsystematic supvr authority, need not wait until and take over the authority that system operator is revised former system operator.Thus, the authority of former system operator is not just had an authority of system operator after handing-over, thereby can avoid joining before the former system operator in back do not delete its authority as yet the risk that project management system is destroyed by former system operator.
Though the present invention discloses as above with embodiment; Right its is not in order to limit the present invention; Anyly be familiar with this art; Do not breaking away from the spirit and scope of the present invention, when can doing various changes and retouching, so protection scope of the present invention is as the criterion when looking the scope that appending claims defines.

Claims (9)

1. a project management system is characterized in that, comprises:
One database has a plurality of personnel's recognition data, user's authority of those personnel and the file of a plurality of projects, and user's authority of each those personnel is one of them of a plurality of optional authorities, and those optional authorities comprise a system operator authority; And
One processing components electrically connects this database, and this processing components comprises:
One identifying information receiver module is from the identifying information of this client of client reception;
One authority obtains module, according to this database of identifying information inquiry of this client, obtains user's authority of this client with the user's authority from those personnel;
One access module according to user's authority of this client, provides the authority of this this database of client access; And
One system operator module is carried out when user's authority of this client is this system operator authority, and this system operator module comprises:
One handing-over command receiver, this client receives system operator handing-over instruction certainly, and wherein this system operator handing-over instruction comprises the identifying information of taking over system operator; And
One system operator phallus; User's authority of this client is revised as non-this system operator authority person in those optional authorities; And with in user's authority of those personnel to taking over the identifying information person of system operator, be revised as this system operator authority.
2. project management system according to claim 1 is characterized in that, this database also has the rights of using of file and those function pages of a plurality of function pages, and this system operator module also comprises:
One authority setting device is set the rights of using of those function pages, and wherein its user's authority meets the rights of using person of those function pages, the authority of the file of those function pages of tool access among those personnel.
3. project management system according to claim 2; It is characterized in that; Those optional authorities are by high and low ordering one by one, and its user's authority is higher than the rights of using person of those function pages among those personnel, is regarded as the rights of using that meet those function pages.
4. project management system according to claim 2 is characterized in that, the identical person of rights of using of its user's authority and those function pages is regarded as the rights of using that meet those function pages among those personnel.
5. project management system according to claim 1 is characterized in that, this database also has those project maintenance authorities, and this processing components also comprises:
One project maintenance module is safeguarded the file of those projects, and wherein its user's authority meets those project maintenance authority person among those personnel, and tool is safeguarded the authority of the file of those projects.
6. project management system according to claim 1 is characterized in that, this processing components also comprises:
One enquiry module when this client is received a query statement that comprises a querying condition certainly, according to this this database of querying condition inquiry, produces a Query Result that meets this querying condition.
7. project management system according to claim 6 is characterized in that, this enquiry module comprises:
One Gantt chart generator produces a Gantt chart that should Query Result.
8. project management system according to claim 1 is characterized in that, also comprises:
One network card electrically connects this processing components, connects with a network, and wherein this project management system connects through this network and this client.
9. project management system according to claim 1 is characterized in that, this system operator module also comprises:
One project increases repaiies device, increases the file of repairing those projects that are stored in this database.
CN2010102199596A 2010-07-01 2010-07-01 Project management system Pending CN102314573A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102199596A CN102314573A (en) 2010-07-01 2010-07-01 Project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102199596A CN102314573A (en) 2010-07-01 2010-07-01 Project management system

Publications (1)

Publication Number Publication Date
CN102314573A true CN102314573A (en) 2012-01-11

Family

ID=45427731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102199596A Pending CN102314573A (en) 2010-07-01 2010-07-01 Project management system

Country Status (1)

Country Link
CN (1) CN102314573A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104102967A (en) * 2013-04-15 2014-10-15 苏州苏恒网络科技有限公司 Project management system
CN109871705A (en) * 2017-12-01 2019-06-11 中国移动通信集团广东有限公司 A kind of database update method and system
CN113343302A (en) * 2021-06-22 2021-09-03 深圳壹账通智能科技有限公司 Project file management method and device, electronic equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030093472A1 (en) * 2001-10-31 2003-05-15 Warren R. Paul Project management system and method
CN1881245A (en) * 2005-06-14 2006-12-20 Nec液晶技术株式会社 Document management system, client terminal, server, client program and server program
CN101556663A (en) * 2009-01-22 2009-10-14 上海冠信电子系统有限公司 Project design process management system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030093472A1 (en) * 2001-10-31 2003-05-15 Warren R. Paul Project management system and method
CN1881245A (en) * 2005-06-14 2006-12-20 Nec液晶技术株式会社 Document management system, client terminal, server, client program and server program
CN101556663A (en) * 2009-01-22 2009-10-14 上海冠信电子系统有限公司 Project design process management system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104102967A (en) * 2013-04-15 2014-10-15 苏州苏恒网络科技有限公司 Project management system
CN109871705A (en) * 2017-12-01 2019-06-11 中国移动通信集团广东有限公司 A kind of database update method and system
CN113343302A (en) * 2021-06-22 2021-09-03 深圳壹账通智能科技有限公司 Project file management method and device, electronic equipment and storage medium
WO2022267178A1 (en) * 2021-06-22 2022-12-29 深圳壹账通智能科技有限公司 Project file management method and apparatus, electronic device, and storage medium

Similar Documents

Publication Publication Date Title
CN106155812A (en) Method, device, system and the electronic equipment of a kind of resource management to fictitious host computer
CN110838065A (en) Transaction data processing method and device
CN104573611A (en) Distributed face recognition trunking system
CN111538757B (en) Data storage method, query method, device, server and medium
CN102375837A (en) Data acquiring system and method
CN109740129B (en) Report generation method, device and equipment based on blockchain and readable storage medium
CN109271410A (en) Extracting method, device and the computer readable storage medium of bank receipt
CN111240862A (en) Universal interface platform and data conversion method
CN105139103A (en) Method and apparatus for controlling process circulation of project management and terminal device
CN111429121A (en) Block chain-based electronic ticket processing method, device, equipment and storage medium
CN108280754A (en) A kind of routing sub-control account checking method and system
CN102314573A (en) Project management system
CN114092287A (en) Intellectual property management system and method based on block chain
US8069180B1 (en) Systems and methods for automated employee resource delivery
US8042160B1 (en) Identity management for application access
CN111614638A (en) Face recognition data distribution system and method based on big data platform
CN111401861A (en) Office automation OA intelligent office management system
KR20200092590A (en) Real-time Intermediary System Between Work Seeking Driver And Driver Seeking Firm
CN105243161A (en) Information inquiry system and method
CN103237095B (en) A kind of information processor, system and method
CN110457539A (en) List data processing method, device, electric terminal and storage medium
CN111045983B (en) Nuclear power station electronic file management method, device, terminal equipment and medium
CN108197179A (en) Facility information querying method and terminal device
CN104094268A (en) System and method for licensing a plurality of software components
CN110766555A (en) Information acquisition system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120111