CN102312423A - Conjoined plastic net sand stabilization fence and sand stabilization construction method thereof - Google Patents

Conjoined plastic net sand stabilization fence and sand stabilization construction method thereof Download PDF

Info

Publication number
CN102312423A
CN102312423A CN201110190112A CN201110190112A CN102312423A CN 102312423 A CN102312423 A CN 102312423A CN 201110190112 A CN201110190112 A CN 201110190112A CN 201110190112 A CN201110190112 A CN 201110190112A CN 102312423 A CN102312423 A CN 102312423A
Authority
CN
China
Prior art keywords
sand
fence
plastic wire
sand stabilization
fixes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110190112A
Other languages
Chinese (zh)
Inventor
娄志平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110190112A priority Critical patent/CN102312423A/en
Publication of CN102312423A publication Critical patent/CN102312423A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The invention aims at providing a conjoined plastic net sand stabilization fence and a sand stabilization construction method thereof, wherein the conjoined plastic net sand stabilization fence has the advantages that the structure is simple, the manufacturing cost is low and the finished product fence can be directly manufactured in a factory, belonging to the technical field of sand control engineering. The porosity of a sand stabilization plastic nets which form the conjoined plastic net sand stabilization fence is optional within a range of 45 percent to 55 percent, the broad width is optional with a range of 15cm to 25cm, and 5cm-deep cracks are cut on the bottom side of the sand stabilization plastic nets at intervals of 25cm to form a sand pressing net with width being 25cm and depth being 5cm. The conjoined plastic net sand stabilization fence consists of a plurality of sand stabilization plastic nets which are arranged at intervals of 1m, are intersected longitudinally, transversely, perpendicularly and crossly and are scarf-jointed through the cut cracks. On the desert construction site, the conjoined plastic net sand stabilization fence is spread and tightened, bamboo and wood strips on the sand stabilization plastic nets are kept to be perpendicular to the desert, then sand is shoveled towards surrounding sand stabilization plastic nets from the center of each sand stabilization fence by using a tool to bury the sand stabilization fence to more than half of the height of the sand stabilization fence, and finally sand stabilization plants are planted in low positions of the center of the plastic net sand stabilization fence.

Description

The disjunctor plastic wire fixes the sand fence and fix the sand job practices
Technical field
The present invention relates to the sand control engineering technical field, be specially a kind of disjunctor plastic wire and fix the sand fence and fix the sand job practices.
Background technology
At present, being used for the fixing plastic wire fence that recovers with desert ecological in desert, is the plastic wire with width 20cm to 25cm; On the desert every at a distance from 1 meter have in the middle of processing with bamboo and wood a slit, being assembled into the length of side to plastic wire is 1 meter square pattern grid fence, such grid fence comes the support fixation fence with the bamboo and wood stake entirely; On the desert, assembling wastes time and energy; Because desert surface is uneven, during construction, be easy to the built on stilts space that forms between plastic wire base and the desert; This space is washed in a pan empty easily by the wind erosion, make the fence lodging.
Summary of the invention
The technical problem that the present invention will solve and the technical assignment of proposition are to overcome existing plastic wire to fix the sand the technological deficiency of fence; Aim to provide a kind of simple in structure; Plastic wire cheap, that can directly in factory, be processed into finished product fixes the sand fence, can save plastic wire like this and fix the sand the cost that fence constructs on the desert, and can stop to form the space between plastic wire base and the desert; Prevent to fix the sand fence lodging, improve plastic wire and fix the sand the sand-fixing effect of fence.
The present invention adopts following technical scheme for this reason: constitute the disjunctor plastic wire and fix the sand the degree of porosity of plastic wire of fence and can between 45% to 55%, select; Wide cut can be selected between 15cm to 25cm; Fix the sand the 25cm crack of isolating one degree of depth 5cm at interval, base of plastic wire, constitute the husky net of pressure of width 25cm degree of depth 5cm.It is by many 1m at interval that the disjunctor plastic wire fixes the sand fence; The plastic wire that fixes the sand vertical, the horizontal across that intersects vertically constitutes through the crack interlocking of severing; A diameter is between 1cm to 2cm; The bamboo and wood bar of length between 10cm to 20cm is fixed on and fixes the sand right-angled intersection place of plastic wire, tightens to fix the sand plastic wire.In the job site, desert; Fix the sand fence to the disjunctor plastic wire and spread out and tighten, make the bamboo and wood bar that fixes the sand on the plastic wire vertical, make and press husky net pasting the desert and fixing the sand plastic wire and bend to the L font with the desert; Then from each fix the sand fence the centre with instrument to four limits to fix the sand the plastic wire shovel husky; Sand drift is buried to fixing the sand boom net height over half, and plastic wire fixes the sand fence and just has been fixed on the desert by husky pile things on, then sand-fixation plant on plastic wire fixes the sand the pocket plantation at fence center.
Description of drawings
Fig. 1 looks sketch map for disjunctor plastic wire of the present invention fixes the sand the horizontal plastics host that fixes the sand of fence.
Fig. 2 fixes the sand the plastics host longitudinally and looks sketch map for disjunctor plastic wire of the present invention fixes the sand fence.
Fig. 3 fixes the sand the job practices vertical view for disjunctor plastic wire fence of the present invention on the desert.
In the accompanying drawing, 1 is the horizontal plastic wire that fixes the sand, and 2 for fix the sand plastic wire longitudinally; 3 for laterally fixing the sand plastic wire from the crack that the top margin of net is severed vertically downward, and 4 for vertically fixing the sand the crack that plastic wire severs from the base of net vertically upward, and 5 are vertical, the horizontal husky net of pressure that fixes the sand the plastic wire base; 6 for pressing the crack between the husky net, and 7 is the bamboo and wood bar, and 8 fix the sand fence for the disjunctor plastic wire; 9 are fixing the sand the sand of plastic wire both sides for pile things on, 10 sand-fixation plants that go down for plantation.
The specific embodiment
Combine accompanying drawing that the present invention is further described: to constitute the disjunctor plastic wire and fix the sand the degree of porosity of plastic wire of fence 8 and can between 45% to 55%, select at present; Wide cut can be selected between 15cm to 25cm; Fix the sand the 25cm crack 6 of isolating one degree of depth 5cm at interval, base of plastic wire, constitute the husky net 5 of pressure of width 25cm degree of depth 5cm.It is by many 1m at interval that the disjunctor plastic wire fixes the sand fence 8; The plastic wire that fixes the sand vertical, the horizontal across that intersects vertically constitutes through the crack interlocking of severing; The horizontal plastic wire 1 interval 1m that fixes the sand cuts crack 3 one vertically downward from the top margin of netting, and the degree of depth in crack 3 is 1/2nd of plastic wire 1 wide cuts; Fix the sand longitudinally plastic wire 2 at interval 1m cut crack 4 vertically upward one from the base of net, the degree of depth in crack is 1/2nd of plastic wire 2 wide cuts, many horizontal plastic wire 1 1m at interval that fix the sand, crack 3 is fitly horizontal up; Many are fixed the sand plastic wire 2 1m at interval longitudinally; Fitly horizontally and with crack horizontal plastic wire crack 3 intercalations up of fixing the sand of 4 alignings go down down in crack 4; Plastic wire top margin until vertical and horizontal flushes, and intersects the grid of decussation, then crack of isolating 3 and crack 4 is sewed up again; Sew up when finishing at each decussation place a diameter between the 1cm to 2cm; The bamboo and wood bar of length between 10cm to 20cm is fixed on and fixes the sand any side of right-angled intersection place of plastic wire, tightens to fix the sand plastic wire, and the disjunctor plastic wire fixes the sand fence 8 completion of processing.
The disjunctor plastic wire fixes the sand the job practices of fence; It is characterized in that: in the job site, desert; Fix the sand fence 8 to the disjunctor plastic wire and spread out and tighten, make the bamboo and wood bar that fixes the sand on the plastic wire vertical, make and press husky net 5 pasting the desert and fixing the sand plastic wire and bend to the L font with the desert; Then fix the sand the centre of fence and fix the sand plastic wire shovel husky 9 to four limits with instrument from each; Husky 9 heaps are buried to fixing the sand plastic wire height over half, and plastic wire fixes the sand fence 8 and just has been fixed on the desert by husky pile things on, fixes the sand the pocket of fence space center at each plastic wire then and plants sand-fixation plant 10.
Disjunctor plastic wire of the present invention fixes the sand fence can be in factory mass production.

Claims (3)

1. a disjunctor plastic wire fixes the sand fence; It is characterized in that: constitute the disjunctor plastic wire and fix the sand the degree of porosity of plastic wire of fence (8) and can between 45% to 55%, select; Wide cut can be selected between 15cm to 25cm; Fix the sand the 25cm crack (6) of isolating one degree of depth 5cm at interval, base of plastic wire, constitute the husky net (5) of pressure of width 25cm degree of depth 5cm.
2. a kind of disjunctor plastic wire according to claim 1 fixes the sand fence; It is characterized in that: it is by many 1m at interval that the disjunctor plastic wire fixes the sand fence (8); The plastic wire that fixes the sand vertical, the horizontal across that intersects vertically constitutes through the crack interlocking of severing; In each right-angled intersection place a diameter between the 1cm to 2cm, the bamboo and wood bar (7) of length between 10cm to 20cm is fixed on and fixes the sand any side of right-angled intersection place of plastic wire, tightens to fix the sand plastic wire.
3. the disjunctor plastic wire fixes the sand the job practices of fence; It is characterized in that: in the job site, desert; Fixing the sand fence (8) to the disjunctor plastic wire spreads out and tightens; Make the bamboo and wood bar (7) that fixes the sand on the plastic wire vertical, make and press husky net (5) pasting the desert and fixing the sand plastic wire and bend to the L font, then fix the sand the centre of fence and fix the sand plastic wire shovel husky (9) to four limits with instrument from each with the desert; Sand (9) heap is buried to fixing the sand plastic wire height over half, then sand-fixation plant (10) on each plastic wire fixes the sand the pocket plantation at fence center.
CN201110190112A 2011-06-27 2011-06-27 Conjoined plastic net sand stabilization fence and sand stabilization construction method thereof Pending CN102312423A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110190112A CN102312423A (en) 2011-06-27 2011-06-27 Conjoined plastic net sand stabilization fence and sand stabilization construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110190112A CN102312423A (en) 2011-06-27 2011-06-27 Conjoined plastic net sand stabilization fence and sand stabilization construction method thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN2011102901460A Division CN102418335A (en) 2011-06-27 2011-06-27 Integrated plastic mesh sand fixation fence and sand fixation construction method thereof

Publications (1)

Publication Number Publication Date
CN102312423A true CN102312423A (en) 2012-01-11

Family

ID=45425961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110190112A Pending CN102312423A (en) 2011-06-27 2011-06-27 Conjoined plastic net sand stabilization fence and sand stabilization construction method thereof

Country Status (1)

Country Link
CN (1) CN102312423A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010096241A (en) * 2000-04-18 2001-11-07 김윤 Textile geogrid
CN1526885A (en) * 2003-03-06 2004-09-08 中国科学院寒区旱区环境与工程研究所 Honeycomb sand-binding plastic braid net
CN2659958Y (en) * 2003-12-16 2004-12-01 中国科学院寒区旱区环境与工程研究所 Sand-fixation protective screen using rough straw paper honeycomb plates
CN1641110A (en) * 2004-01-18 2005-07-20 中国科学院寒区旱区环境与工程研究所 Coarse paper honeycomb plate sand-protecting barrier and its use for preventing sand harm
KR100736120B1 (en) * 2006-02-15 2007-07-06 (주)내경엔지니어링 Moisture preservation type net type vegetation block and the construction method of this

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010096241A (en) * 2000-04-18 2001-11-07 김윤 Textile geogrid
CN1526885A (en) * 2003-03-06 2004-09-08 中国科学院寒区旱区环境与工程研究所 Honeycomb sand-binding plastic braid net
CN2659958Y (en) * 2003-12-16 2004-12-01 中国科学院寒区旱区环境与工程研究所 Sand-fixation protective screen using rough straw paper honeycomb plates
CN1641110A (en) * 2004-01-18 2005-07-20 中国科学院寒区旱区环境与工程研究所 Coarse paper honeycomb plate sand-protecting barrier and its use for preventing sand harm
KR100736120B1 (en) * 2006-02-15 2007-07-06 (주)내경엔지니어링 Moisture preservation type net type vegetation block and the construction method of this

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马全林等: "塑料方格沙障的固沙原理及其推广应用前景", 《水土保持学报》, vol. 19, no. 01, 28 February 2005 (2005-02-28), pages 37 *

Similar Documents

Publication Publication Date Title
CN206956660U (en) A kind of lattice guest gabion box ecological revetment
CN204305674U (en) Anchor pole grid is utilized to carry out shale side slope plantation greening structure
CN101881028B (en) Construction method of raft foundation
CN102691306B (en) Environment-friendly and energy-saving slope protection bamboo-wood lattice beam for mountain highway
CN201794080U (en) Greening slope protection network
CN204199304U (en) Ecological revetment
CN201722679U (en) Geotechnical grid for slope plant restoration and greening
JP5695452B2 (en) Construction method of greening retaining wall
CN102011408B (en) Wire pole base embedded in pit
CN102704499B (en) Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams
CN105544567B (en) A kind of civil engineering structure of the full slope greening engineering method of steep rocky slope
CN102312423A (en) Conjoined plastic net sand stabilization fence and sand stabilization construction method thereof
CN202202315U (en) Connected plastic net sand solidification barrier and sand solidification construction structure thereof
JP5513067B2 (en) Civil construction block, method for producing civil construction block, and civil construction
CN202175943U (en) Connected plastic net sand solidification barrier
CN102313682A (en) Simulator of grassland vegetation coverage and simulation method thereof
CN202208913U (en) Miscellaneous tree sand stabilization fence and structure for constructing grid sand stabilization fence
CN204139178U (en) Plant raw eco-concrete earth-covering greening protective slope structure for one kind
CN202689010U (en) Novel ecological slope greening protection beam with bamboo ladder lattice
CN202644546U (en) Staggered joint bamboo ladder grid beam for ecological protection of side slope
CN206328749U (en) Concrete stake
CN205205854U (en) Building block of assembled ecological retaining wall
CN212506316U (en) Highway side slope plant matter protective structure
CN202323918U (en) Conjoined plastic net sand fixing fence and sand fixing construction structure thereof
KR200306388Y1 (en) Van Block

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120111