CN102312410A - 900吨架桥机隧道口近距离架设的施工方法 - Google Patents
900吨架桥机隧道口近距离架设的施工方法 Download PDFInfo
- Publication number
- CN102312410A CN102312410A CN201110199906A CN201110199906A CN102312410A CN 102312410 A CN102312410 A CN 102312410A CN 201110199906 A CN201110199906 A CN 201110199906A CN 201110199906 A CN201110199906 A CN 201110199906A CN 102312410 A CN102312410 A CN 102312410A
- Authority
- CN
- China
- Prior art keywords
- bridge girder
- supporting leg
- bridge formation
- front leg
- erection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明具体为一种900吨架桥机隧道口近距离架设的施工方法,解决了现有隧道口架设900吨架桥机没有足够施工场地的问题。采用如下步骤:a、将900吨架桥机后支腿、前支腿、前支腿斜撑以及C型腿折叠;b、缩短前走行支腿和C型腿后移动;c、下导梁移动一次过孔到位后支立其前腿;d、架桥机移动至前支腿到达桥台位置时,直立前支腿斜撑;e、架桥机继续移动,直立架桥机前支腿;f、900吨架桥机至架梁高度;g、架桥机移动至架梁位置后,安装好架桥机前支腿斜撑并支立其前支腿;h、C型腿恢复架梁状态后,下导梁二次过孔到位进行箱梁架设。本发明只需要有7.5米以上的施工场地就可以用进行架设箱梁,减少了对场地的要求,而且节省成本的同时提高了施工效率。
Description
技术领域
本发明涉及桥梁工程中混凝土箱梁架设的施工方法,具体为一种900吨架桥机隧道口近距离架设的施工方法。
背景技术
在以往的900吨混凝土箱梁的架设过程中,900吨架桥机都是在支立好架桥机的状态下过孔架梁的,而这种状态下架梁,必须要求有足够的施工场地(50-60米的空旷场地),而隧道口近距离(即场地小于50米)900吨混凝土箱梁的架设不具备这样的条件。
发明内容
本发明为了解决现有隧道口架设900吨架桥机没有足够施工场地的问题,提供了一种900吨架桥机隧道口近距离架设的施工方法。
本发明是采用如下技术方案实现的:900吨架桥机隧道口近距离架设的施工方法,采用如下步骤:a、将900吨架桥机后支腿、前支腿、前支腿斜撑以及C型腿折叠并拆除前支腿的加长节;b、缩短前走行支腿和C型腿后,下导梁和架桥机向隧道移动;c、下导梁移动一次过孔到位后支立其前腿;d、架桥机移动至其前支腿刚穿过隧道位于桥台位置时,连接其前支腿加长节并直立前支腿斜撑;e、架桥机继续移动至其前走行支腿与下导梁前腿位于同一位置时,直立架桥机前支腿;f、伸长C型腿和前走行支腿使900吨架桥机至架梁高度;g、架桥机移动至架梁位置后,安装好架桥机前支腿斜撑并支立其前支腿;h、C型腿恢复架梁状态后,下导梁二次过孔到位进行箱梁架设。通过将900吨架桥机降低爬行通过隧道进行架设,能够安全高效的完成在隧道口近距离内进行900吨混凝土箱梁的架设任务。
本发明通过巧妙地构思,解决了现有隧道口架设900吨架桥机没有足够施工场地的问题,只需要有7.5米以上的施工场地就可以用进行架设箱梁,减少了对场地的要求,而且节省成本的同时提高了施工效率。
附图说明
图1为本发明的结构示意图。
图中:1-后支腿,2-前支腿,3-前支腿斜撑,4-C型腿,5-前走行支腿,6-下导梁,7-前腿。
具体实施方式
900吨架桥机隧道口近距离架设的施工方法,采用如下步骤:a、将900吨架桥机后支腿1、前支腿2、前支腿斜撑3以及C型腿4折叠并拆除前支腿2的加长节,使其满足低位爬行要求;b、缩短前走行支腿5和C型腿4后,下导梁6和架桥机向隧道移动,下导梁6通过前托辊和后托辊的来回行走实现移动,架桥机通过C型腿4驱动前走行支腿5随动实现移动;c、下导梁6移动一次过孔到位后支立其前腿7;d、架桥机移动至其前支腿2刚穿过隧道位于桥台位置时,连接其前支腿2加长节并直立前支腿斜撑3;e、架桥机继续移动至其前走行支腿5与下导梁6前腿位于同一位置时,直立架桥机前支腿2;f、伸长C型腿4和前走行支腿5使900吨架桥机至架梁高度;g、架桥机移动至架梁位置后,安装好架桥机前支腿斜撑3并支立其前支腿2;h、C型腿4恢复架梁状态后,下导梁6二次过孔到位进行箱梁架设。
Claims (1)
1.一种900吨架桥机隧道口近距离架设的施工方法,其特征在于:采用如下步骤:a、将900吨架桥机后支腿(1)、前支腿(2)、前支腿斜撑(3)以及C型腿(4)折叠并拆除前支腿(2)的加长节;b、缩短前走行支腿(5)和C型腿(4)后,下导梁(6)和架桥机向隧道移动;c、下导梁(6)移动一次过孔到位后支立其前腿(7);d、架桥机移动至其前支腿(2)刚穿过隧道位于桥台位置时,连接其前支腿(2)加长节并直立前支腿斜撑(3);e、架桥机继续移动至其前走行支腿(5)与下导梁(6)前腿位于同一位置时,直立架桥机前支腿(2);f、伸长C型腿(4)和前走行支腿(5)使900吨架桥机至架梁高度;g、架桥机移动至架梁位置后,安装好架桥机前支腿斜撑(3)并支立其前支腿(2);h、C型腿(4)恢复架梁状态后,下导梁(6)二次过孔到位进行箱梁架设。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110199906A CN102312410A (zh) | 2011-07-18 | 2011-07-18 | 900吨架桥机隧道口近距离架设的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110199906A CN102312410A (zh) | 2011-07-18 | 2011-07-18 | 900吨架桥机隧道口近距离架设的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102312410A true CN102312410A (zh) | 2012-01-11 |
Family
ID=45425947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110199906A Pending CN102312410A (zh) | 2011-07-18 | 2011-07-18 | 900吨架桥机隧道口近距离架设的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102312410A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005016106A (ja) * | 2003-06-25 | 2005-01-20 | Ohbayashi Corp | 高架橋の沈下防止方法 |
CN1880581A (zh) * | 2006-01-18 | 2006-12-20 | 秦皇岛市北戴河通联路桥机械有限公司 | 铁路架桥机架设隧道前最后一孔桥及进隧道的方法 |
CN201746780U (zh) * | 2010-06-09 | 2011-02-16 | 中铁科工集团有限公司 | 能通过隧道且实现隧道口架梁的架桥机 |
CN102071650A (zh) * | 2010-12-02 | 2011-05-25 | 秦皇岛天业通联重工股份有限公司 | 高速铁路隧道内外通用架桥机及其架梁工艺 |
-
2011
- 2011-07-18 CN CN201110199906A patent/CN102312410A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005016106A (ja) * | 2003-06-25 | 2005-01-20 | Ohbayashi Corp | 高架橋の沈下防止方法 |
CN1880581A (zh) * | 2006-01-18 | 2006-12-20 | 秦皇岛市北戴河通联路桥机械有限公司 | 铁路架桥机架设隧道前最后一孔桥及进隧道的方法 |
CN201746780U (zh) * | 2010-06-09 | 2011-02-16 | 中铁科工集团有限公司 | 能通过隧道且实现隧道口架梁的架桥机 |
CN102071650A (zh) * | 2010-12-02 | 2011-05-25 | 秦皇岛天业通联重工股份有限公司 | 高速铁路隧道内外通用架桥机及其架梁工艺 |
Non-Patent Citations (1)
Title |
---|
于文涛;薛泽民;洪彩葵: "客运专线900t过隧道架桥机的特点及作业流程", 《铁道标准设计》, 30 November 2007 (2007-11-30) * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100543235C (zh) | 斜拉索辅助全悬臂架设钢桁梁的方法及系统 | |
CN102251475A (zh) | 变位平台运架一体机及桥梁架设方法 | |
CN104480862B (zh) | 一种斜拉桥边跨钢桁梁的架设方法 | |
CN105952482A (zh) | 自行式隧道仰拱衬砌台车 | |
CN104652283A (zh) | 斜拉桥钢主梁架梁吊机对称拼装的异步拼装施工方法 | |
CN102373670B (zh) | 移动平台运架一体机及桥梁架设方法 | |
CN103669216A (zh) | 一种钢箱梁散拼滑移装置及安装方法 | |
CN103572708B (zh) | 大跨度混凝土连续梁桥边跨合拢装置及方法 | |
CN103352428A (zh) | 悬索桥索塔横梁无支架施工方法 | |
CN201106155Y (zh) | 斜拉索辅助全悬臂架设钢桁梁装置 | |
CN103194977B (zh) | 运架一体式架桥机架设首孔箱梁前导梁机就位方法 | |
CN104594201B (zh) | 一种利用单侧墩旁托架架设墩顶钢梁的方法 | |
CN101284628A (zh) | 大吨位压力机架的吊装方法 | |
CN103147406B (zh) | 一种小曲线穿越山岭隧道箱梁运架一体机及其首末孔箱梁架设方法 | |
CN103485574B (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN205778918U (zh) | 黄土隧道开挖及初支模筑混凝土施工复合式台车 | |
CN110172922B (zh) | 一种环境友好型下行自行式钢栈桥结构施工方法 | |
CN205636503U (zh) | 一种箱梁侧模滑移装置 | |
CN104314009A (zh) | 大节段提升机构及使用方法 | |
CN104110002A (zh) | 一种更换钢桁梁桥桥面板的方法 | |
CN204418013U (zh) | 桥梁翼缘板施工自走式悬臂吊篮 | |
CN110158486A (zh) | 一种架设拼宽梁的架桥机及施工方法 | |
CN203213019U (zh) | 长悬臂盖梁现浇施工支架体系 | |
CN102312410A (zh) | 900吨架桥机隧道口近距离架设的施工方法 | |
CN210827111U (zh) | 一种环境友好型下行自行式钢栈桥结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120111 |