CN102307152A - Method and device for pushing inter-domain resources - Google Patents

Method and device for pushing inter-domain resources Download PDF

Info

Publication number
CN102307152A
CN102307152A CN201110308485A CN201110308485A CN102307152A CN 102307152 A CN102307152 A CN 102307152A CN 201110308485 A CN201110308485 A CN 201110308485A CN 201110308485 A CN201110308485 A CN 201110308485A CN 102307152 A CN102307152 A CN 102307152A
Authority
CN
China
Prior art keywords
resource
territory
subordinate
message
resource supplying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110308485A
Other languages
Chinese (zh)
Other versions
CN102307152B (en
Inventor
黄军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
New H3C Information Technologies Co Ltd
Original Assignee
Hangzhou H3C Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou H3C Technologies Co Ltd filed Critical Hangzhou H3C Technologies Co Ltd
Priority to CN201110308485.7A priority Critical patent/CN102307152B/en
Publication of CN102307152A publication Critical patent/CN102307152A/en
Application granted granted Critical
Publication of CN102307152B publication Critical patent/CN102307152B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a method and device for pushing inter-domain resources. In the method, when resource pushing request messages issued by multiple lower-level domains exist, the resource pushing request message of each lower-level domain can be processed according to the sequence of the priorities, and the resource pushing starting times of the messages issued by the lower-level domains can be calculated according to the resource pushing request messages. The method and device provided by the invention can be used for improving the inter-domain resource sharing efficiency.

Description

A kind of inter-domain resource method for pushing and device
Technical field
The present invention relates to the monitoring technique field, particularly a kind of inter-domain resource method for pushing and device.
Background technology
Development along with monitoring business; Many industries and some cross-region large enterprises not only have been satisfied with local networking monitoring to the demand of monitoring; But on original local networking monitoring basis; Networking monitoring provincial and even that the nationwide is trans-regional is carried out in requirement, forms large-scale monitoring network system.
Can adopt multistage multiple domain cascade system, large-scale monitoring network system is divided into independently several regions subsystem, each territory subsystem is disposed more complete supervisory control system assembly, can independently accomplish the monitoring business function.Territory subsystem in the whole monitoring network system can be divided into multistage; The higher level territory a plurality of subordinates of management subsystem territory subsystem, subordinate's territory subsystem can be pushed to higher level territory subsystem with shared resource (like camera, switching value and resource status) through the inter-domain resource push-mechanism.Below abbreviate higher level territory subsystem as the higher level territory, subordinate's territory subsystem abbreviates the subordinate territory as.
The subordinate territory pushes resource to the higher level territory and mainly comprises two kinds of situation:
The resource supplying message when register in the higher level territory, is sent to the higher level territory first in the subordinate territory, and all shared resources are pushed to the higher level territory;
When the shared resource in subordinate territory changes (comprise newly-increased, revise and cancellation is shared), send the resource supplying message, the shared resource that changes is pushed to the higher level territory to the higher level territory.
When the higher level territory receives the resource supplying message in subordinate territory, one by one the resource information of carrying in the resource supplying message is updated to this territory.
Yet; When the resource that pushes simultaneously when the subordinate territory is many; After for example the higher level territory starts; The subordinate territory is pushed to shared resource the higher level territory simultaneously; The higher level territory will receive a large amount of resource supplying messages; It is higher that CPU handles duty ratio, the situation that part resource supplying message can not get responding may occur, thus resource-sharing efficient between the domain of influence.
Summary of the invention
In view of this, the object of the present invention is to provide a kind of inter-domain resource method for pushing, this method can improve the inter-domain resource sharing efficiency.
To achieve these goals, the invention provides a kind of inter-domain resource method for pushing, be applied to adopt the monitoring network system of multistage multiple domain cascade, this method comprises:
Select the resource supplying request message in the highest subordinate territory of priority; The resource updates mark corresponding as if the resource updates mark that carries in the resource supplying request message of this selection and this subordinate territory is identical, then selects the resource supplying request message in the highest subordinate territory of next priority to handle; If the resource updates mark that the resource updates mark that carries in the resource supplying request message of this selection is corresponding with this subordinate territory is inequality; Then calculate the resource supplying zero-time in this subordinate territory according to this resource supplying request message; Notify this subordinate territory to begin to push resource, and select the resource supplying request message in the highest subordinate territory of next priority to handle from said resource supplying zero-time.
The present invention also provides a kind of inter-domain resource pusher, is applied to the higher level territory in the monitoring network system of multistage multiple domain cascade; This device comprises: selected cell, processing unit;
Said selected cell; Be used to select the resource supplying request message in the highest subordinate territory of priority; The resource updates mark corresponding as if the resource updates mark that carries in this resource supplying request message and this subordinate territory is identical, then selects the resource supplying request message in the highest subordinate territory of next priority to handle; If the resource updates mark that the resource updates mark that carries in this resource supplying request message is corresponding with this subordinate territory is inequality, then this resource supplying request message is sent to processing unit; After being used to receive the selection notice of processing unit, select the resource supplying request message in the highest subordinate territory of next priority to handle;
Said processing unit; Be used to receive the resource supplying request message that selected cell is sent; Calculate the resource supplying zero-time in the subordinate territory of sending this message according to this resource supplying request message; Notify this subordinate territory to begin to push resource, and send the selection notice to selected cell from said resource supplying zero-time.
Can know by top technical scheme; Among the present invention; When the resource supplying request message that exists a plurality of subordinates territory to send; Sequencing according to priority is handled the resource supplying request message that send in each subordinate territory, calculates the resource supplying zero-time in the subordinate territory of sending this resource supplying request message according to the resource supplying request message.The present invention passes through rationally to arrange the resource supplying time in each subordinate territory, thereby can avoid the congested of resource supplying message, improves the inter-domain resource sharing efficiency.
Description of drawings
Fig. 1 is the schematic flow sheet of embodiment of the invention inter-domain resource method for pushing;
Fig. 2 is the networking sketch map of the monitoring network system of multistage multiple domain;
Fig. 3 is the resource supplying scheduling result sketch map of the embodiment of the invention to each subordinate territory shown in Figure 2;
Fig. 4 is the structural representation of embodiment of the invention inter-domain resource pusher.
Embodiment
In order to make the object of the invention, technical scheme and advantage clearer,, technical scheme of the present invention is elaborated below in conjunction with the accompanying drawing embodiment that develops simultaneously.
Referring to Fig. 1, Fig. 1 is the schematic flow sheet of embodiment of the invention inter-domain resource method for pushing, may further comprise the steps:
Step 101, select the resource supplying request message in the highest subordinate territory of priority.
When the subordinate territory first when register in the higher level territory, or when resource updates takes place, all can send the resource supplying request message to the higher level territory.Can carry the resource information number that this need push in the said resource supplying request message, if this subordinate territory is to push resource to this territory first, then this resource information number that need push is total to this territory resources shared for this subordinate territory; If this subordinate territory is not to push resource to this territory first, then the accumulative total number of the resource of renewal for taking place in this resource information number that need push behind the resource supplying from last time.
Here; The priority in each subordinate territory is provided with in advance; Can set the priority in each subordinate territory through multiple strategy; For example; Can come to be provided with in advance the priority in each territory according to each importance of subordinate territory in practical application; Can also priority be set according to the usage frequency of shared resource in each subordinate territory, be the higher priority that is provided with in the higher subordinate territory of the usage frequency of shared resource.
If the higher level territory receives the resource supplying request message in a plurality of subordinates territory simultaneously; Then can be according to the priority in the subordinate territory of sending the resource supplying request message; The resource supplying request message in the subordinate territory that priority treatment priority is the highest; And then select the resource supplying request message in the highest subordinate territory of next priority, up to all resource supplying request messages are disposed.
Step 102, judge whether the corresponding resource updates mark in the resource updates mark that carries in the resource supplying request message in the subordinate territory that this priority of selecting is the highest and this subordinate territory is identical, if, then go to step 104 and carry out, otherwise, execution in step 103;
In the present embodiment; Source synchronous for the ease of subordinate territory and higher level territory; The source synchronous situation of using the resource updates mark to come mark subordinate territory and higher level territory; For example; Can use the nearest resource updates time as the resource updates mark; Send in the resource updates request message to the higher level territory when the subordinate territory, the nearest resource updates time is carried in the resource updates request message; When the higher level territory receives the resource updates request message in this subordinate territory; Can compare the nearest resource updates time of carrying in the resource updates request message in the nearest resource updates time in this subordinate territory of writing down in this territory and this subordinate territory that receives; If it is consistent; Illustrate that then this subordinate territory is after last resource supplying; Resource updates does not take place; Do not need to push again resource to this higher level territory; If it is inconsistent; Illustrate that then this subordinate territory is after last resource supplying; Resource updates has taken place again, has needed to push resource to the higher level territory.
In addition, the subordinate territory begins after the higher level territory pushes resource, behind the resource supplying message in every reception in higher level territory and processing subordinate territory, needs to upgrade the corresponding resource updates mark in this subordinate territory, and returns the resource supplying confirmation message; The subordinate territory receives after the resource supplying confirmation message in higher level territory, confirms that the resource that the higher level territory will push before this successfully upgrades, and writes down in view of the above the nearest resource updates time of the resource that successfully is pushed to the higher level territory.Like this; If in the process of resource supplying; Break down in higher level territory or subordinate territory; Then when fault recovery; The subordinate territory can be pushed to the nearest resource updates time of the resource in higher level territory according to the success of record; Only will not pushing successful more new resources is pushed to the higher level territory again, and does not need again all more new resources to be pushed to the higher level territory again.Here; If subordinate's territory shared resource is to a plurality of higher levels territory; Then need be directed against the nearest resource updates time that the resource that successfully is pushed to this higher level territory is write down in each higher level territory; In order to this higher level territory propelling movement resource the time, the resource supplying that only takes place after the time that will write down to upgrade arrives this higher level territory.
Step 103, calculate the resource supplying zero-time in this subordinate territory, and notify this subordinate territory to begin to push resource from said resource supplying zero-time, execution in step 104 according to this resource supplying request message.
Here; Handle the resource supplying request message in the highest subordinate territory of the priority of selection in the higher level territory; After calculating the resource supplying zero-time in this subordinate territory, the resource supplying zero-time is carried at returns to this subordinate territory in the resource supplying request confirmation message; And after this subordinate territory receives the resource supplying request confirmation message in higher level territory; According to the resource supplying zero-time of wherein carrying; Begin to push resource from this resource supplying zero-time to the higher level territory; Thereby can avoid occurring simultaneously the situation of a large amount of resource supplying messages; Therefore; Can alleviate the burden that the resource supplying message is handled in the higher level territory, improve the inter-domain resource sharing efficiency.
Step 104, the highest resource supplying request message of the next priority of selection, and judge whether to select successfully, if, then go to step 102 and carry out, otherwise, execution in step 105.
Here, after handling a resource supplying request message, need to continue to select the highest resource supplying request message of next priority to handle, dispose up to all resource supplying request messages.
Step 105, the processing of resource supplying request message finish.
Here, select the highest resource supplying request message failure of next priority, illustrate there is not untreated resource supplying request message that therefore, the processing of resource supplying request message finishes.
In practical application, the maximum resource information number of carrying in each resource supplying message is conditional, is assumed to be N, then when the subordinate territory need surpass N to the resource that the higher level territory pushes, needs to send a plurality of resource supplying messages and accomplishes resource supplying.The resource information number M that the subordinate territory can need push this is carried in the resource supplying request message; When the higher level territory receives the resource supplying request message of sending in this subordinate territory, can confirm the resource supplying message number that these these needs of subordinate territory send to this territory according to the resource information number M that wherein carries.Calculate the resource supplying message number that need send in the subordinate territory and can adopt following formula:
X=[(M+N-1)/N],
Wherein, "/" expression division; " [] " expression rounds downwards the result of calculation of (M+N-1)/N; X is this resource supplying message number that need send of this subordinate territory; M this resource information number that need push of this subordinate territory for carrying in this resource supplying request message; N is a carry-on maximum resource information number in each resource supplying message.
In addition, the subordinate territory need push according to the sequencing of resource updates when carrying out resource supplying; Only send a resource supplying message at every turn; After receiving the resource supplying confirmation message in higher level territory, if also have the more new resources that do not push, the next resource supplying message of then redispatching.Like this, the resource that can avoid in the subordinate territory back to upgrade is updated to the higher level territory earlier and the asynchronous problem of resource that possibly cause.
Above-mentioned resource supplying mode according to the subordinate territory; The higher level territory can be according to the resource information number of this needs propelling movement of each subordinate territory; And the message between higher level territory and this subordinate territory comes and goes duration; Confirm this resource supplying duration that needs of this subordinate territory, specifically can adopt following formula computational resource to push duration:
RD=TD*X;
Wherein, RD is the resource supplying duration in this subordinate territory, and TD is that the message between this subordinate territory and this territory comes and goes duration; X is this resource supplying message number that need send of this subordinate territory.
Here, the message that can obtain in advance in several ways between subordinate territory and the higher level territory comes and goes duration:
The subordinate territory obtain and the higher level territory between message come and go duration, and notify the higher level territory.For example, the subordinate territory is when logon message is sent in the higher level territory, the record transmitting time, when receiving the accreditation verification message that returns in the higher level territory, the recorder time, with the difference of time of reception and transmitting time as the round duration of the message between this subordinate territory and higher level territory.Perhaps, the logon message transmitting time is carried when logon message is sent in the higher level territory in the subordinate territory; After the higher level territory receives this logon message; Can calculate the transmission time of logon message according to the time that receives this logon message and logon message transmitting time, and logon message transmission time and accreditation verification message transmitting time be carried at return to the subordinate territory in the accreditation verification message; When the subordinate territory receives the accreditation verification message; Can calculate the transmission time of accreditation verification message according to the time that receives the accreditation verification message and accreditation verification message transmitting time, then with logon message transmission time and accreditation verification message transfer time and come and go duration as the message between this subordinate territory and higher level territory.Like this, when the resource supplying request message is sent in the subordinate territory to the higher level territory, the round duration of the message that calculates can be carried in this resource supplying request message and send to the higher level territory.
The higher level territory obtain and each subordinate territory between message come and go duration.For example, the message transmitting time is carried when logon message or resource supplying request message are sent in the higher level territory in the subordinate territory; When the higher level territory receives this message; Can calculate the transmission time of this message according to the message transmitting time of carrying in the time that receives this message and this message, this message transfer time multiply by 2 values that obtain as the message two-way time between this subordinate territory and higher level territory.
In addition, for each subordinate territory, all have certain resource supplying message transmitting capacity, here, said resource supplying message transmitting capacity is meant that this subordinate territory can be to the number of higher level territory transmission resource supplying message in the unit interval.Because each subordinate territory is when pushing resource; Only send a resource supplying message at every turn; Therefore; Can confirm the resource supplying message transmitting capacity in this subordinate territory according to the message between this subordinate territory and higher level territory two-way time; Suppose that be TD the message two-way time between this subordinate territory and higher level territory, then can with 1 with the merchant of TD resource supplying message transmitting capacity as this subordinate territory.
And, have certain resource supplying message processing capability TotalCapability for the higher level territory, here, said resource supplying message processing capability is meant that the higher level territory can handle the number of resource supplying message in the unit interval.TotalCapability is bigger, illustrates that then the resource supplying message processing capability in higher level territory is stronger, if only handle the resource supplying message in a subordinate territory, then can cause the wasting of resources.Therefore, the higher level territory can push message processing capability and determine whether to handle simultaneously the resource supplying message in a plurality of subordinates territory when calculating the resource supplying zero-time in subordinate territory according to the surplus resources of self.
Like this; Resource supplying duration according to aforementioned this subordinate territory that calculates; And resource supplying message transmitting capacity; Can search the resource supplying message transmitting capacity of the surplus resources propelling movement message processing capability in this territory on the time shaft after current point in time greater than this subordinate territory; And time span is confirmed as the zero-time of this time period the resource supplying zero-time in this subordinate territory greater than the time period of the resource supplying duration in this subordinate territory; Wherein, said surplus resources pushes message processing capability and is meant: on the time point in office, and the resource supplying message processing capability in this territory and the difference of resource supplying message transmitting capacity summation that on this time point, pushes all subordinate territories of resource to this territory.Suppose on the time point in office; There is n subordinate territory pushing resource to this territory; Then the surplus resources in this territory pushes message processing capability RemainCapability=TotalCapability-(R1+R2+...+Rn); Wherein, R1+R2+...+Rn is the resource supplying message transmitting capacity summation in said n subordinate territory.
Below in conjunction with Fig. 2, Fig. 3 the embodiment of the invention shown in Figure 1 is described.
Fig. 2 is the networking sketch map of the monitoring network system of multistage multiple domain, comprises territory A, territory B, territory C, territory D, territory E, territory F, and wherein territory A is the higher level territory, and territory B, C, D, E, F are the subordinate territory; The territory B of subordinate, C, D, E, F can be as required be pushed to higher level territory A to higher level territory A registration and with self part or all of shared resource.
Suppose that the priority order from high to low that preestablishes territory B, C, D, E, F is: B, E, D, C, F; If territory B, C, D, E, F have sent the resource supplying request message to territory A simultaneously; Then territory A is according to the priority in each subordinate territory; The resource supplying request message of processing domain B, E, D, C, F successively; Calculate the resource supplying duration in each subordinate territory; Confirm the resource supplying zero-time in each subordinate territory, and notify each subordinate territory to begin to push resource from each self-corresponding resource supplying zero-time.
The resource supplying message processing capability of at present supposing territory A is 5, and the resource supplying duration, resource supplying message transmitting capacity that finally calculate each subordinate territory are shown in table one:
The resource supplying duration Resource supplying message transmitting capacity
B 1.5 second 3
E 2 seconds 2
D 1 second 2
C 3 seconds 2
F 2.5 second 1
Table one
Then territory A according to the priority in each territory to territory B; C; D; E; The resource supplying scheduling result embodiment of the invention as shown in Figure 3 of F is to the resource supplying scheduling result sketch map in each subordinate territory shown in Figure 2; Wherein, The resource supplying message processing capability of lines 30 representative domain A; Territory B wherein; C; D; E; The square frame that F is corresponding representes self to take the processing time (also being the resource supplying duration) of territory A along time shaft (the horizontal as shown in Figure 3 axle) length of direction, representes self to take the resource supplying message processing capability of territory A along resource supplying message processing capability axle (the vertical as shown in Figure 3 axle) length of direction.
Territory A is specific as follows to the resource supplying scheduling process of territory B, C, D, E, F:
Territory A is preferential to be selected and the resource supplying request message of processing domain B, and the resource supplying duration that calculates territory B is 1.5 seconds; Resource supplying message transmitting capacity is 3.Owing to begin also not have other subordinate territories to take the resource supplying message processing capability of territory A from current point in time; Territory A after the current point in time on the time period surplus resources message processing capability be 5; Therefore; The resource supplying zero-time that can confirm territory B is current point in time (being assumed to be 0), continues 1.5 seconds.To the resource supplying scheduling result of territory B as shown in Figure 3.
Then, territory A selects and the resource supplying request message of processing domain E, and the resource supplying duration that calculates territory E is 2 seconds; Resource supplying message transmitting capacity is 2.Because territory A is respectively 2,5 at the surplus resources propelling movement message processing capability of time period 0-1.5 and time period 1.5-2; The resource supplying message of all right parallel processing territory E; Therefore, the resource supplying zero-time of confirming territory E also is a current point in time, 2 seconds duration.To the resource supplying scheduling result of territory E as shown in Figure 3.
Follow, territory A selects and the resource supplying request message of processing domain D again, and the resource supplying duration that calculates territory D is 1 second; Resource supplying message transmitting capacity is 2.Owing in time period 0-1.5, arranged territory B and territory E to carry out resource supplying, in the period, it is 0 that the surplus resources of territory A pushes message processing capability at this section, therefore, and resource supplying message that can not while processing domain D; And territory A is respectively 3,5 at the surplus resources propelling movement message processing capability of time period 1.5-2 and time period 2-2.5, the resource supplying message of all right parallel processing territory D, and therefore, the resource supplying zero-time of confirming territory D is 1.5 seconds, 1 second duration.To the resource supplying scheduling result of territory D as shown in Figure 3.
Follow, territory A selects and the resource supplying request message of processing domain C again, and the resource supplying duration that calculates territory C is 3 seconds; Resource supplying message transmitting capacity is 2.Then owing in time period 1.5-2, arranged territory E and territory D to carry out resource supplying, in the period, it is 1 that the surplus resources of territory A pushes message processing capability at this section, therefore, and resource supplying message that can not while processing domain C; And territory A is respectively 3,5 at the surplus resources propelling movement message processing capability of time period 2-2.5 and time period 2.5-5, therefore, all right resource supplying message of processing domain C simultaneously, therefore, the resource supplying zero-time of confirming territory C is 2.To the resource supplying scheduling result of territory C as shown in Figure 3.
At last, territory A selects and the resource supplying request message of processing domain F, and the resource supplying duration that calculates territory F is 2.5 seconds; Resource supplying message transmitting capacity is 1.Because territory A is respectively 1,3 at the interior surplus resources propelling movement message processing capability of time period 1.5-2.5, time period 2.5-4; Therefore, all right resource supplying message of processing domain F simultaneously, therefore; The resource supplying zero-time of confirming territory F is 1.5, continues 2.5 seconds.To the resource supplying scheduling result of territory F as shown in Figure 3.
As can be seen from Figure 3, according to the method for the embodiment of the invention shown in Figure 1, both made full use of the disposal ability in higher level territory; That has avoided again that the resource supplying message too much possibly cause blocks up; Therefore, can rationally arrange the resource supplying time in each subordinate territory, improve the inter-domain resource sharing efficiency.
More than method embodiment of the present invention is described in detail, the present invention also provides a kind of inter-domain resource pusher, is applied to the higher level territory in the monitoring network system of multistage multiple domain.
Referring to Fig. 4, Fig. 4 is the structural representation of embodiment of the invention inter-domain resource pusher, and this device comprises: selected cell 401, processing unit 402; Wherein,
Selected cell 401; Be used to select the resource supplying request message in the highest subordinate territory of priority; The resource updates mark corresponding as if the resource updates mark that carries in this resource supplying request message and this subordinate territory is identical, then selects the resource supplying request message in the highest subordinate territory of next priority to handle; If the resource updates mark that the resource updates mark that carries in this resource supplying request message is corresponding with this subordinate territory is inequality, then this resource supplying request message is sent to processing unit 402; After being used to receive the selection notice of processing unit 402, select the resource supplying request message in the highest subordinate territory of next priority to handle;
Processing unit 402; Be used to receive the resource supplying request message that selected cell 401 is sent; Calculate the resource supplying zero-time in the subordinate territory of sending this message according to this resource supplying request message; Notify this subordinate territory to begin to push resource, and send the selection notice to selected cell 401 from said resource supplying zero-time.
Said processing unit 402 is used for when calculating the resource supplying zero-time in this subordinate territory according to this resource supplying request message:
Use following formula to calculate the resource supplying message number that this subordinate territory need be sent:
X=[(M+N-1)/N], wherein, "/" expression division; " [] " expression rounds downwards the result of calculation of (M+N-1)/N; X is this resource supplying message number that need send of this subordinate territory; M this resource information number that need push of this subordinate territory for carrying in this resource supplying request message; N is a carry-on maximum resource information number in each resource supplying message;
Use following formula to calculate the resource supplying duration that this subordinate territory needs:
RD=TD*X; Wherein, RD is the resource supplying duration that this subordinate territory needs, and TD comes and goes duration for this subordinate territory and the message between this territory that obtains in advance;
The surplus resources of searching this territory on the time shaft after current point in time pushes the resource supplying message transmitting capacity of message processing capability greater than this subordinate territory; And time span is confirmed as the zero-time of this time period the resource supplying zero-time in this subordinate territory greater than the time period of the resource supplying duration in this subordinate territory; Wherein, said surplus resources pushes message processing capability and is meant: on the time point in office, and the resource supplying message processing capability in this territory and the difference of resource supplying message transmitting capacity summation that on this time point, pushes all subordinate territories of resource to this territory.
The above only is preferred embodiment of the present invention, and is in order to restriction the present invention, not all within spirit of the present invention and principle, any modification of being made, is equal to replacement, improvement etc., all should be included within the scope that the present invention protects.

Claims (4)

1. inter-domain resource method for pushing is applied to adopt the monitoring network system of multistage multiple domain cascade, it is characterized in that this method comprises:
Select the resource supplying request message in the highest subordinate territory of priority; The resource updates mark corresponding as if the resource updates mark that carries in the resource supplying request message of this selection and this subordinate territory is identical, then selects the resource supplying request message in the highest subordinate territory of next priority to handle; If the resource updates mark that the resource updates mark that carries in the resource supplying request message of this selection is corresponding with this subordinate territory is inequality; Then calculate the resource supplying zero-time in this subordinate territory according to this resource supplying request message; Notify this subordinate territory to begin to push resource, and select the resource supplying request message in the highest subordinate territory of next priority to handle from said resource supplying zero-time.
2. inter-domain resource method for pushing according to claim 1 is characterized in that,
Said resource supplying zero-time according to this this subordinate territory of resource supplying request message calculating comprises:
Use following formula to calculate the resource supplying message number that this subordinate territory need be sent:
X=[(M+N-1)/N], wherein, "/" expression division; " [] " expression rounds downwards the result of calculation of (M+N-1)/N; X is this resource supplying message number that need send of this subordinate territory; M this resource information number that need push of this subordinate territory for carrying in this resource supplying request message; N is a carry-on maximum resource information number in each resource supplying message;
Use following formula to calculate the resource supplying duration that this subordinate territory needs:
RD=TD*X; Wherein, RD is the resource supplying duration that this subordinate territory needs, and TD comes and goes duration for this subordinate territory and the message between this territory that obtains in advance;
The surplus resources of searching this territory on the time shaft after current point in time pushes the resource supplying message transmitting capacity of message processing capability greater than this subordinate territory; And time span is confirmed as the zero-time of this time period the resource supplying zero-time in this subordinate territory greater than the time period of the resource supplying duration in this subordinate territory; Wherein, said surplus resources pushes message processing capability and is meant: on the time point in office, and the resource supplying message processing capability in this territory and the difference of resource supplying message transmitting capacity summation that on this time point, pushes all subordinate territories of resource to this territory.
3. inter-domain resource pusher is applied to the higher level territory in the monitoring network system of multistage multiple domain, it is characterized in that this device comprises: selected cell, processing unit;
Said selected cell; Be used to select the resource supplying request message in the highest subordinate territory of priority; The resource updates mark corresponding as if the resource updates mark that carries in this resource supplying request message and this subordinate territory is identical, then selects the resource supplying request message in the highest subordinate territory of next priority to handle; If the resource updates mark that the resource updates mark that carries in this resource supplying request message is corresponding with this subordinate territory is inequality, then this resource supplying request message is sent to processing unit; After being used to receive the selection notice of processing unit, select the resource supplying request message in the highest subordinate territory of next priority to handle;
Said processing unit; Be used to receive the resource supplying request message that selected cell is sent; Calculate the resource supplying zero-time in the subordinate territory of sending this message according to this resource supplying request message; Notify this subordinate territory to begin to push resource, and send the selection notice to selected cell from said resource supplying zero-time.
4. inter-domain resource pusher as claimed in claim 3 is characterized in that,
Said processing unit is used for when calculating the resource supplying zero-time in this subordinate territory according to this resource supplying request message:
Use following formula to calculate the resource supplying message number that this subordinate territory need be sent:
X=[(M+N-1)/N], wherein, "/" expression division; " [] " expression rounds downwards the result of calculation of (M+N-1)/N; X is this resource supplying message number that need send of this subordinate territory; M this resource information number that need push of this subordinate territory for carrying in this resource supplying request message; N is a carry-on maximum resource information number in each resource supplying message;
Use following formula to calculate the resource supplying duration that this subordinate territory needs:
RD=TD*X; Wherein, RD is the resource supplying duration that this subordinate territory needs, and TD comes and goes duration for this subordinate territory and the message between this territory that obtains in advance;
The surplus resources of searching this territory on the time shaft after current point in time pushes the resource supplying message transmitting capacity of message processing capability greater than this subordinate territory; And time span is confirmed as the zero-time of this time period the resource supplying zero-time in this subordinate territory greater than the time period of the resource supplying duration in this subordinate territory; Wherein, said surplus resources pushes message processing capability and is meant: on the time point in office, and the resource supplying message processing capability in this territory and the difference of resource supplying message transmitting capacity summation that on this time point, pushes all subordinate territories of resource to this territory.
CN201110308485.7A 2011-10-12 2011-10-12 Method and device for pushing inter-domain resources Active CN102307152B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110308485.7A CN102307152B (en) 2011-10-12 2011-10-12 Method and device for pushing inter-domain resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110308485.7A CN102307152B (en) 2011-10-12 2011-10-12 Method and device for pushing inter-domain resources

Publications (2)

Publication Number Publication Date
CN102307152A true CN102307152A (en) 2012-01-04
CN102307152B CN102307152B (en) 2015-01-14

Family

ID=45380964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110308485.7A Active CN102307152B (en) 2011-10-12 2011-10-12 Method and device for pushing inter-domain resources

Country Status (1)

Country Link
CN (1) CN102307152B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103491353A (en) * 2013-10-09 2014-01-01 南京怀业信息技术有限公司 Method for video-monitoring streaming media transmission optimal path under multistage multi-domain network
CN105339915A (en) * 2013-06-28 2016-02-17 日本电气株式会社 Push-type information transmission device, push-type information transmission method, and program
CN105743922A (en) * 2016-04-15 2016-07-06 浙江宇视科技有限公司 Method, device and system for inter-domain communication

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7636781B2 (en) * 2003-01-16 2009-12-22 Hua Wei Technologies Co., Ltd. System and method for realizing the resource distribution in the communication network
CN101616311A (en) * 2009-07-31 2009-12-30 杭州华三通信技术有限公司 A kind of video frequency monitoring method and video monitoring server
CN102137087A (en) * 2010-09-15 2011-07-27 华为技术有限公司 Service processing method, method for adjusting delivery content and service nodes

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7636781B2 (en) * 2003-01-16 2009-12-22 Hua Wei Technologies Co., Ltd. System and method for realizing the resource distribution in the communication network
CN101616311A (en) * 2009-07-31 2009-12-30 杭州华三通信技术有限公司 A kind of video frequency monitoring method and video monitoring server
CN102137087A (en) * 2010-09-15 2011-07-27 华为技术有限公司 Service processing method, method for adjusting delivery content and service nodes

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105339915A (en) * 2013-06-28 2016-02-17 日本电气株式会社 Push-type information transmission device, push-type information transmission method, and program
CN105339915B (en) * 2013-06-28 2018-08-24 日本电气株式会社 Push-type information transmitting apparatus, push-type method for sending information and program
US10122812B2 (en) 2013-06-28 2018-11-06 Nec Corporation Push-type information transmission device, push-type information transmission method, and program
CN103491353A (en) * 2013-10-09 2014-01-01 南京怀业信息技术有限公司 Method for video-monitoring streaming media transmission optimal path under multistage multi-domain network
CN105743922A (en) * 2016-04-15 2016-07-06 浙江宇视科技有限公司 Method, device and system for inter-domain communication
CN105743922B (en) * 2016-04-15 2019-03-12 浙江宇视科技有限公司 The method, apparatus and system of inter-domain communication

Also Published As

Publication number Publication date
CN102307152B (en) 2015-01-14

Similar Documents

Publication Publication Date Title
US8458266B2 (en) Scheduling method and scheduling information synchronizing method in wireless ad hoc network
US9218220B2 (en) Elastic and scalable publish/subscribe service
CN101604264B (en) Task scheduling method and system for supercomputer
CN102132527B (en) Method and device for obtaining and propagating information about processing capacity of node
CN109947551B (en) Multi-turn task allocation method, edge computing system and storage medium thereof
KR101976533B1 (en) Method for affiliating a cluster of electronic devices communicating via a wireless network, associated electronic device implementing said method and system
Castano et al. Exact approaches for lifetime maximization in connectivity constrained wireless multi-role sensor networks
CN113852405B (en) Construction method and device of multi-beam relay satellite task scheduling model
CN109949160A (en) A kind of sharding method and device of block chain
KR101462737B1 (en) Electronics shelf label system and operating method using the same
CN102695190B (en) Data acquisition method in wireless sensor network
CN101179553A (en) Efficient order-preserving delivery method and device for concurrent messages
CN103781094A (en) A networking optimization method for wireless networks for industrial automation
CN102132254A (en) Method and system for scheduling periodic processes
CN101365220A (en) Stochastic access method based on user side cooperative grouping in collaboration cellular network
Achary et al. Dynamic job scheduling using ant colony optimization for mobile cloud computing
CN101331715A (en) Node discovery involving multiple node enumerators
CN102307152A (en) Method and device for pushing inter-domain resources
CN101547188B (en) System and method for achieving generalized routing protocol of wireless sensor network
Hu et al. Minimizing the number of mobile chargers to keep large-scale WRSNs working perpetually
ParandehGheibi et al. Optimal reverse carpooling over wireless networks-a distributed optimization approach
CN101616055A (en) A kind of method, system and node of setting up label switched path
Neumann et al. Redundancy infrastructure for service-oriented wireless sensor networks
CN104243579A (en) Computational node control method and system applied to water conservancy construction site
CN116582173A (en) Method, device and storage medium for processing data by satellite-based distributed network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 310052 Binjiang District Changhe Road, Zhejiang, China, No. 466, No.

Patentee after: NEW H3C TECHNOLOGIES Co.,Ltd.

Address before: 310053 Hangzhou hi tech Industrial Development Zone, Zhejiang province science and Technology Industrial Park, No. 310 and No. six road, HUAWEI, Hangzhou production base

Patentee before: HANGZHOU H3C TECHNOLOGIES Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20230620

Address after: 310052 11th Floor, 466 Changhe Road, Binjiang District, Hangzhou City, Zhejiang Province

Patentee after: H3C INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 310052 Changhe Road, Binjiang District, Hangzhou, Zhejiang Province, No. 466

Patentee before: NEW H3C TECHNOLOGIES Co.,Ltd.

TR01 Transfer of patent right