CN102304975B - Beam bottom reinforcing bar-planting hole forming device - Google Patents

Beam bottom reinforcing bar-planting hole forming device Download PDF

Info

Publication number
CN102304975B
CN102304975B CN 201110180695 CN201110180695A CN102304975B CN 102304975 B CN102304975 B CN 102304975B CN 201110180695 CN201110180695 CN 201110180695 CN 201110180695 A CN201110180695 A CN 201110180695A CN 102304975 B CN102304975 B CN 102304975B
Authority
CN
China
Prior art keywords
support bar
bar
forming device
sliding sleeve
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110180695
Other languages
Chinese (zh)
Other versions
CN102304975A (en
Inventor
李一瑗
周静
陈赣予
谢峰林
路平
赵天鸣
王海红
李晓松
唐顺利
潘晓晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN GUOJI CONSTRUCTION GROUP CO Ltd
Original Assignee
HENAN GUOJI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN GUOJI CONSTRUCTION GROUP CO Ltd filed Critical HENAN GUOJI CONSTRUCTION GROUP CO Ltd
Priority to CN 201110180695 priority Critical patent/CN102304975B/en
Publication of CN102304975A publication Critical patent/CN102304975A/en
Application granted granted Critical
Publication of CN102304975B publication Critical patent/CN102304975B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a beam bottom reinforcing bar-planting hole forming device comprising a vertical supporting rod and a base, wherein a transverse supporting rod is fixed at one side of the vertical supporting rod, and a transverse chute is arranged in the middle of the transverse supporting rod; a controllable lifting mechanism and a base are arranged at the lower end of the vertical supporting rod, a sleeve capable of sliding up and down with a guide mechanism is sleeved at the upper end of the vertical supporting rod, a manual control pushing rod is articulated at the outer side of the lower end of the sliding sleeve through a fixing pin shaft, a sliding pin shaft is transversely fixed at the lower end of the manual control pushing rod and installed in the transverse chute; a drilling body is vertically fixed at the upper end of the sliding sleeve, and the switch of the drilling body is installed on the vertical supporting rod or on a handrail fixed together with the verticalsupporting rod. The invention can be used for reducing construction difficulty and has the advantages of simplicity and convenience for operation and high working efficiency. In addition, a worker isfar from a drilling tool, therefore, the damage of dust to human body is reduced, and a dust prevention measure is easily adopted.

Description

Bar planting hole-forming device at the bottom of the beam
Technical field
The present invention relates to a kind of drill body aid, bar planting hole-forming device at the bottom of especially a kind of beam.
Background technology
At present, the workman will carry out aerial work by means of ladder usually when constructed in beam subdrilling hole, and this working method is cumbersome, inefficiency.And also there is potential safety hazard in the stability of ladder.Make the workman be in dust atmosphere inevitably with the close contact of drilling tool, do not possess the condition of safety and Health construction.
Summary of the invention
At the deficiencies in the prior art, the object of the present invention is to provide bar planting hole-forming device at the bottom of a kind of beam.
The present invention adopts following technical scheme to realize its purpose: bar planting hole-forming device at the bottom of a kind of beam, comprise a vertical support bar, and vertical support bar one side fixedly has a transverse support bar, and the middle part of this transverse support bar is provided with horizontal concrete chute; The lower end of vertical support bar is provided with controlled elevating mechanism and base, and this vertical post upper is set with one and has the sleeve pipe that guiding mechanism can slide up and down, the outside, lower end of this sliding sleeve is hinged with a manual pull bar by fixed pin shaft, the lower end crosswise fixed of this manual control pull bar has slidiing pin, and this slidiing pin coupling is installed in the described horizontal concrete chute; The upper end of described sliding sleeve is vertically fixed with drill body, and the switch of drill body is installed on the vertical support bar or is installed in and holding up on the bar that vertical support bar is fixed together.
The cross section of described sliding sleeve and support bar is the circle of coupling, is respectively arranged with vertical guiding rib and the vertical gathering sill of coupling between sliding sleeve and the support bar.
The cross section of described sliding sleeve and support bar is the polygon of coupling.
Described elevating mechanism is to be set with a fixed sleeving in the lower end of vertical support bar, and at the fixed sleeving sidewall locating hole is set respectively from top to bottom, and vertical support bar is provided with corresponding jack and alignment pin, and the fixed sleeving lower end is equipped with base.
Described alignment pin is fixed locating stud or is elastic positioning pin that this elastic positioning pin is horizontal through hole to be set and to be symmetrically installed with bearing pin in through hole in the lower end of vertical support bar, between two bearing pins compression spring is installed.
Side in the sliding sleeve lower end is provided with hinged ear, and the upper end of manual pull bar is hinged on this hinged ear.
Transverse support bar also be provided with horizontal center cylindrical void, manual pull bar is arranged in this center cylindrical void, manually pull bar is terminal fixedly symmetrical horizontal slidiing pin, two slidiing pins lay respectively in the horizontal concrete chute of transverse support bar both sides.
The side of vertical support bar is provided with vertical guiding rib or gathering sill, on the inwall of sliding sleeve upper/lower terminal, is symmetrically installed with the pulley with this guiding rib or gathering sill coupling respectively.
The beneficial effect of technical scheme provided by the invention is: 1, utilize auxiliary stand and control the drill body elevating movement, the workman can be positioned at ground and construct, and reduces difficulty of construction, have easy and simple to handle, the advantage of high efficiency.In addition, the workman is away from drilling tool, thereby reduces dust to the infringement of health, and is easy to take dust prevention.
2, the present invention drives the vertical slip of sliding sleeve by the horizontal movement of manual pull bar, and is simple and reliable for structure, makes easily and implements, and easy and simple to handle, result of use is good.
3, make vertical support bar control more convenient by elastic positioning pin.
4, adopt pulley along the structure of guiding rib or gathering sill slip between sliding sleeve and the vertical support bar, make elevating movement control more free and relaxed.
Description of drawings
Fig. 1 is one of structural representation of the present invention;
Fig. 2 is the A-A cross-sectional view of Fig. 1;
Fig. 3 is the another kind of structural representation of controlled elevating mechanism;
Fig. 4 is two of structural representation of the present invention;
Fig. 5 is one of B-B cross-sectional view of Fig. 4;
Fig. 6 be Fig. 4 the B-B cross-sectional view two;
Fig. 7 is the perspective view of the transverse support bar of Fig. 4;
Fig. 8 is the another kind of sliding matching structure between sliding sleeve and the vertical support bar;
Fig. 9 is the C-C cross-sectional view of Fig. 7.
Among the figure, label 1 is cylindrical interior loop bar (or pipe), and 1 ' is loop bar in the square column type (or pipe), 2 is transverse support bar, and 3 for holding up bar, and 4 are expansion link (or stretching pipe), 5 is fixed sleeving, and 6 is cylindrical sliding sleeve, and 6 ' is the square column type sliding sleeve, 7 is base, and 8 is manual pull bar, and 10 is slidiing pin, 11 is fixed pin shaft, and 12 is drill body, and 13 is cable, 14 is fixture, 15 is switch, and 16 is gathering sill, and 16 ' is the guiding rib, 17 is locating hole, 18 is alignment pin, and 19 is handle, and 20 is insulation sleeve, 21 is elastic positioning pin, cylindrical void centered by 22,23 is pulley, 24 is the pulley rotating shaft, 25 is guide pin, and 26 ' and 26 ' is respectively L type positioning sliding block and sheet positioning sliding block.
The specific embodiment
Embodiment one: referring to Fig. 1 and Fig. 2, bar planting hole-forming device at the bottom of a kind of beam comprises that a vertical support bar and transverse support bar form decussate texture.Wherein transverse support bar is vertically fixed on vertical support bar middle part or the appropriate location, middle and lower part.Thereby vertical support bar is divided into the cylindrical interior loop bar 1 of epimere and the cylindrical interior loop bar 4 of hypomere.And what transverse support bar was divided into the transverse support bar (or plate) 2 of left side section and right section holds up bar 3.
Loop bar 1 outside is set with a sleeve pipe that can slide 6 in cylindrical, for preventing sleeve pipe 6 loop bar 1 rotation in cylindrical, the gathering sill 16 of coupling is set at interior loop bar 1, and sleeve pipe 6 is provided with screwed hole, guide pin 25 is installed in the screwed hole, and this guide pin 25 stretches out certain-length and extends in the gathering sill 16.The quantity of gathering sill 16 is not limit, and has one at least.Thereby sleeve pipe 6 only can move up and down and can not rotate along interior loop bar 1.Drill body 12 is fixed on the upper end of sleeve pipe 6 by fixture 14.
Loop bar 4 is sleeved in the sleeve pipe 5 that is fixed on the base 7 in cylindrical, be provided with controlled elevating mechanism between interior loop bar 4 and the sleeve pipe 5, in the present embodiment, this controlled elevating mechanism is at interior loop bar 4 cross binding hole (not with meeting mark) to be set, sleeve pipe 5 is provided with located lateral hole 17, insert in locating hole 17 and the cross binding hole by steady pin 18, be in stationary state between loop bar 4 and the sleeve pipe 5 in making.When needing to adjust the height of interior loop bar 4, extract and inserting after steady pin 18 is changed different locating holes.
Transverse support bar 2 middle parts are provided with horizontal concrete chute 9, and horizontal bar 3 outsides of holding up are set with insulation sleeve (handrail) 20, and insulation sleeve 20 is provided with switch 15, and the cable 13 of drill body is connected on this switch 15.
The outside, lower end of described sliding sleeve 6 is hinged with a manual pull bar 8 by fixed pin shaft 11, the lower end crosswise fixed of this manual control pull bar 8 has slidiing pin 10, these slidiing pin 10 couplings are installed in the described horizontal concrete chute 9, and the end of manual pull bar 8 is provided with handle 19.
During use, put correct position under whole device is positioned over drilled beam, the controlled elevating mechanism of adjusting the lower end makes drill body put the position that relatively approaches under being positioned at beam, open switch 15 then, pulling handle 19 and then driving sliding sleeve 6 are done elevating translational, and sliding sleeve 6 carries drill body 12 and carries out work in lifting.
Embodiment two: accompanying drawing is not drawn, content and embodiment one are basic identical, something in common does not repeat, different is: the loop bar outside is set with a sleeve pipe that can slide in cylindrical, for preventing that sleeve pipe loop bar in cylindrical from rotating, at interior loop bar and sleeve pipe guiding rib and the gathering sill of coupling are set, the guiding rib can be the reinforcing bar on the loop bar in vertically being welded on, perhaps in loop bar be the section bar that has the rib that leads.The quantity of guiding rib 16 ' is not limit, and has one at least.Thereby sleeve pipe only can move up and down and can not rotate along interior loop bar.Drill body 12 is fixed on the upper end of sleeve pipe by fixture.
Embodiment three: referring to Fig. 3, content and embodiment one are basic identical, and something in common does not repeat, and different is: the controlled elevating mechanism that arranges between expansion link 4 and the fixed sleeving 5 adopts elastic positioning pin 21.Be about to fixing among the embodiment one, 18 become resilient key 21.Concrete structure is, at expansion link 4 cross through hole is set, be symmetrically installed with little alignment pin in the through hole, connect with compression spring between the two little alignment pins, spacing with the retaining platform between each little alignment pin and the above-mentioned cross through hole, thus two little alignment pins can eject from the trend both sides in cross through hole but can not break away from cross through hole.In expansion link 4 insertion fixed sleevings 5, two little alignment pins will stretch out and be arranged in locating hole 17 automatically.Because match ratio is tightr between expansion link 4 and the fixed sleeving 5, so two little alignment pins can play enough big supporting role.In addition, the upside of each little alignment pin is set to inclined-plane or curve slope, thus each little alignment pin indentation automatically when being pulled upwardly expansion link after running into corresponding locating hole, eject automatically, easy to use.Downwards during the translation expansion link, need press two little alignment pins simultaneously and make its indentation.
Embodiment four: referring to Fig. 4, and Fig. 5, Fig. 6 and Fig. 7, content and embodiment one are basic identical, and something in common does not repeat, and different is: sliding sleeve 6 ' is the square of coupling with the cross section of support bar 1 ', thereby has saved guiding rib and gathering sill fit structure.On the quadrangle support bar lateral wall or polygon slip collar inwall be provided with L type or sheet positioning sliding block.
In addition, in the present embodiment, be positioned at the sliding sleeve downside fixed pin shaft 11 be arranged on the side, namely the side in the sliding sleeve lower end is provided with hinged ear, the upper end of manual pull bar 8 is hinged on this hinged ear by bearing pin 11.
Transverse support bar also be provided with horizontal center cylindrical void 22, manual pull bar 8 is arranged in this center cylindrical void, manually pull bar 8 is terminal fixedly has symmetrical horizontal slidiing pin 10, two slidiing pins 10 to lay respectively in the horizontal concrete chute 9 of transverse support bar both sides.
Embodiment five: referring to Fig. 8, Fig. 9, content and embodiment one are basic identical, something in common does not repeat, different is: the side of vertical support bar 1 is provided with vertical guiding rib 16 ' (or gathering sill), on the inwall of sliding sleeve 6 upper/lower terminals, be symmetrically installed with the pulley 23 with this guiding rib 16 ' (or gathering sill) coupling respectively, the two ends of pulley rotating shaft 24 are installed on the sliding sleeve inside wall, thereby can not fit tightly and can shake between sliding sleeve 6 and the support bar 1, have good sliding effect again.

Claims (9)

1. bar planting hole-forming device at the bottom of the beam comprises a vertical support bar and base, it is characterized in that: vertical support bar one side fixedly has a transverse support bar, and the middle part of this transverse support bar is provided with horizontal concrete chute; The lower end of vertical support bar is provided with controlled elevating mechanism and base, and this vertical post upper is set with one and has the sleeve pipe that guiding mechanism can slide up and down, the outside, lower end of this sliding sleeve is hinged with a manual pull bar by fixed pin shaft, the lower end crosswise fixed of this manual control pull bar has slidiing pin, and this slidiing pin coupling is installed in the described horizontal concrete chute; The upper end of described sliding sleeve is vertically fixed with drill body, and the switch of drill body is installed on the vertical support bar or is installed in and holding up on the bar that vertical support bar is fixed together; On the polygon support bar lateral wall or polygon slip collar inwall be provided with L type or sheet positioning sliding block.
2. bar planting hole-forming device at the bottom of the beam according to claim 1 is characterized in that: the cross section of described sliding sleeve and support bar is the circle of coupling, is respectively arranged with vertical guiding rib and the vertical gathering sill of coupling between sliding sleeve and the support bar.
3. bar planting hole-forming device at the bottom of the beam according to claim 2 is characterized in that: the guide pin with the gathering sill coupling is installed on the sliding sleeve sidewall.
4. bar planting hole-forming device at the bottom of the beam according to claim 1 is characterized in that: the polygon of the cross section of described sliding sleeve and support bar for mating.
5. bar planting hole-forming device at the bottom of the beam according to claim 1, it is characterized in that: described elevating mechanism is to be set with a fixed sleeving in the lower end of vertical support bar, and at the fixed sleeving sidewall locating hole is set respectively from top to bottom, vertical support bar is provided with corresponding jack and alignment pin, and the fixed sleeving lower end is equipped with base.
6. bar planting hole-forming device at the bottom of the beam according to claim 1, it is characterized in that: described alignment pin is fixed locating stud or is elastic positioning pin, this elastic positioning pin is horizontal through hole to be set and to be symmetrically installed with bearing pin in through hole in the lower end of vertical support bar, between two bearing pins compression spring is installed.
7. bar planting hole-forming device at the bottom of the beam according to claim 1, it is characterized in that: the side in the sliding sleeve lower end is provided with hinged ear, and the upper end of manual pull bar is hinged on this hinged ear.
8. bar planting hole-forming device at the bottom of the beam according to claim 7, it is characterized in that: transverse support bar also be provided with horizontal center cylindrical void, manual pull bar is arranged in this center cylindrical void, manually pull bar is terminal fixedly symmetrical horizontal slidiing pin, and two slidiing pins lay respectively in the horizontal concrete chute of transverse support bar both sides.
9. bar planting hole-forming device at the bottom of the beam according to claim 1, it is characterized in that: the side of vertical support bar is provided with vertical guiding rib or gathering sill, on the inwall of sliding sleeve upper/lower terminal, be symmetrically installed with the pulley with this guiding rib or gathering sill coupling respectively.
CN 201110180695 2011-06-30 2011-06-30 Beam bottom reinforcing bar-planting hole forming device Expired - Fee Related CN102304975B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110180695 CN102304975B (en) 2011-06-30 2011-06-30 Beam bottom reinforcing bar-planting hole forming device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110180695 CN102304975B (en) 2011-06-30 2011-06-30 Beam bottom reinforcing bar-planting hole forming device

Publications (2)

Publication Number Publication Date
CN102304975A CN102304975A (en) 2012-01-04
CN102304975B true CN102304975B (en) 2013-09-25

Family

ID=45378877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110180695 Expired - Fee Related CN102304975B (en) 2011-06-30 2011-06-30 Beam bottom reinforcing bar-planting hole forming device

Country Status (1)

Country Link
CN (1) CN102304975B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102996077A (en) * 2012-12-10 2013-03-27 常熟建工建设集团有限公司苏州分公司 High punch positioning device
CN103406572A (en) * 2013-08-27 2013-11-27 北京北方车辆集团有限公司 Rotating type drilling jig clamp suitable for deep hole machining
CN103611967B (en) * 2013-11-21 2015-08-26 栾蓬勃 A kind of elevation type percussion drill auxiliary support apparatus
CN107538046A (en) * 2016-06-24 2018-01-05 中建六局建设发展有限公司 A kind of portable beam bottom laser positioning bar planting is bored
CN106555482B (en) * 2017-01-24 2019-02-26 中建八局第一建设有限公司 A kind of masonry constructional column bar planting device
CN112942799A (en) * 2021-01-29 2021-06-11 中建七局第二建筑有限公司 Connecting piece for building wall and using method
CN112922315A (en) * 2021-01-29 2021-06-08 中建七局第二建筑有限公司 Firmly-connected wall connecting piece and construction process
CN117399475B (en) * 2023-12-15 2024-03-15 杭州华翊科技有限公司 Manual pipe bending device of oil supply pipeline of turbojet engine

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86206879U (en) * 1986-09-15 1987-08-19 地质矿产部探矿工程研究所 Diamond piercer for construction engineering
CN2265391Y (en) * 1996-04-26 1997-10-22 于明宪 Lifting type airing frame
CN2326116Y (en) * 1998-03-03 1999-06-30 王定华 Translational telescopic clothes-airing holder
CN2345565Y (en) * 1998-07-16 1999-10-27 陈东 Clothes hanger
CN202227990U (en) * 2011-06-30 2012-05-23 河南国基建设集团有限公司 Beam bottom bar planting hole forming device

Also Published As

Publication number Publication date
CN102304975A (en) 2012-01-04

Similar Documents

Publication Publication Date Title
CN102304975B (en) Beam bottom reinforcing bar-planting hole forming device
CN202227990U (en) Beam bottom bar planting hole forming device
CN107920443B (en) A kind of outdoor communication cabinet with anti-soaking function
CN105108716A (en) Portable and adjustable percussion drill support for ceiling drilling
CN204896772U (en) Extract device with centre bore part
CN112606223B (en) Semi-automatic vertical drilling device
CN201202298Y (en) Apparatus for erecting or laying down thin long rod
CN206677242U (en) A kind of boring device of top plate
CN109761160B (en) Electric power screen cabinet migration device
CN204024078U (en) For the rig falsework of bar planting bottom beam slab
CN204700349U (en) A kind of beam slab bar planting boring bar tool
CN209288360U (en) A kind of boring supporting structure
CN205008624U (en) Electric portable drill support
CN111645202A (en) Movable automatic lifting rack of drilling machine for reinforcing railway retaining wall
CN208662089U (en) Multifunction transformer disassembles hanging apparatus automatically
CN206436185U (en) A kind of rotatable pneumatic valve piston assembly tooling
CN205382893U (en) Tubular column handling device and tubular column snatchs mechanism thereof
CN205532244U (en) Be applied to portable operation ladder of production tree operation
CN209856662U (en) Movable device for fixing electric drill
CN219530603U (en) Telescopic movable lighthouse
CN220066735U (en) Cable fixing support
CN116131158B (en) Equipotential operation device and method for high-voltage transmission line
CN218844238U (en) Stable drill rig frame body
CN117287019B (en) Scaffold for building
CN220710061U (en) Ultrahigh-voltage vegetable oil transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Yihuan

Inventor after: Pan Xiaohui

Inventor after: Zhou Jing

Inventor after: Chen Ganyu

Inventor after: Xie Fenglin

Inventor after: Lu Ping

Inventor after: Zhao Tianming

Inventor after: Wang Haihong

Inventor after: Li Xiaosong

Inventor after: Tang Shunli

Inventor before: Li Yihuan

Inventor before: Pan Xiaohui

Inventor before: Zhou Jing

Inventor before: Chen Ganyu

Inventor before: Xie Fenglin

Inventor before: Lu Ping

Inventor before: Zhao Tianming

Inventor before: Wang Haihong

Inventor before: Li Xiaosong

Inventor before: Zhu Xiaozhi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI YIYUAN ZHOU JING CHEN GANYU XIE FENGLIN LU PING ZHAO TIANMING WANG HAIHONG LI XIAOSONG ZHU XIAOZHI PAN XIAOHUI TO: LI YIYUAN ZHOU JING CHEN GANYU XIE FENGLIN LU PING ZHAO TIANMING WANG HAIHONG LI XIAOSONG TANG SHUNLI PAN XIAOHUI

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925