CN102296611A - Construction method of foundation slab - Google Patents

Construction method of foundation slab Download PDF

Info

Publication number
CN102296611A
CN102296611A CN2011101616892A CN201110161689A CN102296611A CN 102296611 A CN102296611 A CN 102296611A CN 2011101616892 A CN2011101616892 A CN 2011101616892A CN 201110161689 A CN201110161689 A CN 201110161689A CN 102296611 A CN102296611 A CN 102296611A
Authority
CN
China
Prior art keywords
ater
casting
casting zone
later casting
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101616892A
Other languages
Chinese (zh)
Inventor
张耀龙
李克江
卢国豪
楼永良
蒋金生
古正华
姚晓东
陈赛菊
刘建平
龚小东
宋巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd Tianjin Branch
Original Assignee
Zhongtian Construction Group Co Ltd Tianjin Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd Tianjin Branch filed Critical Zhongtian Construction Group Co Ltd Tianjin Branch
Priority to CN2011101616892A priority Critical patent/CN102296611A/en
Publication of CN102296611A publication Critical patent/CN102296611A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a construction method of a foundation slag, which comprises the steps: firstly, constructing an under layer; secondarily, constructing a reinforcing layer of a later casting zone, a waterproof layer, a waterproof protection layer, concrete structures at two sides of the later casting zone and a concrete structure of the later casting zone in sequence, wherein the reinforcing layer of the later casting zone is positioned below the later casting zone and of an integral structure formed by steel plates laid in the length direction of the later casting zone, two sides of the steel plates both exceed the later casting zone in the width direction of the later casting zone, and the adjacent steel plates are welded in the length direction of the later casting zone. In the invention, the integral steel plate structure is used as the reinforcing layer of the later casting zone and used for substituting for a reinforced concrete structure, thus the structure and construction procedures of the reinforcing layer of the later casting zone can be simplified, and the work amount and labor force can be reduced. After the under layer is constructed, the steel plates are placed at the designed positions, thus the construction is convenient, the work amount is reduced greatly, the working efficiency is improved, the construction time is reduced, the project cost is decreased and the economic benefits and the social benefits are remarkable.

Description

The job practices of sole plate
Technical field
The present invention relates to a kind of job practices of sole plate.
Background technology
At present, the sole plate Structural Engineering can be provided with the ater-casting for solving differential settlement or reducing temperature shrinkage crack problem.The ater-casting is meant in cast-in-place whole reinforced concrete structure, only the provisional band shape seam of retaining in construction period plays the effect of digestion sedimentation shrinkage strain, according to requirement of engineering, after keeping certain hour, again with the closely knit structure that becomes continuous integral body of concreting.At present, adopt the engineering that the ater-casting is set generally enhancement Layer to be set at the position, ater-casting.Enhancement Layer generally adopts reinforced concrete structure, and the earthwork of enhancement Layer position needs the local subsidence excavation, assembling reinforcement, and concreting, maintenance, time-consuming.Especially grade beam sinking position, the operation exception complexity.
Summary of the invention
The present invention provides a kind of job practices of sole plate for solving the technical problem that exists in the known technology, this job practices easy construction, and speed is fast, the efficient height, cost is low.
The technical scheme that the present invention takes for the technical problem that exists in the solution known technology is: a kind of job practices of sole plate; elder generation's construction cushion coat; the ater-casting enhancement Layer of constructing successively again; waterproofing course; fish tail and waterproof layer; the concrete structure of both sides, ater-casting and the concrete structure of ater-casting; described ater-casting enhancement Layer is positioned at the below of ater-casting; the integrative-structure that described ater-casting enhancement Layer is served as reasons and formed along the steel plate of ater-casting length direction laying; on the width of ater-casting; the both sides of described steel plate all exceed the ater-casting; on the length direction of ater-casting, adjacent described steel plate welding.
On the width of ater-casting, the every side of described steel plate exceeds the equal in length of ater-casting, and all more than or equal to 500mm.
Advantage and good effect that the present invention has are: the ater-casting enhancement Layer adopts the steel plate structure that forms one to replace reinforced concrete structure, has simplified the structure and the working procedure of ater-casting enhancement Layer, has reduced engineering quantity and labour; After cushion construction finishes, only need that steel plate is pressed the design attitude placement and get final product, easy construction, the workload that can lighten one's labor is greatly increased work efficiency, and reduces the engineering time, reduces engineering cost, economic benefit and obvious social benefit.
Description of drawings
The structural representation that Fig. 1 uses for the present invention.
Among the figure: 1, plain soil, 2, bed course, 3, the ater-casting enhancement Layer, 4, waterproofing course, 5, fish tail and waterproof layer, 6, the concrete structure of both sides, ater-casting, 7, the ater-casting.
The specific embodiment
For further understanding summary of the invention of the present invention, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows:
See also Fig. 1, a kind of job practices of sole plate may further comprise the steps:
One) after being excavated at the bottom of the foundation ditch, the plain soil 1 of labor cleaning's foundation ditch, behind the check of foundation subsoil, construction cushion coat 2; After the construction of bed course 2 is finished, it is carried out maintenance; Measure the position of determining ater-casting 7, after the concrete for the treatment of bed course 2 reaches the intensity of designing requirement, 7 length direction is laid on the below of ater-casting 7 to the thick steel plate 3 of 5~20mm that width is wideer a meter than the ater-casting along the ater-casting, makes that steel plate 3 every sides are wide to go out ater-casting 500mm at least; 7 the length direction along the ater-casting adopts 45 ° of groove welding between the adjacent steel plate 3;
Two) concrete structure 6 of construction waterproof layer 4, fish tail and waterproof layer 5 and both sides, ater-casting successively, the concrete structure of the ater-casting 7 of constructing at last.
Although in conjunction with the accompanying drawings the preferred embodiments of the present invention are described above; but the present invention is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment only is schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; not breaking away under the scope situation that aim of the present invention and claim protect, can also make a lot of forms, these all belong within protection scope of the present invention.

Claims (2)

1. the job practices of a sole plate; elder generation's construction cushion coat; construct the successively again concrete structure of ater-casting enhancement Layer, waterproofing course, fish tail and waterproof layer, both sides, ater-casting and the concrete structure of ater-casting; described ater-casting enhancement Layer is positioned at the below of ater-casting; it is characterized in that; the integrative-structure that described ater-casting enhancement Layer is served as reasons and formed along the steel plate of ater-casting length direction laying; on the width of ater-casting; the both sides of described steel plate all exceed the ater-casting; on the length direction of ater-casting, adjacent described steel plate welding.
2. the job practices of sole plate according to claim 1 is characterized in that, on the width of ater-casting, the every side of described steel plate exceeds the equal in length of ater-casting, and all more than or equal to 500mm.
CN2011101616892A 2011-01-28 2011-06-16 Construction method of foundation slab Pending CN102296611A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101616892A CN102296611A (en) 2011-01-28 2011-06-16 Construction method of foundation slab

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201120029580.9 2011-01-28
CN201120029580 2011-01-28
CN2011101616892A CN102296611A (en) 2011-01-28 2011-06-16 Construction method of foundation slab

Publications (1)

Publication Number Publication Date
CN102296611A true CN102296611A (en) 2011-12-28

Family

ID=45357274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101616892A Pending CN102296611A (en) 2011-01-28 2011-06-16 Construction method of foundation slab

Country Status (1)

Country Link
CN (1) CN102296611A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499498A (en) * 2014-12-24 2015-04-08 河北省电力勘测设计研究院 Construction method of mass concrete construction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29900313U1 (en) * 1999-01-11 1999-04-08 Tiletschke, Lothar, 32130 Enger Joint element between two concrete bodies with external joint sealing tape
CN1467351A (en) * 2002-05-28 2004-01-14 日吉华株式会社 Joint connecting equipment
CN101498136A (en) * 2008-02-03 2009-08-05 钱忠勤 After-pouring strips structure with high underground water level
CN101666125A (en) * 2009-09-15 2010-03-10 中建四局第三建筑工程有限公司 Sealing method and structure of late poured band of basement

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29900313U1 (en) * 1999-01-11 1999-04-08 Tiletschke, Lothar, 32130 Enger Joint element between two concrete bodies with external joint sealing tape
CN1467351A (en) * 2002-05-28 2004-01-14 日吉华株式会社 Joint connecting equipment
CN101498136A (en) * 2008-02-03 2009-08-05 钱忠勤 After-pouring strips structure with high underground water level
CN101666125A (en) * 2009-09-15 2010-03-10 中建四局第三建筑工程有限公司 Sealing method and structure of late poured band of basement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499498A (en) * 2014-12-24 2015-04-08 河北省电力勘测设计研究院 Construction method of mass concrete construction
CN104499498B (en) * 2014-12-24 2016-11-23 河北省电力勘测设计研究院 A kind of construction method of mass concrete building

Similar Documents

Publication Publication Date Title
CN101550698B (en) Constructing method for basic pit at the upper part of shield tunnel
CN101858222B (en) Method for controlling deformation in zero-distance tunneling of new tunnel under existing subway construction
CN103388341B (en) Large-sized piled raft foundation structure and construction method
CN203239357U (en) Adjacent tunnel supporting structure suitable for collapsible loess
CN104594361B (en) A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN105178327A (en) Composite retaining structure of foundation pit project and construction method thereof
CN103711056B (en) Steel tool-type temporary construction road and construction method thereof
CN108678751A (en) The shield cutter inspection-pit assembly construction method excavated after first jacking
CN104674863A (en) Method for reinforcing existing municipal pipe gallery within deep foundation pit excavation range
CN108952766A (en) The construction method of Tunnel Passing karst location punishment
CN206570840U (en) Gravity type retaining wall structure formed by waste tires
CN203383223U (en) Large piled raft foundation structure
CN107654239A (en) A kind of tunnel bottom is excavated and inverted arch construction method
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN109826230A (en) A kind of town road pipeline reinforcement protection structure and its construction method
CN101285302B (en) Method for reinforcing caisson of concrete dam
CN108412499A (en) A kind of vertical reparation shaft wall structure
CN108708727A (en) The shield cutter inspection-pit assembly construction method of jacking after half excavation
CN210163910U (en) Pipeline pipe jacking receiving well foundation pit supporting structure
CN108708736A (en) Shield cutter inspection-pit assembly construction method
CN102296611A (en) Construction method of foundation slab
CN107299635A (en) A kind of soft soil foundation slope collapse support reinforcement method
CN203066083U (en) Supporting structure for two adjacent foundation pits
CN203373753U (en) Pile anchor retaining wall concrete anchor cable top beam structure of foundation ditches
CN202899176U (en) Existing bridge pile foundation cross section increasing reinforced structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111228