CN102289452A - Method and device for outputting telecommunication network management performance data - Google Patents

Method and device for outputting telecommunication network management performance data Download PDF

Info

Publication number
CN102289452A
CN102289452A CN201110165840XA CN201110165840A CN102289452A CN 102289452 A CN102289452 A CN 102289452A CN 201110165840X A CN201110165840X A CN 201110165840XA CN 201110165840 A CN201110165840 A CN 201110165840A CN 102289452 A CN102289452 A CN 102289452A
Authority
CN
China
Prior art keywords
information
data
output
time granularity
performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110165840XA
Other languages
Chinese (zh)
Other versions
CN102289452B (en
Inventor
曾钦宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201110165840.XA priority Critical patent/CN102289452B/en
Publication of CN102289452A publication Critical patent/CN102289452A/en
Priority to PCT/CN2012/071609 priority patent/WO2012174882A1/en
Application granted granted Critical
Publication of CN102289452B publication Critical patent/CN102289452B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention discloses a method for outputting telecommunication network management performance data. The method comprises the following steps: acquiring the performance object (PO) data of each device according to time granularity; searching for a pre-established reference performance object (RPO) reference table according to an output time period designated in the received performance data output instruction and the first PO information needing to output performance data included in the output time period, and determining the time granularity information included by the first PO needing to output performance data in the output time period; and searching for the acquired PO data according to the time granularity included in the time granularity information of the first PO to obtain the PO data of the first PO ordered according to the time granularity in the output time period, wherein the PO data of the first PO of the time granularity in which PO data are not found are null.

Description

A kind of method and device of telecommunicatioin network management performance data output
Technical field
The present invention relates to the communications field, refer to a kind of method and device of telecommunicatioin network management performance data output especially.
Background technology
(telecommunication network management provides five big basic functions to one of performance management five big management functions that to be telecom network management system provide for telecommunications network and telecommunication service, comprise performance management, configuration management, safety management, fault management and accounting management), mainly the service data of gathering from network element by Collection and analysis monitors and the behavior and the efficient of roll-off network and network element, helps the user to carry out planning, enforcement and maintenance and quality of service measurement.For the operation conditions of awareness network and network element, performance management needs regularly to gather from the network element of being managed the performance data of mobile system, deposits in then in the background data base, uses during for statistical study.
And in telecom network management system, the processing of performance data is a problem that is difficult to thorough solution always, because be reported to performance object (the Performance Object of background net management system from foreground equipment, PO) data are unordered at random, and will offering final user's performance data, the backstage network management system divides with time granularity, order, complete is arranged, and wherein, a time granularity just is meant a time slice; This contradiction is that performance data is handled the basic reason that has defective all the time.At present, collection and existing more complete algorithm and the realization of filling mining for performance data, can guarantee the foreground can be correctly, collecting performance data intactly, but can't guarantee that still these data can both be deposited in the background data base, this just makes that also the performance data in the performance database of backstage is not that each moment data all is complete.Cause the incomplete reason of performance data in the performance database of backstage mainly to be: first, when wireless system is busy, for guaranteeing the real-time report of data such as the higher alarm of priority, signaling, probe, (Quality of Service QOS) can allow the some or all of delay of performance data report or abandons the system service quality; The second, take place to open circuit for a long time at the AM/BAM link, Network Transmission occurs long-time when congested, also can cause section data to lose.
In sum, because foreground equipment fails to collect the PO data or the data failed that collects deposits in the background data base, this all can cause in the user inquiring performance data, can not intuitively, clearly see the data of disappearance, what lack is the data of which time granularity, influence is to the performance monitoring and the analysis of total system, and then can increase the difficulty of performance evaluation and localization of fault.
Summary of the invention
The embodiment of the invention provides a kind of telecommunicatioin network management performance data output intent and device, in order to solve the disappearance that exists in the prior art owing to indivedual or whole PO data in the background data base, performance evaluation and the big problem of localization of fault difficulty that cause to total system.
The embodiment of the invention provides a kind of method of telecommunicatioin network management performance data output, comprising:
Gather the performance object PO data of each equipment by the time granularity;
According to the output time section of appointment in the performance data output order that receives and a PO information of the needs output performance data that comprise, search in advance set up with reference to performance object RPO reference table, time granularity information that need to determine a PO of output performance data in described output time section, to comprise; The time granularity information that comprises PO information and each PO in the described RPO reference table;
The time granularity that comprises in the time granularity information according to a described PO, search the PO data of collection, obtain the PO data of the PO that the sequencing by the time granularity in the described output time section arranges, the PO data of a PO of time granularity that wherein do not find the PO data are for empty.
Accordingly, the embodiment of the invention also provides a kind of telecommunicatioin network management performance data output unit, comprising:
Reference table is set up the unit, is used for setting up in advance the RPO reference table of the time granularity information that comprises PO information and each PO;
Data acquisition unit is used for gathering by the time granularity performance object PO data of each equipment;
Time granularity information determining unit, be used for according to the output time section of the performance data output order appointment that receives and a PO information of the needs output performance data that comprise, search in advance the RPO reference table of setting up, time granularity information that need to determine a PO of output performance data in described output time section, to comprise;
PO data output unit, be used for the time granularity that the time granularity information according to a described PO comprises, search the PO data of collection, obtain the PO data of the PO that the sequencing by the time granularity in the described output time section arranges, the PO data of a PO of time granularity that wherein do not find the PO data are for empty.
Beneficial effect of the present invention is as follows:
The telecommunicatioin network management performance data output intent that the embodiment of the invention provides, this method is when receiving the performance data output order, can at first search the RPO reference table of setting up in advance, find the time granularity information that needs the PO that exports in the instruction, according to the time granularity that comprises in this time granularity information, in the required PO data of PO data search of gathering, obtain the PO data that the required sequencing by the time granularity is arranged, the PO data that do not find the time granularity of PO data are sky.What finally obtain by this method is orderly data, even Foreground Data fails to collect the PO loss of data that PO data or foreground collect, what also can clearly see disappearance is the data of which time granularity, can real-time and effective to the performance monitoring and the analysis of total system, can carry out performance evaluation and localization of fault fast and accurately, avoided the disappearance of indivedual or whole PO data in the background data base, performance evaluation and the big problem of localization of fault difficulty that cause to total system.
Description of drawings
Fig. 1 is the process flow diagram of embodiment of the invention telecommunicatioin network management performance data output intent;
Fig. 2 sets up the process flow diagram of RPO reference table for the embodiment of the invention;
Fig. 3 sets up the preferred embodiment process flow diagram of RPO reference table for the embodiment of the invention;
Fig. 4 is the process flow diagram of embodiment of the invention inquiry KPI;
Fig. 5 is the process flow diagram of embodiment of the invention output PO data;
Fig. 6 is the structural representation of embodiment of the invention telecommunicatioin network management performance data output unit.
Embodiment
At the disappearance that exists in the prior art owing to indivedual or whole PO data in the background data base, performance evaluation and the big problem of localization of fault difficulty that cause to total system, the embodiment of the invention provides a kind of method of telecommunicatioin network management performance data output, the flow process of the inventive method as shown in Figure 1, execution in step is as follows:
Step S10: the performance object PO data of gathering each equipment by the time granularity.
Concrete, setting-up time granularity at first, time granularity can be time slice arbitrarily, for example 10 minutes, 20 minutes, 60 minutes or the like, can be according to specifically setting.Gather the PO data of each equipment then, equipment can corresponding a plurality of PO, also can the corresponding a plurality of equipment of PO.The PO data comprise PO information, performance parameter information, acquisition time information, and wherein, PO information comprises PO title and PO sign.
More excellent, during PO data that storage of collected arrives, performance database can be set, with the PO data storage of gathering in performance database.
Step S20: when receiving the performance data output order, according to the output time section of appointment in the performance data output order that receives and a PO information of the needs output performance data that comprise, search in advance set up with reference to performance object RPO reference table, time granularity information that need to determine a PO of output performance data in the output time section, to comprise; Wherein, the time granularity information that comprises PO information and each PO in the RPO reference table.
Concrete, foundation comprises the RPO reference table of the time granularity information of PO information and each PO, as shown in Figure 2, comprises the steps:
Step S201: when each time granularity arrives, the PO information of gathering each equipment.
When each time granularity of setting arrives, the PO information of gathering each equipment.What here gather is the PO information of each equipment, is different from each the equipment PO data of collection among the step S10, and the PO data comprise PO information, and PO information comprises the configuration information of equipment etc.
Step S202: the PO information of arranging each equipment that collects according to the sequencing of the time granularity of the PO information of gathering each equipment, or at each time granularity, the PO information of each equipment that record acquisition arrives, generation comprises the RPO reference table of the time granularity information of PO information and each PO.
Concrete, the form of the RPO reference table of the time granularity of here setting up that comprises PO information and each PO can have two kinds, a kind of is the PO information of arranging each equipment that collects according to the sequencing of the time granularity of the PO information of gathering each equipment, the RPO reference table that obtains like this is exactly the PO at each equipment, the PO information of arranging each equipment that collects according to the order of time granularity; Another kind is at each time granularity, comes the PO information of each equipment that record acquisition arrives, and the RPO reference table that obtains like this is the PO information of each equipment under granularity at the same time.
Above-mentioned receptivity data output instruction can have two kinds of situations:
First kind: receive the performance data output order that initiatively triggers according to the triggering rule of setting.
Concrete, the part or all of PO that selects selected equipment according to the triggering rule of setting is as a PO, and definite output time section, generates the performance data output order of a PO information that comprises output time section and selection.
Here the rule of She Dinging can be set according to concrete situation, for example, in order to obtain fixing situation every day in the performance data of certain time, just can be set in regular time every day provides the performance data output order, just can trigger this performance data output order in that regular time every day then.
Second kind: receive performance data output order according to the query statement triggering of user's input.
Concrete, one or more KPI that user's input will be inquired about, and the output time section of user's setting; Parse the PO corresponding as a PO according to predefined KPI computing formula with each KPI; Generation comprises the performance data output order of output time section and a PO information that parses.
Be that the user initiatively imports the KPI that will inquire about in this case, can KPI of one query, also can inquire about a plurality of KPI simultaneously, the output time section that input simultaneously will be inquired about, for example, four KPI that inquire about in 10 o'clock to the 11 o'clock morning, time granularity is 10 minutes, so, method of the present invention just can parse the PO corresponding with each KPI according to predefined KPI computing formula, and generates the performance data output order of the PO information that comprises the output time section and parse.Inquire about if import a plurality of KPI, can resolve the PO of each KPI correspondence successively, also can parse the PO corresponding with each KPI simultaneously, wherein, the formula that calculates KPI according to the PO data belongs to prior art, here repeats no more.
Step S30: the time granularity that comprises in the time granularity information according to a PO, search the PO data of collection, obtain the PO data of the PO that the sequencing by the time granularity in the output time section arranges, the PO data of a PO of time granularity that wherein do not find the PO data are for empty.
Concrete, at the receptivity data output instruction, search the process of the PO data of collection, concrete step is: the RPO reference table that a PO information searching that comprises according to the performance data output order is set up in advance; At a PO information that in the RPO reference table, exists, create first query statement that comprises the output time section; At a non-existent PO information in the RPO reference table, create second query statement that comprises the output time section; Carry out first query statement and/or second query statement, the PO data of in the PO data of gathering, searching each time granularity of a PO in the output time section, with the PO data that obtain the PO that the sequencing by the time granularity in the output time section arranges of the PO that finds, the PO data of a PO of time granularity that do not find the PO data are for empty.
Concrete, when among the step S10 with after the PO data storage of gathering is in performance database, at the receptivity data output instruction, when searching the PO data of collection, the PO data of in the performance database that is provided with, searching each time granularity of a PO in the output time section.
Above-mentioned at the embodiment that sets up the RPO reference table of the time granularity information that comprises PO information and each PO in each time granularity, as shown in Figure 3, flow process is as follows:
Step S211: when each time granularity arrived, flow process began.
Step S212: all PO information in the traversal queries RPO reference table.
Step S213: from the RPO reference table, take out a PO information.
Step S214: the PO information with extracting deposits in the RPO reference table with time granularity information.
Step S215: judge whether the next PO information in the RPO reference table is empty, if change step S217 over to; Otherwise, change step S216 over to.
Step S216: take out next PO information, execution in step S214.
Step S217: all generated record in the RPO reference table in each PO information of this time granularity, flow process finishes.
All carry out above-mentioned flow process at each time granularity, just can generate the RPO reference table of the time granularity information that comprises PO information and each PO.
More excellent, during the above-mentioned performance data output order that triggers according to the query statement of user's input, the user carries out the specific implementation of performance data query analysis, as shown in Figure 4, comprises the steps:
Step S301: the user selects KPI on the interface, flow process begins.
Step S302: create outermost selection (select) part in the query statement according to the querying condition that the user selects.
Querying condition is meant output time section and one or more KPI that the user imports.
Step S303 a: KPI who extracts user's input.
Step S304: judge whether the PO that parses according to this KPI is present in the RPO reference table, if change step S305 over to; Otherwise, change step S307 over to.
Step S305: the PO information of taking out this KPI correspondence.
Step S306: create the output time section comprise user's input, by outer first query statement that connects (left join) key word RPO reference table Left-wing Federation corresponding in a left side with the PO information of taking-up.
Step S307: create the Structured Query Language (SQL) output time section, common (Structured Query Language, SQL) second query statement that comprise user's input.
At the KPI that selects, may generate what all be that first query statement also may generate all is second query statement, also may the both have.
This is because at the KPI that selects, judge whether the PO that parses according to this KPI is present in the RPO reference table, if form first query statement, otherwise form second query statement.So, just PO that might be all be present among the RPO or all PO do not exist with RPO in again or part be present among the RPO part and be not present among the RPO, the result who obtains so only generates first query statement or only generates second query statement or existing first query statement has second query statement again.
Step S308: judge whether next KPI is empty, if change step S310 over to; Otherwise, change step S309 over to.
Step S309: extract next KPI, and return execution in step S304.
Step S310: first query statement that will create and/or second query statement and outermost select partly are merged into a SQL query statement.
Step S311: carry out SQL query statement query performance database.
Wherein, in the SQL query statement that forms, comprise first query statement and/or second query statement, when carrying out the SQL query statement, just can reach the effect of execution first query statement and/or second query statement.
Step S312:, export its Query Result for empty for the KPI in the output time section of user's input that does not inquire for the KPI output Query Result in the output time section of user's input that inquires.Flow process finishes.
Above-mentioned flow process can realize whether the PO that parses at KPI is present in a plurality of query statement of generation in the RPO reference table, i.e. first query statement and second query statement, and a plurality of query statement that will generate then merges, and carries out conjunctive query.This is at first to have generated the statement that carries out conjunctive query, inquires about the PO data of KPI correspondence then.
More excellent, during the above-mentioned performance data output order that initiatively triggers according to the triggering rule of setting, the specific implementation of carrying out performance data output as shown in Figure 5, comprises the steps:
Step S321: when receiving the performance data output order that initiatively triggers according to the triggering rule of setting, performance data output task triggers, and flow process begins.
Wherein the part or all of PO that has selected selected equipment according to the triggering rule of setting is as a PO, and determined the output time section, includes a PO information of output time section and selection like this in the performance data output order of Sheng Chenging.
Step S322: the part or all of PO of the equipment that traversal is selected.
Step S323: extract a PO.
Step S324: whether the PO data of judging the PO that takes out are empty, if change step S333 over to, otherwise change step S325 over to.
Step S325: judge whether these PO data have corresponding PO information in the RPO reference table, if do not change step S328 over to; Otherwise, change step S326 over to.
Step S326: take out this PO information.
Step S327: create and to comprise first query statement definite output time section, by the left join key word RPO reference table Left-wing Federation corresponding with the PO information of taking-up.
Step S328: create second query statement that comprises the definite SQL query statement output time section, common.
Step S329: carry out the first or second query statement query performance database.
Step S330: storing queries result.
For the direct output PO data of finding PO, the corresponding output Query Result of PO that do not inquire is for empty.
Step S331: whether the PO data of judging next PO are empty, if then change step S332 over to, otherwise return step S333.
Step S332: extract next PO, return execution in step S324.
Step S333: all PO all check out, and have stored Query Result.Flow process finishes.
Aforesaid way does not merge the query statement that generates, and first query statement that just will not generate and second query statement merge, and realizes data query but carry out each query statement respectively, finally obtains the PO data of the PO of all needs inquiries.
With two specific embodiments method flow of the present invention is described below:
Embodiment one:
At first, the setting-up time granularity is 10 minutes, on the foreground will with 10 minutes be the PO data that each equipment is gathered in a unit, and with the PO data storage that collects in the performance database on backstage.
Simultaneously, on the backstage, when each time granularity of setting arrives, be the PO information that a time quantum is gathered each equipment of foreground just with 10 minutes, and, generate the RPO reference table of the time granularity information that comprises PO information and each PO according to the PO information that the sequencing of the time granularity of the PO information of gathering each equipment is arranged each equipment that collects.The reflection of this RPO reference table be exactly data to be arranged in which time, and these time granularities also have sequencing, the sequencing of this time granularity is recorded in the PO information, this just provides reference for later output performance data, but being indifferent to here specifically is any data, so be different with the PO data of setting up the performance database collection.
Then, receive predefined triggering rule, such as at 10 in every morning just begins to export 10 o'clock to 11 o'clock these output time sections, the PO of selected all devices is a PO the most, generates then to comprise this output time section and the performance data output order of a PO information in 10 o'clock to the 11 o'clock morning.
Then, determine 10 o'clock to 10: 10,10: 10 to 10: 20,10: 20 to 10: 30,10: 30 to 10: 40,10: 40 to 10: 50,10 o'clock 50 minutes to 11 these 6 time granularities in 10 o'clock to 11 o'clock these output time sections that comprise in the time granularity information of a PO.The RPO reference table that a PO information searching that comprises according to the performance data output order is set up in advance; If in the RPO reference table, there is the PO information of each PO among the PO who selects, establishment comprises 10 o'clock to 11 o'clock these output time sections query statement of winning, here can the utilization structure query language (Structured Query Language, SQL) the key word left join of conjunctive query creates first query statement; If there is not the PO information of each PO of selection in the RPO reference table, create second query statement of the SQL of nature conjunctive query; Carry out first query statement or second query statement, in performance database, search the PO data of 6 time granularities of a PO in 10 o'clock to 11 o'clock these output time sections, if the PO data that inquire were divided into PO1 at 10 o'clock to 10: 10, be divided into PO2 to 10: 30 in 10: 20, be divided into PO3 to 10: 50 in 10: 40, the result who finally obtains be exactly PO data that inquire in 10 o'clock to 11 o'clock these output time sections be to be divided into PO1 to 10: 10 at 10 o'clock, be divided into sky to 10: 20 in 10: 10, be divided into PO2 to 10: 30 in 10: 20, be divided into sky to 10: 40 in 10: 30, be divided into PO3 to 10: 50 in 10: 40,10 o'clock 50 minutes to 11 is empty.
From the above-mentioned result who obtains, the loss of data of knowing that time granularity that we can be cheer and bright, this can carry out performance evaluation and localization of fault fast.
Embodiment two:
At first, the setting-up time granularity is 15 minutes, on the foreground will with 15 minutes be the PO data that each equipment is gathered in a unit, and with the PO data storage that collects in the performance database on backstage.
Simultaneously, on the backstage, when each time granularity of setting arrives, be the PO information that a time quantum is gathered each equipment of foreground just with 15 minutes, and, generate the RPO reference table of the time granularity information that comprises PO information and each PO according to the PO information that the sequencing of the time granularity of the PO information of gathering each equipment is arranged each equipment that collects.The reflection of this RPO reference table be exactly data to be arranged in which time, and these time granularities also have sequencing, the sequencing of this time granularity is recorded in the PO information, this just provides reference for later output performance data, but being indifferent to here specifically is any data, so be different with the PO data of setting up the performance database collection.
Then, receive the query statement of user's input, such as inquiry KPI1, KPI2 and the KPI3 in 1 o'clock to 2 o'clock this output time section in the afternoon, computing formula according to predefined KPI parses the PO corresponding with each KPI as a PO, generates then to comprise this output time section and the performance data output order of a PO information in 1 o'clock to 2 o'clock afternoon.
Then, determine 1 o'clock to 1: 15,1: 15 to 1: 30,1: 30 to 1: 45,1 o'clock 45 minutes to 2 these 4 time granularities in this output time section in 1 o'clock to 2 o'clock afternoon that comprise in the time granularity information of a PO.The RPO reference table that a PO information searching that comprises according to the performance data output order is set up in advance; If in the RPO reference table, there is the PO information of each PO among the PO who selects, establishment comprises first query statement of 1 o'clock to 2 o'clock this output time section in afternoon, here can the utilization structure query language (Structured Query Language, SQL) the key word left join of conjunctive query creates first query statement; If there is not the PO information of each PO of selection in the RPO reference table, create second query statement of the SQL of nature conjunctive query; Carry out first query statement or second query statement, in performance database, search the PO PO data of 4 time granularities in 1 o'clock to 2 o'clock this output time section in the afternoon, if the PO data that inquire were divided into PO5,1: 30 at 1 o'clock to 1: 15 and are divided into PO6 to 1: 45, the result who obtains be exactly in the afternoon the PO data that inquire in 1 o'clock to 2 o'clock this output time section be to be divided into PO5,1: 15 to 1: 15 at 1 o'clock to be divided into sky, 1: 30 to 1: 30 and to be divided into PO6,1 o'clock 45 minutes to 2 for empty to 1: 45.The KPI that can obtain inquiring about again according to the relational expression between KPI and the PO.
The above-mentioned telecommunicatioin network management performance data output intent that provides based on embodiment, the embodiment of the invention also provides a kind of telecommunicatioin network management performance data output unit, this device can be arranged in any telecom network management system that needs the output performance data, and its structure comprises as shown in Figure 6:
Reference table is set up unit 10, is used for setting up in advance the RPO reference table of the time granularity information that comprises PO information and each PO.
Concrete, reference table is set up unit 10, also is used for: when each time granularity arrives, and the PO information of gathering each equipment; The PO information of arranging each equipment that collects according to the sequencing of the time granularity of the PO information of gathering each equipment, or at each time granularity, the PO information of each equipment that record acquisition arrives, generation comprises the RPO reference table of the time granularity information of PO information and each PO.
Data acquisition unit 20 is used for gathering by the time granularity performance object PO data of each equipment.
Time granularity information determining unit 30, be used for according to the output time section of the performance data output order appointment that receives and a PO information of the needs output performance data that comprise, search in advance the RPO reference table of setting up, time granularity information that need to determine a PO of output performance data in the output time section, to comprise.
Concrete, time granularity information determining unit 30 is used for: receive the performance data output order that initiatively triggers according to the triggering rule of setting; Perhaps receive performance data output order according to the query statement triggering of user's input.
More specifically, time granularity information determining unit 30, also be used for: the part or all of PO that selects selected equipment according to the triggering rule of setting is as a PO, and definite output time section, generates the performance data output order of a PO information that comprises output time section and selection; Perhaps the user imports one or more KPI that will inquire about, and the output time section of user's setting; Parse the PO corresponding as a PO according to predefined KPI computing formula with each KPI; Generation comprises the performance data output order of output time section and a PO information that parses.
PO data output unit 40, be used for the time granularity that the time granularity information according to the PO that determines comprises, search the PO data of collection, obtain the PO data of the PO that the sequencing by the time granularity in the output time section arranges, the PO data of a PO of time granularity that wherein do not find the PO data are for empty.
Concrete, PO data output unit 40 also is used for: the RPO reference table that a PO information searching that comprises according to the performance data output order is set up in advance; At a PO information that in the RPO reference table, exists, create first query statement that comprises the output time section; At a non-existent PO information in the RPO reference table, create second query statement that comprises the output time section; Carry out first query statement and/or second query statement, the PO data of in the PO data of gathering, searching each time granularity of a PO in described output time section, with the PO data that obtain the PO that the sequencing by the time granularity in the output time section arranges of the PO that finds, the PO data of a PO of time granularity that do not find the PO data are for empty.
More excellent, this telecommunicatioin network management performance data output unit also comprises: performance data library unit 50 is used to store the performance object PO data of gathering each equipment by the time granularity.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.

Claims (14)

1. the method for a telecommunicatioin network management performance data output is characterized in that, comprising:
Gather the performance object PO data of each equipment by the time granularity;
According to the output time section of appointment in the performance data output order that receives and a PO information of the needs output performance data that comprise, search in advance set up with reference to performance object RPO reference table, time granularity information that need to determine a PO of output performance data in described output time section, to comprise; The time granularity information that comprises PO information and each PO in the described RPO reference table;
The time granularity that comprises in the time granularity information according to a described PO, search the PO data of collection, obtain the PO data of the PO that the sequencing by the time granularity in the described output time section arranges, the PO data of a PO of time granularity that wherein do not find the PO data are for empty.
2. the method for claim 1 is characterized in that, sets up the RPO reference table of the time granularity information that comprises PO information and each PO, specifically comprises:
When each time granularity arrives, the PO information of gathering each equipment;
The PO information of arranging each equipment that collects according to the sequencing of the time granularity of the PO information of gathering each equipment, or at each time granularity, the PO information of each equipment that record acquisition arrives, generation comprises the RPO reference table of the time granularity information of PO information and each PO.
3. the method for claim 1 is characterized in that, the receptivity data output instruction specifically comprises:
The performance data output order that reception initiatively triggers according to the triggering rule of setting; Perhaps
Reception is according to the performance data output order of the query statement triggering of user's input.
4. method as claimed in claim 3, it is characterized in that, initiatively trigger the performance data output order according to the triggering rule of setting, specifically comprise: select the part or all of PO of selected equipment as a PO according to the triggering rule of setting, and definite output time section, generation comprises the performance data output order of a PO information of output time section and selection;
Described query statement according to user's input triggers the performance data output order, specifically comprises: one or more KPI that user's input will be inquired about, and the output time section of user's setting; Parse the PO corresponding as a PO according to predefined KPI computing formula with each KPI; Generation comprises the performance data output order of output time section and a PO information that parses.
5. method as claimed in claim 4 is characterized in that, the process of searching the PO data of collection comprises:
The RPO reference table that a PO information searching that comprises according to the performance data output order is set up in advance;
At a PO information that in the RPO reference table, exists, create first query statement that comprises the output time section;
At a non-existent PO information in the RPO reference table, create second query statement that comprises the output time section;
Carry out first query statement and/or second query statement, the PO data of in the PO data of gathering, searching each time granularity of a PO in described output time section, with the PO data that obtain the PO that the sequencing by the time granularity in the described output time section arranges of the PO that finds, the PO data of a PO of time granularity that do not find the PO data are for empty.
6. the method for claim 1 is characterized in that, described PO data comprise PO information, performance parameter information, acquisition time information.
7. method as claimed in claim 1 or 2 is characterized in that, described PO information comprises PO title and PO sign.
8. a telecommunicatioin network management performance data output unit is characterized in that, comprising:
Reference table is set up the unit, be used for setting up in advance the time granularity information that comprises performance object PO information and each PO with reference to performance object RPO reference table;
Data acquisition unit is used for gathering by the time granularity performance object PO data of each equipment;
Time granularity information determining unit, be used for according to the output time section of the performance data output order appointment that receives and a PO information of the needs output performance data that comprise, search in advance the RPO reference table of setting up, time granularity information that need to determine a PO of output performance data in described output time section, to comprise;
PO data output unit, be used for the time granularity that the time granularity information according to a described PO comprises, search the PO data of collection, obtain the PO data of the PO that the sequencing by the time granularity in the described output time section arranges, the PO data of a PO of time granularity that wherein do not find the PO data are for empty.
9. device as claimed in claim 8 is characterized in that, described reference table is set up the unit, specifically is used for:
When each time granularity arrives, the PO information of gathering each equipment;
The PO information of arranging each equipment that collects according to the sequencing of the time granularity of the PO information of gathering each equipment, or at each time granularity, the PO information of each equipment that record acquisition arrives, generation comprises the RPO reference table of the time granularity information of PO information and each PO.
10. device as claimed in claim 8 is characterized in that, described time granularity information determining unit specifically is used for:
The performance data output order that reception initiatively triggers according to the triggering rule of setting; Perhaps
Reception is according to the performance data output order of the query statement triggering of user's input.
11. device as claimed in claim 10 is characterized in that, described time granularity information determining unit specifically is used for:
The part or all of PO that selects selected equipment according to the triggering rule of setting is as a PO, and definite output time section, generates the performance data output order of a PO information that comprises output time section and selection; Perhaps
One or more KPI that user's input will be inquired about, and the output time section of user's setting; Parse the PO corresponding as a PO according to predefined KPI computing formula with each KPI; Generation comprises the performance data output order of output time section and a PO information that parses.
12. device as claimed in claim 11 is characterized in that, described PO data output unit specifically is used for:
The RPO reference table that a PO information searching that comprises according to the performance data output order is set up in advance;
At a PO information that in the RPO reference table, exists, create first query statement that comprises the output time section;
At a non-existent PO information in the RPO reference table, create second query statement that comprises the output time section;
Carry out first query statement and/or second query statement, the PO data of in the PO data of gathering, searching each time granularity of a PO in described output time section, with the PO data that obtain the PO that the sequencing by the time granularity in the described output time section arranges of the PO that finds, the PO data of a PO of time granularity that do not find the PO data are for empty.
13. device as claimed in claim 8 is characterized in that, also comprises: the performance data library unit is used to store the performance object PO data of gathering each equipment by the time granularity.
14. a telecom network management system is characterized in that, bag is as the described arbitrary telecommunicatioin network management performance data output unit of claim 8-12.
CN201110165840.XA 2011-06-20 2011-06-20 A kind of method and device of telecommunicatioin network management performance data output Active CN102289452B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110165840.XA CN102289452B (en) 2011-06-20 2011-06-20 A kind of method and device of telecommunicatioin network management performance data output
PCT/CN2012/071609 WO2012174882A1 (en) 2011-06-20 2012-02-24 Method and apparatus for outputting telecommunication network management performance data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110165840.XA CN102289452B (en) 2011-06-20 2011-06-20 A kind of method and device of telecommunicatioin network management performance data output

Publications (2)

Publication Number Publication Date
CN102289452A true CN102289452A (en) 2011-12-21
CN102289452B CN102289452B (en) 2018-02-27

Family

ID=45335884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110165840.XA Active CN102289452B (en) 2011-06-20 2011-06-20 A kind of method and device of telecommunicatioin network management performance data output

Country Status (2)

Country Link
CN (1) CN102289452B (en)
WO (1) WO2012174882A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012174882A1 (en) * 2011-06-20 2012-12-27 中兴通讯股份有限公司 Method and apparatus for outputting telecommunication network management performance data
CN106911519A (en) * 2017-04-10 2017-06-30 北京搜狐新媒体信息技术有限公司 A kind of data acquisition monitoring method and device
CN111130921A (en) * 2019-11-28 2020-05-08 中盈优创资讯科技有限公司 Method and device for processing performance index of core network element

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104639350B (en) * 2013-11-11 2019-09-13 南京中兴新软件有限责任公司 Performance object polymerization route interface display method and device in comprehensive network management

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08305616A (en) * 1995-04-28 1996-11-22 Fuji Xerox Co Ltd Data management system
US20060161645A1 (en) * 2005-01-14 2006-07-20 Norihiko Moriwaki Sensor network system and data retrieval method for sensing data
CN101197712A (en) * 2007-10-19 2008-06-11 中兴通讯股份有限公司 Method for capturing performance object data in telecommunication network management system
CN101247271A (en) * 2008-03-24 2008-08-20 中兴通讯股份有限公司 Performance data storage method and device
CN101645062A (en) * 2009-08-21 2010-02-10 金蝶软件(中国)有限公司 Report form generation method, system and information management equipment
CN101790257A (en) * 2009-01-22 2010-07-28 大唐移动通信设备有限公司 Method for memorizing data and network management system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101114946A (en) * 2007-09-12 2008-01-30 中兴通讯股份有限公司 Method for collecting performance object data in telecommunication network management system
CN102289452B (en) * 2011-06-20 2018-02-27 中兴通讯股份有限公司 A kind of method and device of telecommunicatioin network management performance data output

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08305616A (en) * 1995-04-28 1996-11-22 Fuji Xerox Co Ltd Data management system
US20060161645A1 (en) * 2005-01-14 2006-07-20 Norihiko Moriwaki Sensor network system and data retrieval method for sensing data
CN101197712A (en) * 2007-10-19 2008-06-11 中兴通讯股份有限公司 Method for capturing performance object data in telecommunication network management system
CN101247271A (en) * 2008-03-24 2008-08-20 中兴通讯股份有限公司 Performance data storage method and device
CN101790257A (en) * 2009-01-22 2010-07-28 大唐移动通信设备有限公司 Method for memorizing data and network management system
CN101645062A (en) * 2009-08-21 2010-02-10 金蝶软件(中国)有限公司 Report form generation method, system and information management equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012174882A1 (en) * 2011-06-20 2012-12-27 中兴通讯股份有限公司 Method and apparatus for outputting telecommunication network management performance data
CN106911519A (en) * 2017-04-10 2017-06-30 北京搜狐新媒体信息技术有限公司 A kind of data acquisition monitoring method and device
CN106911519B (en) * 2017-04-10 2020-04-07 北京搜狐新媒体信息技术有限公司 Data acquisition monitoring method and device
CN111130921A (en) * 2019-11-28 2020-05-08 中盈优创资讯科技有限公司 Method and device for processing performance index of core network element

Also Published As

Publication number Publication date
CN102289452B (en) 2018-02-27
WO2012174882A1 (en) 2012-12-27

Similar Documents

Publication Publication Date Title
CN107196804A (en) Power system terminal communication access network Centralized Alarm Monitoring system and method
CN110245078A (en) A kind of method for testing pressure of software, device, storage medium and server
CN109995650B (en) SDN network-based path calculation method and device under multidimensional constraint
CN101808351B (en) Method and system for business impact analysis
CN1763778A (en) System and method for problem determination using dependency graphs and run-time behavior models
CN103370904A (en) Method for determining a severity of a network incident
CN102289452A (en) Method and device for outputting telecommunication network management performance data
CN111127250B (en) Power data monitoring event analysis system and method
CN103209096A (en) Method and device for alarm processing
CN108108445A (en) A kind of data intelligence processing method and system
CN109542868A (en) Position method, apparatus, electronic equipment and the storage medium of abnormal SQL statement
CN101388794A (en) Method and system for positioning network management system exception affair
CN107360035A (en) A kind of data processing method and system
CN107204868B (en) Task operation monitoring information acquisition method and device
CN102404760A (en) Method and device for real-time measurement of system performance
CN103812688A (en) Alarm determining method and device
CN100413257C (en) Network element warning data obtaining method
CN108696371A (en) Network failure determines method and system
CN102377610A (en) Automatic testing system and automatic testing method for simple network management protocol
CN109687592A (en) Substation information display control method, device and electronic equipment
CN108989116B (en) Big data collection and analysis system and method
CN102013996B (en) Data acquisition management method and system and telecommunication network management system
CN101227520B (en) Method and system for generating telecommunication traffic model report form
CN102932825B (en) The method of network O&M and device
CN109889258A (en) A kind of optical network fault method of calibration and equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant