CN102288466A - 岩体试样的制备方法 - Google Patents

岩体试样的制备方法 Download PDF

Info

Publication number
CN102288466A
CN102288466A CN2011102040546A CN201110204054A CN102288466A CN 102288466 A CN102288466 A CN 102288466A CN 2011102040546 A CN2011102040546 A CN 2011102040546A CN 201110204054 A CN201110204054 A CN 201110204054A CN 102288466 A CN102288466 A CN 102288466A
Authority
CN
China
Prior art keywords
test
brace summer
rock mass
plane
drill bit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102040546A
Other languages
English (en)
Other versions
CN102288466B (zh
Inventor
杜卫长
杜建中
熊传义
薄清元
李振灵
钱艳辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianghe Anlan Engineering Consulting Co ltd
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN 201110204054 priority Critical patent/CN102288466B/zh
Publication of CN102288466A publication Critical patent/CN102288466A/zh
Application granted granted Critical
Publication of CN102288466B publication Critical patent/CN102288466B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

本发明涉及岩体试样的制备方法,可有效解决目前岩体试验试件制备困难,费用高,操作繁琐、周期较长、效率低下的问题,方法是,清除试验点处震松的石块,在试验点旁的洞壁上凿出平面,在平面上架设第一根支撑梁,将第一支撑梁两端分别顶在洞壁上,然后在第一支撑梁的同一平面上平行架设第二支撑梁,将第二支撑梁两端分别顶在洞壁上,再在第一支撑梁、第二支撑梁上垂直铰接自由滑动的第三支撑梁,然后在第三支撑梁上装自由滑动的电动钻芯机,使电动钻芯机定位在试验面上方锁定,对试验面突起部分用钻头钻进至确定高度,钻掉凸起部分,对试验面磨平,制成岩体变形试验中的试件,本发明方法设备简单,易安装使用,易操作,费用低,效率高,用途广。

Description

岩体试样的制备方法
技术领域
本发明涉及岩体试样,特别是一种岩体试样的制备方法。
背景技术
目前岩体试验试件的制备一是依靠石匠,用錾子一锤一锤对岩体凿挖而成;另一种是用锯石设备先锯出大致形状,再经人工进行细部处理,不但费用较高,而且操作繁琐、周期较长、效率低下,已逐渐与现在岩体试验技术不相适应。因此,对其进行创新及改进势在必行。
发明内容
针对上述情况,为克服现有技术之缺陷,本发明之目的就是提供一种岩体试样的制备方法,可有效解决目前岩体试验试件制备困难,费用高,操作繁琐、周期较长、效率低下的问题。
本发明解决的技术方案是,清除试验点处震松的石块(即用炸药开挖试验洞过程中震松的石块),在试验点旁的洞壁上凿出平面,然后在平面上架设第一根支撑梁,将第一支撑梁两端分别顶在洞壁上,然后在第一支撑梁的同一平面上,平行架设第二支撑梁,将第二支撑梁两端分别顶在洞壁上,再在第一支撑梁、第二支撑梁上垂直铰接自由滑动的第三支撑梁,然后在第三支撑梁上装自由滑动的电动钻芯机,并使电动钻芯机定位在试验面上方锁定,之后,对试验面突起部分用取芯钻头钻进至确定高度,调整第三支撑梁和电动钻芯机位置,钻掉凸起部分,对试验面磨平,然后根据需要制成岩体变形试验中的刚性承压板法试件,或柔性承压板法试验的试件,或狭缝法试验的试件,或单(双)轴压缩法试验的试件,或混凝土与岩体接触面直剪试验的试件,或岩体直剪试验或结构面试验的试件。
本发明方法设备简单,易安装使用,易操作,费用低,生产效率高,用途广,可有效用于多种岩体试样的制备。
附图说明
图1为本发明的设备结构俯视图。
图2为本发明的设备结构主视图。
具体实施方式
以下结合附图对本发明的具体实施方式作详细说明。
本发明在具体实施中,由以下步骤实现:
第一步:用锤、钢钎清除试验点处被炮震松的石块;
第二步:在试验点位旁的左右洞壁或洞顶与洞底上找到相对平整的地方,或由人工凿平,架设第一支撑梁2a,将第一支撑梁两端分别装上丝杠或液压装置3,顶在洞壁上,调节丝杠或液压装置使其顶紧,确保牢靠;
第三步:以第一支撑梁的长短为准,选取第二支撑梁2b,使其与第一根支撑梁处于同一高度,在第二支撑梁两端分别装上丝杠或液压装置,顶在洞壁上,调节丝杠或液压装置使其顶紧,确保牢靠;
第四步:安装第三支撑梁1,使第三支撑梁铰接装在第一支撑梁和第二支撑梁上,能自由滑动;
第五步:将电动钻芯机4安装在第三支撑梁上,使电动钻芯机在第三支撑横梁上能自由滑动,连接部位确保牢靠、安全;
第六步:调整第三支撑梁和电动钻芯机,使其定位在试验面上方,锁定(固定);
第七步:对试验面凸起多的部分用电动钻芯机的钻杆5上的取芯钻头6钻进至确定面高度,并取芯,再调整第三支撑梁和电动钻芯机位置,钻掉凸起部分,为提高效率可采用打排钻或换用较大钻头;
第八步:换磨平钻头处理,将钻芯钻头换成磨平钻头,调整电动钻芯机位置对试验面进行磨平处理;
第九步:根据岩体试样的需要,分别制成不同用途的岩体试样,方法是,对试验面进行磨平处理后,用锤砸试验面,使试验面上布满麻点,成岩体变形试验中的刚性承压板法试验的试件;
或调整钻机,使钻头处于试验要求的部位固定钻机,选取合适钻头钻进至要求深度,取芯,成岩体变形试验中的柔性承压板法试验的试件;
或调整钻机,使钻头处于要求制作狭缝的部位固定钻机,按照狭缝宽度选取钻头打单排钻孔,钻进至要求深度,并取芯,各钻孔之间尽量重叠,达到要求长度后,换磨平钻头对该排钻孔孔壁及孔底进行磨平处理,成岩体变形试验中的狭缝法试验的试件;
或调整钻机使钻头处于要求开槽的部位(试点的四周)固定钻机,根据槽宽选取合适的钻头打单排钻孔,钻进至要求深度,各钻孔之间尽量重叠,达到要求长度后,换磨平钻头对该排钻孔孔壁及孔底进行磨平处理,成岩体变形试验中的单(双)轴压缩法试验的试件;
或调整钻机,使其处于需开挖千斤顶槽位置,固定钻机,打排钻至要求深度,取芯,成岩体强度试验中的混凝土与岩体接触面直剪试验的试件;
或调整钻机,使其处于需开挖千斤顶槽位置,固定钻机,用排钻法开挖千斤顶槽,然后试点周围用小钻头以排钻的方式钻至合适的深度,在小钻孔周围再用大钻头进行多余岩石的剥离,成岩体强度试验中的岩体直剪试验或结构面试验的试件。
本发明经测试,并与现有技术相比,具有以下突出的特点:
1、设备简单,易安装使用,电动钻芯机为市售产品,易购置,费用低,比原有技术设备费用降低50%以上;
2、易操作,工作效率高,制作岩体试样周期短,由于设备非常简单,而且电动钻芯机为现有技术,一般技术人员均可容易操作,工作效率提高2倍以上,试样制作周期大大缩短,仅为依靠石匠人工制作试样周期的1/3,不但节约了费用,而且劳动强度小;
3、使用安全,减少人工制样灰尘对环境造成的污染,利于人们身体健康,经济和社会效益突出;
4、应用面广,本发明方法适用于不同试样的制作,特别是涉及《水利水电工程岩石试验规程》(SL264-2001),如岩体变形试验中的刚性承压板法、柔性承压板法、狭缝法、单(双)轴压缩法等试验试件的制备;岩体强度试验中所有类型试验试件的制备,是一种多功能岩体试验制件方法,其效果之好,现有技术无法相比,是岩体试样制备上的一大创新,经济和社会效益巨大。

Claims (2)

1.一种岩体试样的制备方法,其特征在于,在试验点旁的洞壁上凿出平面,然后在平面上架设第一根支撑梁,将第一支撑梁两端分别顶在洞壁上,然后在第一支撑梁的同一平面上,平行架设第二支撑梁,将第二支撑梁两端分别顶在洞壁上,再在第一支撑梁、第二支撑梁上垂直铰接自由滑动的第三支撑梁,然后在第三支撑梁上装自由滑动的电动钻芯机,并使电动钻芯机定位在试验面上方锁定,之后,对试验面突起部分用取芯钻头钻进至确定高度,调整第三支撑梁和电动钻芯机位置,钻掉凸起部分,对试验面磨平,然后制成岩体变形试验中的刚性承压板法试件,或柔性承压板法试验的试件,或狭缝法试验的试件,或单、双轴压缩法试验的试件,或混凝土与岩体接触面直剪试验的试件,或岩体直剪试验或结构面试验的试件。
2.根据权利要求1所述的岩体试样的制备方法,其特征在于,由以下步骤实现:
第一步:用锤、钢钎清除试验点处被炮震松的石块;
第二步:在试验点位旁的左右洞壁或洞顶与洞底上找到相对平整的地方,或由人工凿平,架设第一支撑梁(2a),将第一支撑梁两端分别装上丝杠或液压装置(3),顶在洞壁上,调节丝杠或液压装置使其顶紧,确保牢靠;
第三步:以第一支撑梁的长短为准,选取第二支撑梁(2b),使其与第一根支撑梁处于同一高度,在第二支撑梁两端分别装上丝杠或液压装置,顶在洞壁上,调节丝杠或液压装置使其顶紧,确保牢靠;
第四步:安装第三支撑梁(1),使第三支撑梁铰接装在第一支撑梁和第二支撑梁上,能自由滑动;
第五步:将电动钻芯机(4)安装在第三支撑梁上,使电动钻芯机在第三支撑横梁上能自由滑动,连接部位确保牢靠、安全;
第六步:调整第三支撑梁和电动钻芯机,使其定位在试验面上方,锁定;
第七步:对试验面凸起较多的部分用电动钻芯机的钻杆(5)上的取芯钻头(6)钻进至确定面高度,并取芯,再调整第三支撑梁和电动钻芯机位置,钻掉其它凸起较多部分,为提高效率可采用打排钻或换用较大钻头;
第八步:换磨平钻头处理,将钻芯钻头换成磨平钻头,调整电动钻芯机位置对试验面进行磨平处理;
第九步:根据岩体试样的需要,分别制成不同用途的岩体试样,方法是,对试验面进行磨平处理后,用锤轻砸试验面,使试验面上布满麻点,成岩体变形试验中的刚性承压板法试验的试件;
或调整钻机,使钻头处于试验部位固定钻机,由钻头钻进至要求深度,取芯,成岩体变形试验中的柔性承压板法试验的试件;
或调整钻机,使钻头处于制作狭缝的部位固定钻机,由钻头打单排钻孔,钻进至要求深度,并取芯,各钻孔之间重叠,达到要求长度后,换磨平钻头对该排钻孔孔壁及孔底进行磨平处理,成岩体变形试验中的狭缝法试验的试件;
或调整钻机使钻头处于开槽的部位固定钻机,由钻头打单排钻孔,钻进至要求深度,换磨平钻头,对该排钻孔孔壁及孔底进行磨平处理,成岩体变形试验中的单或双轴压缩法试验的试件;
或调整钻机,使其处于需开挖千斤顶槽位置,固定钻机,钻至要求深度,取芯,成岩体强度试验中的混凝土与岩体接触面直剪试验的试件;
或调整钻机,使其处于需开挖千斤顶槽位置,固定钻机,开挖千斤顶槽,然后试点周围用钻头以排钻的方式钻至要求的深度,在钻孔周围用钻头对多余的岩石剥离,成岩体强度试验中的岩体直剪试验或结构面试验的试件。
CN 201110204054 2011-07-21 2011-07-21 岩体试样的制备方法 Active CN102288466B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110204054 CN102288466B (zh) 2011-07-21 2011-07-21 岩体试样的制备方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110204054 CN102288466B (zh) 2011-07-21 2011-07-21 岩体试样的制备方法

Publications (2)

Publication Number Publication Date
CN102288466A true CN102288466A (zh) 2011-12-21
CN102288466B CN102288466B (zh) 2013-03-20

Family

ID=45335066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110204054 Active CN102288466B (zh) 2011-07-21 2011-07-21 岩体试样的制备方法

Country Status (1)

Country Link
CN (1) CN102288466B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103308363A (zh) * 2013-06-24 2013-09-18 黄河勘测规划设计有限公司 岩体制样变形测试方法
CN103323286A (zh) * 2013-06-24 2013-09-25 黄河勘测规划设计有限公司 岩体制样、变形测试系统
CN104764745A (zh) * 2015-04-21 2015-07-08 中国矿业大学 一种可直接观测内部变形的岩体模型物理试验方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101294876A (zh) * 2008-06-03 2008-10-29 中国科学院武汉岩土力学研究所 软煤岩试验样品的制备方法及装置
US20090241696A1 (en) * 2006-09-26 2009-10-01 Lafarge On-line production process of sand presenting a controlled methylene blue value
CN101949790A (zh) * 2010-09-08 2011-01-19 中国科学院武汉岩土力学研究所 一种制备多互层岩土类模型材料的装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090241696A1 (en) * 2006-09-26 2009-10-01 Lafarge On-line production process of sand presenting a controlled methylene blue value
CN101294876A (zh) * 2008-06-03 2008-10-29 中国科学院武汉岩土力学研究所 软煤岩试验样品的制备方法及装置
CN101949790A (zh) * 2010-09-08 2011-01-19 中国科学院武汉岩土力学研究所 一种制备多互层岩土类模型材料的装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张天军等: "岩石渗透性试验技术研究", 《实验技术与管理》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103308363A (zh) * 2013-06-24 2013-09-18 黄河勘测规划设计有限公司 岩体制样变形测试方法
CN103323286A (zh) * 2013-06-24 2013-09-25 黄河勘测规划设计有限公司 岩体制样、变形测试系统
CN103308363B (zh) * 2013-06-24 2015-02-18 黄河勘测规划设计有限公司 岩体制样变形测试方法
CN104764745A (zh) * 2015-04-21 2015-07-08 中国矿业大学 一种可直接观测内部变形的岩体模型物理试验方法

Also Published As

Publication number Publication date
CN102288466B (zh) 2013-03-20

Similar Documents

Publication Publication Date Title
CN105773850B (zh) 制备含不同倾角结构面岩石试样的切割装置及操作方法
CN106381865B (zh) 一种应用于硬岩成槽的钻铣组合工法
CN205638225U (zh) 一种建筑用钻孔装置
CN102288466B (zh) 岩体试样的制备方法
CN208280928U (zh) 一种可旋转便捷式取芯机
CN106226121A (zh) 一种自动岩石取芯机夹具底座全方位调节装置及调节方法
CN203129949U (zh) 一种简易螺旋钻机
CN209783941U (zh) 一种手自一体地质检测取样装置
CN202141623U (zh) 多功能岩体试验制件机
CN110095326A (zh) 立方体原岩试样钻孔内垂直预射孔装置及预射孔加工方法
CN209066405U (zh) 一种公路基层压实度取样装置
CN217891440U (zh) 水泥墙面钻孔机
CN218716572U (zh) 一种建筑工程规划设计用钻探装置
CN211422569U (zh) 一种具有定位功能的防震岩土钻孔取样装置
CN210705388U (zh) 一种用于土石方开挖施工中的简易钻孔装置
CN220104544U (zh) 一种土木工程勘察用取样装置
CN220218860U (zh) 一种土木工程用钻孔装置
CN221032440U (zh) 一种地质勘探用钻孔设备
CN211773654U (zh) 一种桩基施工用桩头凿除装置
CN205025354U (zh) 一种适用于矿业开采的全液压旋挖钻机
CN215039052U (zh) 一种具有减震缓冲功能的冲击钻
CN220036594U (zh) 一种岩土勘探用钻探装置
CN210359365U (zh) 一种高效的钢板钻孔装置
CN217211546U (zh) 一种用于岩土工程勘察取样装置
CN215953594U (zh) 一种建设管理用模拟煤炭开采实验装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450000 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

Address before: 450000 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210825

Address after: 450003 No. 109 Jinshui Road, Jinshui District, Henan, Zhengzhou

Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

Patentee after: Jianghe Engineering Inspection Co.,Ltd.

Address before: 450000 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 450003 No. 109 Jinshui Road, Jinshui District, Henan, Zhengzhou

Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

Patentee after: Jianghe Anlan Engineering Consulting Co.,Ltd.

Address before: 450003 No. 109 Jinshui Road, Jinshui District, Henan, Zhengzhou

Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

Patentee before: Jianghe Engineering Inspection Co.,Ltd.

CP01 Change in the name or title of a patent holder