crossbeam
bailey truss
threaded rod
rod
displacable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102424989A
Other languages
Chinese (zh)
Other versions
CN102286942B (en
Inventor
袁爱民
周元华
程磊科
徐敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN 201110242498 priority Critical patent/CN102286942B/en
Publication of CN102286942A publication Critical patent/CN102286942A/en
Application granted granted Critical
Publication of CN102286942B publication Critical patent/CN102286942B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a device for replacing suspenders of a tied arch bridge, comprising a top supporting device and a computer data acquisition and control system, wherein the top supporting device comprises four threaded rods, a bailey truss girder, a carrying pole girder, a distribution girder and a cross-core sensor; the threaded rods are uniformly arranged around a crossbeam where a to-be-replaced suspender is; one end of each threaded rod is fixed at the lower end of the crossbeam through the carrying pole girder and the other end of the threaded rod sequentially penetrates a board hollow slab beam, the bailey truss girder, the distribution girder, a cross-core hydraulic jack, the cross-core sensor and a nut; the bailey truss girder is placed at the upper side of a crossbeam where an adjacent suspender is; and the cross-core sensor is connected with the computer data acquisition and control system. The device provided by the invention is controllable at any time, needs no special manufacturing, can increase the cable replacing efficiency and has the advantages of good safety, high standardization degree, low equipment cost, large operation surface and convenience for mechanized operation.

Description

Tied arch bridge hanger rod is changing device more
Technical field
The present invention relates to a kind of more exchange device of tied arch bridge hanger rod, belong to the civil engineering area of maintenance.
Background technology
Bowstring arch bridge is a kind of typical bridge type in the arch bridge, and it is with outside static determinacy, and is inner indeterminate, under the lateral force effect, and the arch springing horizontal-less thrust, two ends access bridge height is low, to geology conditional request advantages of higher and finding broad application not.Suspension rod is one of main bearing member of bowstring arch bridge, and the lower end is connecting crossbeam, and the upper end is connecting arch rib, is playing the part of the bridge floor lotus is cut the important function that passes to arch rib.
In long-term use, various diseases can appear in suspension rod, mainly comprise: first: upper and lower anchor head concrete protection ftractures, comes off; Second: loosening, the inefficacy of anchoring, stripped thread; The the 3rd: ponding, grouting leakiness in the conduit; The 4th: protective jacket destroys aging, cracking, breakage; The 5th: rope axis off normal, short steeve is cut; The the 6th: steel strand of hanger rod or steel wire discontinuity; The 7th: tired fracture of wire appears in cable body.
The existence of these diseases of bowstring arch bridge makes the serious hidden danger of security presence of bridge.In early morning on November 7th, 2002, the little south gate bridge suspension rod in Yibin ruptures suddenly, causes that bridge two ends bridge floor collapses.As seen, the suspension rod of bowstring arch bridge such as untimely replacing will cause the bridge disaster, and still present more changing device to tied arch bridge hanger rod still lacks.
Summary of the invention
The objective of the invention is to design a kind of quick replacement device of tied arch bridge hanger rod, solve the problem that to change when suspension rod generation disease.
For achieving the above object, the invention provides more changing device of tied arch bridge hanger rod, it is characterized in that: comprise support device and computer data acquiring control system, described support device comprises threaded rod, the Bailey truss beam, shoulder pole girder, distribution beam, the feed-through hydraulic jack, the vertically-displacable sensor, described threaded rod is 4, be evenly arranged in suspension rod to be replaced place crossbeam around, one end of described every threaded rod is fixed on described crossbeam lower end by described shoulder pole girder, the threaded rod other end passes plate face hollow slab beam successively, the Bailey truss beam, distribution beam, the feed-through hydraulic jack, the vertically-displacable sensor, nut, described Bailey truss beam is placed on the upside of adjacent suspension rod place crossbeam, and described vertically-displacable sensor is connected with described computer data acquiring control system.
Also be provided with bearing beam between described Bailey truss beam and the described suspension rod to be replaced left and right sides crossbeam, described bearing beam is placed on the upside at the adjacent beams center line.
Described distribution beam is vertical perpendicular to the Bailey truss beam, and shoulder pole girder is perpendicular to the crossbeam under the suspension rod, and the Bailey truss beam is along vertical layout of bridge, and described threaded rod and suspension rod to be replaced are arranged in parallel.
The axis of described distribution beam, vertically-displacable jack, vertically-displacable load sensor and the dead in line of described threaded rod.
Apparatus of the present invention have the following advantages:
One, can adapt to different suspension rod spacings all kinds of bowstring arch bridges change Suo Zuoye.
Two, adopt the construction of load sensor and computer data acquiring control system exchange rope to monitor, controlled at any time, safety is good.
Three, adopt standard Bailey truss beam to underpin beam as bearing capacity, the standardization level height need not special manufacturing, and equipment cost is low.
Four, construction operation carries out on bridge floor, and operating surface is big, is convenient to mechanized, improves and changes rope efficient.
Description of drawings:
Fig. 1 is that tied arch bridge hanger rod of the present invention is changed the apparatus structure schematic diagram;
Fig. 2 is a replacing assembly of devices of the present invention;
Fig. 3 is the A-A sectional view of Fig. 1;
Wherein 1,Suspension rod; 2, Bailey truss beam; 3, shoulder pole girder; 4, distribution beam; 5, vertically-displacable jack; 6, vertically-displacable load sensor; 7, nut; 8, threaded rod; 9, computer data acquisition system; 12, crossbeam; 13, bearing beam.
The specific embodiment:
Below in conjunction with accompanying drawing technical scheme of the present invention is elaborated:
As Fig. 1, Fig. 2 and shown in Figure 3, this suspender replacement device is made up of Bailey truss beam 2, shoulder pole girder 3, distribution beam 4, vertically-displacable jack 5, vertically-displacable load sensor 6, nut 7, threaded rod 8, computer data acquisition system 9 and bearing beam 13.
Concrete arrangement, the present invention is erected between the adjacent suspension rod by Bailey truss beam 2, and be shelved on the bearing beam 13, bearing beam 13 is placed on the upside at the adjacent beams center line, it above the Bailey truss beam 2 distribution beam 4, feed-through hydraulic jack 5 places between distribution beam 4 and the vertically-displacable load sensor 6, layout one shoulder pole girder 3 below suspension rod 1 lower crossbeam 12 to be replaced, threaded rod 8 runs through open-core type sensor 6, feed-through hydraulic jack 5, distribution beam 4, Bailey truss beam 2, hollow slab beam 11, shoulder pole girder 3, the upper and lower side of threaded rod 8 are fixing by nut 7 respectively.
Vertically-displacable load sensor 6 is connected with computer data acquiring control system 9.Distribution beam 4 is vertical perpendicular to Bailey truss beam 2, and shoulder pole girder 3 is parallel to the crossbeam 12 of suspension rod 1 over against the below, and Bailey truss beam 2 directions are parallel to the vertical of bridge.Threaded rod 8 is parallel to suspension rod 1 so that stressed.
When the present invention works, comprise the steps:
The first step, the support device is installed---between the suspension rod of described suspension rod to be replaced 1 left and right sides, set up Bailey truss beam 2, the support device is installed in the next door of suspension rod 1 to be replaced, internal force size by 6 collections of computer data acquisition system 9 Real Time Observation vertically-displacable load sensors, when this internal force is not less than suspension rod 1 internal force to be replaced, the internal force of suspension rod 1 to be replaced is offloaded to zero, and feed-through hydraulic jack 5 applies the Load Transfer approach that active force makes progress and is: feed-through hydraulic jack 5 → vertically-displacable load sensor 6 → nut 7 → threaded rod 8 → shoulder pole girder 3 → crossbeam 12; The downward power pipeline of this active force is: feed-through hydraulic jack 5 → distribution beam 4 → Bailey truss beam 2 → bearing beam 13 → left and right sides crossbeam;
Second step, removal suspension rod 1 to be replaced, new suspension rod is installed---after suspension rod 1 internal force unloading to be replaced is zero, remove the anchor device at suspension rod to be replaced 1 two ends, with pulling equipment suspension rod 1 to be replaced is taken out, and new suspension rod is launched, installation in position is tightened new ground tackle;
In the 3rd step, loading---Bailey truss beam 2 internal force shift: Bailey truss beam 2 → new suspension rod; The active force of removal feed-through hydraulic jack progressively, load still transmit according to the described power pipeline of the first step, make the suspension rod of new replacing stressed, and replacing is finished.
Above-mentioned feed-through hydraulic jack 5 upwards acts on jacking and unloading downwards, all by the stress of computer data acquiring control system 9 monitoring threaded rods 8, measures the Suo Li of suspension rod 1 to be replaced simultaneously and changes later suspender force.

Claims (4)

1. tied arch bridge hanger rod changing device more, it is characterized in that: comprise support device and computer data acquiring control system (9), described support device comprises threaded rod (8), Bailey truss beam (2), shoulder pole girder (3), distribution beam (4), feed-through hydraulic jack (5), vertically-displacable sensor (6), described threaded rod (8) is 4, be evenly arranged in suspension rod to be replaced (1) place crossbeam (12) around, one end of described every threaded rod (8) is fixed on described crossbeam (12) lower end by described shoulder pole girder (3), threaded rod (8) other end passes plate face hollow slab beam (11) successively, Bailey truss beam (2), distribution beam (4), feed-through hydraulic jack (5), vertically-displacable sensor (6), nut (7), described Bailey truss beam (2) is placed on the upside of adjacent suspension rod place crossbeam, and described vertically-displacable sensor (6) is connected with described computer data acquiring control system (9).
2. tied arch bridge hanger rod according to claim 1 is changing device more, it is characterized in that: also be provided with bearing beam (13) between described Bailey truss beam (2) and adjacent suspension rod place, described suspension rod to be replaced (1) left and right sides crossbeam, described bearing beam (13) is placed on the upside at the adjacent beams center line.
3. tied arch bridge hanger rod according to claim 1 is changing device more, it is characterized in that: shoulder pole girder (3) is placed perpendicular to crossbeam (12), Bailey truss beam (2) is along vertical layout of bridge, distribution beam (4) is perpendicular to vertical placement of described Bailey truss beam (2), and described threaded rod (8) is arranged in parallel with suspension rod to be replaced (1).
4. tied arch bridge hanger rod according to claim 1 is changed device and method, it is characterized in that: the axis of described distribution beam (4), vertically-displacable jack (5), vertically-displacable load sensor (6) and the dead in line of described threaded rod (8).
CN 201110242498 2011-08-23 2011-08-23 Device for replacing suspenders of tied arch bridge Expired - Fee Related CN102286942B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110242498 CN102286942B (en) 2011-08-23 2011-08-23 Device for replacing suspenders of tied arch bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110242498 CN102286942B (en) 2011-08-23 2011-08-23 Device for replacing suspenders of tied arch bridge

Publications (2)

Publication Number Publication Date
CN102286942A true CN102286942A (en) 2011-12-21
CN102286942B CN102286942B (en) 2013-03-06

Family

ID=45333672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110242498 Expired - Fee Related CN102286942B (en) 2011-08-23 2011-08-23 Device for replacing suspenders of tied arch bridge

Country Status (1)

Country Link
CN (1) CN102286942B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926332A (en) * 2012-11-09 2013-02-13 武汉二航路桥特种工程有限责任公司 Derrick arrangement of tools for replacing steel arch bridge suspender and replacing method thereof
CN103485285A (en) * 2013-08-30 2014-01-01 河南省交通科学技术研究院有限公司 Replacement method of rigid hanger of tied-arch bridge
CN104746442A (en) * 2015-04-17 2015-07-01 柳州欧维姆工程有限公司 Steel wire drawing and hole cleaning device assembly for replacing old lifting rod of arched bridge pre-stressed boom and method for dismounting old lifting rod
CN104929057A (en) * 2015-07-07 2015-09-23 合肥工业大学 Wrapping and hanging device with arch bridge suspenders convenient to replace
CN105401532A (en) * 2015-12-16 2016-03-16 柳州欧维姆工程有限公司 Device for replacing traction friction type anchoring hanger rod and method for replacing steel tube arch bridge hanger rod by using device
CN105507167A (en) * 2015-12-30 2016-04-20 杭州市市政工程集团有限公司 Construction method for replacing suspender of tied-arch bridge by PLC (Programmable Logic Controller) synchronous tensioning
CN105887703A (en) * 2016-06-06 2016-08-24 江苏华通工程检测有限公司 Replacing device for concrete tied arch bridge flexible suspension rod and using method thereof
CN106087770A (en) * 2016-08-12 2016-11-09 柳州欧维姆工程有限公司 Hood type instrument derrick rig for steel pipe truss concrete arch-type bridge suspender replacement
CN106480829A (en) * 2016-12-13 2017-03-08 上海浦东新区公路建设发展有限公司 Derrick type arch bridge suspender intelligently changes system
CN106592448A (en) * 2016-12-12 2017-04-26 上海浦东新区公路建设发展有限公司 Intelligent replacing system for tied-arch bridge boom
CN107268457A (en) * 2017-05-19 2017-10-20 中交公路规划设计院有限公司 A kind of compensation cable-stayed bridge of advancing integrally changes rope equipment and changes Suo Fangfa using the equipment
CN109505222A (en) * 2018-11-05 2019-03-22 安徽省交通规划设计研究总院股份有限公司 A kind of netted sunpender bowstring arch bridge of assembled
CN110820522A (en) * 2019-11-22 2020-02-21 柳州欧维姆机械股份有限公司 Sling conversion device for replacing main cable of suspension bridge, sling and construction method
CN111622131A (en) * 2020-05-06 2020-09-04 中铁桥隧技术有限公司 Method for replacing sling by truss and truss used in method
CN112942152A (en) * 2021-04-06 2021-06-11 厦门合诚工程技术有限公司 Device for improving replacement efficiency of suspension bridge suspender
CN114293812A (en) * 2021-12-22 2022-04-08 上海建工二建集团有限公司 Suspension underpinning system and underpinning method for existing building

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887701B (en) * 2016-04-18 2018-01-30 武汉二航路桥特种工程有限责任公司 Suspension bridge superstructure is removed with changing installation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1401854A (en) * 2002-09-10 2003-03-12 同济大学 Method for dynamic control of nondestructive replacement of tied arch bridge hanger rod
CN2570319Y (en) * 2002-09-10 2003-09-03 同济大学 Transferring control device of tied arch bridge hanger rod changing
KR20070027162A (en) * 2005-09-06 2007-03-09 선영선 Truss bridge lifting apparatus for maintenance and method thereof
JP3907356B2 (en) * 1999-10-07 2007-04-18 トピー工業株式会社 Steel bridge dedicated replacement device and steel bridge support replacement method using it
CN202214680U (en) * 2011-08-23 2012-05-09 河海大学 Replacing device for suspender of tied-arch bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3907356B2 (en) * 1999-10-07 2007-04-18 トピー工業株式会社 Steel bridge dedicated replacement device and steel bridge support replacement method using it
CN1401854A (en) * 2002-09-10 2003-03-12 同济大学 Method for dynamic control of nondestructive replacement of tied arch bridge hanger rod
CN2570319Y (en) * 2002-09-10 2003-09-03 同济大学 Transferring control device of tied arch bridge hanger rod changing
KR20070027162A (en) * 2005-09-06 2007-03-09 선영선 Truss bridge lifting apparatus for maintenance and method thereof
CN202214680U (en) * 2011-08-23 2012-05-09 河海大学 Replacing device for suspender of tied-arch bridge

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926332A (en) * 2012-11-09 2013-02-13 武汉二航路桥特种工程有限责任公司 Derrick arrangement of tools for replacing steel arch bridge suspender and replacing method thereof
CN102926332B (en) * 2012-11-09 2014-08-20 武汉二航路桥特种工程有限责任公司 Derrick arrangement of tools for replacing steel arch bridge suspender and replacing method thereof
CN103485285A (en) * 2013-08-30 2014-01-01 河南省交通科学技术研究院有限公司 Replacement method of rigid hanger of tied-arch bridge
CN103485285B (en) * 2013-08-30 2016-08-24 河南省交通科学技术研究院有限公司 A kind of replacing options of bowstring arch bridge rigid hanger
CN104746442A (en) * 2015-04-17 2015-07-01 柳州欧维姆工程有限公司 Steel wire drawing and hole cleaning device assembly for replacing old lifting rod of arched bridge pre-stressed boom and method for dismounting old lifting rod
CN104746442B (en) * 2015-04-17 2016-08-24 柳州欧维姆工程有限公司 For changing the withdrawing steel wire of the old suspension rod of arched bridge pre-stressed boom and hole cleaning device assembly and the method removed for old suspension rod thereof
CN104929057A (en) * 2015-07-07 2015-09-23 合肥工业大学 Wrapping and hanging device with arch bridge suspenders convenient to replace
CN105401532A (en) * 2015-12-16 2016-03-16 柳州欧维姆工程有限公司 Device for replacing traction friction type anchoring hanger rod and method for replacing steel tube arch bridge hanger rod by using device
CN105507167A (en) * 2015-12-30 2016-04-20 杭州市市政工程集团有限公司 Construction method for replacing suspender of tied-arch bridge by PLC (Programmable Logic Controller) synchronous tensioning
CN105887703A (en) * 2016-06-06 2016-08-24 江苏华通工程检测有限公司 Replacing device for concrete tied arch bridge flexible suspension rod and using method thereof
CN106087770A (en) * 2016-08-12 2016-11-09 柳州欧维姆工程有限公司 Hood type instrument derrick rig for steel pipe truss concrete arch-type bridge suspender replacement
CN106592448A (en) * 2016-12-12 2017-04-26 上海浦东新区公路建设发展有限公司 Intelligent replacing system for tied-arch bridge boom
CN106480829A (en) * 2016-12-13 2017-03-08 上海浦东新区公路建设发展有限公司 Derrick type arch bridge suspender intelligently changes system
CN107268457A (en) * 2017-05-19 2017-10-20 中交公路规划设计院有限公司 A kind of compensation cable-stayed bridge of advancing integrally changes rope equipment and changes Suo Fangfa using the equipment
CN109505222A (en) * 2018-11-05 2019-03-22 安徽省交通规划设计研究总院股份有限公司 A kind of netted sunpender bowstring arch bridge of assembled
CN109505222B (en) * 2018-11-05 2021-06-22 安徽省交通规划设计研究总院股份有限公司 Assembled netted jib tied arch bridge
CN110820522A (en) * 2019-11-22 2020-02-21 柳州欧维姆机械股份有限公司 Sling conversion device for replacing main cable of suspension bridge, sling and construction method
CN111622131A (en) * 2020-05-06 2020-09-04 中铁桥隧技术有限公司 Method for replacing sling by truss and truss used in method
CN112942152A (en) * 2021-04-06 2021-06-11 厦门合诚工程技术有限公司 Device for improving replacement efficiency of suspension bridge suspender
CN114293812A (en) * 2021-12-22 2022-04-08 上海建工二建集团有限公司 Suspension underpinning system and underpinning method for existing building

Also Published As

Publication number Publication date
CN102286942B (en) 2013-03-06

Similar Documents

Publication Publication Date Title
CN102286942B (en) Device for replacing suspenders of tied arch bridge
CN102108786B (en) Overall lifting construction method of ultra-large type building member and device thereof
CN103866986B (en) Long span variable cross-section bolted spherical node net shell mounting method
CN102080357B (en) Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket
CN102926333B (en) External prestressed reinforcement structure for old bridge and construction method thereof
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN105887703A (en) Replacing device for concrete tied arch bridge flexible suspension rod and using method thereof
CN110804952B (en) Suspension bridge beam prefabrication and assembly construction process
CN202214680U (en) Replacing device for suspender of tied-arch bridge
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN101761031B (en) Continuous and perpendicular lifting apparatus for large segmental bridge floor beam
CN102286944A (en) Device for replacing stay cable of cable-stayed bridge
CN102296829A (en) Method for constructing three-dimensional cable net curtain wall and node connection member used in same
CN102786004A (en) Integrally moving on-load hydraulic lifting system without mooring rope and lifting method
CN105155418A (en) Construction method for bridge horizontal movement
CN202214681U (en) Suspension bridge sling replacing device
CN102286943B (en) Suspension bridge sling replacing device
CN105672672A (en) Pier column construction system and construction method
CN103726449B (en) Automatically fall Liangping table apparatus and the construction method for changing railway beam thereof
CN202214682U (en) A cable-stayed bridge stay cable replacing device
CN201434807Y (en) Loading device based on steering ground anchor group
CN209584872U (en) The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device
CN208733618U (en) A kind of anchor structure of ground-connecting-wall and main structure
CN209816906U (en) Prefabricated utility tunnel of straight bolted connection
CN203188125U (en) Side-sliding system of cable crane towers

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130306

Termination date: 20150823