Summary of the invention
For the problems referred to above, the purpose of this invention is to provide and a kind ofly can effectively protect forest tree resource and ecologic environment, effectively the corona test method of the DC power transmission line of control engineering investment on contiguous trees impact.
For achieving the above object, the present invention takes following technical scheme: the corona test method of a kind of DC power transmission line on contiguous trees impact, and its step is as follows: (1) arranges one and comprises that the DC power transmission line of positive wire, cathode conductor and ultraviolet imager of mobile hoistable platform, container, test trees, test line segment is on the corona test device of contiguous trees impact; (2) will test planting tree in container; (3) successively mobile hoistable platform being positioned over the positive wire of test line segment and the below of cathode conductor tests; The test trees that (4) will be planted in container are placed on mobile hoistable platform, and the root that will test trees with ground wire is connected with the earth; (5) adjust the height of mobile hoistable platform, change tree crown and positive wire or the tree crown of test trees and the distance between cathode conductor of test trees; (6) test line segment is powered by DC experiment power supply, and the voltage of DC experiment power supply is adjusted to the required voltage of test, and the tree crown of testing trees is begun test; (7) use the corona phenomenon of tree crown in electric field of ultraviolet imager viewing test trees; If obvious corona phenomenon does not appear in the tree crown of test trees, mobile hoistable platform raises; If obvious corona phenomenon appears in the tree crown of test trees, reduce mobile hoistable platform, the minimum perpendicular distance when obtaining just obvious corona phenomenon having occurred between DC power transmission line and trees.
In described step (1), the lifting travel of described mobile hoistable platform arranges according to the distance to the ground of the test height of trees and positive wire, cathode conductor.
The lifting travel of described mobile hoistable platform is 10m.
In described step (1), described positive wire and described cathode conductor be arranged in parallel along surface level.
In described step (5), the tree crown and the initial distance between described positive wire of described test trees is set, and describedly tests the tree crown of trees and the initial distance between described cathode conductor is 10m.
The ultraviolet sensitivity of described ultraviolet imager is 3 * 10
-18W/cm
2, corona detection sensitivity is is 1.5~2pC in 8m place's shelf depreciation sensitivity.
The present invention is owing to taking above technical scheme; it has the following advantages: 1, the present invention is due to the corona phenomenon of tree crown in electric field that adopts ultraviolet imager viewing test trees; can determine minimum perpendicular distance between DC power transmission line and trees; therefore; effectively protect forest tree resource and ecologic environment, and effectively controlled construction investment.2, the present invention owing to adopting mobile hoistable platform bearing test trees, realizes the adjusting of distance between test trees and positive wire, cathode conductor, can avoid testing the trees tree crown by the dizzy burn of forceful electric power.3, the present invention is owing to adopting ground wire to be communicated with the earth at the test trees ' root, like this can be so that the trees that plant on the electric circumstance of the test trees in container and ground be consistent, and then guaranteed that the present invention can use in practice preferably.The present invention can be widely used in the Forestry Ecological in high-voltage engineering and Forest Protection.
Embodiment
Below in conjunction with drawings and Examples, the present invention is described in detail.
As shown in Figure 1 and Figure 2, the corona test device of the contiguous trees impact of DC power transmission line of the present invention comprises positive wire 4, cathode conductor 5 and the ultraviolet imager (not shown) of mobile hoistable platform 1, container 2, test trees 3, test line segment, wherein, positive wire 4 be arranged in parallel along surface level with cathode conductor 5.
Mobile hoistable platform 1 is used for carrying and is placed on test trees 3 in container 2, by the distance between mobile hoistable platform 1 adjusting test trees 3 and positive wire 4, cathode conductor 5.The lifting travel of mobile hoistable platform 1 arranges according to the distance to the ground of the test height of trees and positive wire 4, cathode conductor 5, it is 10m that the present invention adopts the lifting travel of mobile hoistable platform 1, lifting load carrying can satisfy the institute bearing test trees 3 weight requirement of (comprising cultivating soil and container 2), and platform size satisfies the dimensional requirement of container 2.
The root of test trees 3 connects the earth by ground wire 6, and ground wire 6 is plain conductor.
The positive wire 4 of test line segment, cathode conductor 5 are used for the analog DC overhead transmission line; Level interval between the distance to the ground of positive wire 4 and cathode conductor 5 and positive wire 4 and cathode conductor 5 all can be regulated.Wherein, positive wire 4, the cathode conductor 5 of test line segment provide power supply by DC experiment power supply for it, and the working voltage of DC experiment power supply can satisfy the working voltage of test line segment.
Ultraviolet imager is used for the corona of viewing test trees 3.The ultraviolet imager technical parameter that the present invention adopts is: ultraviolet sensitivity is 3 * 10
-18W/cm
2, corona detection sensitivity is is 1.5~2pC in 8m place's shelf depreciation sensitivity.
The corona test method of DC power transmission line of the present invention on contiguous trees impact, its step is as follows:
1) will test trees 3 and be planted in container 2, warranty test trees 3 are in normal existing state at duration of test;
2) successively mobile hoistable platform 1 being positioned over the positive wire 4 of test line segment and the below of cathode conductor 5 tests;
The test trees 3 that 3) will be planted in container 2 are placed on mobile hoistable platform 1, and the root that will test trees 3 with ground wire 6 is connected with the earth;
4) adjust the height of mobile hoistable platform 1, between the tree crown that changes test trees 3 and positive wire 4 or test the tree crown of trees 3 and the distance between cathode conductor 5, tree crown and the initial distance between cathode conductor 5 of the tree crown of test trees 3 and positive wire 4 or test trees 3 should be far away, for example 10m, burn in order to avoid tree crown is swooned by forceful electric power;
5) test line segment is powered by DC experiment power supply, and the voltage of DC experiment power supply is adjusted to the required voltage of test, and the tree crown of testing trees 3 is begun test;
6) use the corona phenomenon of tree crown in electric field of ultraviolet imager viewing test trees 3; If obvious corona phenomenon does not appear in the tree crown of test trees 3, mobile hoistable platform 1 raises; If obvious corona phenomenon appears in the tree crown of test trees 3, reduce mobile hoistable platform 1, and then the minimum perpendicular distance when obtaining just obvious corona phenomenon having occurred between DC power transmission line and trees.
In sum, by the corona test method of DC power transmission line of the present invention on contiguous trees impact, can finally draw when obvious corona occurring, the test tree crown of trees 3 and test distance farthest, positive wire 4 and cathode conductor 5 between positive wire 4 and cathode conductor 5 to data such as ground level, DC experiment voltage and trees kind titles, these are important foundation data of minimum perpendicular distance between researching DC transmission line of electricity and trees.Therefore, can determine minimum perpendicular distance between DC power transmission line and trees, effectively protect forest tree resource and ecologic environment, and effectively control construction investment.
The various embodiments described above only are used for explanation the present invention, and on the basis of technical solution of the present invention, all improvement and equivalents of individual steps being carried out according to the principle of the invention all should not got rid of outside protection scope of the present invention.