CN102268963B - Basement rock fractured formation mixed drilling well completion process - Google Patents

Basement rock fractured formation mixed drilling well completion process Download PDF

Info

Publication number
CN102268963B
CN102268963B CN 201110167688 CN201110167688A CN102268963B CN 102268963 B CN102268963 B CN 102268963B CN 201110167688 CN201110167688 CN 201110167688 CN 201110167688 A CN201110167688 A CN 201110167688A CN 102268963 B CN102268963 B CN 102268963B
Authority
CN
China
Prior art keywords
water
well
piston
drilling
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110167688
Other languages
Chinese (zh)
Other versions
CN102268963A (en
Inventor
冯红喜
阴文行
冯永军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Weiye Geothermal New Energy Technology Co.,Ltd.
Original Assignee
HANDAN WEIYE UNDERGROUND HEAT DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANDAN WEIYE UNDERGROUND HEAT DEVELOPMENT Co Ltd filed Critical HANDAN WEIYE UNDERGROUND HEAT DEVELOPMENT Co Ltd
Priority to CN 201110167688 priority Critical patent/CN102268963B/en
Publication of CN102268963A publication Critical patent/CN102268963A/en
Application granted granted Critical
Publication of CN102268963B publication Critical patent/CN102268963B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a basement rock fractured formation mixed drilling well completion process. The process comprises the following process steps of: (1) drilling at a certain depth from an upper part loose layer to a basement rock layer by a mud positive circulation process, inserting a surface casing after the drilling, and fixedly sealing by using cement; (2) drilling the basement rock layer by an air downhole hammer reverse circulation process; (3) after a water-bearing layer is drilled, drilling convertibly by a gas lift reverse circulation process until a target layer is reached when drilling efficiency is influenced by back pressure, which is generated by a water column in a hole, on the downhole hammer; (4) washing a well by acidification; (5) washing the well by using a piston; (6) washing the well by using air; and (7) pumping water by using a water pump to complete the well, namely putting a submersible pump down to pump the water after the process that the well is washed by the air is finished until a water pumping test is finished. The invention has the advantages that: 1, dry holes are avoided or reduced, and construction risks are reduced; 2, a well constructioncycle is shortened, unnecessary investment is reduced, and production cost is reduced; 3, mud is not used, fresh water resources are saved, and environment pollution caused by mud construction or emission is prevented; and 4, all fractures are changed into water catchment channels to the maximum extent to realize the maximum water yield of a single hole.

Description

Basement rock fractured formation mixed drilling well completion process
Technical field
The present invention relates to a kind of drilling technology, especially a kind of basement rock fractured formation mixed drilling well completion process.
Background technology
The aquifer lithology of Bedrock Crevice Water is take intrusive rock class, lava, volcano lava as main, groundwater occurrence at the joint, structural fracture, weathering fissures and the separation fracture fracture zone of fracture of growing.2~3 millimeters of general Fracture Widths, 10~20 millimeters of large persons, rice more than long number rice to ten, underground water are enriched in north-south, northwest (NW) relatively in a property or the property turned round crack, and take diving as main, there is the veiny artesian water fracture zone of fracture part.Watery is uneven, and the water yield is poor, general 0.008~0.4 liter/second of spring flow, people's well yield 3~12 ton per days, drilling well single hole water yield 3~200 ton per days.
When utilizing the conventional drilling construction technology, to carry drilling cuttings ability and its viscosity (the higher mud cake of viscosity stops up more serious) relevant with shear force due to mud, often cause drilling cuttings to repeat in the shaft bottom broken, repeat the part drilling cuttings to be ground broken the time in borehole wall crack, form artificial the obstruction, affect water yield.In addition, the swell soil in mud or clay particle usually are penetrated in bedrock fracture, form hard mud cake and also can stop up the crack under differential pressure action.
The crack is less originally for basement rock fractured formation, and the water yield is poor, usually brings out again mud and drilling cuttings and stop up in drilling process.Long because of the common process drilling period again, Cheng Jinghou drilling cuttings, mud cake and charges are difficult for coming out, and cause the less or anhydrous dry hole that becomes of single hole water yield, make drilling well lose meaning.For avoiding stopping up the less or anhydrous result of the water yield that causes, therefore, study a kind of crack of avoiding artificially stopping up, also to as much as possible strengthen simultaneously the basement rock fractured formation mixed drilling well completion process of the permeability in crack, be the present technical issues that need to address.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of basement rock fractured formation mixed drilling well completion process.
The technical scheme that the present invention solves its technical problem is:
Basement rock fractured formation mixed drilling well completion process, its processing step is: 1. top unconsolidated formation to horizon d certain depth uses the mud normal circulation technology to creep into, be lowered to surface pipe after boring and use cement sealing, 2. horizon d uses air latent drift reverse circular technique to creep into, after 3. being drilled into the aquifer, when water column produces back pressure and affects drilling efficiency down-hole hammer to the hole, using gas lift reverse circulation technique instead creeps into, until target zone, 4. acidizing flushing
Figure 2011101676889100002DEST_PATH_IMAGE001
The piston well-flushing,
Figure 2011101676889100002DEST_PATH_IMAGE002
Air circulation, The pumping for water pump completion, dive pumping for water pump at once after namely air circulation finishes is until pumping test is completed.
Preferably, after described acidizing flushing is the drilling well end-of-job, first carry out electrical measurement and sentence layer, determine the position, crack of target zone according to electrical measurement result and the data of sieving residue log, then calculate the hydrochloric acid consumption, determine concentration of hydrochloric acid, re-use the slush pump acid filling, static certain hour after acid filling makes hydrochloric acid and gapfiller that chemical reaction fully occur, decompose or softening filler, then inject and the clear water of hydrochloric acid content with volume in the hole from the aperture.
Preferably, during acid filling first with under the acid filling drilling tool at the bottom of the hole, the water filling pressure testing checks acid filling pipeline seal, then begins water filling, measures to inject clear water amount and aperture whether rout up the water yield consistent, if it is consistent with injection clear water amount to rout up the water yield, adopt disposable acid filling at the bottom of the hole, if inconsistent, adopt at the bottom of the hole first layer position, crack to begin successively upwards in each layer position, crack acid filling respectively, after acid filling finishes, drilling tool in the hole is proposed.
Preferably, concentration of hydrochloric acid is 15%~30%, and concentration of hydrochloric acid is generally 20% left and right, if the more repeatedly acid filling of filler or strengthen concentration of hydrochloric acid in the crack, but concentration can not surpass 30%, and be 4~8 hours quiescent time.
Preferably, described piston well-flushing has namely been annotated lower piston in clear water backward hole, when the piston depth of setting guarantees to draw piston on piston starting point below hydrostatic level, draw continuously piston or intermittently draw piston all can, the piston rising or falling speed is 1~3 meter per second, draws the piston cumulative time to be not less than 12 hours.
Preferably, the piston depth of setting is following 30 meters~50 meters of hydrostatic level.
Preferably, described air circulation is namely after the piston well-flushing finishes, employing is lowered to common drilling tool air compressor machine well-flushing or is lowered to the both arms drilling tool and common drilling tool employing gas lift reverse circulation well-flushing, less Kong Zhongke adopts foam blocking to coordinate air circulation in the water yield, to form larger suction force, the well-flushing duration reaches " water is clear husky clean " as principle take the aperture water outlet.
Know-why of the present invention:
Bedrock Crevice Water is composed the fracture zone of fracture that exists joint, structural fracture, weathering fissures and separation fracture to grow.2~3 millimeters of general Fracture Widths, 10~20 millimeters of large persons, rice more than long number rice to ten, watery is uneven, and the water yield is poor.Some gapfillers of filling usually in the crack, impact or stop up the charge for remittance passage causes water yield of well less.
The crack is less originally for basement rock fractured formation, the water yield is poor, usually bringing out mud and drilling cuttings when utilizing the conventional drilling construction technology stops up, long because of the common process drilling period again, Cheng Jinghou drilling cuttings, mud cake and charges are difficult for coming out, cause the less or anhydrous dry hole that becomes of single hole water yield, make drilling well lose meaning.For avoiding stopping up the less or anhydrous result of the water yield that causes, only have the research one novel drilling process of cover, avoid artificially stopping up the crack, also to as much as possible strengthen simultaneously the permeability in crack.
Method is exactly: the anti-blocking yield-increasing technology of basement rock fractured formation well (adopt air reverse circulation drilling, get into acidizing flushing after target zone, piston well-flushing, gas lift reverse circulation well-flushing or air compressor machine well-flushing).
Adopt air reverse circulation drilling, can avoid mud cake to stop up; Adopt air reverse circulation drilling can also guarantee drilling cuttings in the very first time from hole on bottom, avoid the repetition fragmentation that the part drilling cuttings is ground in borehole wall crack; Adopt air reverse circulation drilling can also rinse, carry out the charges in the crack, to increase the crack water permeable area.Make to greatest extent every crack all become the charge for remittance passage, to realize the single hole max water yield, reduce construction risk, reduce unnecessary investment, the environment pollution of avoiding mud to cause, fresh-water-saving resource.
Acidizing flushing is the effective measures of volume increase, and particularly the carbonate strata effect is very remarkable.Utilize hydrochloric acid to the chemical action of stratum and gapfiller, form a kind of extension crack and strengthen the crack, to reach the purpose that increases water yield.Acidizing flushing should be better in conjunction with the water filling working effect.
The piston well-flushing is the more creviced formation of the effective measures of getting through the crack passage, particularly filler.The piston well-flushing can be with the filler in the crack or the drilling cuttings fallen in the crack when creeping into release, to get through the purpose that the crack passage reaches increases water yield.
Gas lift reverse circulation well-flushing, air compressor machine well-flushing can be discharged wellhole with the sediment in boring, to guarantee effective drilling depth, avoid affecting water yield.
The anti-blocking yield-increasing technology points for attention of basement rock fractured formation water and technical essential:
Figure DEST_PATH_IMAGE004
Top unconsolidated formation or unconformable horizon d must be lowered to surface pipe or pump chamber pipe, and fixed with cement paste.
The reverse circulation drilling of air latent drift can only used without water hole section or the stratum that goes out a small amount of water section.If the stratum water yield is larger, anti-circulation can not be discharged to water outlet outside the hole again, and when the hole internal water accumulation was flowed or blow over and cover completely the down-hole hammer certain altitude, the down-hole hammer operating efficiency reduced, and when down-hole hammer creeps into efficient lower than 2 m/hs, pull out of hole and use gas lift reverse circulation technique instead and continue to creep into.
Figure 2011101676889100002DEST_PATH_IMAGE006
Gas lift reverse circulation creeps into, the sinking ratio of gas-water mixer can not be less than 1/5(sinking ratio: refer to that gas-water mixer imbeds the ratio that under water the degree of depth and gas-water mixer to air water tap top exports distance, sinking is than larger, and it is larger that generation pressure reduction forms reverse circulating ability).In time recharge clear water in the hole, make the aperture water level steady, guarantee larger sinking ratio.
Gas-water mixer is generally 3~4 times of gas-water mixer submersible depth with the drilling tool length down to drill bit, generally be no more than 7 times.
Figure DEST_PATH_IMAGE007
Acidizing flushing.The acid filling amount is that the target zone hole segment body of 2 times is long-pending.
Calculate hydrochloric acid consumption: Q=r 2Π 2H,
Q in formula---hydrochloric acid content (m3)
R---boring radius (m)
Π---pi
H---need acid filling hole segment length (m)
Determine concentration of hydrochloric acid.For guaranteeing safe acid filling, concentration of hydrochloric acid is generally 20% left and right, if the more repeatedly acid filling of filler or strengthen concentration of hydrochloric acid in the crack, but concentration can not surpass 30%.
Use the slush pump acid filling, first that acid filling drilling tool (or oil pipe) is lower at the bottom of the hole, water filling pressure testing (pressure test pressure should be when replacing hydrochloric acid pressure 50%) checks acid filling pipeline seal.Then begin water filling, whether measure injecting clear water amount and aperture, to rout up the water yield consistent.If inconsistent, acid filling can not be disposable firmly complete at the bottom of the hole, should begin to inject hydrochloric acid in first layer position, crack at the bottom of the hole, successively upwards in each layer position, crack difference acid filling.
After acid filling finishes, drilling tool (or oil pipe) in the hole is proposed, static 4~8 hours, make hydrochloric acid and gapfiller that chemical reaction fully occur, decompose or softening filler.Then inject and the clear water of hydrochloric acid content with volume in the hole from the aperture.Annotated lower piston in clear water backward hole.
5, piston well-flushing.The piston depth of setting is 30 meters~50 meters (on piston, starting point gets final product below hydrostatic level when drawing piston) below hydrostatic level.The piston rising or falling speed is 1~3 meter per second.Draw the piston cumulative time to be not less than 12 hours.
6, gas lift reverse circulation well-flushing, air compressor machine well-flushing.Adopt the gas lift reverse circulation well-flushing, the drilling tool water inlet will be positioned at the crack layer, and from going up most crack layer well-flushing successively downwards, until clean at the bottom of the hole.
Be lowered to common drilling tool air compressor machine well-flushing, the drilling tool depth of setting is determined according to the air compressor machine ability to bear, turns over the air water post as long as can form, and produces suction force and gets final product.Less Kong Zhongke adopts foam blocking to coordinate air circulation in the water yield, has formed larger suction force.The well-flushing duration reaches " water is clear husky clean " as principle take the aperture water outlet.
Gas lift reverse circulation well-flushing, air compressor machine well-flushing can be discharged wellhole with the sediment in boring, to guarantee effective drilling depth, avoid affecting water yield.
Compared with prior art, have the following advantages:
1, avoid or reduce the appearance of dry hole, reduce construction risk.
2, shorten well construction period, reduce unnecessary investment, reduce production costs.
3, do not use mud, fresh-water-saving resource, the environment pollution of avoiding mud construction or discharging to cause.
4, make to greatest extent every crack all become the charge for remittance passage, to realize the single hole max water yield.
The specific embodiment
Basement rock fractured formation mixed drilling well completion process, its processing step is: 1. top unconsolidated formation to horizon d certain depth uses the mud normal circulation technology to creep into, be lowered to surface pipe after boring and use cement sealing, 2. horizon d uses air latent drift reverse circular technique to creep into, after 3. being drilled into the aquifer, when water column produces back pressure and affects drilling efficiency down-hole hammer to the hole, using gas lift reverse circulation technique instead creeps into, until target zone, 4. acidizing flushing
Figure 741039DEST_PATH_IMAGE001
The piston well-flushing,
Figure 658180DEST_PATH_IMAGE002
Air circulation,
Figure 500234DEST_PATH_IMAGE003
The pumping for water pump completion, dive pumping for water pump at once after namely air circulation finishes is until pumping test is completed.
After described acidizing flushing is the drilling well end-of-job, first carry out electrical measurement and sentence layer, determine the position, crack of target zone according to electrical measurement result and the data of sieving residue log, then calculate the hydrochloric acid consumption, determine concentration of hydrochloric acid, re-use the slush pump acid filling, static certain hour after acid filling, make hydrochloric acid and gapfiller that chemical reaction fully occur, decompose or softening filler, then inject and the clear water of hydrochloric acid content with volume in the hole from the aperture.
During acid filling first with under the acid filling drilling tool at the bottom of the hole, the water filling pressure testing checks acid filling pipeline seal, then begin water filling, whether measure injecting clear water amount and aperture, to rout up the water yield consistent, if rout up the water yield and inject that the clear water amount is consistent adopts disposable acid filling at the bottom of the hole, if inconsistent, adopt at the bottom of the hole first layer position, crack to begin successively upwards in each layer position, crack acid filling respectively, after acid filling finishes, drilling tool in the hole is proposed.
Concentration of hydrochloric acid is 15%~30%, and concentration of hydrochloric acid is generally 20% left and right, if the more repeatedly acid filling of filler or strengthen concentration of hydrochloric acid in the crack, but concentration can not surpass 30%, and be 4~8 hours quiescent time.
Described piston well-flushing has namely been annotated lower piston in clear water backward hole, when the piston depth of setting guarantees to draw piston on piston starting point below hydrostatic level, draw continuously piston or intermittently draw piston all can, the piston rising or falling speed is 1~3 meter per second, draws the piston cumulative time to be not less than 12 hours.
The piston depth of setting is following 30 meters~50 meters of hydrostatic level.
Described air circulation is namely after the piston well-flushing finishes, employing is lowered to common drilling tool air compressor machine well-flushing or is lowered to the both arms drilling tool and common drilling tool employing gas lift reverse circulation well-flushing, less Kong Zhongke adopts foam blocking to coordinate air circulation in the water yield, to form larger suction force, the well-flushing duration reaches " water is clear husky clean " as principle take the aperture water outlet.

Claims (7)

1. basement rock fractured formation mixed drilling well completion process, it is characterized in that: its processing step is: 1. top unconsolidated formation to horizon d certain depth uses the mud normal circulation technology to creep into, be lowered to surface pipe after boring and use cement sealing, 2. horizon d uses air latent drift reverse circular technique to creep into, 3. after being drilled into the aquifer, when water column produces back pressure and affects drilling efficiency down-hole hammer to the hole, using gas lift reverse circulation technique instead creeps into, until target zone, 4. acidizing flushing, 5. piston well-flushing, 6. air circulation, 7. pumping for water pump completion, it is dive pumping for water pump at once after air circulation finishes, until pumping test is completed.
2. basement rock fractured formation mixed drilling well completion process according to claim 1, it is characterized in that: after described acidizing flushing is the drilling well end-of-job, first carry out electrical measurement and sentence layer, determine the position, crack of target zone according to electrical measurement result and the data of sieving residue log, then calculate the hydrochloric acid consumption, determine concentration of hydrochloric acid, re-use the slush pump acid filling, static certain hour after acid filling, make hydrochloric acid and gapfiller that chemical reaction fully occur, decompose or softening filler, then inject and the clear water of hydrochloric acid content with volume in the hole from the aperture.
3. basement rock fractured formation mixed drilling well completion process according to claim 2, it is characterized in that: during acid filling first with under the acid filling drilling tool at the bottom of the hole, the water filling pressure testing checks acid filling pipeline seal, then begin water filling, whether measure injecting clear water amount and aperture, to rout up the water yield consistent, if it is consistent with injection clear water amount to rout up the water yield, disposable acid filling at the bottom of the employing hole, if inconsistent, employing first layer position, crack at the bottom of the hole begins successively upwards in each layer position, crack difference acid filling, after acid filling finishes, drilling tool in the hole is proposed.
4. basement rock fractured formation mixed drilling well completion process according to claim 2, it is characterized in that: concentration of hydrochloric acid is 15%~30%, be 4~8 hours quiescent time.
5. basement rock fractured formation mixed drilling well completion process according to claim 2, it is characterized in that: described piston well-flushing has namely been annotated lower piston in clear water backward hole, when the piston depth of setting guarantees to draw piston on piston starting point below hydrostatic level, draw continuously piston or intermittently draw piston all can, the piston rising or falling speed is 1~3 meter per second, draws the piston cumulative time to be not less than 12 hours.
6. basement rock fractured formation mixed drilling well completion process according to claim 5 is characterized in that: the piston depth of setting is following 30 meters~50 meters of hydrostatic level.
7. basement rock fractured formation mixed drilling well completion process according to claim 1, it is characterized in that: described air circulation is namely after the piston well-flushing finishes, employing is lowered to common drilling tool air compressor machine well-flushing or is lowered to the both arms drilling tool and common drilling tool employing gas lift reverse circulation well-flushing, less Kong Zhongke adopts foam blocking to coordinate air circulation in the water yield, to form larger suction force, the well-flushing duration reaches " water is clear husky clean " as principle take the aperture water outlet.
CN 201110167688 2011-06-21 2011-06-21 Basement rock fractured formation mixed drilling well completion process Active CN102268963B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110167688 CN102268963B (en) 2011-06-21 2011-06-21 Basement rock fractured formation mixed drilling well completion process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110167688 CN102268963B (en) 2011-06-21 2011-06-21 Basement rock fractured formation mixed drilling well completion process

Publications (2)

Publication Number Publication Date
CN102268963A CN102268963A (en) 2011-12-07
CN102268963B true CN102268963B (en) 2013-05-22

Family

ID=45051390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110167688 Active CN102268963B (en) 2011-06-21 2011-06-21 Basement rock fractured formation mixed drilling well completion process

Country Status (1)

Country Link
CN (1) CN102268963B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161405B (en) * 2013-03-03 2015-07-29 中国矿业大学 Mine underground visits the casing off stratum crushing band method of putting high pressure karst water drilling construction
CN103867119B (en) * 2014-02-27 2016-08-03 中国石油天然气股份有限公司 Coal seam reservoirs completion remodeling method
US10337249B2 (en) 2017-02-04 2019-07-02 Jason A Hatfield Drilling wells with air

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4237974A (en) * 1978-05-09 1980-12-09 The Dow Chemical Company Method of controlling fluid loss in acidizing treatment of a subterranean formation
US6772847B2 (en) * 2002-02-26 2004-08-10 Bj Services Company Chemically enhanced drilling methods
US8714244B2 (en) * 2007-12-18 2014-05-06 Schlumberger Technology Corporation Stimulation through fracturing while drilling
CN101718184B (en) * 2009-12-15 2013-10-30 中国石油大学(华东) Foamed acid washing technological method for horizontal well
CN101929309B (en) * 2010-08-16 2011-08-31 邯郸市伟业地热开发有限公司 Gas lift reverse circulation drilling process

Also Published As

Publication number Publication date
CN102268963A (en) 2011-12-07

Similar Documents

Publication Publication Date Title
CN106285617B (en) Gas water horizontal well completion method
CN110397428B (en) Displacement coalbed methane yield increasing method for coalbed methane jointly mined by vertical well and U-shaped butt well
RU2496001C1 (en) Development method of oil-gas deposit using hydraulic fracturing of formation
CN106194122B (en) A kind of method that oil field abandoned well transform geothermal well or sub-salt well as
CN110318674B (en) Method for preventing outburst caused by cracking of roadway roof
CN104481495A (en) Coalbed methane (CBM) cluster double multi-branch horizontal well and drilling method relative to discharging and mining vertical well system
RU2460875C1 (en) Carbonate formation hydraulic fracturing method
CN102817603A (en) Method communicating ground with underground mining coal bed gas
CN106761606A (en) The asynchronous note CO of different well of symmetrical expression cloth seam2Oil production method
RU2407879C1 (en) Construction method of well of small diametre
CN107724953A (en) The down-the-hole hammer reverse circulating drilling process construction method of Fluid Sealing
CN105507887A (en) High-water-content horizontal well tracer injection water exploration process and string
CN105986795A (en) Coal bed gas horizontal well coal bed transformation method
CN110886594B (en) Method for exploiting coal bed gas
RU2570157C1 (en) Method for enhanced oil recovery for deposit penetrated by horizontal well
CN102268963B (en) Basement rock fractured formation mixed drilling well completion process
RU2630519C1 (en) Method for well construction in complicated conditions
Xiumin et al. Research and application of gas-lift reverse circulation drilling technology to geothermal well construction in Dalian Jiaoliu Island
CN108222821B (en) A kind of well drilling technology suitable for middle low temperature geothermal well
CN205445599U (en) Two single deck tape -recorder technology tubular columns that seal of spike agent water detection are annotated to high moisture horizontal well
RU2427703C1 (en) Procedure for construction of wells of multi-pay oil field
RU2379492C2 (en) Development method at wells re-entry and oil field in general
RU2511329C1 (en) Method of action on coal bed
CN101240693B (en) Method for carrying dry well casing after gas drilling
Tóth et al. A prospect geothermal potential of an abandoned copper mine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Hybrid drilling technology for bedrock fracture formation

Effective date of registration: 20220920

Granted publication date: 20130522

Pledgee: Guangping County Rural Credit Cooperative

Pledgor: HANDAN WEIYE GEOTHERMAL DEVELOPMENT CO.,LTD.

Registration number: Y2022130000073

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 057651 North side of the middle section of Jin Guangyuan Road, Guangping County, Handan City, Hebei Province

Patentee after: Hebei Weiye Geothermal New Energy Technology Co.,Ltd.

Address before: 057650 South of Renmin Road East Section, Guangping County, Handan City, Hebei Province

Patentee before: HANDAN WEIYE GEOTHERMAL DEVELOPMENT CO.,LTD.