CN102267040B - Preparation method for stainless steel bearing steel tube and ferrule - Google Patents

Preparation method for stainless steel bearing steel tube and ferrule Download PDF

Info

Publication number
CN102267040B
CN102267040B CN2011101883003A CN201110188300A CN102267040B CN 102267040 B CN102267040 B CN 102267040B CN 2011101883003 A CN2011101883003 A CN 2011101883003A CN 201110188300 A CN201110188300 A CN 201110188300A CN 102267040 B CN102267040 B CN 102267040B
Authority
CN
China
Prior art keywords
stainless steel
preparation
bearing steel
pipe
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011101883003A
Other languages
Chinese (zh)
Other versions
CN102267040A (en
Inventor
罗志钢
徐卫新
陈文元
朱雪峰
张秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHANGJIAGANG CITY YIYANG PIPE PRODUCING CO Ltd
Original Assignee
ZHANGJIAGANG CITY YIYANG PIPE PRODUCING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHANGJIAGANG CITY YIYANG PIPE PRODUCING CO Ltd filed Critical ZHANGJIAGANG CITY YIYANG PIPE PRODUCING CO Ltd
Priority to CN2011101883003A priority Critical patent/CN102267040B/en
Publication of CN102267040A publication Critical patent/CN102267040A/en
Application granted granted Critical
Publication of CN102267040B publication Critical patent/CN102267040B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)
  • Heat Treatment Of Steel (AREA)

Abstract

The invention discloses a preparation method of a stainless steel bearing steel tube. The method can improve yield and production efficiency and comprises the steps of: 1) heating and perforating: heating a round bar to 1,040 DEG C-1,070 DEG C, carrying out thermal insulation for 20-30 minutes, perforating at a speed of 10-18 meters per minute, thus obtaining a tube blank; 2) annealing at equal temperature: heating the tube blank to 830-850 DEG C, carrying out thermal insulation for 2-3 hours, then cooling to 700-720 DEG C at a cooling speed less then 30 DEG C per hour, and then discharging under the condition that a cooling speed is less than 50 DEG C per hour; 3) rolling: heating the annealed tube blank to 250-300 DEG C, and then rolling the annealed tube blank into a bearing steel tube with a given size at a speed of 7-8mm per minute; and 4) stress relief annealing: increasing the temperature of the rolled bearing steel tube to 760-780 DEG C, carrying out thermal insulation for 2-3 hours, then discharging under the condition that a cooling speed is less than 50 DEG C per hour. By adopting the preparation method, the stainless steel round bar made from 3Cr13 can be manufactured into the bearing steel tube meeting the requirement.

Description

The preparation method of stainless steel bearing steel pipe and lasso
Technical field
The present invention relates to a kind of preparation method of bearing ring, refer more particularly to a kind of preparation method of stainless steel shaft bearing ring.
Background technology
Along with the extensive popularization and application of non-maintaining technology, stainless steel bearing has obtained application more and more widely in food machinery, daily machinery and various corrosion-resistant field.Because the particularity of stainless steel; Present stainless steel bearing can only pass through round steel bar turning; Strike out lasso then; Traditional perforation tube-making process can't be used for the processing stainless steel bearing ring, so just makes that the lumber recovery of round steel bar is very low, and the production efficiency of stainless steel shaft bearing ring is lower.
Summary of the invention
Technical problem to be solved by this invention is: a kind of preparation method who improves the stainless steel bearing steel pipe of lumber recovery and production efficiency is provided.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: the preparation method of stainless steel bearing steel pipe the steps include:
1) adds hot piercing: round bar is heated to 1040 ~ 1070 ℃, is incubated 20 ~ 30 minutes, bore a hole, obtain pipe with 10 ~ 18 meters/minute speed;
2) isothermal annealing: with heating of pipe blank to 830 ~ 850 ℃, be incubated 2 ~ 3 hours, then,, be cooled to 700 ~ 720 ℃, again to come out of the stove less than 50 ℃ cooling velocity per hour with less than 30 ℃ cooling velocity per hour;
3) rolling: annealed tube blank is heated to 250 ~ 300 ℃, and the speed with 7 ~ 8 millimeters of per minutes is rolling to the bearing steel pipe of given size with it then;
4) stress relief annealing: rolling good bearing steel pipe is warming up to 760 ~ 780 ℃, is incubated 2 ~ 3 hours, then, to come out of the stove less than 50 ℃ cooling velocity per hour.
Said stainless steel grade is 3Cr13.
To pass through pipe that described isothermal annealing obtains carry out pickling lubricated after, be rolled again; The bearing steel pipe that stress relief annealing obtains is aligned.
Another technical problem to be solved by this invention is: a kind of preparation method who improves the stainless steel shaft bearing ring of lumber recovery and production efficiency is provided.
For solving above-mentioned another technical problem, the technical scheme that the present invention adopts is: the preparation method of stainless steel shaft bearing ring, the steps include: the bearing steel pipe that the preparation method who adopts above-mentioned stainless steel bearing steel pipe obtains is cut, and obtain bearing ring.
The invention has the beneficial effects as follows: the preparation method who adopts stainless steel bearing steel pipe of the present invention; Can the stainless steel round bar of 3Cr13 material be processed satisfactory bearing steel pipe; Then; The bearing steel pipe is cut into bearing ring, improved the production efficiency of the lumber recovery and the stainless steel shaft bearing ring of stainless steel round bar greatly.
The specific embodiment
Describe specific embodiments of the present invention below in detail.
The preparation method of stainless steel bearing steel pipe of the present invention the steps include:
1) adds hot piercing: the round bar of 3Cr13 material is heated to 1040 ~ 1070 ℃, is incubated 20 ~ 30 minutes, bore a hole, obtain pipe with 10 ~ 18 meters/minute speed;
2) isothermal annealing: with heating of pipe blank to 830 ~ 850 ℃, be incubated 2 ~ 3 hours, then,, be cooled to 700 ~ 720 ℃, again to come out of the stove less than 50 ℃ cooling velocity per hour with less than 30 ℃ cooling velocity per hour;
3) rolling: annealed tube blank is heated to 250 ~ 300 ℃, and the speed with 7 ~ 8 millimeters of per minutes is rolling to the bearing steel pipe of given size with it then;
4) stress relief annealing: rolling good bearing steel pipe is warming up to 760 ~ 780 ℃ in 0.6 ~ 1 hour, is incubated 2 ~ 3 hours, then, to come out of the stove less than 50 ℃ cooling velocity per hour.
In the present embodiment, cause damage in order to prevent rolling surface to pipe, will pass through pipe that isothermal annealing obtains carry out pickling lubricated after, be rolled again; In order to improve the glacing flatness of bearing ring pipe, the bearing steel pipe that stress relief annealing obtains is aligned.
Through the bearing steel pipe that above-mentioned preparation technology obtains, its performance parameter is following:
1. microscopic structure, equally distributed globular pearlite: press GB/T18254 grading figure, should be between 2 ~ 4 grades;
Actual measurement is 2.5 ~ 3 grades, meets standard.
2. Hardness Control: press the GB/T231 check, hardness should be between HBW185 ~ 240;
Actual measurement meets standard for HBW200 ~ 210.
3. decarburized layer check: press GB/T224, decarburized layer is answered≤0.20 millimeter;
Actual measurement is decarburized layer≤0.1 millimeter, meets standard.
4. mechanical performance test: press GB/T228, tensile strength should be between 600 ~ 800MPa;
Actual measurement is 660 ~ 700MPa, meets standard.
5. grain size check: press GB/T6394, grain size should be greater than 7 grades;
Measured grain size meets standard between 8 ~ 9.
Above-mentioned standard compliant bearing steel pipe is cut, just can obtain the stainless steel shaft bearing ring.

Claims (3)

1. the preparation method of stainless steel bearing steel pipe the steps include:
1) adds hot piercing: round bar is heated to 1040 ~ 1070 ℃, is incubated 20 ~ 30 minutes, bore a hole, obtain pipe with 10 ~ 18 meters/minute speed;
2) isothermal annealing: with heating of pipe blank to 830 ~ 850 ℃, be incubated 2 ~ 3 hours, then,, be cooled to 700 ~ 720 ℃, again to come out of the stove less than 50 ℃ cooling velocity per hour with less than 30 ℃ cooling velocity per hour;
3) rolling: annealed tube blank is heated to 250 ~ 300 ℃, and the speed with 7 ~ 8 millimeters of per minutes is rolling to the bearing steel pipe of given size with it then;
4) stress relief annealing: rolling good bearing steel pipe is warming up to 760 ~ 780 ℃, is incubated 2 ~ 3 hours, then, to come out of the stove less than 50 ℃ cooling velocity per hour;
Said stainless steel grade is 3Cr13.
2. the preparation method of stainless steel bearing steel pipe as claimed in claim 1 is characterized in that: will pass through pipe that described isothermal annealing obtains carry out pickling lubricated after, be rolled again; The bearing steel pipe that stress relief annealing obtains is aligned.
3. the preparation method of stainless steel shaft bearing ring the steps include: the bearing steel pipe that adopts the described preparation method of claim 1 to obtain is cut, and obtains bearing ring.
CN2011101883003A 2011-06-16 2011-07-06 Preparation method for stainless steel bearing steel tube and ferrule Expired - Fee Related CN102267040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101883003A CN102267040B (en) 2011-06-16 2011-07-06 Preparation method for stainless steel bearing steel tube and ferrule

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201110162501.6 2011-06-16
CN201110162501 2011-06-16
CN2011101883003A CN102267040B (en) 2011-06-16 2011-07-06 Preparation method for stainless steel bearing steel tube and ferrule

Publications (2)

Publication Number Publication Date
CN102267040A CN102267040A (en) 2011-12-07
CN102267040B true CN102267040B (en) 2012-10-03

Family

ID=45049603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101883003A Expired - Fee Related CN102267040B (en) 2011-06-16 2011-07-06 Preparation method for stainless steel bearing steel tube and ferrule

Country Status (1)

Country Link
CN (1) CN102267040B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699104A (en) * 2012-06-11 2012-10-03 常熟市旋力轴承钢管有限公司 Preparation method of G20CrNiMo bearing steel pipe
CN103643124B (en) * 2013-11-20 2015-09-16 江苏天舜金属材料集团有限公司 The working method of the above High Strength Steel Bar joint sleeve of a kind of 600MPa level
CN113245857B (en) * 2021-05-06 2023-03-14 张家港保税区恒隆钢管有限公司 Manufacturing process of heat exchange tube for seawater desalination evaporator

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI265053B (en) * 2004-01-16 2006-11-01 Sumitomo Metal Ind Method for producing seamless pipe
CN1259515C (en) * 2004-07-13 2006-06-14 天津市天材科技发展有限公司 Method for making ferrite stainless steel seamless pipes and cold working process thereof
JP4935812B2 (en) * 2006-05-26 2012-05-23 住友金属工業株式会社 Manufacturing method of seamless stainless steel pipe
CN101091984A (en) * 2007-08-03 2007-12-26 攀钢集团攀枝花钢铁研究院 Method for manufacturing stainless steel pipe
CN101612700B (en) * 2008-06-23 2010-10-13 宝山钢铁股份有限公司 Method for preparing seamless steel tubes made of martensite precipitation hardening stainless steel

Also Published As

Publication number Publication date
CN102267040A (en) 2011-12-07

Similar Documents

Publication Publication Date Title
CN102294431B (en) Method for manufacturing stationary blade ring blank forged piece of F-grade combustion gas turbine
CN102029290B (en) Cold rolling method for hard stainless steel band
CN104841823A (en) Forging process for improving 1Cr11Ni2W2MoV forging grain size
CN104651589A (en) Process for hot deformation of fine 316LN austenite stainless steel grains
CN102925657A (en) Rolling deformation quenching composite reinforcing method of middle carbon alloyed steel bearing ring piece
CN102267040B (en) Preparation method for stainless steel bearing steel tube and ferrule
CN105177259A (en) Method for rapidly promoting deformation to induce martensite transformation
CN105834347A (en) Method for carrying out temperature control and forging control intermittent forging through radial precision forging machine
CN101899556A (en) Heat treatment method for thinning coarse grains of ferrite refractory steel for bearing pressure at high temperature
CN105543465A (en) Controlled cooling quenching tempering technology of yaw gear of large wind driven generator
CN102719643A (en) Heat processing technology of high-carbon carbon steel coil rod for steel wire rope
CN102107210B (en) Method for producing stainless steel band of heating pipe
CN104525808A (en) Blank making method for 42CrMoA axial forging
CN110153199A (en) A kind of controlled rolling method of large scale rod bar
CN103706640B (en) Manufacturing method of nickel-based alloy tube
CN102489646A (en) Method for processing steel ball
CN103121034B (en) Super duplex stainless steel ingot hot working cogging method
CN102248370A (en) Method for producing precise linear guide slide seat for machining center
CN106834804A (en) To the compound cryosar nitridation process of the Ti alloy disc type parts of effective strengthening effect
CN103436806A (en) Production method of forged flange capable of meeting A694F70 high yield value core sampling requirements
CN103409686A (en) Production method of Q345D steel plate
CN101318198B (en) Process for manufacturing casting and rolling 3004 alloy deep punching material
CN106424496A (en) Forging method for conducting radial forging on preliminarily rolled square billet
CN103436677B (en) Production method of stainless steel tube specially used for double-tube plate heat exchanger
CN103060533A (en) Laboratory annealing process suitable for detecting non-uniformity of bearing steel carbide

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20160706