CN102261041B - End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge - Google Patents

End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge Download PDF

Info

Publication number
CN102261041B
CN102261041B CN 201110134417 CN201110134417A CN102261041B CN 102261041 B CN102261041 B CN 102261041B CN 201110134417 CN201110134417 CN 201110134417 CN 201110134417 A CN201110134417 A CN 201110134417A CN 102261041 B CN102261041 B CN 102261041B
Authority
CN
China
Prior art keywords
big nut
screw thread
post
sebific duct
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110134417
Other languages
Chinese (zh)
Other versions
CN102261041A (en
Inventor
张长林
田东升
王茂
田大军
王建军
白峰
刘明
吴仁友
闫晓光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN 201110134417 priority Critical patent/CN102261041B/en
Publication of CN102261041A publication Critical patent/CN102261041A/en
Application granted granted Critical
Publication of CN102261041B publication Critical patent/CN102261041B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides an end part fixing device of a pre-buried rubber tube of a post-tensioned prestressed bridge for solving the problem of forming quality of a prestressed steel bar pore canal of the post-tensioned prestressed bridge. The end part fixing device comprises an upper sleeve, a lower sleeve, a big nut and a clamping piece, wherein the lower half part of the upper sleeve is a steel tube, the upper half part of the upper sleeve is a flared tube and a screw thread in reverse direction is arranged on the surface at the front end of the steel tube; the upper half part of the lower sleeve is the steel tube, the lower part of the lower sleeve is the flared tube and the screw thread in positive direction is arranged on the surface at the front end of the steel tube; the screw thread in the position direction is arranged at one end on the inner side of the big nut and the screw thread in the reverse direction is arranged on the other side of the big nut; and the section of the clamping piece is in the shape of a wedge and four circular holes are formed on the side surface of the big nut. Through the method of rotating the screw threads in the position direction and the reverse direction of the big nut, the upper sleeve and the lower sleeve, the sleeves can drive the rubber tube to tension, thereby achieving the desired fixing effect, preventing the pre-buried rubber tube from deforming and displacing during pouring of concrete, enabling the formed pore canal to be straight and ensuring that the friction resistance of the pore canal is in line with design requirements.

Description

The pre-buried sebific duct of post-tensioned prestressing bridge end fastening devices
Technical field
The present invention relates to a kind of fastening devices, be specially the pre-buried sebific duct of a kind of post-tensioned prestressing bridge end fastening devices.
Background technology
The post-tensioned prestressing bridge is the bridge that adopts post-tensioned construction, therefore need form the duct of prestressed reinforcing bar at concrete beam body.Method commonly used is pre-buried sebific duct before concreting, extracts sebific duct after concreting is solidified.But pre-buried sebific duct was installed and was put laying along cage of reinforcement in the past, constraint is unfixing reliably, so when concreting, because the shock and vibration that concrete falls rod is inserted crowded the bumping when smashing, pre-buried sebific duct often is out of shape displacement, thereby make the duct of moulding also just not straight, caused the duct frictional resistance to strengthen the unmanageable adverse consequences of prestressed stretch-draw value.
Summary of the invention
For solving the problem of post-tensioned prestressing bridge prestress reinforcing bar duct Forming Quality, the invention provides the pre-buried sebific duct of a kind of post-tensioned prestressing bridge end fastening devices.
For addressing the above problem, the pre-buried sebific duct of a kind of post-tensioned prestressing bridge of the present invention end fastening devices comprises sleeve pipe, setting of casing, big nut and intermediate plate, and the Lower Half of last sleeve pipe is a steel pipe, the first half is an oviduct, and the steel pipe front-end surface is provided with reverse screw thread; The cased first half is a steel pipe, and Lower Half is an oviduct, and the steel pipe front-end surface is provided with the forward screw thread; Inboard one end of big nut is provided with the forward screw thread, and opposite side is provided with reverse screw thread; The cross section of intermediate plate is wedge shape.
During use, the effective big nut of upper and lower sleeve is assembled into integral body, be enclosed within on the pre-buried sebific duct, setting of casing is pushed into anchor recess, withstand on the anchor recess end face, between last sleeve pipe horn mouth and sebific duct, insert intermediate plate and wedging, the rotation big nut, effect by positive and negative screw thread makes sleeve pipe outwards mobile, makes it tensioning by intermediate plate drive sebific duct and fixes.
For the ease of the rotation big nut, have four circular holes in the side of big nut, in circular hole, insert reinforcing bar and just can rotate big nut.
The present invention has following beneficial effect:
(1) novel, initiative has designed the pre-buried sebific duct of post-tensioned prestressing bridge end fastening devices, has solved a post-tensioned prestressing bridge prestress reinforcing bar duct Forming Quality control difficult problem.
(2) design is ingenious, has adopted the method for placing the wedge type intermediate plate between last sleeve pipe horn mouth and sebific duct, has both solved the problem that clamps sebific duct, again the unlikely sebific duct surface damage that causes; By turn big nut and the positive and negative screw thread method between sleeve pipe up and down, make sleeve pipe drive the sebific duct tensioning, reached the fixed effect of expection.
(3) use this device after, can make the indeformable displacement when concreting of pre-buried sebific duct, the moulding duct is straight, has guaranteed that the duct frictional resistance adheres to specification, and has improved the prestressed stretch-draw quality.
(4) use this device after because pre-buried sebific duct does not produce distortion displacement when concreting, the difficulty when also having reduced to extract sebific duct has been accelerated the tube drawing progress, has improved operating efficiency.
(5) simple in structure, make easily, load and unload easyly, cost is lower.
Description of drawings
Fig. 1 makes up structural representation after the installation for the present invention.
Fig. 2 is last sleeve pipe.
Fig. 3 is setting of casing.
Fig. 4 is big nut.
Fig. 5 is the lateral view of Fig. 5.
Fig. 6 is intermediate plate.
Among the figure, the last sleeve pipe of 1-, 2-setting of casing, 3-big nut, 4-intermediate plate, 5-circular hole, 6-sebific duct, 7-anchor recess.
The specific embodiment
The present invention will be further described below in conjunction with accompanying drawing.
The pre-buried sebific duct of a kind of post-tensioned prestressing bridge of the present invention end fastening devices, comprise sleeve pipe 1, setting of casing 2, big nut 3 and intermediate plate 4, the Lower Half of last sleeve pipe 1 is a steel pipe, pipe diameter is slightly larger than pre-buried sebific duct external diameter, the first half is an oviduct, the horn mouth diameter is according to the design of self-locking angle needs, and the steel pipe front-end surface is provided with reverse screw thread; The first half of setting of casing 2 is a steel pipe, and pipe diameter is identical with last sleeve pipe 1 pipe diameter, and Lower Half is an oviduct, and the horn mouth diameter is greater than Circularhole diameter on the anchor recess, in order to be supported on the anchor recess bottom surface, the steel pipe front-end surface is provided with the forward screw thread; Inboard one end of big nut 2 is provided with the forward screw thread, and opposite side is provided with reverse screw thread; Big nut 3 is steel component, and the processing of screw thread is to match with sleeve pipe male thread up and down in it.The cross section of intermediate plate 4 is wedge shape, is steel component, and the gap between size and last sleeve pipe horn mouth and the sebific duct external diameter adapts, and uses for convenient, can be designed as two lobes.
The side of big nut 3 has four circular holes 5.Four circular holes 5 are used for inserting reinforcing bar rotation big nut 3, by big nut 3 up and down sleeve pipe be assembled into integral body.
During use, two fastening devicess are a cover, are used for the two ends of a sebific duct 6, earlier the effective big nut 3 of upper and lower sleeve are assembled into integral body, are enclosed within on the pre-buried sebific duct 6, and assembly is pushed in the anchor recess, withstand on anchor recess 7 end faces, and every 6 one of sebific duct is installed one.Between last sleeve pipe 1 horn mouth and sebific duct, insert intermediate plate 4, and wedging.Insert reinforcing bar to inner rotary big nut 3 in big nut 3 circular holes, the effect by positive and negative screw thread makes sleeve pipe 1 outwards mobile, makes it tensioning by intermediate plate 4 drive sebific ducts 6 and fixes.

Claims (2)

1. the pre-buried sebific duct of post-tensioned prestressing bridge end fastening devices, it is characterized in that: comprise sleeve pipe (1), setting of casing (2), big nut (3) and intermediate plate (4), the Lower Half of last sleeve pipe (1) is a steel pipe, the first half is an oviduct, and the steel pipe front-end surface is provided with reverse screw thread; The first half of setting of casing (2) is a steel pipe, and Lower Half is an oviduct, and the steel pipe front-end surface is provided with the forward screw thread; Last sleeve pipe (1) and setting of casing (2) are by big nut (3) assembling, be enclosed within on the pre-buried sebific duct, inboard one end of big nut (3) is provided with the forward screw thread that is connected with setting of casing (2) front-end surface, and opposite side is provided with last sleeve pipe (1) front-end surface and is connected reverse screw thread; Insert intermediate plate (4) between last sleeve pipe (1) oviduct and sebific duct, the cross section of intermediate plate (4) is wedge shape.
2. the pre-buried sebific duct of a kind of post-tensioned prestressing bridge according to claim 1 end fastening devices, it is characterized in that: the side of big nut (3) has four circular holes (5).
CN 201110134417 2011-05-24 2011-05-24 End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge Active CN102261041B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110134417 CN102261041B (en) 2011-05-24 2011-05-24 End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110134417 CN102261041B (en) 2011-05-24 2011-05-24 End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge

Publications (2)

Publication Number Publication Date
CN102261041A CN102261041A (en) 2011-11-30
CN102261041B true CN102261041B (en) 2013-07-17

Family

ID=45007859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110134417 Active CN102261041B (en) 2011-05-24 2011-05-24 End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge

Country Status (1)

Country Link
CN (1) CN102261041B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817315B (en) * 2012-05-22 2015-04-08 北京交通大学 Support flexible anchoring system
CN102995556B (en) * 2012-12-04 2014-11-05 北京交通大学 Support for straddle-type monorail traffic track beam
CN105889625B (en) * 2016-04-13 2018-01-09 中国科学院武汉岩土力学研究所 A kind of combined steel pipe relay well equipment and construction method for jacking construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2739290Y (en) * 2004-09-18 2005-11-09 柳州欧维姆机械股份有限公司 Steel strand vertical prestress anchoring system
JP2007254975A (en) * 2006-03-20 2007-10-04 Dps Bridge Works Co Ltd Composite girder of steel and concrete, and method of manufacturing the composite girder
JP2008231700A (en) * 2007-03-16 2008-10-02 Anderson Technology Kk Flat anchorage device for post-tensioned type prestressed concrete floor slab, post-tensioned type prestressed concrete floor slab using the anchorage device, and construction method for the post-tensioned type prestressed concrete floor slab
CN101736701A (en) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 Bridge steel and concrete mixing section constructing method
CN201704628U (en) * 2010-03-16 2011-01-12 中国建筑土木建设有限公司 Girder-end anchor recess plugging formwork for box girder
CN202073042U (en) * 2011-05-24 2011-12-14 中铁三局集团有限公司 End fixing device of pre-embedded hose of post-tensioning pre-stressed bridge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2739290Y (en) * 2004-09-18 2005-11-09 柳州欧维姆机械股份有限公司 Steel strand vertical prestress anchoring system
JP2007254975A (en) * 2006-03-20 2007-10-04 Dps Bridge Works Co Ltd Composite girder of steel and concrete, and method of manufacturing the composite girder
JP2008231700A (en) * 2007-03-16 2008-10-02 Anderson Technology Kk Flat anchorage device for post-tensioned type prestressed concrete floor slab, post-tensioned type prestressed concrete floor slab using the anchorage device, and construction method for the post-tensioned type prestressed concrete floor slab
CN101736701A (en) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 Bridge steel and concrete mixing section constructing method
CN201704628U (en) * 2010-03-16 2011-01-12 中国建筑土木建设有限公司 Girder-end anchor recess plugging formwork for box girder
CN202073042U (en) * 2011-05-24 2011-12-14 中铁三局集团有限公司 End fixing device of pre-embedded hose of post-tensioning pre-stressed bridge

Also Published As

Publication number Publication date
CN102261041A (en) 2011-11-30

Similar Documents

Publication Publication Date Title
CN102261041B (en) End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge
US10024051B2 (en) Embedded concrete anchor system
WO2014199706A1 (en) Method for rehabilitating existing pipe and support member for rehabilitating pipe
CN108797897B (en) Self-locking steel bar connector for prefabricated parts
CN109235779B (en) Full-grouting sleeve structure capable of realizing self-centering of reinforcing steel bars and manufacturing method
CN202073042U (en) End fixing device of pre-embedded hose of post-tensioning pre-stressed bridge
CN211524173U (en) Aluminum alloy template screw hole shutoff composite set
CN204139589U (en) The construction formwork assembly of vertical concrete wall
CN203821765U (en) Multilayer elastic hook anchor bolt
CN216553005U (en) A novel attach wall device for creeping formwork support body
CN201671339U (en) Fixing device for wall bodies and beam column templates of buildings
CN214328845U (en) Steel reinforcement cage extension connection structure
CN204492012U (en) A kind of bar connecting device
CN205000329U (en) Splicer
KR102096802B1 (en) Apparatus and Method for the penetration sleeve for the wall retaining wall having multiple thread acid with a cap and a cylindrical members is integrally formed
CN204040316U (en) Reinforcing steel bar connecting device
KR100822748B1 (en) Length variable support
CN201474290U (en) Scaffold lapping component
JP5002085B2 (en) Induction embedding material and crack induction structure using the same
KR102446331B1 (en) Sepatie fixing device for formwork
CN211447799U (en) Formwork opposite-pulling device for concrete structure pouring
KR102528443B1 (en) Clamp bar for the temporary installation ash support of the construction structure
KR100771232B1 (en) Space sustenance unit for mold
CN204492205U (en) A kind of reinforcing steel bar connecting device
CN214460324U (en) Prefabricated building monomer assembly structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant