CN102256271B - The acquisition methods and device of capacity expansion indication information - Google Patents

The acquisition methods and device of capacity expansion indication information Download PDF

Info

Publication number
CN102256271B
CN102256271B CN201110157718.8A CN201110157718A CN102256271B CN 102256271 B CN102256271 B CN 102256271B CN 201110157718 A CN201110157718 A CN 201110157718A CN 102256271 B CN102256271 B CN 102256271B
Authority
CN
China
Prior art keywords
information
resource
capacity expansion
indication information
expansion indication
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110157718.8A
Other languages
Chinese (zh)
Other versions
CN102256271A (en
Inventor
钟永丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201110157718.8A priority Critical patent/CN102256271B/en
Publication of CN102256271A publication Critical patent/CN102256271A/en
Application granted granted Critical
Publication of CN102256271B publication Critical patent/CN102256271B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a kind of acquisition methods of capacity expansion indication information and device, the above method includes:Indicator model is created, wherein, indicator model includes:The corresponding relation of resource apparatus state corresponding information and capacity expansion indication information;The resource apparatus status information collected is analyzed using the indicator model of establishment, obtains capacity expansion indication information.According to technical scheme provided by the invention, intelligently it can indicate whether resource needs dilatation, the urgency for needing dilatation, the selectable type of hardware of dilatation by indicator model, carrying out dilatation in time makes resource apparatus system more reliable and more stable.

Description

The acquisition methods and device of capacity expansion indication information
Technical field
The present invention relates to the communications field, in particular to the acquisition methods and device of a kind of capacity expansion indication information.
Background technology
At present, in the technology related to mobile communication equipment dilatation, relate to how to carry out the technology of dilatation mostly, but it is right The technology that dilatation is indicated is related to less.
In correlation technique, following dilatation indicating means be present:Monitor and periodically report each by backbone network flow direction in real time The network traffics of individual user;Calculate and store the actual measurement bandwidth of each user, according to the port bandwidth of each user and actual measurement band Width, the port coefficient of each user is calculated, according to the size of port coefficient, generate different dilatation promptings.
But the above method is the dilatation prompting for bandwidth, can not be applied on resource apparatus (for example, resource board).
The content of the invention
Prompt, can not apply on resource apparatus the problem of, the present invention carries for the dilatation that bandwidth is directed in correlation technique The acquisition methods and device of a kind of capacity expansion indication information are supplied, at least one to solve the above problems.
A kind of according to an aspect of the invention, there is provided acquisition methods of capacity expansion indication information.
Included according to the acquisition methods of the capacity expansion indication information of the present invention:Indicator model is created, wherein, indicator model Including:The corresponding relation of resource apparatus state corresponding information and capacity expansion indication information;Using the indicator model of establishment to collection To resource apparatus status information analyzed, obtain capacity expansion indication information.
According to another aspect of the present invention, there is provided a kind of acquisition device of capacity expansion indication information.
Included according to the acquisition device of the capacity expansion indication information of the present invention:Creation module, for creating indicator model, its In, indicator model includes:The corresponding relation of resource apparatus state corresponding information and capacity expansion indication information;Acquisition module, it is used for The resource apparatus status information collected is analyzed using the indicator model of establishment, obtains capacity expansion indication information.
By the present invention, the resource apparatus status information collected is analyzed using the indicator model of establishment, obtained Capacity expansion indication information is taken, the dilatation in correlation technique for bandwidth is solved and prompts, can not apply on resource apparatus the problem of, And then intelligently it can indicate whether resource needs dilatation, the urgency for needing dilatation, dilatation selectable by indicator model Type of hardware, carrying out dilatation in time makes resource apparatus system more reliable and more stable.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the acquisition methods of capacity expansion indication information according to embodiments of the present invention;
Fig. 2 is the flow chart of the acquisition methods of capacity expansion indication information according to the preferred embodiment of the invention;
Fig. 3 is the structured flowchart of the acquisition device of capacity expansion indication information according to embodiments of the present invention;
Fig. 4 is the structured flowchart of the acquisition device of capacity expansion indication information according to the preferred embodiment of the invention.
Embodiment
Describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that do not conflicting In the case of, the feature in embodiment and embodiment in the application can be mutually combined.
Fig. 1 is the flow chart of the acquisition methods of capacity expansion indication information according to embodiments of the present invention.As shown in figure 1, the expansion Holding the acquisition methods of configured information includes:
Step S102:Indicator model is created, wherein, indicator model includes:Resource apparatus state corresponding information is with expanding Hold the corresponding relation of configured information;
Step S104:The resource apparatus status information collected is analyzed using the indicator model of establishment, obtained Capacity expansion indication information.
In correlation technique, the dilatation for bandwidth is prompted, and can not be applied on resource apparatus (for example, resource board).In Fig. 1 In the acquisition methods of shown capacity expansion indication information, using the indicator model of establishment to the resource apparatus status information that collects Analyzed, capacity expansion indication information is obtained, suitable for the dilatation of resource apparatus.Can intelligently indicate resource whether need dilatation, Urgency, the selectable type of hardware of dilatation of dilatation are needed, carrying out dilatation in time makes resource apparatus system more reliable and more stable.
Wherein, above-mentioned resource apparatus state corresponding information includes but is not limited to one below:Resource metrics Comprehensive Assessment is believed Cease (for example, resource metrics comprehensive score), resource apparatus status information.
Wherein, above-mentioned resource apparatus status information includes but is not limited at least one of:Resource utilization status information, money Source information on load, throughput information.
Wherein, above-mentioned capacity expansion indication information includes but is not limited at least one of:Capacity of expansion information, whether dilatation Configured information, dilatation urgency information, the selectable type of hardware information of dilatation.
In step S102, various ways can be used to create indicator model, describe two kinds of preferred embodiments below.
Mode one
(1) the importance alignment matrix of resource capacity expansion index is collected;
(2) consistency check is carried out to importance alignment matrix;
(3) determine each resource capacity expansion index in resource capacity expansion according to by the importance alignment matrix of consistency check Weight;
(4) threshold value is determined to each resource capacity expansion index, the resource that will be collected corresponding to each resource capacity expansion index The difference proportion of device status data and threshold value is multiplied by weight calculation and obtains resource metrics Comprehensive Assessment information (for example, resource Index comprehensive score);
(5) corresponding relation of resource metrics Comprehensive Assessment information and capacity expansion indication information is established.
Mode two
(1) historical information of resource apparatus status information, and capacity expansion indication information corresponding to historical information are collected;
(2) information of collection is divided into model training collection data and model checking collection data;
(3) corresponding relation of resource apparatus status information and capacity expansion indication information is established using model training collection data;
(4) corresponding relation is verified using model checking collection data, if checking is not by re-establishing corresponding pass System, until being verified.
Preferably, in step S104, using the indicator model of first way establishment, to the resource apparatus shape collected State information is analyzed, and following processing can be included by obtaining capacity expansion indication information:
(1) actual resource metrics Comprehensive Assessment is calculated according to weight and the resource apparatus status information collected Information;
(2) in the corresponding relation of resource metrics Comprehensive Assessment information and capacity expansion indication information, search and actual resource Capacity expansion indication information corresponding to index comprehensive evaluation information.
Preferably, in step S104, using the indicator model of second way establishment, to the resource apparatus shape collected State information is analyzed, and following processing can be included by obtaining capacity expansion indication information:Indicated in resource apparatus status information and dilatation In the corresponding relation of information, capacity expansion indication information corresponding with the resource apparatus status information collected is searched.
Preferably, after capacity expansion indication information is obtained, the inspection report comprising capacity expansion indication information can be generated.
Preferably, after indicator model is created, in addition to following processing:The newly-increased resource apparatus state of periodic collection Information, capacity expansion indication information, threshold value and type of hardware information;The indicator model created using newly-increased Information revision.
Above-mentioned preferred embodiment is described below in conjunction with Fig. 2.
Fig. 2 is the flow chart of the method for generation dilatation instruction according to the preferred embodiment of the invention.As shown in Fig. 2 the life Method into dilatation instruction includes:
Step S202:Establish indicator model:
Preferably, following two methods can be used by establishing indicator model:
The first:Threshold value is determined, type of hardware data is collected, indicator model is established using analytic hierarchy process (AHP);
Establish comprising the following steps that for model:
(1) the importance alignment matrix to resource capacity expansion index is collected.
(2) consistency check is carried out to importance alignment matrix, if by consistency check, into step (3), if not By repeat step (1) (2), until passing through consistency check.
(3) according to the importance alignment matrix by consistency check, weight of each index in resource capacity expansion is determined.
(4) threshold value is determined according to actual conditions to each index.
(5) the weight calculation resource metrics synthesis being multiplied by according to the difference proportion of actual value and threshold value in step (3) is commented Determine information (for example, resource metrics comprehensive score).
(6) establish resource metrics Comprehensive Assessment information with whether the corresponding relation of the configured information of dilatation;Resource metrics are comprehensive Close the corresponding relation of evaluation information and capacity of expansion information;Resource metrics Comprehensive Assessment information is corresponding with dilatation urgency information Relation;The corresponding relation of resource metrics Comprehensive Assessment information and type of hardware information.
Second:Collect history resource utilization status, resource load, throughput data, whether need dilatation, dilatation urgent The data such as degree, capacity of expansion, type of hardware information is collected, establish the mapping of capacity of expansion and each type of hardware, divided using returning Analysis method establishes indicator model;
Establish the specific steps of model:
(1) historical informations such as resource utilization status, resource load, handling capacity are collected, and are corresponding to these historical informations No dilatation, dilatation urgency, capacity of expansion data.
(2) data in step (1) are divided into model training collection data, model checking collection data two parts.
(3) the model training collection data in step (2) are utilized to establish resource utilization status, resource using regression analysis The corresponding relation of the resource apparatus such as load, handling capacity status information and capacity of expansion, resource utilization status, resource load, handle up Amount etc. resource apparatus status information with whether the resource such as the corresponding relation of dilatation, resource utilization status, resource load, handling capacity is set The resource apparatus state such as corresponding relation, resource utilization status, resource load, handling capacity of standby status information and dilatation urgency is believed Breath and the corresponding relation of dilatation type of hardware.
(4) using the model in model checking collection data authentication step (3), checking is not by adjusting the specific method returned Or data are carried out with conversion repeat step (3), until model is verified.
Step S204:Health check tool gathered data (i.e. above-mentioned resource apparatus status information).
Wherein, the related patrol task collection resource utilization status of health check tool client terminal start-up dilatation instruction, resource are born The relevant informations such as lotus, handling capacity;
Step S206:Using indicator model analysis data:
(1) in the indicator model created according to first way the weight of each index to the correlation data calculation that collects Actual resource metrics Comprehensive Assessment information, can be defeated according to the corresponding relation of resource metrics Comprehensive Assessment information and type of hardware Go out whether to need dilatation, the urgency for needing dilatation, the selectable type of hardware of dilatation.
(2) Correlative data analysis that collects is obtained according to the indicator model that the second way creates capacity of expansion, Whether dilatation, dilatation urgency.It is exportable whether to need dilatation, needs according to capacity of expansion and the corresponding relation of type of hardware The urgency of dilatation, the selectable type of hardware of dilatation.
Step S208:Health check tool generation inspection report:According to the output data of indicator model, health check tool is given birth to automatically Reported into inspection, show whether resource apparatus needs dilatation, the urgency for needing dilatation, the selectable hardware of dilatation in report Type information;
Step S210:Periodically amendment indicator model:The regular foundation of indicator model established using regression analysis Collect newly-increased resource utilization status, resource load, handling capacity, type of hardware, whether need dilatation, dilatation urgency etc. number According to amendment indicator model;The indicator model established using analytic hierarchy process (AHP) periodically redefines threshold value and adding hardware class Type data correction indicator model.
Fig. 3 is the structured flowchart of the acquisition device of capacity expansion indication information according to embodiments of the present invention.As shown in figure 3, should The acquisition device of capacity expansion indication information includes:Creation module 10, for creating indicator model, wherein, indicator model includes: The corresponding relation of resource apparatus state corresponding information and capacity expansion indication information;Acquisition module 20, it is connected with creation module 10, uses The resource apparatus status information collected is analyzed in using the indicator model created, obtains capacity expansion indication information.
In the acquisition device of the capacity expansion indication information shown in Fig. 3, using the indicator model of establishment to the money that collects Source device status information is analyzed, and capacity expansion indication information is obtained, suitable for the dilatation of resource apparatus.Resource can intelligently be indicated Whether dilatation, the urgency that needs dilatation, dilatation selectable type of hardware are needed, and carrying out dilatation in time makes resource apparatus system It is more reliable and more stable.
Wherein, resource apparatus status information includes but is not limited at least one of:Resource utilization status information, resource are born Lotus information, throughput information.
Wherein, above-mentioned capacity expansion indication information includes but is not limited at least one of:Capacity of expansion information, whether dilatation Configured information, dilatation urgency information, the selectable type of hardware information of dilatation.
Preferably, as shown in figure 4, above-mentioned creation module 10 may further include:First collector unit 100, for receiving Collect the importance alignment matrix of resource capacity expansion index;Verification unit 102, it is connected with the first collector unit 100, for important Property alignment matrix carry out consistency check;Determining unit 104, it is connected with verification unit 102, for being examined according to by uniformity The importance alignment matrix tested determines weight of each resource capacity expansion index in resource capacity expansion;First computing unit 106, it is and true Order member 104 is connected, for determining threshold value to each resource capacity expansion index, by collection corresponding to each resource capacity expansion index To resource apparatus status data and the difference proportion of threshold value be multiplied by weight calculation and obtain resource metrics Comprehensive Assessment information, its In, resource metrics Comprehensive Assessment information is resource apparatus state corresponding information;First establishes unit 108, with the first computing unit 106 are connected, for establishing the corresponding relation of resource metrics Comprehensive Assessment information and capacity expansion indication information.
Preferably, as shown in figure 4, acquisition module 20 may further include:Second computing unit 200, established with first Unit 108 is connected, for actual resource metrics to be calculated according to weight and the resource apparatus status information collected Comprehensive Assessment information;First searching unit 202, it is connected with the second computing unit 200, for believing in resource metrics Comprehensive Assessment Breath is believed with the corresponding relation of capacity expansion indication information, searching dilatation instruction corresponding with the resource metrics Comprehensive Assessment information of reality Breath.
Preferably, as shown in figure 4, above-mentioned creation module 10 can further include:Second collector unit 110, is used for Collect the historical information of resource apparatus status information, and capacity expansion indication information corresponding to historical information;Division unit 112, with Second collector unit 110 is connected, for the information of collection to be divided into model training collection data and model checking collection data;The Two establish unit 114, are connected with division unit 112, for establishing resource apparatus status information using model training collection data With the corresponding relation of capacity expansion indication information, wherein, resource apparatus status information is resource apparatus state corresponding information;Authentication unit 116, establish unit 114 with second and be connected, for being verified using model checking collection data to corresponding relation, if checking Not by then triggering second and establishing unit, until being verified.
Preferably, as shown in figure 4, acquisition module 20 includes:Second searching unit 210, for believing in resource apparatus state Breath is with the corresponding relation of capacity expansion indication information, searching dilatation instruction letter corresponding with the resource apparatus status information collected Breath.
Preferably, as shown in figure 4, said apparatus may further include:Generation module 30, it is connected with acquisition module 20 Connect, reported for generating the inspection comprising capacity expansion indication information.
Preferably, as shown in figure 4, said apparatus may further include:Collection module 40, increased newly for periodic collection Resource apparatus status information, capacity expansion indication information, threshold value and type of hardware information;Correcting module 50, for using newly-increased Information revision create indicator model.
As can be seen from the above description, the present invention realizes following technique effect:For intellectuality, by patrolling The information such as inspection instrument automatic detecting resource utilization status, resource load, handling capacity, by indicator model, intelligently instruction resource is No to need dilatation, the urgency for needing dilatation, the selectable type of hardware of dilatation, carrying out dilatation in time makes system is more stable can Lean on;For simplification, simplify and detect whether to need the process for carrying out system resource dilatation;For automation, use Health check tool automatic detecting resource information, dilatation instruction can be automatically generated.
Obviously, those skilled in the art should be understood that above-mentioned each module of the invention or each step can be with general Computing device realize that they can be concentrated on single computing device, or be distributed in multiple computing devices and formed Network on, alternatively, they can be realized with the program code that computing device can perform, so as to being stored in Performed in storage device by computing device, they are either fabricated to each integrated circuit modules respectively or by them Multiple modules or step be fabricated to single integrated circuit module to realize.So, the present invention is not restricted to any specific hard Part and software combine.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (14)

  1. A kind of 1. acquisition methods of capacity expansion indication information, it is characterised in that including:
    Indicator model is created, wherein, the indicator model includes:Resource apparatus state corresponding information and capacity expansion indication information Corresponding relation;
    The resource apparatus status information collected is analyzed using the indicator model of the establishment, obtains dilatation instruction letter Breath;
    Wherein, when the resource apparatus state corresponding information is resource metrics Comprehensive Assessment information, the establishment indicator mould Type includes:
    Collect the importance alignment matrix of resource capacity expansion index;
    Consistency check is carried out to the importance alignment matrix;
    Determine each resource capacity expansion index in resource capacity expansion according to the importance alignment matrix by consistency check Weight;
    Threshold value is determined to each resource capacity expansion index, collected described corresponding to each resource capacity expansion index Resource apparatus status data and the difference proportion of threshold value are multiplied by the weight calculation and obtain the resource metrics Comprehensive Assessment letter Breath;
    Establish the corresponding relation of the resource metrics Comprehensive Assessment information and the capacity expansion indication information.
  2. 2. according to the method for claim 1, it is characterised in that using the indicator model of the establishment to the money that collects Source device status information is analyzed, and obtaining capacity expansion indication information includes:
    Actual resource metrics synthesis is calculated according to the weight and the resource apparatus status information collected to comment Determine information;
    In the corresponding relation of the resource metrics Comprehensive Assessment information and the capacity expansion indication information, search and described actual Capacity expansion indication information corresponding to resource metrics Comprehensive Assessment information.
  3. 3. according to the method for claim 1, it is characterised in that when the resource apparatus state corresponding information is resource apparatus During status information, the establishment indicator model includes:
    Collect the historical information of the resource apparatus status information, and capacity expansion indication information corresponding to the historical information;
    Collected information is divided into model training collection data and model checking collection data;
    Resource apparatus status information pass corresponding with the capacity expansion indication information is established using the model training collection data System;
    Verify that collection data are verified to the corresponding relation using the model, if checking is not by re-establishing described Corresponding relation, until model is verified.
  4. 4. according to the method for claim 3, it is characterised in that using the indicator model of the establishment to the money that collects Source device status information is analyzed, and obtaining capacity expansion indication information includes:
    In the corresponding relation of the resource apparatus status information and the capacity expansion indication information, search and the money collected Capacity expansion indication information corresponding to source device status information.
  5. 5. according to the method for claim 1, it is characterised in that after the capacity expansion indication information is obtained, in addition to:
    Inspection of the generation comprising the capacity expansion indication information is reported.
  6. 6. according to the method for claim 1, it is characterised in that after indicator model is created, in addition to:
    Periodic collection newly-increased resource apparatus status information, capacity expansion indication information, threshold value and type of hardware information;
    Using the indicator model created described in the newly-increased Information revision.
  7. 7. method according to any one of claim 1 to 6, it is characterised in that the resource apparatus status information includes At least one of:Resource utilization status information, resource information on load, throughput information.
  8. 8. method according to any one of claim 1 to 6, it is characterised in that the capacity expansion indication information includes following At least one:Capacity of expansion information, whether configured information, dilatation urgency information, the selectable type of hardware of dilatation of dilatation Information.
  9. A kind of 9. acquisition device of capacity expansion indication information, it is characterised in that including:
    Creation module, for creating indicator model, wherein, the indicator model includes:Resource apparatus state corresponding information With the corresponding relation of capacity expansion indication information;
    Acquisition module, for being analyzed using the indicator model of the establishment the resource apparatus status information collected, Obtain capacity expansion indication information;
    Wherein, the creation module includes:
    First collector unit, for collecting the importance alignment matrix of resource capacity expansion index;
    Verification unit, for carrying out consistency check to the importance alignment matrix;
    Determining unit, for determining that each resource capacity expansion index exists according to by the importance alignment matrix of consistency check Weight in resource capacity expansion;
    First computing unit, for determining threshold value to each resource capacity expansion index, by each resource capacity expansion index The corresponding resource apparatus status data collected and the difference proportion of threshold value are multiplied by the weight calculation and obtain resource Index comprehensive evaluates information, wherein, the resource metrics Comprehensive Assessment information is the resource apparatus state corresponding information;
    First establishes unit, and for establishing, the resource metrics Comprehensive Assessment information is corresponding with the capacity expansion indication information to close System.
  10. 10. device according to claim 9, it is characterised in that the acquisition module includes:
    Second computing unit, for reality to be calculated according to the weight and the resource apparatus status information collected Resource metrics Comprehensive Assessment information;
    First searching unit, for the corresponding relation in the resource metrics Comprehensive Assessment information and the capacity expansion indication information In, search capacity expansion indication information corresponding with the actual resource metrics Comprehensive Assessment information.
  11. 11. device according to claim 9, it is characterised in that the creation module includes:
    Second collector unit, for collecting the historical information of the resource apparatus status information, and the historical information corresponds to Capacity expansion indication information;
    Division unit, for collected information to be divided into model training collection data and model checking collection data;
    Second establishes unit, for establishing the resource apparatus status information and the dilatation using the model training collection data The corresponding relation of configured information, wherein, the resource apparatus status information is the resource apparatus state corresponding information;
    Authentication unit, for using the model checking collection data corresponding relation is verified, if checking not by, Then trigger described second and establish unit, until being verified.
  12. 12. device according to claim 11, it is characterised in that the acquisition module includes:
    Second searching unit, in the corresponding relation of the resource apparatus status information and the capacity expansion indication information, looking into Look for capacity expansion indication information corresponding with the resource apparatus status information collected.
  13. 13. the device according to any one of claim 9 to 12, it is characterised in that described device also includes:
    Generation module, reported for generating the inspection comprising the capacity expansion indication information.
  14. 14. the device according to any one of claim 9 to 12, it is characterised in that described device also includes:
    Collection module, resource apparatus status information, capacity expansion indication information, threshold value and the hardware classes increased newly for periodic collection Type information;
    Correcting module, for using the indicator model created described in the newly-increased Information revision.
CN201110157718.8A 2011-06-13 2011-06-13 The acquisition methods and device of capacity expansion indication information Active CN102256271B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110157718.8A CN102256271B (en) 2011-06-13 2011-06-13 The acquisition methods and device of capacity expansion indication information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110157718.8A CN102256271B (en) 2011-06-13 2011-06-13 The acquisition methods and device of capacity expansion indication information

Publications (2)

Publication Number Publication Date
CN102256271A CN102256271A (en) 2011-11-23
CN102256271B true CN102256271B (en) 2018-01-02

Family

ID=44983199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110157718.8A Active CN102256271B (en) 2011-06-13 2011-06-13 The acquisition methods and device of capacity expansion indication information

Country Status (1)

Country Link
CN (1) CN102256271B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105323770B (en) * 2014-07-31 2019-01-01 中国移动通信集团公司 The dilatation appraisal procedure and device of wireless communication system
CN106713021B (en) * 2016-12-09 2020-02-11 北京奇虎科技有限公司 Method and device for judging whether server in cluster needs to be recycled

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101242460A (en) * 2008-03-19 2008-08-13 珠海市伊特高科技有限公司 Distribution network monitoring management system
CN101426217A (en) * 2008-10-24 2009-05-06 中国移动通信集团山东有限公司 Method and apparatus for cell capacity-enlarging information confirming
CN101471872A (en) * 2007-12-27 2009-07-01 华为技术有限公司 Method and device for processing network resource data and resource accommodation control subsystem

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101471872A (en) * 2007-12-27 2009-07-01 华为技术有限公司 Method and device for processing network resource data and resource accommodation control subsystem
CN101242460A (en) * 2008-03-19 2008-08-13 珠海市伊特高科技有限公司 Distribution network monitoring management system
CN101426217A (en) * 2008-10-24 2009-05-06 中国移动通信集团山东有限公司 Method and apparatus for cell capacity-enlarging information confirming

Also Published As

Publication number Publication date
CN102256271A (en) 2011-11-23

Similar Documents

Publication Publication Date Title
CN102946616B (en) Internet of things middleware performance testing system and testing method
CN110515811A (en) Terminal artificial intelligence performance benchmark test method and device
CN110027437B (en) Electric automobile fills electric pile online calibration system
WO2018082340A1 (en) Simulation test system and method
CN111325463A (en) Data quality detection method, device, equipment and computer readable storage medium
CN108495329B (en) Method and device for evaluating reliability of base station
CN107665172A (en) A kind of Software Defects Predict Methods based on complicated weighting software network
CN102904755A (en) Method and device for measuring quality of user experience of mobile-internet services
CN112506757A (en) Automatic test method, system, computer device and medium thereof
CN110247816A (en) Index monitoring method and device
US7617313B1 (en) Metric transport and database load
CN111294730A (en) Method and device for processing network problem complaint information
CN116136950B (en) Chip verification method, device, system, electronic equipment and storage medium
CN105355021A (en) ZigBee-based remote wireless meter reading system and performance detection method thereof
CN110571926A (en) intelligent power distribution network based on Internet of things technology and data model construction method thereof
CN105868956A (en) Data processing method and device
CN102256271B (en) The acquisition methods and device of capacity expansion indication information
WO2022088809A1 (en) Method and system for determining interval time for testing servers, and device and medium
CN112686773B (en) Electric power metering all-link key business anomaly positioning model construction method based on fusion business topology
CN116319081B (en) Electronic signature security management system based on big data cloud platform
CN110728315B (en) Real-time quality control method, system and equipment
RU2532714C2 (en) Method of acquiring data when evaluating network resources and apparatus therefor
CN102761888B (en) The sensor network abnormal detection method that a kind of feature based is selected and device
CN110543415A (en) Computer software technology development and debugging system
CN109687592A (en) Substation information display control method, device and electronic equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant