CN102244573B - clock reporting method and device - Google Patents
clock reporting method and device Download PDFInfo
- Publication number
- CN102244573B CN102244573B CN201110200873.3A CN201110200873A CN102244573B CN 102244573 B CN102244573 B CN 102244573B CN 201110200873 A CN201110200873 A CN 201110200873A CN 102244573 B CN102244573 B CN 102244573B
- Authority
- CN
- China
- Prior art keywords
- tlv
- equipment
- upstream
- active
- standby switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The invention discloses a clock reporting method and device. The method comprises the following steps: upstream equipment transmits a notification message to downstream equipment when undergoing main-standby switching occurs; and the downstream equipment receives the notification message and keeps locking a current clock source. Through adoption of the technical scheme disclosed by the invention, the problem of network oscillation caused because the upstream equipment undergoes the main-standby switching in the prior art is solved so that the effect of maintaining frequency synchronization stability in a network is realized.
Description
Technical field
The present invention relates to the communications field, in particular to a kind of clock reporting method and device.
Background technology
In communication network PTN (Packet Transfer Network, Packet Transport Network) equipment, clock rate synchronization
SSM (Synchronization Status Message, clock synchronous state signal) technology is adopted typically.SSM synchronizing frequencies
When, according to its clock source credit rating and priority, the optimum circuit of credit rating signal is selected as synchronous clock source, most gone up
Trip equipment going down clock quality grade step by step.When there is concussion in upstream equipment, and clock source switching occurs, upstream device meeting
It is affected step by step, generally requires longer time and could select again clock source and stablize.When the locked circuit of upstream equipment
Clock source, but primary master control breaks down, and when being surprisingly switched to standby master control, before slave board enters working condition, needs experience
One of short duration initialization procedure, now procotol short interruption, is sent to upstream device clock quality grade and can also interrupt,
Upstream device is detected and does not continue to credit rating this period, then can tranmitting data register source switching, lock other clocks
Source, and when the standby master control of upstream equipment is completely in normal operating conditions, upstream device can continue to quality etc. again
The circuit locked before level, therefore meeting and switchback.It is such it is unstable transmit step by step, whole network occur concussion, need one section
Time regains stable.For this problem, effective solution is not yet proposed at present.
The content of the invention
Present invention is primarily targeted at a kind of clock reporting method and device are provided, to solve the above problems.
According to an aspect of the invention, there is provided a kind of clock reporting method, including:There is active and standby cutting in upstream equipment
When changing, downstream equipment dispatch order message;Upstream device receives the notification message, keeps locking present clock source.
Upstream equipment when there is active-standby switch, using SSM messages downstream equipment dispatch order message.
Upstream equipment sends logical using SSM messages by channel downstream equipment of quickly giving out a contract for a project when there is active-standby switch
Know message.
SSM messages are included for representing that upstream equipment there occurs the extension tlv of active-standby switch.
After extension tlv is located at s1 bytes tlv.
According to a further aspect in the invention, there is provided a kind of clock reporting device, including:Judge module, for judgement
Whether trip equipment there occurs active-standby switch;Put module on record, for when upstream equipment occurs active-standby switch, downstream equipment sends
Notification message, notifies that upstream device keeps locking present clock source.
Put module on record, for when there is active-standby switch, downstream equipment sends logical using number SSM messages in upstream equipment
Know message.
Put module on record, for upstream equipment occur active-standby switch when, using SSM messages by quickly give out a contract for a project passage to
Upstream device sends a notification message.
SSM messages are included for representing that upstream equipment there occurs the extension tlv of active-standby switch.
After extension tlv is located at s1 bytes tlv.
By the present invention, using when upstream equipment occurs active-standby switch, notify upstream device keep locking it is current when
The scheme of Zhong Yuan, solves the problems, such as that prior art middle and upper reaches equipment occurs active-standby switch and network can be caused concussion occur, and then
The effect for maintaining the network medium frequency stability of synchronization is reached.
Description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this
Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of clock reporting method according to embodiments of the present invention;
Fig. 2 is the SSM message structure schematic diagrams according to present example;
Fig. 3 is the tlv structural representations according to present example;
Fig. 4 is the structural representation of the distributed system according to present example;
Fig. 5 is the flow chart of giving out a contract for a project of the equipment of the generation masterslave switchover according to present example;
Fig. 6 is the packet receiving flow chart of the upstream device of the generation masterslave switchover equipment according to present example;
Fig. 7 is the structured flowchart of clock reporting device according to embodiments of the present invention.
Specific embodiment
Below with reference to accompanying drawing and in conjunction with the embodiments describing the present invention in detail.It should be noted that not conflicting
In the case of, the feature in embodiment and embodiment in the application can be mutually combined.
Fig. 1 is the flow chart of clock reporting method according to embodiments of the present invention.As shown in figure 1, according to present invention enforcement
The clock reporting method of example includes:
Step S102, upstream equipment when there is active-standby switch, downstream equipment dispatch order message;
Step S104, upstream device receive the notification message, keep locking present clock source.
The method provided by the present embodiment, when active-standby switch occurs in upstream equipment, upstream device can be feeling in time
Know and keep the locking to clock source, so as to overcome in prior art when upstream equipment active-standby switch can cause upstream device same
The problem of Shi Fasheng concussions, maintains the network medium frequency stability of synchronization.
Upstream equipment notifies upstream device, and which there occurs that the mode of active-standby switch is provided in having many kinds, this preferred embodiment
A kind of preferred mode.Preferably, when there is active-standby switch in upstream equipment, it is possible to use downstream equipment sends SSM messages
Notification message.
Due to the SSM technologies that clock is synchronously inherently adopted, therefore advice method the simplest is implemented, be exactly
Directly sent a notification message using SSM messages.
Preferably, when there is active-standby switch, during use, SSM messages are set upstream equipment by channel downstream of quickly giving out a contract for a project
It is standby to send a notification message.
In order to ensure the transmission for carrying the SSM messages of notification message is not affected by active-standby switch, it is preferred to use fast bag is sent out
Interface is sent to send the SSM messages of the carrying notification message by channel downstream equipment of quickly giving out a contract for a project.
Notification message is carried using SSM messages and notifies that upstream device upstream equipment there occurs active-standby switch many kinds realization side
Method.This preferred embodiment provides one kind and is preferably carried out mode.Preferably, SSM messages can be included for representing upstream equipment
There occurs the extension tlv of active-standby switch.
Tlv is the abbreviation of tlv structures, and tlv is made up of three fields, respectively tag (label), length (length),
Value (is worth), and all tlv structures being added on after source messages are expansion structure.In order to change premise as little as possible
Under, notify that upstream device upstream equipment there occurs active-standby switch, one can be added on the basis of original SSM message structures
Extension tlv is called masterslave switchover mark tlv, shows whether upstream equipment there occurs active-standby switch by its value.
Preferably, after extension tlv is located at s1 bytes tlv.
S1 bytes are the tlv structure that must be carried in source messages, represent the credit rating of ssm messages transmission, from SSM
From the point of view of current structure, it is the most suitable that extension tlv is arranged on behind s1 bytes tlv, implements and facilitates the most.
Above preferred embodiment is described in detail with reference to example.
Firstly, it is necessary to carry out to the possible equipment that active-standby switch occurs arranged below:
1st, during active-standby switch, start passage of quickly giving out a contract for a project, after s1 bytes tlv of message, increase tlv_hold and (use
The extension tlv/ masterslave switchovers mark tlv of active-standby switch be there occurs in expression upstream equipment), arranging its mark place value (bTag) is
3, and the effect that tlv length is that 4, tlv values (bValue) represent a tlv for 1, bTag is set, it is that the 2 expressions tlv is extension
Byte tlv, is that the 3 expressions tlv identifies tlv for masterslave switchover.
If what is the 2, enabled is expansion algorithm, increase extended byte tlv_exts1, its flag bit after s1 bytes tlv
It is worth for 2, is further added by tlv_hold after extended byte tlv_exts1, tlv_exts1 is extended byte tlv, in source messages
S1 bytes tlv cannot release the loop in network, and extended byte tlv is used for solving loop problem.
3rd, it is non-it is active and standby in the case of, normally give out a contract for a project, after s1 bytes, if extended byte, then directly fill out after the s1
Extended byte tlv is filled, if extended byte tlv, then tlv_hold is filled after extended byte tlv, otherwise tlv_hold
After being filled in s1 bytes tlv.
Specifically SSM message structures and tlv structures be as shown in Figure 2 and Figure 3.
The structure of the distributed system in this example is as shown in figure 4, when optimal clock source occurs active-standby switch, now receive
Give out a contract for a project and be not normally functioning, so credit rating not by send and receive packets flow process, is directly encapsulated by fast bag transmission interface by equipment
Framing, downstream transmission carry the SSM messages of tlv_hold information, the SSM letters of accepted downstream to this carrying tlv_hold field
Breath, judges that upstream equipment is occurring active-standby switch, so as within the of short duration time, not obtain circuit s1 bytes, keeps locking
Circuit, when tlv_hold is no longer received, then by normal algorithm flow, obtains circuit s1 information, and performs algorithm determination locking
Clock source.
Specifically, there is the flow process of giving out a contract for a project of equipment of masterslave switchover as shown in figure 5, comprising the following steps:
Step S502,1s timers triggers are given out a contract for a project;
Step S504, fills ssm message elementary fields;
Step S506, fills ssm message s1 bytes;
Step S508, determines whether extended byte, if it has, step S510 is gone to, if not, going to step S512;
Step S510, filling ssm message extension s1;
Step S512, judges whether just in masterslave switchover, if it is, step S516 is gone to, if not, going to step
S514;
Step S514, sends message by protocol encapsulation flow process;
Step S516, fills ssm message tlv_hold;
Step S518, by quickly giving out a contract for a project, passage sends message.
After receiving terminal receives SSM messages, need to judge whether the extension tlv mark place values after s1 bytes tlv are 3,
And whether value is 1, upstream equipment is if it is represented just during masterslave switchover, this equipment does not temporarily receive s1 bytes
With extension s1 bytes;If extension tlv flag bits and value are unsatisfactory for, for normal SSM messages, s1 bytes and extension is taken
S1 bytes.Specifically, there is the packet receiving flow process of upstream device of masterslave switchover equipment as shown in fig. 6, comprising the following steps:
Step S602, receives ssm messages;
Step S604, reads the next tlv of s1 bytes;
Step S606, judges whether the bTag of the tlv is 3, if it is not, then step S608 is gone to, if it is, going to step
Rapid S614;
Step S608, judges whether the bTag of the tlv is 2, if it is not, then step S618 is gone to, if it is, going to step
Rapid S610;
Step S610, reads extended byte;
Step S612, reads the next tlv of extended byte, goes to step S606;
Step S614, judges whether bValue is 1, if it is not, then step S618 is gone to, if it is, going to step
S616;
Step S616, upstream equipment wouldn't process s1 bytes just in masterslave switchover, keep the current locked clock of locking
Source;
Step S618, performs normal packet receiving flow process, processes s1 byte informations, and performs algorithm.
Fig. 7 is the structured flowchart of clock reporting device according to embodiments of the present invention.As shown in fig. 7, according to of the invention real
The clock reporting device for applying example includes:
Judge module 72, for judging whether upstream equipment there occurs active-standby switch;
Put module 74 on record, be connected to judge module 72, for when upstream equipment occurs active-standby switch, downstream equipment is sent out
Notification message is sent, notifies that upstream device keeps locking present clock source.
The device that the present embodiment is provided allows upstream device to perceive in time simultaneously when active-standby switch occurs in upstream equipment
The locking to clock source is kept, so as to overcome in prior art when upstream equipment active-standby switch can cause upstream device while sending out
The problem of raw concussion, maintains the network medium frequency stability of synchronization.
Preferably, put module 74 on record, can be used in upstream equipment when active-standby switch occurs, it is downward using SSM messages
Trip equipment dispatch order message.
Due to the SSM technologies that clock is synchronously inherently adopted, therefore advice method the simplest is implemented, be exactly
Directly sent a notification message using SSM messages.
Preferably, putting module 74 on record, can be used in upstream equipment, when there is active-standby switch, passing through using SSM messages
Channel downstream of quickly giving out a contract for a project equipment dispatch order message.
In order to ensure the transmission for carrying the SSM messages of notification message is not affected by active-standby switch, it is preferred to use fast bag is sent out
Interface is sent to send the SSM messages of the carrying notification message by channel downstream equipment of quickly giving out a contract for a project.
Preferably, SSM messages can be included for representing that upstream equipment there occurs the extension tlv of active-standby switch.
In order to, on the premise of change is as little as possible, notify that upstream device upstream equipment there occurs active-standby switch, Ke Yi
On the basis of original SSM message structures, add an extension tlv or be called masterslave switchover mark tlv, by its value table
Whether bright upstream equipment there occurs active-standby switch.
Preferably, after extension tlv is located at s1 bytes tlv.
S1 bytes are the tlv structure that must be carried in source messages, represent the credit rating of ssm messages transmission, from SSM
From the point of view of current structure, it is the most suitable that extension tlv is arranged on behind s1 bytes tlv, implements and facilitates the most.
As can be seen from the above description, when the technical scheme that the present invention is provided makes upstream equipment that active-standby switch to occur,
Upstream device can keep locking, not affect credit rating to transmit to other equipment.There is that of active-standby switch in upstream equipment
In the section time, enable upstream device to perceive upstream equipment and active-standby switch is occurring, so as to keep locking present clock source, dimension
The synchronous stability of network medium frequency is held.
Obviously, those skilled in the art should be understood that each module or each step of the above-mentioned present invention can be with general
Computing device realizing, they can be concentrated on single computing device, or are distributed in multiple computing devices and are constituted
Network on, alternatively, they can be realized with the executable program code of computing device, it is thus possible to they are stored
In the storage device by computing device performing, and in some cases, can be with shown in performing different from order herein
The step of going out or describe, or they are fabricated to each integrated circuit modules respectively, or by the multiple modules in them or
Step is fabricated to single integrated circuit module to realize.So, the present invention is not restricted to any specific hardware and software combination.
The preferred embodiments of the present invention are the foregoing is only, the present invention is not limited to, for the skill of this area
For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair
Change, equivalent, improvement etc., should be included within the scope of the present invention.
Claims (10)
1. a kind of clock reporting method, it is characterised in that include:
Upstream equipment when there is active-standby switch, downstream equipment dispatch order message;
Upstream device receives the notification message, keeps locking present clock source.
2. method according to claim 1, it is characterised in that upstream equipment is when there is active-standby switch, same using clock
Walk status signal SSM messages downstream equipment dispatch order message.
3. method according to claim 2, it is characterised in that upstream equipment when there is active-standby switch, using SSM messages
By channel downstream equipment dispatch order message of quickly giving out a contract for a project.
4. method according to claim 3, it is characterised in that the SSM messages are included for representing the upstream equipment
There occurs the extension tlv of active-standby switch.
5. method according to claim 4, it is characterised in that after the extension tlv is located at s1 bytes tlv.
6. a kind of clock reporting device, it is characterised in that include:
Judge module, for judging whether upstream equipment there occurs active-standby switch;
Put module on record, for when upstream equipment occurs active-standby switch, downstream equipment dispatch order message, notifies upstream device
Keep locking present clock source.
7. device according to claim 6, it is characterised in that described to put module on record, for leading in upstream equipment
During standby switching, using clock synchronous state signal SSM messages downstream equipment dispatch order message.
8. device according to claim 7, it is characterised in that described to put module on record, for leading in upstream equipment
During standby switching, using SSM messages by channel downstream equipment dispatch order message of quickly giving out a contract for a project.
9. device according to claim 8, it is characterised in that the SSM messages are included for representing the upstream equipment
There occurs the extension tlv of active-standby switch.
10. device according to claim 9, it is characterised in that after the extension tlv is located at s1 bytes tlv.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110200873.3A CN102244573B (en) | 2011-07-18 | 2011-07-18 | clock reporting method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110200873.3A CN102244573B (en) | 2011-07-18 | 2011-07-18 | clock reporting method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102244573A CN102244573A (en) | 2011-11-16 |
CN102244573B true CN102244573B (en) | 2017-03-22 |
Family
ID=44962433
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110200873.3A Active CN102244573B (en) | 2011-07-18 | 2011-07-18 | clock reporting method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102244573B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102904661B (en) * | 2011-07-27 | 2017-07-14 | 中兴通讯股份有限公司 | PTP equipment realizes the method and PTP equipment of smooth restarting |
CN103051404B (en) * | 2011-10-12 | 2017-02-01 | 中兴通讯股份有限公司 | Method of preventing synchronizing network topology from generating shaking, and clock synchronizer |
CN102594481B (en) * | 2012-03-08 | 2017-05-10 | 中兴通讯股份有限公司 | Clock oscillation generating method, device and system |
CN102946291A (en) * | 2012-11-12 | 2013-02-27 | 华为技术有限公司 | Clock maintaining method and clock equipment |
CN104410975B (en) | 2014-11-06 | 2018-06-15 | 东莞宇龙通信科技有限公司 | Resource allocation method, system, the equipment and terminal with base station functions |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1324148A (en) * | 2000-07-11 | 2001-11-28 | 深圳市中兴通讯股份有限公司 | Jitter-free change-over method and device for main and stand-by units capable of being hot plugged and unplugged in digital communication system |
CN101141240A (en) * | 2007-04-18 | 2008-03-12 | 中兴通讯股份有限公司 | SDH clock automatically networking method |
CN101895361A (en) * | 2010-07-12 | 2010-11-24 | 中兴通讯股份有限公司 | Method, system and clock board for transmitting synchronous status message |
CN102123046A (en) * | 2011-01-21 | 2011-07-13 | 烽火通信科技股份有限公司 | Packet transport network (PTN) device and method for realizing time synchronization protection switching (PS) by using main cross disk and spare cross disk of PTN device |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6194969B1 (en) * | 1999-05-19 | 2001-02-27 | Sun Microsystems, Inc. | System and method for providing master and slave phase-aligned clocks |
TWI424731B (en) * | 2008-12-03 | 2014-01-21 | Realtek Semiconductor Corp | Master device for an ethernet system and related clock synchronization method |
CN102013969B (en) * | 2010-12-02 | 2015-06-03 | 中兴通讯股份有限公司 | Method and device for realizing time synchronization |
-
2011
- 2011-07-18 CN CN201110200873.3A patent/CN102244573B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1324148A (en) * | 2000-07-11 | 2001-11-28 | 深圳市中兴通讯股份有限公司 | Jitter-free change-over method and device for main and stand-by units capable of being hot plugged and unplugged in digital communication system |
CN101141240A (en) * | 2007-04-18 | 2008-03-12 | 中兴通讯股份有限公司 | SDH clock automatically networking method |
CN101895361A (en) * | 2010-07-12 | 2010-11-24 | 中兴通讯股份有限公司 | Method, system and clock board for transmitting synchronous status message |
CN102123046A (en) * | 2011-01-21 | 2011-07-13 | 烽火通信科技股份有限公司 | Packet transport network (PTN) device and method for realizing time synchronization protection switching (PS) by using main cross disk and spare cross disk of PTN device |
Non-Patent Citations (1)
Title |
---|
PTN时钟同步技术及应用;李勤;《中兴通讯技术》;20100630;第16卷(第3期);第28-30页 * |
Also Published As
Publication number | Publication date |
---|---|
CN102244573A (en) | 2011-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112688754B (en) | Method and device for transmitting service flow based on flexible Ethernet Flexe | |
CN102244573B (en) | clock reporting method and device | |
CN101299749B (en) | Method and apparatus for transferring clock between networks | |
CN102130766B (en) | Method, equipment and system for synchronizing Ethernet clock tracking | |
CN103107876B (en) | A kind of method and system and device of multi-clock simultaneous techniques mixed networking | |
CN103916950A (en) | Time synchronization method and system | |
CN105450321B (en) | A kind of network data transmission method and device | |
US8194704B2 (en) | Network equipment | |
US9215092B2 (en) | Clock selection for synchronous Ethernet | |
CN101895361B (en) | Method, system and clock board for transmitting synchronous status message | |
US20060039347A1 (en) | Synchronous transmission network system | |
CN111970759B (en) | Delay adjustment method and device for end-to-end service, storage medium and electronic device | |
CN102208958A (en) | Clock synchronization method for synchronous Ethernets, as well as synchronous information sending/receiving method, device and apparatus | |
CN108631899A (en) | It is forwarded and fault-tolerance approach and device based on the data packet in time triggered Ethernet | |
CN105024798A (en) | Method and device for time synchronization | |
JP5266705B2 (en) | Communications system | |
CN109245842A (en) | Method, equipment and the computer readable storage medium of synchronizing clock time | |
CN108011682A (en) | Determine the method and the network equipment of time source | |
CN102447611B (en) | Method and system for establishing bidirectional point-to-multipoint label switched path as well as method and system for removing bidirectional point-to-multipoint label switched path | |
CN107959537B (en) | State synchronization method and device | |
CN103428009A (en) | Method and device for achieving OAM of grouped synchronous networks | |
US9264212B2 (en) | Method for distributing time within synchronous ethernet and SONET/SDH domains | |
CN102170398B (en) | The reverse method of external time port and device | |
CN102158412B (en) | Transmission method and system of synchronous state information in Ethernet synchronization | |
EP1583266A2 (en) | Synchronisation for TDM services in packet networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |