CN102243130A - Gas tightness detection device of high speed train - Google Patents

Gas tightness detection device of high speed train Download PDF

Info

Publication number
CN102243130A
CN102243130A CN2011101004646A CN201110100464A CN102243130A CN 102243130 A CN102243130 A CN 102243130A CN 2011101004646 A CN2011101004646 A CN 2011101004646A CN 201110100464 A CN201110100464 A CN 201110100464A CN 102243130 A CN102243130 A CN 102243130A
Authority
CN
China
Prior art keywords
detection device
tightness detection
observing
metal hose
compartment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101004646A
Other languages
Chinese (zh)
Inventor
王非
林明瑞
吴金林
李聪
于海照
阮航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shanghai for Science and Technology
Original Assignee
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shanghai for Science and Technology filed Critical University of Shanghai for Science and Technology
Priority to CN2011101004646A priority Critical patent/CN102243130A/en
Publication of CN102243130A publication Critical patent/CN102243130A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses a gas tightness detection device of a high speed train. The gas tightness detection device comprises a measuring and control box and an industrial personal computer, and is characterized in that a gasholder is built in a lower layer of the measuring and control box, a compressed air inlet is arranged at one side of the gasholder, and a compressed air outlet of the gasholder is orderly connected with a pressure reducing valve, a solenoid valve and a metal hose through a pipeline; the metal hose is connected with a detected railway carriage through a metal hose connector on a sealing plate of the detected railway carriage; and a pressure sensor and a PLC (programmable logic controller) are mounted on an upper layer of the measuring and control box, wherein an output end of the pressure sensor is connected with the PLC through a lead, and the output end of the PLC is respectively connected with the solenoid valve and the industrial personal computer. The measuring and control box and the industrial personal computer are arranged on the base of a plain trolley. The gas tightness detection device of the high speed train is not only compact in structure and convenient to move, but also has accurate detection results.

Description

A kind of air-tightness detection device of bullet train
Technical field
The present invention relates to a kind of air-tightness detection device of bullet train, belong to technical field of measurement and test.
Background technology
The present domestic high-speed railway of greatly developing, the travel speed of train is brought up to 380km/h rapidly by original 100km/h, and the distance in city is shortened greatly.Along with the raising of train running speed, the aerodynamics problem in the train operation more and more causes people's attention.Wherein, the impermeability of train is one of gordian technique of development bullet train.Whole tightness is meant at train and finishes the state of reorganizing and outfit (after promptly lavatory, water system, vehicle window and car door or the like being installed) and close train and extraneous all perforates (comprising the perforate by door and air-conditioning equipment) that communicate, the sealing property that the relative car external pressure of interior pressure changes.Influence bubble-tight factor, except the structure and technology of end door, side door, vehicle window, also various cables, the pipeline that welds on situation, car end syndeton, the floor with steel structure of car body is relevant by the concrete structure of hole and osculum, sewage treatment plant and compound ventilation air-changing device.
For bullet train (speed is greater than 200km/h), during when the intersection of train high speed or at a high speed by the tunnel, especially in the tunnel during intersection, rapid variation all can take place and form air pressure wave in the flow velocity of surrounding air and pressure.Pressure wave impacts passenger's ear-drum by the car body slit into the car, causes passenger's tinnitus, otalgia, makes the people be difficult to stand, and when serious, door and window is damaged.But the impermeability in bullet train compartment is fully by the manual testing at present, also there is not a kind of air tightness test device that is used to detect bullet train, therefore the air tightness test for the bullet train compartment lacks accuracy, and the testing apparatus of using during test is many, and has defective such as mobile inconvenience.In case tested carriage airtightness problem is not finding promptly and accurately not, the energy of being not only of being not only the speed of a motor vehicle, waste of influence when serious the more important thing is that may to cause car body and human body impaired.
Summary of the invention
The invention discloses a kind of air-tightness detection device of bullet train, its objective is the detection system that easy to operate, the good stability of a cover, measuring accuracy height, conveniently moving are provided.This system adopts the PLC controller, by program whole test process is realized control automatically, can synchro control solenoid valve shuts gas circuit when compartment pressure reaches setting value, stop to inflate to the compartment, and make the pressure release of compartment nature, the PLC controller is by connecting the change value of pressure in the collection of pressure transducer high-speed real-time, analysis, the record compartment simultaneously, and generate corresponding pressure history, the last experimental data form that generates automatically can overcome drawbacks such as the test result precision that causes by manually-operated in the prior art is low, mobile inconvenience like this.
A kind of air-tightness detection device of bullet train comprises: observing and controlling case and industrial computer are characterized in:
D) the built-in gas-holder of observing and controlling case lower floor, gas-holder one side is provided with the compressed air inlet, and the gas-holder compressed air outlet is connected with reduction valve, solenoid valve, metal hose successively through pipeline; Metal hose is connected with tested compartment by the metal hose interface on the tested compartment seal pad;
E) observing and controlling case upper strata setting pressure sensor, PLC controller, the input end of pressure transducer connects plastic flexible pipe, and plastic flexible pipe is connected with tested compartment by the plastic flexible pipe interface on the tested compartment seal pad; The output terminal of pressure transducer is connected with the PLC controller by lead, and the output terminal of PLC controller is connected with solenoid valve, industrial computer respectively.
F) described industrial computer is arranged on observing and controlling case outside;
Described observing and controlling case places on the small handcart base.
The reduction valve hand switch is set on the described reduction valve.
Also be provided with blowdown valve on the seal pad in described tested compartment.
Cardinal principle of the present invention is by filling compression gas to tested interior, and pressure boost also reaches after a certain setting value, closes the solenoid valve shuts gas circuit by PLC controller synchro control, makes the compartment keep the nature pressure release.Simultaneously change value of pressure in the compartment is gathered, analyzes, write down to the PLC controller in real time by connecting pressure transducer, and generate corresponding pressure history and be presented on the industrial computer screen the last test experiments data sheet that generates automatically.
The present invention can realize control, not only compact conformation automatically to whole test process by program owing to adopted the PLC controller, be convenient to move, easy to use, and also testing result is accurate, effectively improve the quality in bullet train compartment, ensured the high speed and the safety traffic of train.
Description of drawings
Fig. 1 is the one-piece construction synoptic diagram of bullet train air-tightness detection device of the present invention.
1, solenoid valve, 2, reduction valve, 3, the small handcart base, 4, gas-holder, 5, the observing and controlling case, 6, compressed air inlet port, 7, industrial computer, 8, the PLC controller, 9, pressure transducer, 10, plastic flexible pipe, 11, the plastic flexible pipe interface, 12, blowdown valve, 13, metal hose interface, 14, metal hose, 15, the reduction valve hand switch, 16, observing and controlling case top cover, 17, seal pad.
Embodiment
Below in conjunction with drawings and Examples the present invention is described in further details.
A kind of air-tightness detection device of bullet train comprises observing and controlling case 5 and industrial computer 7 as shown in Figure 1, and observing and controlling case 5 and industrial computer 7 place on the small handcart base 3.
The built-in gas-holder 4 of observing and controlling case 5 lower floors, gas-holder one side is provided with compressed air inlet 6, and the gas-holder compressed air outlet is connected with reduction valve 2, solenoid valve 1, metal hose 14 successively through pipeline; Metal hose 14 is connected with tested compartment by the metal hose interface 13 on the tested compartment seal pad 17;
Observing and controlling case 5 upper strata setting pressure sensor 9 and PLC controllers 8, observing and controlling case top cover 16 can be opened at any time; The input end of pressure transducer 9 connects plastic flexible pipe 10, and plastic flexible pipe is connected with tested compartment by the plastic flexible pipe interface 11 on the tested compartment seal pad 17; The output terminal of pressure transducer 9 is connected with PLC controller 8 by lead, and the output terminal of PLC controller is connected with solenoid valve 1, industrial computer 7 respectively.Industrial computer 7 is arranged on the outside of observing and controlling case 5; Reduction valve hand switch 15 is set on the reduction valve 2.Also be provided with blowdown valve 12 on the seal pad 17 in tested compartment.
The source of the gas of gas-holder 4 adopts pressurized air, and pressurized air enters gas-holder by compressed air inlet port 6; The effect of blowdown valve 12 is: prevent the excessive destruction of causing car body of compartment pressurized, when the car body internal pressure increased to the upper pressure limit value, the blowdown valve of device can be opened automatically, reaches the effect in automatic protection compartment.
During use: the compressed air inlet port 6 of source of the gas and gas-holder is connected, the solenoid valve 1 of opening gas-holder 4 by the manually-operated industrial computer makes pressurized air be adjusted to mild again being pressed in the airtight tested compartment by the metal hose interface 13 on the seal pad 17 through metal hose 14 after the suitable force value by reduction valve hand switch 15, when pressure transducer 9 detects pressure in the compartment and is raised to a certain setting value, 8 controls of PLC controller are closed solenoid valve 1 and are cut off gas circuit, make the compartment keep nature pressure release state.This proving installation test job pressure reaches as high as 5000Pa, by pressure unit compartment internal pressure delta data is carried out the high-speed real-time collection at pressure release stage PLC controller, on industrial computer 7, demonstrate pressure history figure then, can calculate the pressure change rate of unit interval and the changing value of certain section time internal pressure in addition, finally generate the form of experimental data form.

Claims (4)

1. the air-tightness detection device of a bullet train, comprising: observing and controlling case and industrial computer is characterized in that:
A) the built-in gas-holder of observing and controlling case lower floor, gas-holder one side is provided with the compressed air inlet, and the gas-holder compressed air outlet is connected with reduction valve, solenoid valve, metal hose successively through pipeline; Metal hose is connected with tested compartment by the metal hose interface on the tested compartment seal pad;
B) observing and controlling case upper strata setting pressure sensor, PLC controller, the input end of pressure transducer connects plastic flexible pipe, and plastic flexible pipe is connected with tested compartment by the plastic flexible pipe interface on the tested compartment seal pad; The output terminal of pressure transducer is connected with the PLC controller by lead, and the output terminal of PLC controller is connected with solenoid valve, industrial computer respectively.
C) described industrial computer is arranged on observing and controlling case outside;
2. the air-tightness detection device of bullet train according to claim 1, it is characterized in that: described observing and controlling case places on the small handcart base.
3. the air-tightness detection device of bullet train according to claim 1 is characterized in that: the reduction valve hand switch is set on the described reduction valve.
4. the air-tightness detection device of bullet train according to claim 1 is characterized in that: also be provided with blowdown valve on the seal pad in described tested compartment.
CN2011101004646A 2011-04-21 2011-04-21 Gas tightness detection device of high speed train Pending CN102243130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101004646A CN102243130A (en) 2011-04-21 2011-04-21 Gas tightness detection device of high speed train

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101004646A CN102243130A (en) 2011-04-21 2011-04-21 Gas tightness detection device of high speed train

Publications (1)

Publication Number Publication Date
CN102243130A true CN102243130A (en) 2011-11-16

Family

ID=44961298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101004646A Pending CN102243130A (en) 2011-04-21 2011-04-21 Gas tightness detection device of high speed train

Country Status (1)

Country Link
CN (1) CN102243130A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104848999A (en) * 2015-04-29 2015-08-19 凯迈(洛阳)气源有限公司 Air tightness detection device
CN105547609A (en) * 2015-12-08 2016-05-04 广电计量检测(武汉)有限公司 Carriage air-tightness intelligent detection device and control method thereof
CN109307575A (en) * 2018-12-03 2019-02-05 金鑫美莱克空调系统(无锡)有限公司 Rail traffic air-conditioning system airtight detecting apparatus and method
CN110068424A (en) * 2019-05-15 2019-07-30 中车青岛四方机车车辆股份有限公司 Railway carriage air seal test gas-tight door and air tight test method
CN113310638A (en) * 2021-07-05 2021-08-27 成都斯孚凯科技有限公司 Cabin airtightness tester control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6450049B1 (en) * 1999-09-09 2002-09-17 Saargummi Americas, Inc. Glass run seal testing machine
DE10242491A1 (en) * 2001-09-13 2003-05-22 Consens Gmbh Testing or monitoring the leak rate of a sealed container, e.g. for testing containers used in motor vehicle air conditioning systems, by use of a reference container thus allowing use of a differential pressure measurement method
CN101349607A (en) * 2008-08-05 2009-01-21 铁道部运输局 Rail vehicle whole tightness test method and system
CN101957253A (en) * 2010-09-21 2011-01-26 上海理工大学 Automatically marking and labelling device of gas tightness detection of heat exchange core body for vehicle
CN202057466U (en) * 2011-04-21 2011-11-30 上海理工大学 Device for detecting airtightness of high speed train

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6450049B1 (en) * 1999-09-09 2002-09-17 Saargummi Americas, Inc. Glass run seal testing machine
DE10242491A1 (en) * 2001-09-13 2003-05-22 Consens Gmbh Testing or monitoring the leak rate of a sealed container, e.g. for testing containers used in motor vehicle air conditioning systems, by use of a reference container thus allowing use of a differential pressure measurement method
CN101349607A (en) * 2008-08-05 2009-01-21 铁道部运输局 Rail vehicle whole tightness test method and system
CN101957253A (en) * 2010-09-21 2011-01-26 上海理工大学 Automatically marking and labelling device of gas tightness detection of heat exchange core body for vehicle
CN202057466U (en) * 2011-04-21 2011-11-30 上海理工大学 Device for detecting airtightness of high speed train

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104848999A (en) * 2015-04-29 2015-08-19 凯迈(洛阳)气源有限公司 Air tightness detection device
CN105547609A (en) * 2015-12-08 2016-05-04 广电计量检测(武汉)有限公司 Carriage air-tightness intelligent detection device and control method thereof
CN109307575A (en) * 2018-12-03 2019-02-05 金鑫美莱克空调系统(无锡)有限公司 Rail traffic air-conditioning system airtight detecting apparatus and method
CN110068424A (en) * 2019-05-15 2019-07-30 中车青岛四方机车车辆股份有限公司 Railway carriage air seal test gas-tight door and air tight test method
CN113310638A (en) * 2021-07-05 2021-08-27 成都斯孚凯科技有限公司 Cabin airtightness tester control system

Similar Documents

Publication Publication Date Title
CN102243130A (en) Gas tightness detection device of high speed train
CN102680181B (en) Method and device for testing vehicle body airtightness and fatigue of railway vehicle
CN202814666U (en) Comprehensive air tightness test bench
CN105241620A (en) Negative pressure airtight testing device and method
CN205426439U (en) Valve seal nature detection frock
CN203490035U (en) A vacuum actuator online detecting apparatus
CN201884942U (en) Buried pipeline dynamic-simulation leak detection testing system
CN202057466U (en) Device for detecting airtightness of high speed train
CN102072405A (en) Buried pipeline dynamic simulation leakage detection method, and application and simulation test system thereof
CN106768696B (en) Automatic windshield airtight rain test bed and test method
CN201983914U (en) Vehicle body airtightness fatigue test device for railway vehicles
CN102879157A (en) Airtightness detection method for protective engineering ventilation system and system thereof
CN102507107B (en) Test equipment used for measuring air tightness of carriage
CN106225700A (en) Pipeline drift diameter diameter measurer and inflation speed regulating method thereof in high precision
CN109307575A (en) Rail traffic air-conditioning system airtight detecting apparatus and method
CN109115454A (en) The simulation experiment system of piping lane ventilating system safety detection
CN204903096U (en) Batteries of electric vehicle casing gas tightness detection device
CN204202829U (en) Ventilation unit tightness detector
CN203772507U (en) Closed valve service life test device
CN104142213A (en) Building door and window dust prevention performance test equipment and dust detection method
CN205192721U (en) Automotive interior air outlet performance integrated test device that bloies
CN201138273Y (en) Entire carriage air tightness detecting device
CN204330240U (en) Air-tightness detection device
CN203629777U (en) Medicine bottle leak detection machine
CN203444329U (en) Air leakage testing stand

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111116