CN102230139B - Production process of high-strength mining chain wire rod - Google Patents
Production process of high-strength mining chain wire rod Download PDFInfo
- Publication number
- CN102230139B CN102230139B CN201110175029XA CN201110175029A CN102230139B CN 102230139 B CN102230139 B CN 102230139B CN 201110175029X A CN201110175029X A CN 201110175029XA CN 201110175029 A CN201110175029 A CN 201110175029A CN 102230139 B CN102230139 B CN 102230139B
- Authority
- CN
- China
- Prior art keywords
- water
- cooled
- wire rod
- temperature
- rolling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Metal Rolling (AREA)
Abstract
The invention discloses a production process of a high-strength mining chain wire rod. The production process comprises the following procedures: inspecting a billet; heating the steel billet; descaling by high pressure water; rough and intermediate rolling and pre-precision rolling; water-cooling of an area 1; precision-rolling; water-cooling of an area 2; reducing and sizing rolling; water-cooling of an area 3; spinning; air-cooling; covering; slow-cooling; uncovering; coil-collecting; finishing; packaging; and warehousing to finally obtain the high-strength mining chain wire rod. In the invention, by utilizing a controlled-rolling and controlled-cooling process, process control is carried out on the mining chain wire rod so as to form an F+P structure suitable for processing a chain; the obtained chain wire rod has good comprehensive mechanical properties and can be produced in a chain factory by utilizing a simple process; and the production process has the advantages of low energy consumption, less equipment investment and high production efficiency, thus greatly lowering production cost.
Description
Technical field
The invention belongs to field of metallurgy, relate to a kind of production technique of wire rod, the production technique of the mining chain wire rod of a kind of specifically HS.
Background technology
During existing at home mining chain wire rod is produced, generally adopt wire rod such as 25MnVB as the starting material of making mining chain.Existing this mining chain wire rod need just can be processed chain through bakingout process, and production technique is complicated, and tooling cost is higher, the requirement that its finished product chain obdurability does not reach the mining chain of HS.
Summary of the invention
In order to overcome the shortcoming that prior art exists; The production technique that the purpose of this invention is to provide the mining chain wire rod of a kind of HS; Make chain factory can adopt comparatively simple explained hereafter to go out the mining chain of high-quality HS; And but owing to material cold working, energy consumption is low, production efficiency is high, and production cost reduces significantly.
The objective of the invention is to realize through following technical scheme:
The production technique of a kind of HS is mining chain wire rod; It is characterized in that: this production technique comprises following operation: blank check, steel billet heating, high-pressure water descaling, roll in thick and in advance finish rolling, water-cooled 1 district, finish rolling, water-cooled 2 districts, subtract fixed diameter rolling, water-cooled 3 districts, weave silk, air-cooled, go into cover cap, slow cooling, go out cover cap, collect volume, finishing, packing put in storage, obtains the mining chain wire rod of HS;
In the blank inspection process, billet surface does not allow and connects base, crackle, depression, shake trace, pit defective, guarantees into the stove blank surface up-to-standard; The steel billet chemical ingredients requires as follows: C0.2-0.25%, Mn0.7-0.9%, Si0.15-0.35%, P≤0.035%, S≤0.035%, Cr0.4-0.6%, Ni0.4-0.7%, Cu≤0.2%, Mo0.1-0.25%, V≤0.02%, Alt0.015-0.045%, and all the other are Fe;
In the steel billet heating process, the soaking zone temperature is controlled at 1080~1120 ℃;
In the high-pressure water descaling operation, de-scaling pressure is set at 16MPa~20MPa, and red steel temperature is 1040~1080 ℃ after the de-scaling; Strict control de-scaling pressure is guaranteed scale removal effect;
Roll in thick and in advance in the finish rolling operation, the roughing start rolling temperature is 1000~1050 ℃, to go out lipstick steel temperature be 1000~1050 ℃ in finish rolling in advance;
In the finish rolling operation, temperature in is between 900~940 ℃;
Subtract in the fixed diameter rolling operation, temperature in is between 800~840 ℃;
In the operation of weaving silk, laying temperature is between 800~850 ℃;
Go in the cover cap operation, going into the cover cap temperature is 680~700 ℃;
In the slow cooling operation, speed of cooling is 0.6~0.8 ℃/S.
Among the present invention, in water-cooled 1 district, water-cooled case pressure is 1.0-4.0bar, and flow is 1000-3000lpm; In water-cooled 2 districts, water-cooled case pressure is 1.0-4.0bar, and flow is 1000-3000lpm; In water-cooled 3 districts, water-cooled case pressure is 1.0-4.0bar, and flow is 1000-3000lpm.
In the blank inspection process; Remove the blank surface iron scale through shotblasting machine; Through the magnetic powder detection steel billet surface defect; Wherein cave in, shake trace, pit depth of defect and reach the above directly inspection rejects of 2mm and handle, 2mm adopts some mill or the mode of stripping off the skin to handle with interior defective, guarantees into the stove blank surface up-to-standard.
The technological process of production of the present invention is: roll in the blank check → steel billet heating → high-pressure water descaling → thick, in advance finish rolling rolling → fixed diameter rolling → water-cooled 3 districts, water-cooled 1 district → finishing train → water-cooled 2 districts → subtract → weave silk → air-cooled → go into cover cap → slow cooling → go out cover cap → collection volume → inspection after construction → finishing → weigh → pack → put in storage.
Collection was rolled up after wire rod went out cover cap; Be transported to the PF line through coil stripping car; Finished surface quality and dimensional precision are checked by dish; Final dimension tolerance and out of roundness be by GB B class precision control, defectives such as that finished surface does not allow is folding, crackle, the ears or side handles of a utensil, and the surface tear depth of defect does not allow above 7.
The finishing of finished product wire rod, weigh after, adopt the bagging mode to pack, use soft lifting device simultaneously, avoid producing scratch in sign indicating number heap, the transport process.
The present invention adopts cooling controlling and rolling controlling process; Mining chain wire rod is carried out process control; Obtain the F+P tissue of suitable chain processing, possess good comprehensive mechanical properties, only need to adopt simple process just can produce chain; Energy consumption is low, low equipment investment, production efficiency high, can reduce production costs significantly.
Compared with prior art, chemical composition stability of the present invention, plasticity and toughness are good, and can be cold worked into chain ring, low cost of manufacture.
Embodiment
Embodiment 1
In this mining chain wire rod production process of Ф 6.5mm specification, blank is tested, remove the blank surface iron scale through shotblasting machine, through the magnetic powder detection steel billet surface defect, blank surface is up-to-standard.Chemical ingredients such as table 1:
Table 1
C | Mn | Si | P、S | Cr | Ni | Cu | Mo | V | Alt |
0.229 | 0.756 | 0.254 | ≤0.02 | 0.515 | 0.524 | 0.08 | 0.176 | ≤0.01 | 0.025 |
In the steel billet heating process, the furnace atmosphere of strict control process furnace preheating section, 1 section of heating, 2 sections of heating, soaking zone, the soaking zone temperature is controlled at 1092~1112 ℃.
In the high-pressure water descaling operation, strict control de-scaling pressure is guaranteed scale removal effect, and de-scaling pressure is set at 18MPa~20MPa, and red steel temperature is 1048~1062 ℃ after the de-scaling.
Roll in thick, in advance in the finish rolling operation, strict control roughing start rolling temperature, start rolling temperature is 1011~1046 ℃, to go out lipstick steel temperature be 1013~1045 ℃ in finish rolling in advance.
In the finish rolling operation, through regulating the pressure and the flow of water-cooled 1 district's ice chest water coolant, strict control finishing mill temperature in.Ice chest pressure is 1.8bar, and flow is 1245lpm, and the finishing mill temperature in is 925 ℃.
Subtract in the fixed diameter rolling operation, through regulating the pressure and the flow of water-cooled 2 district's water-cooled case water coolants, strict control reducing sizing mill temperature in.Water-cooled case pressure is 1.8bar, and flow is 1458lpm, and subtracting the sizing temperature in is 825 ℃.
In the operation of weaving silk, through regulating the pressure and the flow of water-cooled 3 district's water-cooled case water coolants, strict control laying temperature.Water-cooled case pressure is 1.9bar, and flow is 1986lpm, and laying temperature is 830 ℃.
In the air-cooled operation, one section roller table speed of air-cooled line is set at 20rpm, opens the 1# cooling blower, and air quantity is opened the 1-2# insulation shroud for being set at 30%, and the cover cap temperature is gone in strict control, and going into the cover cap temperature is 695 ℃.
In the slow cooling operation, air-cooled line roller-way increasing ratio is set at 3%, the speed of cooling of strict control wire rod in insulation shroud, and speed of cooling is 0.7 ℃/S.
Collection was rolled up after wire rod went out cover cap, was transported to the PF line through coil stripping car, and the inspection man checks by dish finished surface quality and dimensional precision, and the final dimension tolerance is ± 0.2mm that out of roundness is≤0.3mm defectives such as finished surface does not fold, crackle, the ears or side handles of a utensil, scuffing.
The finishing of finished product wire rod, weigh after, adopt the bagging mode to pack, use soft lifting device simultaneously, avoid producing scratch in sign indicating number heap, the transport process.
Through adopting above production technique, this mining chain wire rod chemical composition stability of 6.5mm specification, tissue and comprehensive mechanical property are good, and detected result is seen table 2:
Table 2
Embodiment 2
In this mining chain wire rod production process of Ф 12mm specification, blank is tested, remove the blank surface iron scale through shotblasting machine, through the magnetic powder detection steel billet surface defect, blank surface is up-to-standard.Chemical ingredients such as table 3:
Table 3
C | Mn | Si | P、S | Cr | Ni | Cu | Mo | V | Alt |
0.235 | 0.762 | 0.264 | ≤0.02 | 0.566 | 0.531 | 0.08 | 0.181 | ≤0.01 | 0.023 |
In the steel billet heating process, the furnace atmosphere of strict control process furnace preheating section, 1 section of heating, 2 sections of heating, soaking zone, the soaking zone temperature is controlled at 1095~1110 ℃.
In the high-pressure water descaling operation, strict control de-scaling pressure is guaranteed scale removal effect, and de-scaling pressure is set at 18MPa~20MPa, and red steel temperature is 1045~1060 ℃ after the de-scaling.
Roll in thick, in advance in the finish rolling operation, strict control roughing start rolling temperature, start rolling temperature is 1010~1045 ℃, to go out lipstick steel temperature be 1010~1040 ℃ in finish rolling in advance.
In the finish rolling operation, through regulating the pressure and the flow of water-cooled 1 district's water-cooled case water coolant, strict control finishing mill temperature in.Water-cooled case pressure is 2.0bar, and flow is 1460lpm, and the finishing mill temperature in is 930 ℃.
Subtract in the fixed diameter rolling operation, through regulating the pressure and the flow of water-cooled 2 district's water-cooled case water coolants, strict control reducing sizing mill temperature in.Water-cooled case pressure is 2.0bar, and flow is 1650lpm, and subtracting the sizing temperature in is 815 ℃.
In the operation of weaving silk, through regulating the pressure and the flow of water-cooled 3 district's water-cooled case water coolants, strict control laying temperature.Water-cooled case pressure is 2.0bar, and flow is 2150lpm, and laying temperature is 820 ℃.
In the air-cooled operation, one section roller table speed of air-cooled line is set at 24rpm, opens 1#, 2# cooling blower, and air quantity is opened the 1-6# insulation shroud for being set at 50%, 30%, and the cover cap temperature is gone in strict control, and going into the cover cap temperature is 685 ℃.
In the slow cooling operation, air-cooled line roller-way increasing ratio is set at 4%, the speed of cooling of strict control wire rod in insulation shroud, and speed of cooling is 0.72 ℃/S.
Collection was rolled up after wire rod went out cover cap; Be transported to the PF line through coil stripping car, the inspection man checks by dish finished surface quality and dimensional precision, and the final dimension tolerance is ± 0.25mm; Out of roundness is≤0.4mm defectives such as finished surface is not folding, crackle, the ears or side handles of a utensil, scuffing.
The finishing of finished product wire rod, weigh after, adopt the bagging mode to pack, use soft lifting device simultaneously, avoid producing scratch in sign indicating number heap, the transport process.
Through adopting above production technique, this mining chain wire rod chemical composition stability of 12mm specification, tissue and comprehensive mechanical property are good, and detected result is seen table 4:
Table 4
Embodiment 3
In this mining chain wire rod production process of Ф 18mm specification, blank is tested, remove the blank surface iron scale through shotblasting machine, through the magnetic powder detection steel billet surface defect, blank surface is up-to-standard.Chemical ingredients such as table 5:
Table 5
C | Mn | Si | P、S | Cr | Ni | Cu | Mo | V | Alt |
0.238 | 0.774 | 0.272 | ≤0.02 | 0.583 | 0.552 | 0.06 | 0.175 | ≤0.01 | 0.021 |
In the steel billet heating process, the furnace atmosphere of strict control process furnace preheating section, 1 section of heating, 2 sections of heating, soaking zone, the soaking zone temperature is controlled at 1092~1114 ℃.
In the high-pressure water descaling operation, strict control de-scaling pressure is guaranteed scale removal effect, and de-scaling pressure is set at 18MPa~20MPa, and red steel temperature is 1046~1066 ℃ after the de-scaling.
Roll in thick, in advance in the finish rolling operation, strict control roughing start rolling temperature, start rolling temperature is 1012~1048 ℃, to go out lipstick steel temperature be 1012~1043 ℃ in finish rolling in advance.
In the finish rolling operation, through regulating the pressure and the flow of water-cooled 1 district's water-cooled case water coolant, strict control finishing mill temperature in.Water-cooled case pressure is 2.5bar, and flow is 1840lpm, and the finishing mill temperature in is 820 ℃.
Subtract in the fixed diameter rolling operation, through regulating the pressure and the flow of water-cooled 2 district's water-cooled case water coolants, strict control reducing sizing mill temperature in.Water-cooled case pressure is 2.8bar, and flow is 1850lpm, subtracts 810 ℃ of sizing temperature ins.
In the operation of weaving silk, through regulating the pressure and the flow of water-cooled 3 district's water-cooled case water coolants, strict control laying temperature.Water-cooled case pressure is 3.0bar, and flow is 2550lpm, and laying temperature is 820 ℃.
In the air-cooled operation, one section roller table speed of air-cooled line is set at 28rpm, opens 1#, 2#, 3# cooling blower, and air quantity is opened the 1-10# insulation shroud for being set at 80%, 50%, 30%, and the cover cap temperature is gone in strict control, and going into the cover cap temperature is 680 ℃.
In the slow cooling operation, air-cooled line roller-way increasing ratio is set at 5%, the speed of cooling of strict control wire rod in insulation shroud, and speed of cooling is 0.75 ℃/S.
Collection was rolled up after wire rod went out cover cap; Be transported to the PF line through coil stripping car, the inspection man checks by dish finished surface quality and dimensional precision, and the final dimension tolerance is ± 0.3mm; Out of roundness is≤0.48mm defectives such as finished surface is not folding, crackle, the ears or side handles of a utensil, scuffing.
The finishing of finished product wire rod, weigh after, adopt the bagging mode to pack, use soft lifting device simultaneously, avoid producing scratch in sign indicating number heap, the transport process.
Through adopting above production technique, this mining chain wire rod chemical composition stability of 18mm specification, tissue and comprehensive mechanical property are good, and detected result is seen table 6:
Table 6
The present invention adopts cooling controlling and rolling controlling process, obtains the F+P tissue of suitable chain processing, possesses good comprehensive mechanical properties, and plasticity and toughness are good, and can be cold worked into chain ring, low cost of manufacture.The performance of the present invention and 25MnVB circular chain steel wire rod is relatively seen table 7:
Table 7
Claims (3)
1. the production technique of the mining chain wire rod of HS; It is characterized in that: this production technique comprises following operation: blank check, steel billet heating, high-pressure water descaling, roll in thick and in advance finish rolling, water-cooled 1 district, finish rolling, water-cooled 2 districts, subtract fixed diameter rolling, water-cooled 3 districts, weave silk, air-cooled, go into cover cap, slow cooling, go out cover cap, collect volume, finishing, packing put in storage, obtains the mining chain wire rod of HS;
In the blank inspection process, billet surface does not allow and connects base, crackle, depression, shake trace, pit defective, guarantees into the stove blank surface up-to-standard; The steel billet chemical ingredients requires as follows: C0.2-0.25%, Mn0.7-0.9%, Si0.15-0.35%, P≤0.035%, S≤0.035%, Cr0.4-0.6%, Ni0.4-0.7%, Cu≤0.2%, Mo0.1-0.25%, V≤0.02%, Alt0.015-0.045%, and all the other are Fe;
In the steel billet heating process, the soaking zone temperature is controlled at 1080~1120 ℃;
In the high-pressure water descaling operation, de-scaling pressure is set at 16MPa~20MPa, and red steel temperature is 1040~1080 ℃ after the de-scaling;
Roll in thick and in advance in the finish rolling operation, the roughing start rolling temperature is 1000~1050 ℃, to go out lipstick steel temperature be 1000~1050 ℃ in finish rolling in advance;
In the finish rolling operation, temperature in is between 900~940 ℃;
Subtract in the fixed diameter rolling operation, temperature in is between 800~840 ℃;
In the operation of weaving silk, laying temperature is between 800~850 ℃;
Go in the cover cap operation, going into the cover cap temperature is 680~700 ℃;
In the slow cooling operation, speed of cooling is 0.6~0.8 ℃/S.
2. the production technique of the mining chain wire rod of HS according to claim 1 is characterized in that: in water-cooled 1 district, water-cooled case pressure is 1.0-4.0bar, and flow is 1000-3000lpm; In water-cooled 2 districts, water-cooled case pressure is 1.0-4.0bar, and flow is 1000-3000lpm; In water-cooled 3 districts, water-cooled case pressure is 1.0-4.0bar, and flow is 1000-3000lpm.
3. the production technique of the mining chain wire rod of HS according to claim 1; It is characterized in that: in the blank inspection process; Remove the blank surface iron scale through shotblasting machine, through the magnetic powder detection steel billet surface defect, wherein cave in, shake trace, pit depth of defect above the direct inspection rejects processing of 2mm; 2mm adopts some mill or the mode of stripping off the skin to handle with interior defective, guarantees into the stove blank surface up-to-standard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110175029XA CN102230139B (en) | 2011-06-27 | 2011-06-27 | Production process of high-strength mining chain wire rod |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110175029XA CN102230139B (en) | 2011-06-27 | 2011-06-27 | Production process of high-strength mining chain wire rod |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102230139A CN102230139A (en) | 2011-11-02 |
CN102230139B true CN102230139B (en) | 2012-06-27 |
Family
ID=44842742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110175029XA Active CN102230139B (en) | 2011-06-27 | 2011-06-27 | Production process of high-strength mining chain wire rod |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102230139B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104190705A (en) * | 2014-08-04 | 2014-12-10 | 南京钢铁股份有限公司 | Production technology for bearing steel wire rod |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102560253B (en) * | 2012-03-13 | 2014-05-28 | 南京钢铁股份有限公司 | Manufacturing method of high-quality cold heading steel with uniform structure property |
CN102825074A (en) * | 2012-09-14 | 2012-12-19 | 南京钢铁股份有限公司 | Bead wire coil rod controlled cooling process |
CN103028611B (en) * | 2012-12-13 | 2015-06-17 | 邢台钢铁有限责任公司 | Hot-rolled wire-stock surface scale softening control method |
CN103276303A (en) * | 2013-06-07 | 2013-09-04 | 南京钢铁股份有限公司 | High strength chain steel for mine, and preparation method thereof |
CN103276189B (en) * | 2013-06-07 | 2017-02-22 | 鞍钢股份有限公司 | Making method of low-tensile-strength weld wire steel |
CN103334058A (en) * | 2013-07-03 | 2013-10-02 | 南京钢铁股份有限公司 | Production process of deformed steel bar wire rod for high-speed rail |
CN103667655B (en) * | 2013-12-10 | 2015-05-27 | 南京钢铁股份有限公司 | Production method of cord thread steel wire rod with diameter of 5mm |
CN103952633B (en) * | 2014-04-30 | 2016-08-24 | 邢台钢铁有限责任公司 | There is high-strength steel wire and the production method thereof of favorable low-temperature impact toughness |
CN104275366A (en) * | 2014-09-23 | 2015-01-14 | 南京钢铁股份有限公司 | Method for controlling oxide iron scale on surface of low-carbon steel hot rolled wire rod |
CN105839019A (en) * | 2016-05-31 | 2016-08-10 | 安阳钢铁股份有限公司 | Steel for 90kg-level high-strength round-link chain and smelting process of steel |
CN107138522B (en) * | 2017-04-27 | 2019-08-16 | 邢台钢铁有限责任公司 | The easy hot rolling wire production method of cold-forging steel containing Cr of pickling after a kind of annealing |
CN109201732A (en) * | 2017-07-03 | 2019-01-15 | 河钢股份有限公司邯郸分公司 | The production method of the simple pickling wire rod of washing machine sunpender |
CN110358965B (en) * | 2019-07-02 | 2021-04-09 | 江阴兴澄合金材料有限公司 | Wire rod for 100-grade or above high-strength chain and manufacturing method thereof |
CN111530923B (en) * | 2020-04-30 | 2021-10-01 | 江苏省沙钢钢铁研究院有限公司 | Production process of high-carbon steel wire rod |
CN112077140A (en) * | 2020-09-04 | 2020-12-15 | 南京钢铁股份有限公司 | Control method for reducing extrusion damage to surface of wire spring steel |
CN112275811A (en) * | 2020-09-10 | 2021-01-29 | 江阴兴澄合金材料有限公司 | Control method for improving coil shape and reducing coil height of high-speed wire |
CN113083886B (en) * | 2021-03-01 | 2022-07-29 | 中天钢铁集团有限公司 | Controlled rolling and controlled cooling method for improving drawing performance of low-carbon cold heading steel wire rod |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1778484A (en) * | 2004-11-17 | 2006-05-31 | 首钢总公司 | Continuous-casting and rolling manufacture for 82B wire rod steel strand |
CN101649416A (en) * | 2009-09-04 | 2010-02-17 | 江苏省沙钢钢铁研究院有限公司 | High carbon steel wire rod and preparation method thereof |
CN101716721A (en) * | 2009-12-23 | 2010-06-02 | 南京钢铁股份有限公司 | Manufacturing process of spring steel wire rod |
-
2011
- 2011-06-27 CN CN201110175029XA patent/CN102230139B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1778484A (en) * | 2004-11-17 | 2006-05-31 | 首钢总公司 | Continuous-casting and rolling manufacture for 82B wire rod steel strand |
CN101649416A (en) * | 2009-09-04 | 2010-02-17 | 江苏省沙钢钢铁研究院有限公司 | High carbon steel wire rod and preparation method thereof |
CN101716721A (en) * | 2009-12-23 | 2010-06-02 | 南京钢铁股份有限公司 | Manufacturing process of spring steel wire rod |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104190705A (en) * | 2014-08-04 | 2014-12-10 | 南京钢铁股份有限公司 | Production technology for bearing steel wire rod |
Also Published As
Publication number | Publication date |
---|---|
CN102230139A (en) | 2011-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102230139B (en) | Production process of high-strength mining chain wire rod | |
CN106834825B (en) | 5182 aluminium alloys | |
CN103769424B (en) | The control method of steekle mill surface of steel plate red scale | |
CN103469091B (en) | A kind of large-size railway vehicle is with rolling over steel solid wheel and production method thereof | |
CN103334058A (en) | Production process of deformed steel bar wire rod for high-speed rail | |
CN104190705A (en) | Production technology for bearing steel wire rod | |
CN106350714B (en) | A kind of 3C industries high-end anodic oxidation aluminium strip and its production method | |
CN103173598B (en) | Annealing-free medium-high carbon steel plate making technology | |
CN103433278B (en) | A kind of LED industry mild steel precision cold-rolled steel band production method | |
CN106702099B (en) | Manufacturing process of large-specification 42CrMo4 quenched and tempered steel for outer main shaft of wind power speed increasing box | |
CN104073715B (en) | A kind of manufacture method of high-magnetic strength non-oriented electrical steel | |
CN101905244B (en) | Method for producing mandrel by utilizing 28NiCrMoV steel as raw material | |
CN102703818A (en) | Material for overweight ring forging and manufacturing process for ring forging | |
CN110396648B (en) | Super-thick alloy die steel plate produced by continuous casting billet and manufacturing method thereof | |
CN102851474B (en) | Production method for improving strip steel through coil mechanical property uniformity | |
CN106929719A (en) | A kind of preparation method of aluminium foil used for automobile air conditioning | |
CN107363124B (en) | The manufacturing method of aerospace seamless steel pipe | |
CN103741028B (en) | Low yield strength ratio low temperature weldless steel tube and production method thereof | |
CN104275366A (en) | Method for controlling oxide iron scale on surface of low-carbon steel hot rolled wire rod | |
CN103071977A (en) | Production method of large-coil-weight white copper alloy coil pipe | |
CN104531964A (en) | Production method of high performance duplex stainless steel hot rolled coil | |
CN105274429A (en) | Production method for alloy filament | |
CN107881423B (en) | Cold heading steel, preparation method thereof and method for preparing steel wire by adopting cold heading steel | |
CN103753116B (en) | The manufacture method of sendzimir mill working roll | |
CN107350303B (en) | Production method of automobile shaft part steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |