CN102207530A - Method of detecting hot swap equipment and system thereof - Google Patents

Method of detecting hot swap equipment and system thereof Download PDF

Info

Publication number
CN102207530A
CN102207530A CN201010141403XA CN201010141403A CN102207530A CN 102207530 A CN102207530 A CN 102207530A CN 201010141403X A CN201010141403X A CN 201010141403XA CN 201010141403 A CN201010141403 A CN 201010141403A CN 102207530 A CN102207530 A CN 102207530A
Authority
CN
China
Prior art keywords
hot
plug equipment
interface unit
equipment
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010141403XA
Other languages
Chinese (zh)
Other versions
CN102207530B (en
Inventor
戴加良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Actions Technology Co Ltd
Original Assignee
Actions Semiconductor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Actions Semiconductor Co Ltd filed Critical Actions Semiconductor Co Ltd
Priority to CN201010141403.XA priority Critical patent/CN102207530B/en
Publication of CN102207530A publication Critical patent/CN102207530A/en
Application granted granted Critical
Publication of CN102207530B publication Critical patent/CN102207530B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method of detecting hot swap equipment. The method is used for detecting whether the hot swap equipment is connected. The system of detecting the hot swap equipment comprises a power supply apparatus, a control apparatus and an equipment interface apparatus which is used for connecting the hot swap equipment. The method includes the following steps that: step A, the control apparatus sends a query command to the equipment interface apparatus; step B, when the control apparatus does not receive a response from the hot swap equipment to the query command, the control apparatus controls a power supply terminal of the equipment interface apparatus to be cut off power and then to be supplied with power through the power supply apparatus; step C, the control apparatus sends again the query command to the equipment interface apparatus. The invention also discloses the apparatus to realize the method.

Description

A kind of method and system that detect hot-plug equipment
Technical field
The present invention relates to electronic technology field, particularly relate to the method and system that detect hot-plug equipment.
Background technology
The basic purpose of hot plug function is to allow circuit board and shell to carry out living in an orderly manner plug, and does not influence the operation of system.Usually to so do when maintenance or replacing have defective device, be difficult to usually to change or to install peripheral because will arrange the server outage time properly.Having the ability of inserting or change I/O equipment by this way can avoid system-down or can be reduced to system downtime the shortest at least.This technology also can be used for increasing new function for reconfiguring of system.
In the prior art, the voltage output end connection device interface of electric supply installation in the system of detection hot-plug equipment, this voltage output end is also by capacity earth, referring to shown in Figure 1 simultaneously.Electric supply installation provides power supply VOUT for the hot-plug equipment that is connected to equipment interface.The system that detects hot-plug equipment just can send querying command to equipment interface at set intervals, and whether detect has hot-plug equipment to insert.If receive the answer of hot-plug equipment, then explanation has hot-plug equipment to insert, and with identifier flag=1, continuation is mutual with hot-plug equipment; Otherwise, continue to send querying command every a period of time with flag=0.
But when inserting hot-plug equipment, VOUT voltage has very big falling, referring to shown in Figure 2.If the system that detects hot-plug equipment sends querying command during the falling of VOUT voltage, the deadlock that then can cause hot-plug equipment, hot-plug equipment can not be replied querying command, and the system that detects hot-plug equipment can't detect hot-plug equipment, unless plug hot-plug equipment again.
Summary of the invention
The embodiment of the invention provides a kind of system that detects the method for hot-plug equipment and detect hot-plug equipment, is used to realize whether connecting the detection of hot-plug equipment.
A kind of method that detects hot-plug equipment is used to realize whether connecting the detection of hot-plug equipment.The system of described detection hot-plug equipment comprises electric supply installation, control device and is used to be connected the FIU facilities interface unit of hot-plug equipment, said method comprising the steps of:
Steps A, control device send querying command to FIU facilities interface unit:
Step B, when control device is not received hot-plug equipment to the response of querying command, control device is by powering on behind the electricity under the power end of electric supply installation opertaing device interface arrangement;
Step C, control device send querying command to FIU facilities interface unit once more.
Step B comprises: control device is electric down to the power end of FIU facilities interface unit by electric supply installation, and postpones behind the default delay duration FIU facilities interface unit to be powered on.
Control device defines hot-plug equipment and is connected with FIU facilities interface unit when receiving hot-plug equipment to the response of querying command.
After the step C,, determine that then no hot-plug equipment is connected with FIU facilities interface unit if do not receive the response of hot-plug equipment to querying command; If receive the response of hot-plug equipment, then define hot-plug equipment and be connected with FIU facilities interface unit to querying command.
After control device is determined no hot-plug equipment and FIU facilities interface unit is connected,, send querying command to FIU facilities interface unit once more through the preset period duration.
A kind of system that is used to detect hot-plug equipment is used to realize whether connecting the detection of hot-plug equipment.Described system comprises:
FIU facilities interface unit is used to connect hot-plug equipment;
Electric supply installation is used to FIU facilities interface unit power supply or outage;
Control device, be used for sending querying command to FIU facilities interface unit, when in default wait duration, not receiving the response of hot-plug equipment, by powering on behind the electricity under the power end of electric supply installation opertaing device interface arrangement, and send querying command to FIU facilities interface unit once more, and determine whether the access of hot-plug equipment according to the response of whether receiving FIU facilities interface unit.
The power end of the voltage output end connection device interface arrangement of electric supply installation, and the voltage output end of electric supply installation passes through capacity earth.
The voltage output end of electric supply installation is also by electric discharge device ground connection.
Electric discharge device comprises the switching device of being with control end;
Control device connects the control end of switching device, and passes through the break-make of this control end gauge tap device.
Control device specifically is used for sending first signal that is used to indicate the electric supply installation outage to the control end of electric supply installation, and the control end to electric supply installation sends the secondary signal that is used to indicate the electric supply installation power supply behind the delay duration that postpones to preset.
Control device defines hot-plug equipment and is connected with FIU facilities interface unit when receiving hot-plug equipment to the response of querying command.
Control device determines that then no hot-plug equipment is connected with FIU facilities interface unit if do not receive the response of hot-plug equipment to querying command; If receive the response of hot-plug equipment, then define hot-plug equipment and be connected with FIU facilities interface unit to querying command.
After control device determined that no hot-plug equipment inserts equipment interface, through the preset period duration, the equipment interface to self sent querying command once more.
When the system that detects hot-plug equipment in the embodiment of the invention did not receive hot-plug equipment at the response of querying command, the equipment interface of controlling self is electricity and powering on down, sends querying command to hot-plug equipment once more after powering on.Under the situation that has hot-plug equipment to insert, the response of not receiving hot-plug equipment, then deadlock may take place in hot-plug equipment.The system that detects hot-plug equipment restarts hot-plug equipment by equipment interface being descended electricity and powering on, and no longer needs the artificial hot-plug equipment of plug again, also just can not occur the situation of VOUT electric voltage dropping again.The system that detects hot-plug equipment sends querying command to hot-plug equipment once more, and this moment, hot-plug equipment recovered normally can receive querying command.
Description of drawings
Fig. 1 is the structural drawing that detects the system of hot-plug equipment in the prior art;
Fig. 2 is the synoptic diagram of change in voltage in the prior art;
Fig. 3 A is the main method process flow diagram that detects hot-plug equipment in the embodiment of the invention;
Fig. 3 B is the method flow diagram of the detection hot-plug equipment that the band duration is judged in the embodiment of the invention;
Fig. 4 is the detailed method process flow diagram that detects hot-plug equipment in the embodiment of the invention;
Fig. 5 is the primary structure figure that detects the system of hot-plug equipment in the embodiment of the invention;
Fig. 6 is the detailed structure view that detects the system of hot-plug equipment in the embodiment of the invention.
Embodiment
When the system that detects hot-plug equipment in the embodiment of the invention does not receive hot-plug equipment at the response of querying command, control the power end electricity and powering on down of the FIU facilities interface unit of self, send querying command to hot-plug equipment once more after powering on.Under the situation that has hot-plug equipment to insert, the response of not receiving hot-plug equipment, then deadlock may take place in hot-plug equipment.The system that detects hot-plug equipment restarts hot-plug equipment by equipment interface being descended electricity and powering on, and no longer needs the artificial hot-plug equipment of plug again, also just can not occur the situation of VOUT electric voltage dropping again.The system that detects hot-plug equipment sends querying command to hot-plug equipment once more, and this moment, hot-plug equipment recovered normally can receive querying command.
The system of the detection hot-plug equipment in the embodiment of the invention is for hot-plug equipment.The system of described detection hot-plug equipment comprises electric supply installation, control device and is used to be connected the FIU facilities interface unit of hot-plug equipment.Following electricity is meant from change in voltage being arranged to no-voltage, comprises transient change and slowly variation.
Referring to Fig. 3 A, the main method flow process that detects hot-plug equipment in the present embodiment is as follows:
Step 31: control device sends querying command to FIU facilities interface unit.
Step 32: when control device was not received hot-plug equipment to the response of querying command, control device was by powering on behind the electricity under the power end of electric supply installation opertaing device interface arrangement.
Step 33: control device sends querying command to FIU facilities interface unit once more.
Referring to Fig. 3 B, the method flow of the detection hot-plug equipment that the band duration is judged in the present embodiment is as follows:
Step 301: the system that detects hot-plug equipment sends querying command to the FIU facilities interface unit of self.
Step 302: the response of whether receiving hot-plug equipment in default duration is judged by the system that detects hot-plug equipment, if then continue step 303, otherwise continue step 304.
Step 303: the system that detects hot-plug equipment defines hot-plug equipment and is connected with FIU facilities interface unit, and flag is changed to 1 with identifier.Can continue to wait operation alternately with hot-plug equipment.
Step 304: power on behind the electricity under the power end of the system control equipment interface arrangement of detection hot-plug equipment.Continue step 305.
Step 305: the system that detects hot-plug equipment sends querying command to FIU facilities interface unit once more.
After step 305, can continue step 302.
Referring to Fig. 4, the detailed method flow process that detects hot-plug equipment in the present embodiment is as follows:
Step 401: the system that detects hot-plug equipment sends querying command to the FIU facilities interface unit of self.
Step 402: the response of whether receiving hot-plug equipment in default wait duration is judged by the system that detects hot-plug equipment, if then continue step 403, otherwise continue step 404.
Step 403: the system that detects hot-plug equipment defines hot-plug equipment and is connected with FIU facilities interface unit, and flag is changed to 1 with identifier.Can continue to wait operation alternately with hot-plug equipment.
Step 404: detect under the power end of system to FIU facilities interface unit of hot-plug equipment.Continue step 405.
Step 405: the power end to equipment interface behind the delay duration that the system delay of detection hot-plug equipment is preset powers on.
Step 406: the system that detects hot-plug equipment sends querying command to equipment interface once more.
Step 407: the response of whether receiving hot-plug equipment in default wait duration is judged by the system that detects hot-plug equipment, if then continue step 403, otherwise continue step 408.
Step 408: the system that detects hot-plug equipment determines that no hot-plug equipment is connected with FIU facilities interface unit, and flag is changed to 0 with identifier.
Above flow process is an one-period, and after the system of detection hot-plug equipment determined that no hot-plug equipment inserts equipment interface, through the preset period duration, the equipment interface to self sent querying command once more, and promptly execution in step 401.
By above description, to have understood and detected the implementation procedure that whether has hot-plug equipment to insert, this process mainly realizes by the system that detects hot-plug equipment, inner structure and the function to the system that detects hot-plug equipment is introduced below.
Referring to Fig. 5, the system that detects hot-plug equipment in the present embodiment comprises: FIU facilities interface unit 501, electric supply installation 502 and control device 503.
FIU facilities interface unit 501 is used to connect hot-plug equipment.
The power end of the voltage output end connection device interface arrangement 501 of electric supply installation 502 is used to equipment interface power supply or outage.
The data terminal of the data terminal connection device interface arrangement 501 of control device 503, and control end EN1 connects the control end of electric supply installation 502, be used for sending querying command to FIU facilities interface unit 501, when not receiving the response of hot-plug equipment, by powering on behind the electricity under the power end of electric supply installation 502 opertaing device interface arrangements 501, and send querying commands to FIU facilities interface unit 501 once more.Control device 503 specifically is used for sending first signal that is used to indicate the electric supply installation outage to the control end of electric supply installation 502, and the control end to electric supply installation 502 sends the secondary signal that is used to indicate the electric supply installation power supply behind the delay duration that postpones to preset.Control device 503 is once more after FIU facilities interface unit 501 sends querying commands, determines that no hot-plug equipment is connected with FIU facilities interface unit 501 during the response of not receiving hot-plug equipment.
The voltage output end of electric supply installation 502 is also by electric capacity 504 ground connection, referring to shown in Figure 6.The power supply of hot-plug equipment was stable when this electric capacity 504 was used to guarantee the hot-plug equipment operate as normal.
The voltage output end of electric supply installation 502 is also by electric discharge device 505 ground connection.This electric discharge device 505 is used for shortening the discharge time of electric capacity 504, but can not making the voltage of FIU facilities interface unit 501 become 0 at once when 501 outages of 502 pairs of FIU facilities interface unit of electric supply installation.Electric discharge device comprises the switching device of being with control end, manages as Metal-oxide-semicondutor (MOS) etc.
Another control end EN2 of control device 503 connects the control end of switching device, and passes through the break-make of this control end gauge tap device.
Wherein, control device 503 comprises processing unit and converting unit.
Processing unit (as CPU) is used to realize software logic.
Converting unit is used for the software command that processing unit generates is converted to electric signal output, and receives electric signal, and is converted to form of software and sends to processing unit.
Concrete, the order of processing unit generated query also sends to converting unit.Converting unit sends to FIU facilities interface unit 501 by data terminal.Whether processing unit receives hot-plug equipment in default wait duration response, if, then defining hot-plug equipment and insert, flag is changed to 1 with identifier, otherwise generates first signal (EN1=0) and the 3rd signal (EN2=1).Converting unit is that high level (also can be low level) signal sends to electric supply installation 502 with first conversion of signals, indicates its outage; And be that high level (if electric discharge device 505 is low level conductings, can be low level also then, adopt the electric discharge device of high level conducting in the present embodiment) signal sends to electric discharge device 505 with the 3rd conversion of signals, indicate it to begin discharge.Processing unit postpones default delay duration (as 1ms) back and generates secondary signal (EN1=1) and the 4th signal (EN2=0).Converting unit is converted to low level (also can be high level) signal with secondary signal and sends to electric supply installation 502, indicates its power supply; And be that low level (also can be high level) signal sends to electric discharge device 505 with the 4th conversion of signals, indicate it to stop discharge.Processing unit is through postponing behind the duration generated query order once more and sending to converting unit, and judge the response of in default wait duration, whether receiving hot-plug equipment, if, then defining hot-plug equipment is connected with FIU facilities interface unit, flag is changed to 1 with identifier, otherwise determine that no hot-plug equipment is connected with FIU facilities interface unit, flag is changed to 0 with identifier.Generated query order once more behind the processing unit process preset period duration (as 5s).
Be used to realize that the software of the embodiment of the invention can be stored in storage mediums such as floppy disk, hard disk, CD and flash memory.
When the system that detects hot-plug equipment in the embodiment of the invention does not receive hot-plug equipment at the response of querying command, control the power end electricity and powering on down of the equipment interface of self, send querying command to hot-plug equipment once more after powering on.Under the situation that has hot-plug equipment to insert, the response of not receiving hot-plug equipment, then deadlock may take place in hot-plug equipment.The system that detects hot-plug equipment descends electricity and powers on hot-plug equipment is restarted by the power end to equipment interface, no longer needs the artificial hot-plug equipment of plug again, also just can not occur the situation of VOUT electric voltage dropping again.The system that detects hot-plug equipment sends querying command to hot-plug equipment once more, and this moment, hot-plug equipment recovered normally can receive querying command.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.

Claims (13)

1. method that detects hot-plug equipment, the system of described detection hot-plug equipment comprises electric supply installation, control device and is used to be connected the FIU facilities interface unit of hot-plug equipment, it is characterized in that, said method comprising the steps of:
Steps A, control device send querying command to FIU facilities interface unit:
Step B, when control device is not received hot-plug equipment to the response of querying command, control device is by powering on behind the electricity under the power end of electric supply installation opertaing device interface arrangement;
Step C, control device send querying command to FIU facilities interface unit once more.
2. the method for claim 1 is characterized in that, step B comprises: control device is electric down to the power end of FIU facilities interface unit by electric supply installation, and postpones behind the default delay duration FIU facilities interface unit to be powered on.
3. the method for claim 1 is characterized in that, control device defines hot-plug equipment and is connected with FIU facilities interface unit when receiving hot-plug equipment to the response of querying command.
4. the method for claim 1 is characterized in that, after the step C, if do not receive the response of hot-plug equipment to querying command, determines that then no hot-plug equipment is connected with FIU facilities interface unit; If receive the response of hot-plug equipment, then define hot-plug equipment and be connected with FIU facilities interface unit to querying command.
5. method as claimed in claim 4 is characterized in that, after control device is determined no hot-plug equipment and FIU facilities interface unit is connected, through the preset period duration, sends querying command to FIU facilities interface unit once more.
6. a system that is used to detect hot-plug equipment is characterized in that, comprising:
FIU facilities interface unit is used to connect hot-plug equipment;
Electric supply installation is used to FIU facilities interface unit power supply or outage;
Control device, be used for sending querying command to FIU facilities interface unit, when in default wait duration, not receiving the response of hot-plug equipment, by powering on behind the electricity under the power end of electric supply installation opertaing device interface arrangement, and send querying command to FIU facilities interface unit once more, and determine whether the access of hot-plug equipment according to the response of whether receiving FIU facilities interface unit.
7. system as claimed in claim 6 is characterized in that, the power end of the voltage output end connection device interface arrangement of electric supply installation, and the voltage output end of electric supply installation passes through capacity earth.
8. system as claimed in claim 7 is characterized in that, the voltage output end of electric supply installation is also by electric discharge device ground connection.
9. system as claimed in claim 8 is characterized in that electric discharge device comprises the switching device of being with control end;
Control device connects the control end of switching device, and passes through the break-make of this control end gauge tap device.
10. system as claimed in claim 6, it is characterized in that, control device specifically is used for sending first signal that is used to indicate the electric supply installation outage to the control end of electric supply installation, and the control end to electric supply installation sends the secondary signal that is used to indicate the electric supply installation power supply behind the delay duration that postpones to preset.
11. system as claimed in claim 6 is characterized in that, control device defines hot-plug equipment and is connected with FIU facilities interface unit when receiving hot-plug equipment to the response of querying command.
12. system as claimed in claim 6 is characterized in that, control device determines that then no hot-plug equipment is connected with FIU facilities interface unit if do not receive the response of hot-plug equipment to querying command; If receive the response of hot-plug equipment, then define hot-plug equipment and be connected with FIU facilities interface unit to querying command.
13. system as claimed in claim 12 is characterized in that, after control device determined that no hot-plug equipment inserts equipment interface, through the preset period duration, the equipment interface to self sent querying command once more.
CN201010141403.XA 2010-03-31 2010-03-31 Method of detecting hot swap equipment and system thereof Expired - Fee Related CN102207530B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010141403.XA CN102207530B (en) 2010-03-31 2010-03-31 Method of detecting hot swap equipment and system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010141403.XA CN102207530B (en) 2010-03-31 2010-03-31 Method of detecting hot swap equipment and system thereof

Publications (2)

Publication Number Publication Date
CN102207530A true CN102207530A (en) 2011-10-05
CN102207530B CN102207530B (en) 2014-03-26

Family

ID=44696463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010141403.XA Expired - Fee Related CN102207530B (en) 2010-03-31 2010-03-31 Method of detecting hot swap equipment and system thereof

Country Status (1)

Country Link
CN (1) CN102207530B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102621917A (en) * 2012-04-06 2012-08-01 潍柴动力股份有限公司 Method and device for preventing situation of carrying out hot plugging on ECU (electronic control unit) connectors
CN106771708A (en) * 2016-11-15 2017-05-31 深圳Tcl数字技术有限公司 Main equipment and the hot plug method of testing and device of slave unit interconnection power supply
CN111540133A (en) * 2020-04-27 2020-08-14 中国银行股份有限公司 Method and device for detecting state of external equipment and related equipment
CN113342592A (en) * 2020-03-03 2021-09-03 合肥杰发科技有限公司 Disconnection detection method, device and medium for hot-plug equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6337569B1 (en) * 1999-09-24 2002-01-08 Hmi Co., Ltd. Apparatus for detecting earthed side of AC power Supply
CN101030188A (en) * 2007-03-31 2007-09-05 华为技术有限公司 Method and device for controlling impact external-equipment interconnected bus interface board circuit
CN101082894A (en) * 2006-05-30 2007-12-05 英业达股份有限公司 Hot-swap system of high speed perimeter component jointing interface device and method thereof
CN101286051A (en) * 2008-05-30 2008-10-15 北京星网锐捷网络技术有限公司 Electric power closed-loop control method and system
CN101631160A (en) * 2009-07-30 2010-01-20 中兴通讯股份有限公司 SIM card slot, SIM card push-pull processing method and terminal thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6337569B1 (en) * 1999-09-24 2002-01-08 Hmi Co., Ltd. Apparatus for detecting earthed side of AC power Supply
CN101082894A (en) * 2006-05-30 2007-12-05 英业达股份有限公司 Hot-swap system of high speed perimeter component jointing interface device and method thereof
CN101030188A (en) * 2007-03-31 2007-09-05 华为技术有限公司 Method and device for controlling impact external-equipment interconnected bus interface board circuit
CN101286051A (en) * 2008-05-30 2008-10-15 北京星网锐捷网络技术有限公司 Electric power closed-loop control method and system
CN101631160A (en) * 2009-07-30 2010-01-20 中兴通讯股份有限公司 SIM card slot, SIM card push-pull processing method and terminal thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102621917A (en) * 2012-04-06 2012-08-01 潍柴动力股份有限公司 Method and device for preventing situation of carrying out hot plugging on ECU (electronic control unit) connectors
CN106771708A (en) * 2016-11-15 2017-05-31 深圳Tcl数字技术有限公司 Main equipment and the hot plug method of testing and device of slave unit interconnection power supply
CN106771708B (en) * 2016-11-15 2020-02-14 深圳Tcl数字技术有限公司 Hot plug test method and device for interconnection power supply of master equipment and slave equipment
CN113342592A (en) * 2020-03-03 2021-09-03 合肥杰发科技有限公司 Disconnection detection method, device and medium for hot-plug equipment
CN113342592B (en) * 2020-03-03 2023-08-25 合肥杰发科技有限公司 Disconnection detection method, device and medium of hot plug equipment
CN111540133A (en) * 2020-04-27 2020-08-14 中国银行股份有限公司 Method and device for detecting state of external equipment and related equipment
CN111540133B (en) * 2020-04-27 2022-07-05 中国银行股份有限公司 Method and device for detecting state of external equipment and related equipment

Also Published As

Publication number Publication date
CN102207530B (en) 2014-03-26

Similar Documents

Publication Publication Date Title
JP2013030154A (en) Rack server system
JP3188501U (en) Hot-swap uninterruptible power supply module and system
CN102207530A (en) Method of detecting hot swap equipment and system thereof
CN102882267A (en) Power supply device, electronic equipment and power supply method
WO2014188733A1 (en) Power control device, power control method, and power control system
CN102354261A (en) Remote control system for power supply switches of machine room servers
CN104412480A (en) In-car power supply apparatus
CN104281465A (en) Computer and awakening method thereof
CN108027780B (en) Memory content protection circuit
CN103870292A (en) FPGA automatic logic loading device and method
CN104333112B (en) A kind of RTC electric power controller and method
CN102780207A (en) Voltage protection system and voltage protection method
CN101799715A (en) Device for power protection against hot-plug function of hard disk interface and implementation method thereof
CN110597376B (en) Sequencing circuit and sequencing system
CN102810904B (en) Method, master control veneer and system that after low-voltage raises, equipment state is recovered
CN102611145A (en) Method and device for managing battery of direct current power supply
CN201903771U (en) Singlechip reset circuit
CN101286051A (en) Electric power closed-loop control method and system
CN101441505B (en) Energy-saving controlled computer power supply device
TW201324113A (en) Hot-pluggable uninterruptible power module
CN105098854A (en) Charging method and electronic apparatus
CN102545330B (en) Power supply circuit, construction machinery and power supply system thereof
CN104345850A (en) Intelligent type automatic power-on device
CN201607685U (en) Hard disk storage device containing stand-by power supply
CN115549234A (en) Power management self-adaptive charging and discharging control method, system and equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JUXIN(ZHUHAI) TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: JULI INTEGRATED CIRCUIT DESIGN CO., LTD.

Effective date: 20141212

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141212

Address after: 519085 C District, 1# workshop, No. 1, science and technology No. four road, hi tech Zone, Zhuhai, Guangdong, China

Patentee after: ACTIONS (ZHUHAI) TECHNOLOGY Co.,Ltd.

Address before: 519085 No. 1, unit 15, building 1, 1 Da Ha Road, Tang Wan Town, Guangdong, Zhuhai

Patentee before: ACTIONS SEMICONDUCTOR Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 519085 High-tech Zone, Tangjiawan Town, Zhuhai City, Guangdong Province

Patentee after: ACTIONS TECHNOLOGY Co.,Ltd.

Address before: 519085 High-tech Zone, Tangjiawan Town, Zhuhai City, Guangdong Province

Patentee before: ACTIONS (ZHUHAI) TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140326