CN102201677B - Power load cache system - Google Patents

Power load cache system Download PDF

Info

Publication number
CN102201677B
CN102201677B CN201010131043.5A CN201010131043A CN102201677B CN 102201677 B CN102201677 B CN 102201677B CN 201010131043 A CN201010131043 A CN 201010131043A CN 102201677 B CN102201677 B CN 102201677B
Authority
CN
China
Prior art keywords
load
generating set
master controller
unit
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010131043.5A
Other languages
Chinese (zh)
Other versions
CN102201677A (en
Inventor
张桂琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=44662150&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN102201677(B) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN201010131043.5A priority Critical patent/CN102201677B/en
Publication of CN102201677A publication Critical patent/CN102201677A/en
Application granted granted Critical
Publication of CN102201677B publication Critical patent/CN102201677B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Eletrric Generators (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a power load cache system, which comprises a load quantity acquisition device, a main controller, a power switchgear unit and a load cache unit, wherein the load quantity acquisition device is connected with a generator set, acquires the load quantity of the generator set and sends the load quantity to the main controller in real time; the main controller is connected with the load quantity acquisition device and compares the load quantity with a load quantity upper limit threshold and/or load quantity lower limit threshold, if the load quantity is greater than or equal to the load quantity upper limit threshold, a load decrease signal is sent to the load cache unit, and if the load quantity is less than or equal to the load quantity lower limit threshold, a load increase signal is sent to the load cache unit; the power switchgear unit is connected between the main controller and the load cache unit; and the load cache unit is connected with the power switchgear unit and the generator set, after receiving the load increase signal from the power switchgear unit, the load cache unit increases the load quantity of the generator set, and after receiving the load decrease signal from the power switchgear unit, the load cache unit decreases the load quantity of the generator set. Therefore, the generator set can be ensured in smooth running.

Description

Power load cache system
Technical field
The present invention relates to the running technology of generating set, the power load cache system using while there is large electric load fluctuation in particular to being in operation for generating set.
Background technology
The steam turbine power generation unit of current lonely network operation, is increased by steam turbine load, need to increase fuel, and temperature rises and makes water vapor, becomes high steam acting, increases load, and these a series of processes can not complete in moment; And when load shedding, subtract fuel, same steam temperature and pressure can not reduce moment, make the load dynamic response characteristic of steam turbine poor, the voltage, frequency and the engine speed that cause steam turbine power generation unit are unstable, can follow the tracks of and change according to the variation of load, cause power supply poor quality, coefficient of safety be low.In moment large load change situation, load impacts very large to steam turbine, and long-time running meeting causes governor for steam turbine to damage, and even wash away steam turbine normal operating conditions, and exhaust is frequent, and noise is large, serious waste heat energy and water resources.
Therefore, exist the electric load buffer memory that can will fluctuate moment, alleviate or eliminate the demand of the dysgenic system that electric load fluctuation produces steam turbine.
Summary of the invention
To achieve these goals, the invention provides a kind of power load cache system, for realizing the electric load buffer memory to generating set, comprise: load harvester, be connected to described generating set, for gathering the load of described generating set, and described load is passed to described master controller in real time; Described master controller, be connected to described load harvester, described load and load upper limit threshold and/or load lower threshold are compared, if described load is more than or equal to described load upper limit threshold, send load and reduce signal to load buffer unit, if described load is less than or equal to described load lower threshold, sending load increases signal to described load buffer unit; Described power switch cabinet unit, be connected between described master controller and load buffer unit, for increase signal or described load according to the described load of described master controller, reduce signal and control described load buffer unit and increase or reduce the load of described generating set, and feed back signal to described master controller; Described load buffer unit, be connected to described power switch cabinet unit and described generating set, receiving that the described load from described power switch cabinet unit increases after signal, increase the load of described generating set, receiving that the described load from described power switch cabinet unit reduces after signal, reduces the load of described generating set.
In technique scheme, this power load cache system further comprises: frequency collection device, be connected to described generating set, for gathering the electric voltage frequency of described generating set, and described electric voltage frequency is passed to described master controller in real time, described master controller judges, if the described electric voltage frequency of described generating set is more than or equal to electric voltage frequency upper limit threshold, send load and increase signal to described load buffer unit, if the described electric voltage frequency of described generating set is less than or equal to electric voltage frequency lower threshold, send load and reduce signal to described load buffer unit, described load buffer unit is receiving that the described load from described master controller increases after signal, increase the load of described generating set, receiving that the described load from described master controller reduces after signal, reduce the load of described generating set.
In technique scheme, this power load cache system further comprises: gateway, is connected between described load harvester and described master controller, for the described load from described load harvester is passed to described master controller.
In technique scheme, described generating set is connected with step-up transformer unit, described step-up transformer unit is transferred to power consumer after processing for the voltage of described generating set output is boosted, described power load cache system also comprises step-down transformer unit, be connected between described step-up transformer unit and described power switch cabinet unit, for being transferred to described power switch cabinet unit after the voltage step-down of described step-up transformer unit output.
In technique scheme, described generating set is steam turbine power generation unit, hydraulic generator unit or wind wheel generation unit.
In technique scheme, described load buffer unit comprises a plurality of little load resistance casees, and the rated power of described little load resistance case is 50KW to 1000KW, is preferably 500KW.
In technique scheme, described load buffer unit sends the operating state of described load buffer unit to described master controller, and described master controller is controlled described load buffer unit according to described operating state.
In technique scheme, described power load cache system is in lonely Running State.
In technique scheme, further comprise industrial computer, be connected to described master controller, for monitoring operational factor and the status data of the described generating set that described master controller receives.
Pass through technique scheme, the electric load buffering device of the technical program design, can moment fluctuation electric load be transferred to the load buffer unit that comprises a plurality of little load resistance casees, and then it is added deduct on steam turbine slowly, to reach, dissolve the impact of large sudden load change to generating set, guarantee generating set even running.
Accompanying drawing explanation
Fig. 1 shows the block diagram according to power load cache system of the present invention;
Fig. 2 shows the work schematic diagram of power load cache system according to an embodiment of the invention.
Embodiment
Fig. 1 shows the block diagram according to power load cache system of the present invention.
As shown in Figure 1, the invention provides a kind of power load cache system 100, for realizing the electric load buffer memory to generating set 112, comprise: load harvester 102, be connected to described generating set 112, for gathering the load of described generating set 112, and described load is passed to described master controller 104 in real time; Described master controller 104, be connected to described load harvester 102, described load and load upper limit threshold and/or load lower threshold are compared, if described load is more than or equal to described load upper limit threshold, send load and reduce signal to load buffer unit 108, if described load is less than or equal to described load lower threshold, sending load increases signal to described load buffer unit 108; Power switch cabinet unit 106, be connected between described master controller 104 and load buffer unit 108, for increase signal or described load according to the described load of described master controller 104, reduce signal and control described load buffer unit 108 and increase or reduce the load of described generating set 112, and feed back signal to described master controller 104; Described load buffer unit 108, be connected to described master controller 104 and described generating set 112, receiving that the described load from described master controller 104 increases after signal, increase the load of described generating set 112, receiving that the described load from described master controller 104 reduces after signal, reduces the load of described generating set 112; Industrial computer 110, is connected to described master controller 104, for monitoring operational factor and the status data of the described generating set 112 that described master controller 104 receives.
In technique scheme, described power load cache system 100 further comprises: frequency collection device, be connected to described generating set 112, for gathering the electric voltage frequency of described generating set 112, and described electric voltage frequency is passed to described master controller 104 in real time, described master controller 104 judges, if the described electric voltage frequency of described generating set 112 is more than or equal to electric voltage frequency upper limit threshold, send load and increase signal to described load buffer unit 108, if the described electric voltage frequency of described generating set 112 is less than or equal to electric voltage frequency lower threshold, send load and reduce signal to described load buffer unit 108, described load buffer unit 108 is receiving that the described load from described master controller 104 increases after signal, increase the load of described generating set 112, receiving that the described load from described master controller 104 reduces after signal, reduce the load of described generating set 112.
In technique scheme, described power load cache system 100 further comprises: gateway, be connected between described load harvester 102 and described master controller 104, for the described load from described load harvester 102 is passed to described master controller 104.
In technique scheme, described generating set 112 is connected with step-up transformer unit, described step-up transformer unit is transferred to power consumer after processing for the voltage of described generating set 112 outputs is boosted, described power load cache system 100 also comprises step-down transformer unit, be connected between described step-up transformer unit and described power switch cabinet unit, for being transferred to described power switch cabinet unit after the voltage step-down of described step-up transformer unit output.
In technique scheme, described generating set 112 is steam turbine power generation unit 112, hydraulic generator unit 112 or wind wheel generation unit 112.
In technique scheme, described load buffer unit 108 comprises a plurality of little load resistance casees.The rated power of described little load resistance case, in the scope of 50KW to 1000KW, is preferably 500KW
In technique scheme, described load buffer unit 108 sends the operating state of described load buffer unit 108 to described master controller 104, and described master controller 104 is controlled described load buffer unit 108 according to described operating state.
In technique scheme, described power load cache system 100 is in lonely Running State.
Fig. 2 shows the work schematic diagram of power load cache system according to an embodiment of the invention.
This device is comprised of frequency collection device 200, load harvester 202, gateway 204, master controller 206, industrial computer 208, step-down transformer unit 210, load buffer unit (a plurality of little load resistance case) 212, power switch cabinet unit 214.Frequency collection device 200 is with the electric voltage frequency of high speed acquisition steam turbine power generation unit 216, in real time frequency is passed to master controller, load harvester 202 is passed to master controller 206 by the load Real-time Collection of steam turbine power generation unit 216 after gateway 204 conversion communications protocol simultaneously, master controller 206 is analyzed steam turbine power generation unit 216 operation conditionss according to real-time frequency and load, by specific control algolithm drive power switch cabinet unit 214, receive or discharge load to the load buffer unit 212 that comprises a plurality of little load resistance casees, to reach, electric load moment of sudden change is cached to load buffer unit 212, and then it is added deduct on steam turbine power generation unit 216 slowly.Thereby make steam turbine power generation unit 216 avoid the impact of large sudden load change, make the 216 safety and steady operations of steam turbine power generation unit.Industrial computer 208 is mainly used to monitor the working condition of master controller 206, power switch cabinet unit 214, load buffer unit 212, and the major parameter of steam turbine power generation unit 216 work is set.
By the description to embodiments of the invention by reference to the accompanying drawings above, can clearly understand, steam turbine power generation group is when lonely network operation, and maximum difficulty is can not be by the large load of moment sudden change, transient absorption digestion, this is poor the causing of dynamic load characteristic by turbo generator set.The present invention mainly adds the load of moment sudden change to reduce to the load buffer unit that comprises a plurality of little load resistance casees, then the load of load buffer unit is slowly added deduct on steam turbine, makes the even running of steam turbine power generation unit.We have designed electric load buffering device for this reason, can moment fluctuation electric load be applied to the load buffer unit that comprises a plurality of little load resistance casees, and then it is added slowly and is reduced on steam turbine, to reach, dissolve the impact of large sudden load change to steam turbine power generation unit, guarantee the even running of steam turbine power generation unit.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (9)

1. a power load cache system, for realizing the electric load buffer memory to generating set, is characterized in that, comprising:
Load harvester, is connected to described generating set, for gathering the load of described generating set, and described load is passed to master controller in real time;
Described master controller, be connected to described load harvester, described load and load upper limit threshold and/or load lower threshold are compared, if described load is more than or equal to described load upper limit threshold, send load and reduce signal to load buffer unit, if described load is less than or equal to described load lower threshold, sending load increases signal to described load buffer unit;
Power switch cabinet unit; be connected between described master controller and load buffer unit; for increase signal or described load according to the described load of described master controller, reduce signal and control described load buffer unit and increase or reduce the load of described generating set, and feed back signal to described master controller;
Described load buffer unit, be connected to described power switch cabinet unit and described generating set, receiving that the described load from described power switch cabinet unit increases after signal, increase the load of described generating set, receiving that the described load from described power switch cabinet unit reduces after signal, reduces the load of described generating set;
Gateway, is connected between described load harvester and described master controller, for the described load from described load harvester is passed to described master controller.
2. power load cache system according to claim 1, it is characterized in that, further comprise: frequency collection device, be connected to described generating set, for gathering the electric voltage frequency of described generating set, and described electric voltage frequency is passed to described master controller in real time, described master controller judges, if the described electric voltage frequency of described generating set is more than or equal to electric voltage frequency upper limit threshold, send load and increase signal to described load buffer unit, if the described electric voltage frequency of described generating set is less than or equal to electric voltage frequency lower threshold, send load and reduce signal to described load buffer unit, described load buffer unit is receiving that the described load from described master controller increases after signal, increase the load of described generating set, receiving that the described load from described master controller reduces after signal, reduce the load of described generating set.
3. power load cache system according to claim 1 and 2, it is characterized in that, described generating set is connected with step-up transformer unit, described step-up transformer unit is transferred to power consumer after processing for the voltage of described generating set output is boosted, described power load cache system also comprises step-down transformer unit, be connected between described step-up transformer unit and described power switch cabinet unit, for being transferred to described power switch cabinet unit after the voltage step-down of described step-up transformer unit output.
4. power load cache system according to claim 1 and 2, is characterized in that, described generating set is steam turbine power generation unit, hydraulic generator unit or wind wheel generation unit.
5. power load cache system according to claim 1 and 2, is characterized in that, described load buffer unit comprises a plurality of little load resistance casees, and the rated power of described little load resistance case is 50KW to 1000KW.
6. power load cache system according to claim 5, is characterized in that, the rated power of described little load resistance case is 500KW.
7. power load cache system according to claim 1 and 2, it is characterized in that, described load buffer unit sends the operating state of described load buffer unit to described master controller, and described master controller is controlled described load buffer unit according to described operating state.
8. power load cache system according to claim 1 and 2, is characterized in that, described power load cache system is in lonely Running State.
9. power load cache system according to claim 1 and 2, is characterized in that, further comprises industrial computer, is connected to described master controller, for monitoring operational factor and the status data of the described generating set that described master controller receives.
CN201010131043.5A 2010-03-22 2010-03-22 Power load cache system Active CN102201677B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010131043.5A CN102201677B (en) 2010-03-22 2010-03-22 Power load cache system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010131043.5A CN102201677B (en) 2010-03-22 2010-03-22 Power load cache system

Publications (2)

Publication Number Publication Date
CN102201677A CN102201677A (en) 2011-09-28
CN102201677B true CN102201677B (en) 2014-05-07

Family

ID=44662150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010131043.5A Active CN102201677B (en) 2010-03-22 2010-03-22 Power load cache system

Country Status (1)

Country Link
CN (1) CN102201677B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103693645B (en) * 2013-12-22 2015-04-15 石家庄新华能源环保科技股份有限公司 Switch load system for isolated power system operation in calcium carbide plant
US10243371B2 (en) * 2016-12-15 2019-03-26 Caterpillar Inc. System, apparatus, and method for controlling load sharing of generator sets

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201656497U (en) * 2010-03-22 2010-11-24 张桂琴 Electric load buffering device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6252753B1 (en) * 1998-12-18 2001-06-26 Southern California Edison Co. Energy service stabilizer
US6858953B2 (en) * 2002-12-20 2005-02-22 Hawaiian Electric Company, Inc. Power control interface between a wind farm and a power transmission system
US7489988B2 (en) * 2003-11-19 2009-02-10 Panasonic Corporation Generator control system, generating apparatus control method, program and record medium
US20070100506A1 (en) * 2005-10-31 2007-05-03 Ralph Teichmann System and method for controlling power flow of electric power generation system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201656497U (en) * 2010-03-22 2010-11-24 张桂琴 Electric load buffering device

Also Published As

Publication number Publication date
CN102201677A (en) 2011-09-28

Similar Documents

Publication Publication Date Title
CN103346587A (en) Anti-countercurrent grid-connected photovoltaic power generation system
CN104696160A (en) Controlling wind power plant with negative power capability to respond to grid frequency instability
CN102013692A (en) Solar energy generating system and control system of header box thereof
CN207588556U (en) Micro- grid-connected dual power supply automatic switching device
CN107425542B (en) The control method of DFIG reactive power compensation in low voltage failure crossing process
CN102457195A (en) Power grid failure traversing system and method of 2 MW and more than 2 MW double-fed wind generating set complete machine
CN201953562U (en) Variable propeller pitch control system of wind generator
CN102201677B (en) Power load cache system
CN103606964B (en) A kind of wind turbine generator and realize low voltage crossing protection method
Suja et al. Power quality improvement in grid connected wind energy system using STATCOM
CN201656497U (en) Electric load buffering device
CN103603768A (en) Variable pitch control system and charging management control method of high-power wind generating set
CN203614323U (en) Variable-pitch control system for high-power wind power generator unit
CN102852714A (en) High-power wind power generating system
CN201789467U (en) Double-fed wind-driven generation unit low-voltage-ride-through frequency conversion control system
CN104022529A (en) Doubly-fed wind generator low voltage ride through control method based on improved Crowbar
CN103401496A (en) Continuous adjustable control method for power generating quantity of low-temperature power generator set
CN201650588U (en) Control device for brushless wind generator
CN203326915U (en) Control system for reducing impact current of grid-connected inverter
CN105305474A (en) Power network load rapid balance adjusting system and control method thereof
CN101964531A (en) Low voltage ride through (LVRT) frequency conversion control system of doubly-fed wind generating set
Gomez et al. Analysis of the doubly fed induction generator performance on frequency support of microgrids
CN103595073B (en) A kind of Wind turbines and Wind turbines overcome the method for grid fluctuations affect
CN110649592B (en) Multi-scene economic dispatching method for electric heat interconnection energy system of heat accumulation type electric boiler
CN102635541B (en) Control device and method for driving external fire pump by using diesel generator for engineering ships

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
IP01 Partial invalidation of patent right

Commission number: 4W103884

Conclusion of examination: The patent shall remain valid on the basis of claims 1-8 filed by the patentee on January 29, 2016.

Decision date of declaring invalidation: 20160505

Decision number of declaring invalidation: 28928

Denomination of invention: Power load cache system

Granted publication date: 20140507

Patentee: Zhang Guiqin

IP01 Partial invalidation of patent right