CN102182491A - 井下集中降温机组冷却水循环系统施工方法 - Google Patents

井下集中降温机组冷却水循环系统施工方法 Download PDF

Info

Publication number
CN102182491A
CN102182491A CN2011100741715A CN201110074171A CN102182491A CN 102182491 A CN102182491 A CN 102182491A CN 2011100741715 A CN2011100741715 A CN 2011100741715A CN 201110074171 A CN201110074171 A CN 201110074171A CN 102182491 A CN102182491 A CN 102182491A
Authority
CN
China
Prior art keywords
unit
ground
cooling water
underground
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100741715A
Other languages
English (en)
Inventor
辛恒奇
刘国庆
张双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG XINJULONG ENERGY CO Ltd
Original Assignee
SHANDONG XINJULONG ENERGY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG XINJULONG ENERGY CO Ltd filed Critical SHANDONG XINJULONG ENERGY CO Ltd
Priority to CN2011100741715A priority Critical patent/CN102182491A/zh
Publication of CN102182491A publication Critical patent/CN102182491A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种井下集中降温机组冷却水循环系统施工方法,它首先根据地下巷道布置图和地面工业厂区布置图,先在井下某巷道确定合适的机组安装位置,该位置避开地面建筑物;根据确定的地面与井下位置,从地面向地下巷道打两个专用钻孔,做为机组冷却水管路的安装通道;在地面建造冷却水厂房,安装冷却塔,拓宽地下巷道安装冷却水机组,通过两个钻孔安装循环管路并接通,施工完毕;当供冷区域移动变化后,按照上述步骤将机组移动到新的位置。本发明解决了制冷机组的安装问题和井下高温的降温问题,改善高温矿井的作业环境。

Description

井下集中降温机组冷却水循环系统施工方法
技术领域
本发明涉及到矿井降温系统。
背景技术
随着煤矿开采深度的延深,井下高温不可避免,因此在井下安装降温系统是改善井下作业环境的必然措施。但是由于该系统的冷却水必须完成地面冷却塔与井下机组的循环,需要特定的冷却水管路通道,如风井、主井等。这样对于老矿井新安装井下集中制冷降温系统时,由于没有预留安装管路,将直接限制矿井无法推广使用该系统,如果重新在井筒中安装管路会造成矿井停风停产。
发明内容
本发明为解决井下集中降温机组的冷却水循环问题,提供一种冷却水循环系统的施工方法。
施工方法如下:
第一步:首先根据地下巷道布置图和地面工业厂区布置图,先在井下某巷道确定合适的机组安装位置,该位置避开地面建筑物。
第二步:根据确定的地面与井下位置,从地面向地下巷道打两个专用钻孔,做为机组冷却水管路的安装通道。
第三步:在地面建造冷却水厂房,安装冷却塔,拓宽地下巷道安装冷却水机组,通过两个钻孔安装循环管路并接通,施工完毕。
第四步:当供冷区域移动变化后,按照上述步骤将机组移动到新的位置。
本发明解决了制冷机组的安装问题和井下高温的降温问题,改善高温矿井的作业环境。
附图说明
图1是本发明的示意图。
图例说明:1-冷却塔;2-钻孔;3-循环管路;4-冷却水机组。
具体实施方式
下面根据图1描述本发明的施工方法。
第一步:首先根据地下巷道布置图和地面工业厂区布置图,先在井下某巷道确定合适的机组安装位置,该位置避开地面建筑物。
第二步:根据确定的地面与井下位置,从地面向地下巷道打两个专用钻孔2,做为机组冷却水管路的安装通道。
第三步:在地面建造冷却水厂房,安装冷却塔1,拓宽地下巷道安装冷却水机组4,通过两个钻孔安装循环管路3并接通,施工完毕。
第四步:当供冷区域移动变化后,按照上述步骤将冷却水机组4移动到新的位置。

Claims (1)

1.一种井下集中降温机组冷却水循环系统施工方法,其特征在于,步骤如下:
第一步:首先根据地下巷道布置图和地面工业厂区布置图,先在井下某巷道确定合适的机组安装位置,该位置避开地面建筑物;
第二步:根据确定的地面与井下位置,从地面向地下巷道打两个专用钻孔,做为机组冷却水管路的安装通道;
第三步:在地面建造冷却水厂房,安装冷却塔,拓宽地下巷道安装冷却水机组,通过两个钻孔安装循环管路并接通,施工完毕;
第四步:当供冷区域移动变化后,按照上述步骤将机组移动到新的位置。
CN2011100741715A 2011-03-21 2011-03-21 井下集中降温机组冷却水循环系统施工方法 Pending CN102182491A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100741715A CN102182491A (zh) 2011-03-21 2011-03-21 井下集中降温机组冷却水循环系统施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100741715A CN102182491A (zh) 2011-03-21 2011-03-21 井下集中降温机组冷却水循环系统施工方法

Publications (1)

Publication Number Publication Date
CN102182491A true CN102182491A (zh) 2011-09-14

Family

ID=44568769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100741715A Pending CN102182491A (zh) 2011-03-21 2011-03-21 井下集中降温机组冷却水循环系统施工方法

Country Status (1)

Country Link
CN (1) CN102182491A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536297A (zh) * 2012-02-20 2012-07-04 河南理工大学 矿井空调输冷系统及其工作方法
CN103485815A (zh) * 2013-09-05 2014-01-01 山东新巨龙能源有限责任公司 井上移动垂直输冷式集中制冷方法
CN105386785A (zh) * 2015-11-26 2016-03-09 中国矿业大学 高温矿井巷道壁面贴附水膜板热换器降温系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4763484A (en) * 1986-06-07 1988-08-16 Sms-Schloemann-Siemag Aktiengesellschaft Method of and apparatus for the cooling of underground mine shafts and/or machinery installed therein
CN101225747A (zh) * 2008-01-18 2008-07-23 郎庆田 深井煤矿建井期间的降温方法及其设备
CN201100135Y (zh) * 2007-09-27 2008-08-13 武汉星田热环境控制技术有限公司 矿用冰冷降温系统
CN201539275U (zh) * 2009-10-26 2010-08-04 大连亿斯德制冷设备有限公司 高效节能移动式降温制冷机组

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4763484A (en) * 1986-06-07 1988-08-16 Sms-Schloemann-Siemag Aktiengesellschaft Method of and apparatus for the cooling of underground mine shafts and/or machinery installed therein
CN201100135Y (zh) * 2007-09-27 2008-08-13 武汉星田热环境控制技术有限公司 矿用冰冷降温系统
CN101225747A (zh) * 2008-01-18 2008-07-23 郎庆田 深井煤矿建井期间的降温方法及其设备
CN201539275U (zh) * 2009-10-26 2010-08-04 大连亿斯德制冷设备有限公司 高效节能移动式降温制冷机组

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡保林: "浅析矿井制冷降温系统方案的选择", 《矿山机械》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536297A (zh) * 2012-02-20 2012-07-04 河南理工大学 矿井空调输冷系统及其工作方法
CN103485815A (zh) * 2013-09-05 2014-01-01 山东新巨龙能源有限责任公司 井上移动垂直输冷式集中制冷方法
CN105386785A (zh) * 2015-11-26 2016-03-09 中国矿业大学 高温矿井巷道壁面贴附水膜板热换器降温系统
CN105386785B (zh) * 2015-11-26 2017-07-04 中国矿业大学 高温矿井巷道壁面贴附水膜板热换器降温系统

Similar Documents

Publication Publication Date Title
CN111911224B (zh) 深部煤层顶板钻孔煤热气共采方法
CN202544925U (zh) 一种一孔两用的隧洞排水孔结构
US12000626B2 (en) Geothermal development system and the construction method thereof
WO2018113488A1 (zh) 一种顶管冻结系统及其施工方法
CN202170515U (zh) 一种马蹄形截面预制拼装综合管廊
Yan et al. Monitoring and evaluation of artificial ground freezing in metro tunnel construction-a case study
WO2016107435A1 (zh) 一种巷外施工优化巷道区域应力场的方法
CN110260039B (zh) 一种基于bim技术的纵向曲线顶管施工方法
CN104197587B (zh) 一种环基坑内扰埋管式地下换热结构及其施工方法
Li et al. Development of the safety control framework for shield tunneling in close proximity to the operational subway tunnels: case studies in mainland China
CN109403984B (zh) 长距离曲线顶管自动导向系统
CN102182491A (zh) 井下集中降温机组冷却水循环系统施工方法
CN104632234A (zh) 用于多管间距断面的矩形顶管施工方法
CN103134236A (zh) 一种地源热泵地下换热器倾斜埋设的施工方法
CN111927454B (zh) 深部煤层超长钻孔探水及地热一体化开采方法
CN102979532B (zh) 一种辅助斜坡道配合胶带斜井运输的开拓方法
CN106152609A (zh) 一种井工厂地源热泵布井线方法
CN103774677A (zh) 地源井灌浆回填方法
Insam et al. Brenner Base Tunnel–interaction between underground structures, complex challenges and strategies
CN205355694U (zh) 一种非开挖电缆顶管
Rybach et al. Verification of rock temperature prediction along the Gotthard base tunnel-A prospect for coming tunnel projects
CN103982204B (zh) 一种高大硐室的漏斗式施工方法
CN202630352U (zh) 中浅层垂直埋管的地下换热系统
CN111911159B (zh) 一种深部煤层开采采空区充填地热开采方法
CN113982681B (zh) 一种煤矿采空区大面积悬顶灾害自动监测预警方法及系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110914