CN102182403B - 鱼刺井分支井眼钻削式完井工艺 - Google Patents

鱼刺井分支井眼钻削式完井工艺 Download PDF

Info

Publication number
CN102182403B
CN102182403B CN201110111399.7A CN201110111399A CN102182403B CN 102182403 B CN102182403 B CN 102182403B CN 201110111399 A CN201110111399 A CN 201110111399A CN 102182403 B CN102182403 B CN 102182403B
Authority
CN
China
Prior art keywords
well hole
branch well
branch
main borehole
reinforced plastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110111399.7A
Other languages
English (en)
Other versions
CN102182403A (zh
Inventor
卜震山
王萍萍
邹吉友
马海禹
佟立红
周永平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110111399.7A priority Critical patent/CN102182403B/zh
Publication of CN102182403A publication Critical patent/CN102182403A/zh
Application granted granted Critical
Publication of CN102182403B publication Critical patent/CN102182403B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明属于油田鱼刺分支井完井工艺,特别涉及一种鱼刺井分支井眼钻削式完井工艺,这种工艺,其特殊之处是:工艺为当主井眼钻到第一分支井眼前端与主井眼交界处的位置时钻第一分支井眼,依次从下至上将第一分支井眼筛管、玻璃钢套管、铝合金倒扣接头相互连接,再与钻杆连接在一起,下入第一分支井眼内,倒扣丢掉第一分支井眼筛管、玻璃钢套管和铝合金倒扣接头的组合,第一分支井眼筛管和玻璃钢套管的一部分在第一分支井眼内,玻璃钢套管的另一部分和铝合金倒扣接头在主井眼内,将主井眼和铝合金倒扣接头和一部分玻璃钢套管钻掉,钻下一部主井眼,重复第一次分支井眼的钻法和完井方法,完成所有分支井眼的钻、完工作,工艺简单,避免分支井眼塌方。

Description

鱼刺井分支井眼钻削式完井工艺
技术领域
本发明属于油田鱼刺分支井完井工艺,特别涉及一种鱼刺井分支井眼钻削式完井工艺。
背景技术
随着开发水平的提高和开采量的增大,石油资源逐渐枯竭,随着节约型开发方式的发展,以及海洋油气田的开发,鱼刺分支井开发油气资源技术越来越受到人们的重视,使用鱼刺分支井开发油田可大幅度提高单井控制储量,降低开发成本,提高油田最终采油收率和开发效果,但分支井比常规垂直井、定向井、水平井要复杂得多,完井的技术难度大,在辽河油田,鱼刺分支井的分支井眼的完井工艺主要有两种,即裸眼完井和预开窗完井技术,由于预开窗完井技术操作比较复杂,所以实际上分支井眼更多地采用裸眼完井方式,辽河油田有70%以上的稠油井,而大部分采用注气开采,在第一轮注气后,除潜山油藏以外的地层,大部分都会造成分支井眼塌方,这就为后续的注气和生产造成困难,从而也造成了很大损失。
发明内容
为了克服上述问题,本发明提供了一种鱼刺井分支井眼钻削式完井工艺,这种工艺是利用玻璃钢套管或铝合金管的可钻性,使分支井眼完井变得简单化,所有的分支井眼与主井眼虚接,操作简单,避免分支井眼塌方。
本发明解决其技术问题所采取的技术方案是:一种鱼刺井分支井眼钻削式完井工艺,其特殊之处是:工艺为所有分支井眼与主井眼虚接,当主井眼钻到第一分支井眼前端与主井眼交界处的位置,换导向钻具组合,钻第一分支井眼,钻完第一分支井眼后,依次从下至上将第一分支井眼筛管、玻璃钢套管、铝合金倒扣接头相互连接,再与钻杆连接在一起,下入第一分支井眼内,倒扣丢掉第一分支井眼筛管、玻璃钢套管和铝合金倒扣接头的组合,此时,第一分支井眼筛管和玻璃钢套管的一部分在第一分支井眼内,玻璃钢套管的另一部分和铝合金倒扣接头在主井眼内。
下稳斜钻具组合,将主井眼内的铝合金倒扣接头和一部分玻璃钢套管钻掉,继续钻下一部分的主井眼。
钻到第二分支井眼前端与主井眼交界处的位置时,重复第一分支井眼的钻法和完井方法,完成第二分支井眼的钻、完工作,以此类推,可以完成所有的分支井眼的钻、完井,当完成所有的分支井眼的完井和主井眼的钻井工作,下主井眼筛管,完成主井眼的完井,如此,完成整个鱼刺井的完井工作。
本发明的有益效果是:主井眼和所有的分井眼连接处的套管采用可钻性的玻璃钢套管,主井眼和所有的分支井眼是虚接的,处于主井眼内的铝合金倒扣接头和玻璃钢套管是用钻头钻削掉的,工艺实施简单,避免分支井眼塌方。
附图说明
附图1为本发明鱼刺井第一分支井眼完井示意图。
附图1中:1是铝合金倒扣接头、2是玻璃钢套管、3是主井眼、4是第一分支井眼、5是第一分支井眼筛管。
附图2为本发明钻削鱼刺井主井眼内铝合金倒扣接头和一部分玻璃钢套管后的井眼结构示意图。
附图2中:2是玻璃钢套管、3是主井眼、4是第一分支井眼、5是第一分支井眼筛管。
附图3为本发明鱼刺井整体完井结构示意图。
附图3中:2是玻璃钢套管、3是主井眼、4是第一分支井眼、5是第一分支井眼筛管、6是主井眼筛管、7是第二分支井眼。
具体实施方式
结合附图描述三个实施例:
实施例一:
附图1中:工艺为所有分支井眼与主井眼(3)虚接,当主井眼(3)钻到第一分支井眼(4)前端与主井眼(3)交界处的位置时,换导向钻具组合,钻第一分支井眼(4),钻完第一分支井眼(4)后,依次从下至上将第一分支井眼筛管(5)、玻璃钢套管(2)、铝合金倒接头(1)相互连接,再与钻杆连接在一起,下入第一分支井眼(4)内,倒扣丢掉第一分支井眼筛管(5)、玻璃钢套管(2)和铝合金倒扣接头(1)的组合,此时,第一分支井眼筛管(5)和玻璃钢套管(2)的一部分在第一分支井眼(4)内,玻璃钢套管(2)的另一部分和铝合金倒接头(1)在主井眼(3)内。
实施例二:
附图2中:下稳斜钻具组合,将主井眼(3)内的铝合金倒扣接头(1)和一部分玻璃钢套管(2)钻掉,继续钻下一部分的主井眼(3)。
实施例三:
附图3中:钻到第二分支井眼(7)前端与主井眼(3)交界处的位置时,重复第一分支井眼(4)的钻法和完井方法,完成第二分支井眼(7)的钻、完井工作,以此类推,可以完成所有的分支井眼的钻、完井,当完成所有的分支井眼的完井和主井眼(3)的钻井工作,下主井眼筛管(6),完成主井眼(3)的完井,如此,完成整个鱼刺井的完井工作。

Claims (1)

1.一种鱼刺井分支井眼钻削式完井工艺,其特征在于:工艺为所有分支井眼与主井眼虚接,当主井眼钻到第一分支井眼前端与主井眼交界处的位置时,换导向钻具组合,钻第一分支井眼,钻完第一分支井眼后,依次从下至上将第一分支井眼筛管、玻璃钢套管、铝合金倒扣接头相互连接,再与钻杆连接在一起,下入第一分支井眼内,倒扣丢掉第一分支井眼筛管、玻璃钢套管和铝合金倒扣接头的组合,此时,第一分支井眼筛管和玻璃钢套管的一部分在第一分支井眼内,玻璃钢套管的另一部分和铝合金倒扣接头在主井眼内,下稳斜钻具组合,将主井眼内的铝合金倒扣接头和一部分玻璃钢套管钻掉,继续钻下一部分的主井眼,钻到第二分支井眼前端与主井眼交界处的位置时,重复第一分支井眼的钻法和完井方法,完成第二分支井眼的钻、完井工作,以此类推,可以完成所有的分支井眼的钻、完井,当完成所有的分支井眼的完井和主井眼的钻井工作,下主井眼筛管,完成主井眼的完井,如此,完成整个鱼刺井的完井工作。
CN201110111399.7A 2011-04-28 2011-04-28 鱼刺井分支井眼钻削式完井工艺 Active CN102182403B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110111399.7A CN102182403B (zh) 2011-04-28 2011-04-28 鱼刺井分支井眼钻削式完井工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110111399.7A CN102182403B (zh) 2011-04-28 2011-04-28 鱼刺井分支井眼钻削式完井工艺

Publications (2)

Publication Number Publication Date
CN102182403A CN102182403A (zh) 2011-09-14
CN102182403B true CN102182403B (zh) 2016-06-29

Family

ID=44568681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110111399.7A Active CN102182403B (zh) 2011-04-28 2011-04-28 鱼刺井分支井眼钻削式完井工艺

Country Status (1)

Country Link
CN (1) CN102182403B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112431583A (zh) * 2020-02-26 2021-03-02 中国海洋石油集团有限公司 疏松砂岩储层鱼刺型水平分支井钻完井支撑装置及其支撑钻井方法
CN113585973A (zh) * 2020-04-30 2021-11-02 中国石油天然气股份有限公司 煤层气鱼骨状水平井的施工方法及煤层气开采方法
CN111535746B (zh) * 2020-05-06 2021-08-10 中国海洋石油集团有限公司 一种适用于鱼骨刺分支井防砂或井壁支撑的笼式连接装置及其使用方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1414207A (zh) * 2002-11-02 2003-04-30 辽河石油勘探局工程技术研究院 油田分支井重入装置
EP1149225B1 (en) * 1999-02-01 2004-04-14 Shell Internationale Researchmaatschappij B.V. Method for creating secondary sidetracks in a well system
CN1884786A (zh) * 2006-05-23 2006-12-27 辽河石油勘探局 一种鱼刺分支井钻完井方法
CN101191407A (zh) * 2006-11-30 2008-06-04 新疆石油管理局钻井工艺研究院 一种浅层稠油分支井的钻井方法
CN101397888A (zh) * 2008-11-03 2009-04-01 中国石油集团长城钻探工程有限公司 鱼骨形分支井钻完井工艺方法
CN101403280A (zh) * 2008-10-30 2009-04-08 中国石油集团长城钻探工程有限公司 六级分支井分叉制作及分叉系统工具
CN101975050A (zh) * 2010-09-17 2011-02-16 北京奥瑞安能源技术开发有限公司 多目标层地质环境中煤层气水平井及排采直井施工方法
CN101975048A (zh) * 2010-10-19 2011-02-16 陕西龙门天地煤层气技术工程有限公司 多分支水平井下筛管施工工艺

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7909094B2 (en) * 2007-07-06 2011-03-22 Halliburton Energy Services, Inc. Oscillating fluid flow in a wellbore

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1149225B1 (en) * 1999-02-01 2004-04-14 Shell Internationale Researchmaatschappij B.V. Method for creating secondary sidetracks in a well system
CN1414207A (zh) * 2002-11-02 2003-04-30 辽河石油勘探局工程技术研究院 油田分支井重入装置
CN1884786A (zh) * 2006-05-23 2006-12-27 辽河石油勘探局 一种鱼刺分支井钻完井方法
CN101191407A (zh) * 2006-11-30 2008-06-04 新疆石油管理局钻井工艺研究院 一种浅层稠油分支井的钻井方法
CN101403280A (zh) * 2008-10-30 2009-04-08 中国石油集团长城钻探工程有限公司 六级分支井分叉制作及分叉系统工具
CN101397888A (zh) * 2008-11-03 2009-04-01 中国石油集团长城钻探工程有限公司 鱼骨形分支井钻完井工艺方法
CN101975050A (zh) * 2010-09-17 2011-02-16 北京奥瑞安能源技术开发有限公司 多目标层地质环境中煤层气水平井及排采直井施工方法
CN101975048A (zh) * 2010-10-19 2011-02-16 陕西龙门天地煤层气技术工程有限公司 多分支水平井下筛管施工工艺

Also Published As

Publication number Publication date
CN102182403A (zh) 2011-09-14

Similar Documents

Publication Publication Date Title
CN102979498B (zh) 一种煤层气多分支水平井系统
CN104533287B (zh) 一种钻鱼刺状多级分支水平井页岩气储层钻完井和增产系统
CN104533288B (zh) 一种钻鱼刺状多级分支水平井页岩气储层钻完井和增产的方法
CN103883293B (zh) 水力喷射径向钻孔与压裂一体化方法
CN102587981B (zh) 地下盐穴储气库及其建造方法
CN201535137U (zh) 钻井扩孔钻具
CN103422812B (zh) 单井眼煤层气多分支水平井钻井及完井方法
CN203335054U (zh) 一种适用于向斜构造的煤层气多分支水平井系统
CN102852490A (zh) 复杂结构井抽放高瓦斯气工艺方法
CN102493790A (zh) 一种煤层气增产方法
CN104847263A (zh) 煤层气远端对接水平井钻井方法
CN110306965A (zh) 一种用于煤层气低产井区的增产方法
CN103161440A (zh) 一种单井眼煤层气水平井系统及其完成方法
CN106968661A (zh) 一种增强水热型地热系统的完井方法
CN102182403B (zh) 鱼刺井分支井眼钻削式完井工艺
CN109403923A (zh) 一种煤层气t型穿采空区短水平井施工方法
CN102434192A (zh) 增加煤层致裂效果的装置及增加煤层致裂效果的方法
CN101979816A (zh) 煤层气水平井和排采直井配合钻井施工方法
CN103422813B (zh) 单井眼煤层气多分支水平井系统及钻井方法
CN202108424U (zh) 油井射孔压裂及排液一体化管柱
CN103924958A (zh) 一种适用于向斜构造的煤层气多分支水平井系统
CN103711473B (zh) 双循环接力式煤层复合井眼钻完井方法
CN104912480B (zh) 煤层气近端对接水平井的钻完井方法
CN103924923B (zh) 同步多分支径向水平井完井方法及工具
CN104790934A (zh) 一种煤层气水平井开发工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Wang Pingping

Document name: Notification to Go Through Formalities of Registration

C14 Grant of patent or utility model
GR01 Patent grant