CN102172751B - Method for forging special-shape plate with side length greater than or equal to 4,000 mm - Google Patents

Method for forging special-shape plate with side length greater than or equal to 4,000 mm Download PDF

Info

Publication number
CN102172751B
CN102172751B CN2010106156250A CN201010615625A CN102172751B CN 102172751 B CN102172751 B CN 102172751B CN 2010106156250 A CN2010106156250 A CN 2010106156250A CN 201010615625 A CN201010615625 A CN 201010615625A CN 102172751 B CN102172751 B CN 102172751B
Authority
CN
China
Prior art keywords
intermediate blank
tubular intermediate
gas cutting
shower nozzle
blank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010106156250A
Other languages
Chinese (zh)
Other versions
CN102172751A (en
Inventor
邓正华
张清华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Erzhong Deyang Heavy Equipment Co Ltd
Original Assignee
China Erzhong Group Deyang Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Erzhong Group Deyang Heavy Industries Co Ltd filed Critical China Erzhong Group Deyang Heavy Industries Co Ltd
Priority to CN2010106156250A priority Critical patent/CN102172751B/en
Publication of CN102172751A publication Critical patent/CN102172751A/en
Application granted granted Critical
Publication of CN102172751B publication Critical patent/CN102172751B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for forging a special-shape plate with the side length greater than or equal to 4,000 mm with relatively high production efficiency. The method comprises the following steps: forging a blank formed by upsetting and punching a steel ingot to obtain a cylindrical intermediate blank; performing gas cutting on the cylindrical intermediate blank; and finally leveling to obtain the required special-shape plate. However, during the gas cutting of the cylindrical intermediate blank, the method controls the cylindrical intermediate blank to spin around the axis thereof and a spray nozzle to feed along the generatrix direction of the cylindrical intermediate blank so that the spray head moves relative to the cylindrical intermediate blank according to the edge shape of the special-shape plate. According to the invention, as the edge shape of the special-shape plate is formed during the gas cutting of the cylindrical intermediate blank, the gas cutting is not needed after leveling, the process is simplified and the production efficiency is improved; and moreover, the effect that the spray nozzle moves in a three-dimensional space relative to the cylindrical intermediate blank is realized by controlling the spinning movement of the cylindrical intermediate blank, and the existing large gas cutting equipment does not need to be reconstructed.

Description

For forging the method for the length of side >=4000mm abnormity plate
Technical field
The present invention relates to the limit system technology for making in a kind of equipment manufacture, be specifically related to a kind of for forging the method for the length of side >=4000mm abnormity plate.
Background technology
C shape plate cutter head forging for super-huge stamp forging hydraulic press frame, be the crucial forging of press rack emphasis, and its forging is shaped as " L " shape, forging ' s block dimension 4320 * 480 * 4880mm.The current domestic production precedent that there is no this type of especially big (being the length of side >=4000mm) special-shaped plate, also there are no the report of disclosed foreign literature.For the forging of special-shaped plate, the way that usually can expect should be first steel ingot to be carried out to jumping-up, and then pulling is square billet, after this further pulls out as flat side again, and last gas cutting goes out finished product.But find in practice, use above-mentioned technique can produce mass defect.
The Forging Technology that the application's applicant is application, application for a patent for invention file (calling documents in the following text) that publication No. is CN101823112A provides a kind of plate, well overcome the quality problems that above-mentioned large-scale plate forges, and had certain experience to draw in this application.Due to this documents in fact for be runner plate such as hydrogenerator, the circular plate such as end sealing plate blank for pressure vessel, therefore, the tubular intermediate blank is cut and flattened to this technique finally open the formation slab, and then the step that cuts out finished product on slab is reasonably fully, there do not is improved necessity.
But the present inventor finds, if the non-circular plates such as manufacture L shaped plate part consider that the direct edge shape that forms the L shaped plate part when gas cutting tubular intermediate blank is possible.If realize forming the edge shape of L shaped plate part when gas cutting tubular intermediate blank, can simplify processing step undoubtedly, enhance productivity.In fact, the proposition of above-mentioned thinking, manufacture field in the limit and can be considered to have breakthrough fully.
Implement above-mentioned thinking and still face following difficulty, for the gas cutting of tubular intermediate blank, in order to guarantee that shower nozzle points to the center of circle (guaranteeing that the gas cutting flame direction is vertical with the gas cutting face all the time) of tubular intermediate blank all the time while moving, except shower nozzle be take the bus of tubular intermediate blank as the situation that the gas cutting route is moved, select other gas cutting route all inevitably to require the relative tubular intermediate blank of shower nozzle to carry out three-dimensional space motion, and, for existing large-scale gas cutting equipment, its shower nozzle can only be along straight line translation or in one plane two dimension interlock.That is to say, existing large-scale gas cutting equipment forms the requirement of the edge shape of L shaped plate part in the time of also can't meeting gas cutting tubular intermediate blank.
Summary of the invention
The present invention aim to provide a kind of production efficiency higher for forging the method for the length of side >=4000mm abnormity plate.
The method still first will become the tubular intermediate blank by the blank forging formed after steel ingot jumping-up punching, and then this tubular intermediate blank is carried out to gas cutting, finally implement to flatten and obtain desired special-shaped plate; But, when the tubular intermediate blank is carried out to gas cutting, the party's rule is by control the feeding of this tubular intermediate blank along the spin of himself axis and shower nozzle along this tubular intermediate blank generatrix direction simultaneously, thereby makes the edge shape motion of the relative tubular intermediate blank of this shower nozzle by described special-shaped plate.
For implementing the method, a kind of plain mode is before the tubular intermediate blank is carried out to gas cutting, first this tubular intermediate blank is positioned over to one for making the rotating supporting device of this tubular intermediate blank along the spin of himself axis, then adjust nozzle position so that this shower nozzle points to the center of circle of tubular intermediate blank all the time, from original position, this tubular intermediate blank is carried out to gas cutting more thereafter.
When for the L shaped plate part, should, when the tubular intermediate blank is carried out to gas cutting, make relative this tubular intermediate blank of shower nozzle respectively by the first gas cutting route in order to form this L shaped plate part left hand edge with in order to form the second gas cutting route motion of this L shaped plate part right hand edge; Described the first gas cutting route is a space line extended along a certain bus of this tubular intermediate blank all the time, and described second gas cutting route is a space zigzag line be comprised of the straight line extended along another two buses of this tubular intermediate blank respectively and the circular arc line that extends along a certain contour of this tubular intermediate blank; Wherein, when shower nozzle moves along described circular arc line, the tubular intermediate blank is along the spin of himself axis and shower nozzle keeps motionless, and all the other time tubular intermediate blank all keep motionless and shower nozzle is done rectilinear motion.
The invention has the beneficial effects as follows: at first, because the present invention has realized forming when the gas cutting tubular intermediate blank edge shape of special-shaped plate, after therefore flattening without carrying out again gas cutting, thereby simplify processing step, enhance productivity; Secondly, the present invention realizes that by the spin motion of controlling the tubular intermediate blank the relative tubular intermediate blank of shower nozzle carries out the effect of three-dimensional space motion, does not need existing large-scale gas cutting equipment is transformed; In addition, in the situation that gas cutting L shaped plate part, can two L shaped plate parts of one-shot forming and can not cause the waste of material, greatly saved production cost; Finally, the surface that the present invention can also guarantee nozzle and tubular intermediate blank in the gas cutting process is vertical (guaranteeing that the gas cutting flame direction is vertical with the gas cutting face all the time) all the time, thereby guarantee shape and the gas cutting quality of forging.
The accompanying drawing explanation
The block diagram that Fig. 1~Fig. 5 is gas cutting L shaped plate part of the present invention.
The three-dimensional structure diagram that Fig. 6 is the L shaped plate part.
The splicing schematic diagram that Fig. 7 is two L shaped plate parts.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described further.
In this specific embodiment, the gas cutting L shaped plate part of take is example, and processing step of the present invention is described in detail.
As shown in Figure 6, the left hand edge 501 of L shaped plate part 5 is straight flange, and right hand edge 502 is the zigzag limit.As shown in Figure 7, two L shaped plate parts 5 are sliceable is a rectangle plate.The present invention first becomes tubular intermediate blank 1 according to the disclosed identical method of the application for a patent for invention file that is CN101823112A with publication No. by blank forging, and then by following processing step the most at last tubular intermediate blank 1 be made into the L shaped plate part 5 shown in Fig. 6.
As shown in Figure 1, the present invention is before carrying out gas cutting to tubular intermediate blank 1, first this tubular intermediate blank 1 is positioned over to one for making the rotating supporting device 2 of this tubular intermediate blank 1 along 4 spins of himself axis, then adjust shower nozzle 3 positions so that this shower nozzle 3 points to the center of circle of tubular intermediate blank 1 all the time, from original position, this tubular intermediate blank 1 is carried out to gas cutting more thereafter.
As shown in Fig. 1~4, for L shaped plate part 5, should be when tubular intermediate blank 1 be carried out to gas cutting, make relative this tubular intermediate blank 1 of shower nozzle 3 respectively by the first gas cutting route in order to form this L shaped plate part left hand edge 501 with in order to form the second gas cutting route motion of this L shaped plate part right hand edge 502, described the first gas cutting route is a space line 6 extended along a certain bus 7 of this tubular intermediate blank 1, described second gas cutting route be one by respectively along another two buses 8 of this tubular intermediate blank 1, 9 space lines 10 that extend, 11 and the space zigzag line that forms of the circular arc line 13 that extends along a certain contour of this tubular intermediate blank 1 12.
At first the present invention selects to carry out gas cutting by the second gas cutting route.As shown in Figure 1, tubular intermediate blank 1 keeps motionless, and shower nozzle 3 relative this tubular intermediate blank 1 is moved along space line 10, thereby cuts out an otch extended along tubular intermediate blank 1 bus 8 directions on tubular intermediate blank 1.Then, as shown in Figure 2, stationary nozzle 3 is motionless, rotating supporting device 2 drives tubular intermediate blank 1 with himself axis 4 spin (each arrow in Fig. 2 means respectively the backing roll of rotating supporting device 2 and the direction of rotation of tubular intermediate blank 1), now, the relative tubular intermediate blank 1 of shower nozzle 3 is moved along circular arc line 13, thereby cuts out an otch extended along tubular intermediate blank 1 contour 12 directions on tubular intermediate blank 1.After this, as shown in Figure 3, it is motionless that tubular intermediate blank 1 keeps again, and shower nozzle 3 relative this tubular intermediate blank 1 is moved along space line 11, thereby cut out an otch extended along tubular intermediate blank 1 bus 9 directions on tubular intermediate blank 1.Above-mentioned three otch are coherent each other, form the right hand edge 502 of L shaped plate part 5.
Then the present invention carries out gas cutting by the first gas cutting route again.As shown in Figure 4, tubular intermediate blank 1 keeps motionless, shower nozzle 3 relative this tubular intermediate blank 1 is moved along space line 6, thereby cuts out an otch extended along tubular intermediate blank 1 bus 7 directions on tubular intermediate blank 1, and this otch forms the left hand edge 501 of L shaped plate part 5.State diagram after being illustrated in figure 5 gas cutting and completing.Finally tubular intermediate blank 1 is implemented to flatten and just can access desired L shaped plate part.

Claims (2)

1. for forging the method for the length of side >=4000mm abnormity plate, the method first will become tubular intermediate blank (1) by the blank forging formed after steel ingot jumping-up punching, and then this tubular intermediate blank (1) is carried out to gas cutting, finally implement to flatten and obtain desired special-shaped plate, it is characterized in that: when this tubular intermediate blank (1) is carried out to gas cutting, by control the feeding of this tubular intermediate blank (1) along the spin of himself axis (4) and shower nozzle (3) along this tubular intermediate blank (1) generatrix direction simultaneously, thereby make this shower nozzle (3) edge shape motion that tubular intermediate blank (1) is pressed described special-shaped plate relatively,
For L shaped plate part (5), should be when tubular intermediate blank (1) be carried out to gas cutting, make shower nozzle (3) relatively this tubular intermediate blank (1) respectively by the first gas cutting route in order to form this L shaped plate part left hand edge (501) with in order to form the second gas cutting route motion of this L shaped plate part right hand edge (502), described the first gas cutting route is a space line (6) extended along this certain bus of tubular intermediate blank (1) (7), described the second gas cutting route be one by respectively along another two buses (8 of this tubular intermediate blank (1), 9) space line (10 extended, 11) and the space zigzag line that forms of the circular arc line (13) extended along this certain contour of tubular intermediate blank (1) (12), wherein, when shower nozzle (3) moves along described circular arc line (13), tubular intermediate blank (1) is along the spin of himself axis (4) and shower nozzle (3) keeps motionless, and all the other time tubular intermediate blank (1) all keep motionless and shower nozzle (3) is done rectilinear motion.
2. as claimed in claim 1 for forging the method for the length of side >=4000mm abnormity plate, it is characterized in that: before tubular intermediate blank (1) is carried out to gas cutting, first this tubular intermediate blank (1) is positioned over to one for making the rotating supporting device (2) of this tubular intermediate blank (1) along the spin of himself axis (4), then adjust shower nozzle (3) position so that this shower nozzle (3) points to the center of circle of tubular intermediate blank (1) all the time, from original position, this tubular intermediate blank (1) is carried out to gas cutting more thereafter.
CN2010106156250A 2010-12-30 2010-12-30 Method for forging special-shape plate with side length greater than or equal to 4,000 mm Active CN102172751B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010106156250A CN102172751B (en) 2010-12-30 2010-12-30 Method for forging special-shape plate with side length greater than or equal to 4,000 mm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010106156250A CN102172751B (en) 2010-12-30 2010-12-30 Method for forging special-shape plate with side length greater than or equal to 4,000 mm

Publications (2)

Publication Number Publication Date
CN102172751A CN102172751A (en) 2011-09-07
CN102172751B true CN102172751B (en) 2013-12-11

Family

ID=44516101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106156250A Active CN102172751B (en) 2010-12-30 2010-12-30 Method for forging special-shape plate with side length greater than or equal to 4,000 mm

Country Status (1)

Country Link
CN (1) CN102172751B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102554085B (en) * 2011-12-30 2015-08-05 中信重工机械股份有限公司 A kind of forging method improving flat side's forging horizontal mechanical performance
CN103691857B (en) * 2014-01-10 2017-01-04 中信重工机械股份有限公司 A kind of forging method of isotropic rectangle sectional axis forging
CN104971963A (en) * 2015-06-24 2015-10-14 陈文建 Slab forging process
CN111331064A (en) * 2020-03-11 2020-06-26 通裕重工股份有限公司 Forming method of large-size plate forging

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2084855U (en) * 1991-03-23 1991-09-18 沈阳工业锅炉厂 Gas cutter
EP1693127A1 (en) * 2005-02-21 2006-08-23 Snecma Method of upsetting a metallic billet and jacket - top set for carrying out said method
CN101823112A (en) * 2010-05-20 2010-09-08 二重集团(德阳)重型装备股份有限公司 Forging process of plate element

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2084855U (en) * 1991-03-23 1991-09-18 沈阳工业锅炉厂 Gas cutter
EP1693127A1 (en) * 2005-02-21 2006-08-23 Snecma Method of upsetting a metallic billet and jacket - top set for carrying out said method
CN101823112A (en) * 2010-05-20 2010-09-08 二重集团(德阳)重型装备股份有限公司 Forging process of plate element

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
赵健.马鞍型管接头气割专机的设计.《工业锅炉》.2005,(第03期),
马鞍型管接头气割专机的设计;赵健;《工业锅炉》;20050620(第03期);第35页2.3工作原理,图2 *

Also Published As

Publication number Publication date
CN102172751A (en) 2011-09-07

Similar Documents

Publication Publication Date Title
CN104399923B (en) A kind of method producing special heavy plate continuous casting billet
CN102172751B (en) Method for forging special-shape plate with side length greater than or equal to 4,000 mm
CN111112793B (en) Electric arc additive manufacturing method of magnesium alloy structural part and equipment used by electric arc additive manufacturing method
CN100496875C (en) Method for manufacturing wave shaped spring
CN101633107B (en) Can manufacturing technology
CN102527897A (en) Forging method for thin-walled step short sleeve type main shaft flange of water turbine
CN106624652A (en) Rotary forging forming method for metal circular plate
CN101020283A (en) Making process of stainless steel belt for composite aluminium-steel contact rail
CN1721097A (en) Hot pressing process for steel sheet rolling wheel
CN205032636U (en) Panel welded nut cold -heading device
CN104759536A (en) Adjustable mechanical bending die
CN202169309U (en) Punching and cutting combined mould equipment
CN107520316A (en) A kind of leaf spring trimming and corner cut assembling die
CN104690157A (en) Processing method for rear supporting frame
CN204523878U (en) A kind of furling plate round machine for processing magnesium crystallizer
CN103920814A (en) Blanking and punching process for small parts
CN103785744A (en) Automobile rear beam flanging process
CN204052605U (en) Before in burner inner liner, punch forming frock used by circle
CN205341624U (en) Stamping die's positive top -cross sword structure
CN102989939A (en) Design method of integral automobile steering knuckle vertical forging blank
CN206392693U (en) A kind of forerunner's stamping system
CN105855357A (en) One-time forming die for manufacturing channel tie
CN206731904U (en) A kind of shaving die for preventing from bursting apart
CN107755538A (en) A kind of mould and its method for flanging including combined type flange insert
CN202162554U (en) An automobile lower dash panel workpiece drawing and cutting die

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180315

Address after: 618013 Deyang Pearl River West Road, Sichuan, No. 460

Patentee after: Double (Deyang) heavy equipment Co., Ltd.

Address before: 618013 Deyang Pearl River West Road, Sichuan, No. 460

Patentee before: Erzhong Group (Deyang) Heavy Equipment Co., Ltd.

TR01 Transfer of patent right