CN102169343B - 电网集中监控中心程序化遥控操作系统及其操作方法 - Google Patents

电网集中监控中心程序化遥控操作系统及其操作方法 Download PDF

Info

Publication number
CN102169343B
CN102169343B CN2011101248180A CN201110124818A CN102169343B CN 102169343 B CN102169343 B CN 102169343B CN 2011101248180 A CN2011101248180 A CN 2011101248180A CN 201110124818 A CN201110124818 A CN 201110124818A CN 102169343 B CN102169343 B CN 102169343B
Authority
CN
China
Prior art keywords
remote control
sequencing
module
programmed
preview
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011101248180A
Other languages
English (en)
Other versions
CN102169343A (zh
Inventor
许先锋
庄卫金
孙名扬
唐涛南
韦凌霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN2011101248180A priority Critical patent/CN102169343B/zh
Publication of CN102169343A publication Critical patent/CN102169343A/zh
Application granted granted Critical
Publication of CN102169343B publication Critical patent/CN102169343B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

本发明公开了一种电网集中监控中心程序化遥控操作系统及其操作方法,操作系统包括以下各功能模块:数据处理模块:实现从电网集中控制系统获取电网模型、图形和实时运行方式;图形模块:实现监控操作票智能生成、操作项目模拟预演、程序化自动遥控操作、安全校核提示的人机界面;智能操作票模块:用于实现图形化智能出票、操作票流程化管理功能;程序化操作模块:用于实现操作前程序化模拟预演、程序化自动遥控操作功能;实现各种程序化执行的控制功能,在系统出现异常状况时自动中止程序化执行;安全校核模块。本发明可实现电网集中监控中心图票一体化模式下程序化自动遥控操作,可以提高集控站日常操作效率和自动化水平,保障操作安全。

Description

电网集中监控中心程序化遥控操作系统及其操作方法
技术领域
本发明涉及一种电网集中监控中心图票一体化模式下程序化遥控操作系统,适用于电网集中监控中心的日常监控操作票管理和程序化自动遥控操作。
背景技术
随着计算机技术、通信技术的发展,电力系统的运行模式发生了重大变化.目前形成了电力调度中心-集中监控中心-变电站监控中心三级调度体制.过去电网倒闸操作主要在变电站监控中心进行,现在越来越多的倒闸操作转移到集中监控中心进行。集中监控中心负责管辖范围内变电站的远方遥控操作,监控人员的工作量日益增加。
目前集中监控中心自动化系统已经具备了智能操作票、图形化单步遥控操作、安全校核等功能,各个功能模块相对独立,没有实现数据共享和交互。监控员的倒闸操作流程一般经过以下几个步骤:
1、监控员在操作票管理系统中新建一张操作票;
2、监控员在图形上通过点选设备自动生成操作票;
3、操作票进行流转;
4、监控员参照操作票的操作项目,在图形上一步步点选设备进行模拟预演;
5、监控员参照操作票的操作项目,在图形上一步步点选设备进行遥控操作;
从目前监控员的倒闸操作流程来看,遥控操作仍然需要监控人员在图形上根据操作票的操作步骤顺序单步人工执行。这种方式效率低,操作时间长,安全性差,无法满足日益繁重的集控中心倒闸操作的需要。
发明内容
本发明所要解决的技术问题是如何实现图形开票、操作票流程管理、程序化模拟预演、程序化自动遥控操作的全过程闭环控制。
为解决上述技术问题,本发明提供一种电网集中监控中心程序化遥控操作系统,其特征在于,包括以下各功能模块:
数据处理模块:服务端初始化,从电网集中控制系统读取电网模型和电网运行方式,根据电网模型和运行方式进行电气岛分析和间隔分析;
智能操作票模块:图形智能开票,操作票进行流转;
在图形上打开待执行监控操作票,列出具体操作项目;
程序化操作模块:点击程序化模拟预演,系统根据操作项目自动进行模拟预演;点击程序化自动遥控操作,系统根据操作项目顺序自动进行遥控操作;在程序化自动遥控过程中,如果某步遥控失败,则自动停止遥控;
安全校核模块:模拟预演过程中如果安全校核不通过,则提示用户,并禁止进行程序化自动遥控操作。
一种电网集中监控中心程序化遥控操作方法,其特征在于,包括以下步骤:
1)服务端初始化,数据处理模块从电网集中控制系统读取电网模型和电网运行方式,根据电网模型和运行方式进行电气岛分析和间隔分析;
2)图形智能开票;
3)操作票进行流转;
4)在图形上打开待执行监控操作票,列出具体操作项目;
5)点击程序化模拟预演,系统根据操作项目自动进行模拟预演;
6)模拟预演过程中如果安全校核不通过,则提示用户,并禁止进行程序化自动遥控操作;
7)点击程序化自动遥控操作,系统根据操作项目顺序自动进行遥控操作;
8)在程序化自动遥控过程中,如果某步遥控失败,则自动停止遥控。
本发明的有益效果:本发明的电网集中监控中心图票一体化模式下程序化遥控操作系统适应电网集中监控中心日常倒闸操作的需要,实现图上开票、操作票流程化管理、图上操作项目模拟预演、程序化自动遥控操作的闭环控制。维护工作少,自动化程度高,安全可靠,系统具备程序化模拟预演和程序化自动遥控操作功能,可以减少监控员日常操作工作量,减轻监控员日常工作压力,提高操作效率。系统采用全流程安全校核控制,可以最大限度的杜绝误操作的发生,提高供电可靠性。本发明充分利用现有资源,挖掘现有系统潜力,提高资源利用率。本发明符合智能电网建设的趋势,具有大规模推广商用前景。
附图说明
图1为本发明的系统结构图;
图2为本发明的系统流程图。
具体实施方式
本发明的一种电网集中监控中心图票一体化模式下程序化遥控操作系统,包括以下各功能模块:
数据接口:实现从现有系统获取电网模型、图形和实时运行方式;
图形模块:提供监控操作票智能生成、操作项目模拟预演、程序化自动遥控操作、安全校核提示人机界面;
智能操作票模块:具备图形化智能出票、操作票流程化管理等功能;
程序化操作模块:具备操作前程序化模拟预演、程序化自动遥控操作等功能;具备各种程序化执行的控制功能,包括开始执行、暂停执行、终止执行、设置断点、继续执行等,在系统出现异常状况时可以自动中止程序化执行;
安全校核模块:在智能出票、模拟预演、程序化遥控操作时对操作项目进行安全校核,包括拓扑防误校核、潮流越限校核等。
本发明工作模式为C/S方式,客户端为人机界面,负责和用户进行交互,运行在监控员工作站。服务端负责数据获取、数据处理、智能出票、程序化操作控制、操作安全校核、和客户端进行信息交互等。具体工作过程为:
1、服务端初始化,数据处理模块从电网集中控制系统读取电网模型和电网运行方式。根据电网模型和运行方式进行电气岛分析和间隔分析。
2、监控人员图形智能开票。
3、操作票进行流转。
4、监控人员在图形上打开待执行监控操作票,列出具体操作项目。
5、监控人员点击程序化模拟预演,系统根据操作项目自动进行模拟预演。
6、模拟预演过程中如果安全校核不通过,则提示用户,并禁止进行程序化自动遥控操作.
7、点击程序化自动遥控操作,系统根据操作项目顺序自动进行遥控操作;
8、在程序化自动遥控过程中,如果某步遥控失败,则自动停止遥控。
以上已以较佳实施例公开了本发明,然其并非用以限制本发明,凡采用等同替换或者等效变换方式所获得的技术方案,均落在本发明的保护范围之内。

Claims (2)

1.一种电网集中监控中心程序化遥控操作系统,其特征在于,包括以下各功能模块:
数据处理模块:服务端初始化,从电网集中控制系统读取电网模型和电网运行方式,根据电网模型和运行方式进行电气岛分析和间隔分析;
智能操作票模块:图形智能开票,操作票进行流转;
在图形上打开待执行监控操作票,列出具体操作项目;
程序化操作模块:点击程序化模拟预演,系统根据操作项目自动进行模拟预演;点击程序化自动遥控操作,系统根据操作项目顺序自动进行遥控操作;在程序化自动遥控过程中,如果某步遥控失败,则自动停止遥控;
安全校核模块:模拟预演过程中如果安全校核不通过,则提示用户,并禁止进行程序化自动遥控操作。
2.一种电网集中监控中心程序化遥控操作方法,其特征在于,包括以下步骤:
1)服务端初始化,数据处理模块从电网集中控制系统读取电网模型和电网运行方式,根据电网模型和运行方式进行电气岛分析和间隔分析;
2)图形智能开票;
3)操作票进行流转;
4)在图形上打开待执行监控操作票,列出具体操作项目;
5)点击程序化模拟预演,系统根据操作项目自动进行模拟预演;
6)模拟预演过程中如果安全校核不通过,则提示用户,并禁止进行程序化自动遥控操作;
7)点击程序化自动遥控操作,系统根据操作项目顺序自动进行遥控操作;
8) 在程序化自动遥控过程中,如果某步遥控失败,则自动停止遥控。
CN2011101248180A 2011-05-16 2011-05-16 电网集中监控中心程序化遥控操作系统及其操作方法 Active CN102169343B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101248180A CN102169343B (zh) 2011-05-16 2011-05-16 电网集中监控中心程序化遥控操作系统及其操作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101248180A CN102169343B (zh) 2011-05-16 2011-05-16 电网集中监控中心程序化遥控操作系统及其操作方法

Publications (2)

Publication Number Publication Date
CN102169343A CN102169343A (zh) 2011-08-31
CN102169343B true CN102169343B (zh) 2013-04-10

Family

ID=44490532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101248180A Active CN102169343B (zh) 2011-05-16 2011-05-16 电网集中监控中心程序化遥控操作系统及其操作方法

Country Status (1)

Country Link
CN (1) CN102169343B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103247087A (zh) * 2012-09-27 2013-08-14 苏州瑞盈科技有限公司 城市配网图形化智能防误操作系统及其方法
CN103177330A (zh) * 2012-12-24 2013-06-26 远光软件股份有限公司 针对热力系统设备生产及维护的操作票管理系统
CN109191082B (zh) * 2018-09-18 2022-08-19 广东电网有限责任公司 一种调度平台的程序化方法、系统及计算机可读存储介质
CN109587161B (zh) * 2018-12-21 2020-06-30 国网四川省电力公司电力科学研究院 智能电网遥控命令传送全过程信息的监测方法
CN111614157B (zh) * 2019-02-26 2022-06-28 南京南瑞继保电气有限公司 一种变电站倒闸操作的顺序控制系统和方法
CN110376944B (zh) * 2019-07-10 2022-07-01 国网福建省电力有限公司 一种顺序控制异常中断处理方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101594004A (zh) * 2009-06-29 2009-12-02 江苏金智科技股份有限公司 变电站自动化系统的智能控制方法
CN101592953A (zh) * 2008-05-30 2009-12-02 北京六所和瑞科技发展有限公司 基于一体化监控智能模拟防误操作票系统及其方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101592953A (zh) * 2008-05-30 2009-12-02 北京六所和瑞科技发展有限公司 基于一体化监控智能模拟防误操作票系统及其方法
CN101594004A (zh) * 2009-06-29 2009-12-02 江苏金智科技股份有限公司 变电站自动化系统的智能控制方法

Also Published As

Publication number Publication date
CN102169343A (zh) 2011-08-31

Similar Documents

Publication Publication Date Title
CN102169343B (zh) 电网集中监控中心程序化遥控操作系统及其操作方法
CN102012809B (zh) 一种综合监控联动模块设计和实现方法
CN102222982B (zh) 基于svg技术的变电站程序化操作的实现方法及装置
CN108736465A (zh) 一种未来态电网模型构建方法和装置
CN104460589B (zh) 移动式模拟调度主站调试系统
CN103997079B (zh) 一种电动汽车交流充电桩及其使用方法
WO2015176563A1 (zh) 采用广义量测横向关联方式的统一建模方法
CN201667560U (zh) 一种跨平台的监控装置
CN104133443A (zh) 一种由电网检修申请单自动生成电网调度操作票的方法
CN104678960A (zh) 一种基于现场防误及拟票培训的离线式调度操作票系统及方法
CN104463696A (zh) 电网运行风险识防方法及系统
CN102324788A (zh) 电力调度一体化防误模拟综合管理平台
CN102867079A (zh) 一种构建和归档电网实时运行方式的简约方法及系统
CN104504483B (zh) 一种用于实现防误操作票省地一体化的方法
CN102955430A (zh) 一种基于仿真技术的电能表全自动检测系统建立方法
Xin et al. A smarter grid operation: New energy management systems in China
CN203289488U (zh) 配电一体化监测平台
CN107545519B (zh) 一种电网企业运检管控方法
CN202013506U (zh) 能源管控系统
CN104156888A (zh) 基于风险综合评价模型的电力系统运营风险监测方法
CN103279834A (zh) 变电站监控信息分类自动化处理方法
CN114124946A (zh) 一种基于容器的网荷协同用能控制系统
Peng et al. Design and development of intelligent operation and maintenance training system for substation based on augmented reality
CN102968087B (zh) 一种防止误操作的智能操作票系统
CN204679830U (zh) 一种基于现场防误及拟票培训的离线式调度操作票系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xu Xianfeng

Inventor after: Zhuang Weijin

Inventor after: Sun Mingyang

Inventor after: Tang Taonan

Inventor after: Wei Lingxiao

Inventor after: Wang Changbao

Inventor before: Xu Xianfeng

Inventor before: Zhuang Weijin

Inventor before: Sun Mingyang

Inventor before: Tang Taonan

Inventor before: Wei Lingxiao

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: XU XIANFENG ZHUANG WEIJIN SUN MINGYANG TANG TAONAN WEI LINGXIAO TO: XU XIANFENG ZHUANG WEIJIN SUN MINGYANG TANG TAONAN WEI LINGXIAO WANG CHANGBAO

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xu Xianfeng

Inventor after: Zhuang Weijin

Inventor after: Sun Mingyang

Inventor after: Tang Taonan

Inventor after: Wang Changbao

Inventor after: Wei Lingxiao

Inventor after: Meng Yongliang

Inventor after: Liu Ji

Inventor after: Du Gang

Inventor before: Xu Xianfeng

Inventor before: Zhuang Weijin

Inventor before: Sun Mingyang

Inventor before: Tang Taonan

Inventor before: Wei Lingxiao

Inventor before: Wang Changbao

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: XU XIANFENG ZHUANG WEIJIN SUN MINGYANG TANG TAONAN WEI LINGXIAO WANG CHANGBAO TO: XU XIANFENG ZHUANG WEIJIN SUN MINGYANG TANG TAONAN WANG CHANGBAO WEI LINGXIAO MENG YONGLIANG LIU JI DU GANG

ASS Succession or assignment of patent right

Owner name: NARI NANJING CONTROL SYSTEM LTD.

Effective date: 20141204

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141204

Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Patentee after: NARI Technology Development Co., Ltd.

Patentee after: SGCC NARI Nanjing Control System Co., Ltd.

Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Patentee before: NARI Technology Development Co., Ltd.