CN102158894A - Power headroom reporting method, base station and user equipment - Google Patents

Power headroom reporting method, base station and user equipment Download PDF

Info

Publication number
CN102158894A
CN102158894A CN2010101202002A CN201010120200A CN102158894A CN 102158894 A CN102158894 A CN 102158894A CN 2010101202002 A CN2010101202002 A CN 2010101202002A CN 201010120200 A CN201010120200 A CN 201010120200A CN 102158894 A CN102158894 A CN 102158894A
Authority
CN
China
Prior art keywords
subscriber equipment
power
control channel
base station
signaling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010101202002A
Other languages
Chinese (zh)
Inventor
李俊飞
梁永明
张应余
罗汉文
邹俊
陈熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
Sharp Corp
Original Assignee
Shanghai Jiaotong University
Sharp Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University, Sharp Corp filed Critical Shanghai Jiaotong University
Priority to CN2010101202002A priority Critical patent/CN102158894A/en
Publication of CN102158894A publication Critical patent/CN102158894A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a power headroom reporting method, a base station and user equipment. In the power headroom reporting method based on an SR (Scheduling Request), provided by the invention, after a trigger event of the user equipment, used for reporting power headroom, occurs, the user equipment actively sends an SR signal to the base station, the base station receives a UL Grant signal to the user equipment after receiving the SR signal, the user equipment reports the information of the power headroom of a PUCCH (Physical Uplink Control Channel) in an uplink resource block of the allocated PUSCH (Physical Uplink Shared Channel), and the base station detects the information of the power headroom of the PUCCH. In the power headroom reporting method based on an L1 signaling, provided by the invention, after the trigger event of the user equipment, used for reporting the power headroom, happens, the user equipment reports the information of the power headroom to the base station by adopting the L1 signaling. The invention has the advantages of simpleness, flexibility, high efficiency and easiness for realization.

Description

Power headroom reporting method, base station and subscriber equipment
Technical field
The present invention relates to the wireless technology transmission field, be specifically related to a kind of power headroom reporting method, base station and subscriber equipment.
Background technology
Because individual or mobile communication equipment have required to have the ability of broadband business such as multimedia service, game on line, video request program and mobile TV, wideer band system band, higher peak rate and better edge service quality have become an important need of following individual or mobile communication system.3GPP (3G (Third Generation) Moblie partner plan) tissue is as the international organization that is devoted to individual or mobile communication standard work, design EUTRA (universal mobile telecommunications system of evolution and continental rise radio insert) and EUTRAN (the universal mobile telecommunications system net of evolution and continental rise radio access network) since the second half year in 2004, this project is also referred to as LTE (Long Term Evolution) project.In April, 2008,3GPP is organized in the China Shenzhen meeting, begin to inquire into the standardization effort of the 4th generation (4G) cellular communication system, 3GPP tissue definition LTE-Advanced (LTE-A) is as the version that carries out evolution to following 4G version from present 3GPP LTE 8.0 versions for this reason, and at Shenzhen session discussing the demand of LTE-A and possible correlation technique motion.In this meeting, many companies have proposed the frequency band problem of LTE-A system and the rendezvous problem of frequency spectrum.After discussing and conferring, the chairman has submitted LTE-A demand draft to, (REV-080058, Draft LTE-AdvancedRequirements), spell out the LTE-A system in this draft and need support the band system band of maximum 100MHz, frequency band for the 100MHz system can be one section continuous carrier wave frequency range, also can assemble (CA by the discrete carrier wave frequency range of multistage being carried out carrier wave, carrieraggregation) obtain, it is exactly a plurality of continuous or discrete carrier wave frequency range (CC of unit that carrier wave is assembled, component carrier) form a wideer frequency range, for example the CC of 5 20MHz can form the frequency range of 1 100MHz.Draft points out also that simultaneously LTE (LTE Release-8.0) system and LTE-A system can coexist on same frequency spectrum, that is to say that the LTE-A system needs the subscriber equipment of forward compatibility LTE.The frequency band of LTE system is designed to maximum 20MHz, the maximum band ability of LTE subscriber equipment also is 20MHz, LTE-A system by 100MHz is had only the LTE subscriber equipment of 20MHz ability that compatible services is provided, this has proposed challenge for design of LTE-A system, especially at aspects such as the design of frequency band division, broadcast channel and synchronization channel design, system's control signaling, uplink power control, carrier dispatching modes.
Power control about the LTE-A system, because LTE system up-link (UL, uplink) adopt the multiplexing (SC-FDMA of single carrier frequency division, single carrier frequency divisionmultiplex acess) technology, different user devices (UE in the sub-district, user equippment) be mutually orthogonal between the upward signal, therefore, system that the up link nonexistent code of LTE-A system divides multiplexing (CDMA, code division multiplex acess) carries out the necessity of power control because of near-far interference.LTE uplink power control (UL PC, uplink power control) is mainly used in the path loss and the shadow fading of compensate for channel, and is used to suppress presence of intercell interference.The power control of LTE system does not need to adopt cdma system fast frequency like that, and adopt the mode of slow power control to get final product, and up link can be respectively to Physical Uplink Shared Channel (PUSCH, physical uplink share channel), Physical Uplink Control Channel (PUCCH, physicaluplink control channel) and uplink detection reference signal (SRS, soundingreference signal) channel transmitting power control.
In LTE (LTE Release-8.0) system, the power of the up link of PUSCH is controlled as shown in Equation (1),
P PUSCH(i)=min{P CMAX
(1)
10log 10(M PUSCH(i))+P O_PUSCH(j)+α(j)·PL+Δ TF(i)+f(i)}
Wherein, i is the call number of subframe (sub-frame), P PUSCH(i) be the uplink transmission power of UE on PUSCH, P CMAX(i) be the maximum transmission power of UE, M PUSCH(i) for distributing to the quantity of ascending resource piece (RB, resource block) of this UE, j is the call number of carrier wave frequency range and is the value of immobilizing, P in the LTE system O_PUSCH(j) be the parameter (comprising target SINR, interference level etc.) that the sub-district is specific or UE is specific, α (j) is the specific path loss penalty coefficient (amplitude that depends on " control of part power " in sub-district, α (j) 1 promptly carries out completely the path loss compensation), PL is the path loss (PL of the down link that measures of UE, pathloss) value, Δ TF(i) be Radio Resource control (RRC, radio resource control) the specific modulation encoding scheme (MCS of layer appointment, modulation and coding scheme) parameter, be that MCS gives the indication in (ULresource grant) information at ascending resource, f (i) is the function of closed power control command.
In the LTE system, the power of the up link of PUCCH is controlled as shown in Equation (2),
P PUCCH(i)=min{P CMAX
(2)
P O_PUCCH+PL+h(n CQI,n HARQ)+Δ TF_PUCCH(F)+g(i)}
Wherein, i is the call number of subframe (sub-frame), P PUCCH(i) be the uplink transmission power of UE on PUCCH, P CMAX(i) be the maximum transmission power of UE, P O_PUCCHThe parameter (comprising target SINR, interference level etc.) specific for the sub-district or UE is specific, PL is downlink path loss (PL, pathloss) value, the h (n that UE measures CQI, n HARQ) be the peculiar functional value of PUCCH, the n here CQIBe bit (bit) number that is used for channel quality indication (CQI, channel quality indicator), n HARQBe the bit number that is used to mix automatic repeat requests (HARQ, hybrid automaticrepeat-request), Δ F_PUCCH(F) be based on the corrected value of UE, g (i) is used to represent that current PUCCH power adjusts the functional value of state, and is the function of transmitting power control (TPC, the transmit power control) instruction of PUCCH.
In the LTE system, the power of the up link of SRS is controlled as shown in Equation (3),
P SRS(i)min{P CMAX
(3)
P SRS_OFFSET+10log 10M SRS)+P O_PUSCH(j)+α(j)·PL+f(i)}
Wherein, i is the call number of subframe (sub-frame), P SRS(i) be the uplink transmission power of UE on SRS, P CMAX(i) be the maximum transmission power of UE, P SRS_OFFSETBe the parameter of representing the semi-static control of high-level signaling with 4 bits based on UE, M SRS(i) be the quantity of distributing to the ascending resource piece that is used for transmitting SRS (RB, resource block) of this UE, P O_PUSCH(j), the definition of α (j), f (i) is identical with the definition in the formula (1).Therefore, the control of the power of uplink SRS can be corresponding with up PUSCH power control, and only there is a fixing deviant in both.
In the uplink power control of UE, in order to make base station (BS, base-station) can provide suitable up closed-loop control instruction to each UE, UE need measure and report the power rising space (PH of oneself, power headroom), it is power headroom, the maximum transmission power of definable UE deducts the difference of UE after by power control emitted power value, then, BS carries out ascending resource scheduling (UL resource scheduling) according to the PH of UE report, the schedule information of ascending resource scheduling decision UE, schedule information comprises number and the position in sub-frame of uplink (sub-frame) thereof of up RB, up MCS mode (comprises modulation system, coded system), uplink transmission block (TB, tranmission block) size etc., then, BS is by Physical Downlink Control Channel (PDCCH, physical downlingk control channel) the transmission ascending resource is given (UL Grant, uplink resource grant) signal is given UE, UE detects the UL Grant information on the PDCCH channel and obtains uplink scheduling information, power control formula (1) according to PUSCH carries out the power adjustment of upstream data again, and sends upstream data with adjusted power.And, consider in LTE Release-8.0 system, same UE transmits the data (Data) of PUSCH or the control signaling (Controlsignaling) of transmission PUCCH in a subframe, do not take place and do not exist simultaneously in PUSCH transmission data with in the situation of PUCCH control channel, therefore, power headroom reporting (PHR, power headroom reporting) only is defined in the power control process of PUSCH.UE goes up pH value to BS report PUSCH, BS carries out scheduling of resource according to pH value, the number that distributes up RB Resource Block, position in subframe, uplink scheduling informations such as the coded system of up PUSCH data and modulation system, BS passes to UE to uplink scheduling information by the PDCCH channel with the ULgrant signaling, UE carries out sending data to BS after the PUSCH uplink power control according to formula (1), at this, because same UE can not send data and control signaling simultaneously respectively on PUSCH and PUCCH, therefore, upstream control signaling only need carry out the power control of up PUCCH according to formula (2), UE need more or not define the trigger event of the PHR of PUCCH to BS report pH value on PUCCH in LTE Release-8.0 system, corresponding triggering timer and corresponding PHR mechanism.Then, consider that the LTE-A system is the frequency lens system of many CC, for improving the performance of LTE-A system, the LTE-A system allows UE to send data and control signaling respectively in same subframe on PUSCH and PUCCH simultaneously, therefore, UE must carry out the uplink power control of PUSCH and PUCCH simultaneously respectively, might have two kinds of situations this moment occurs: one, if the transmitted power of UE is unrestricted, such as the central authorities of UE at wireless area, channel condition information (the CSI of up channel, channel stateinformation) more satisfactory, UE can freely carry out the uplink power control of PUSCH and PUCCH respectively, and the order (Rank) that UE can pass through Uplink MIMO (MIMO, multiple input multipleoutput) is more than or equal to 3 high-order mode transmit ascending data; They are two years old, if the transmitted power of UE is restricted, such as the edge of UE at wireless area, channel condition information (the CSI of up channel, channel state information) poor, UE can not freely carry out the uplink power control of PUSCH and PUCCH respectively, UE is used for PUSCH and PUCCH power all to be subjected to the restriction of the limited maximum transmission power of UE and to influence each other, therefore, the order (Rank) that UE can only adopt Uplink MIMO is smaller or equal to 2 low order mode transmit ascending data, at this, because UE can not carry out the uplink power control process of PUSCH and PUCCH respectively, UE can't carry out the report of pH value accurately, if only carry out the report of the PH of PUSCH, so the LTE-A system must define PH and the corresponding PHR trigger event of PUCCH, trigger timer and trigger mechanism.
Ascending power control method as previously described LTE-A system, because down link and up link have all been introduced the mechanism of a plurality of CC, therefore, LTE-A system decision is all adopted (CC-specific) mode based on CC in the uplink power control mode of up PUSCH, PUCCH and SRS.And, can find that by formula (1), (2), (3) uplink power control all needs the path loss (DL pathloss) of down link is measured, the downlink path loss then comprises the path loss of a plurality of CC in the LTE-A system, therefore, there is company to propose to measure the path loss of a DL CC among a plurality of DL CC in the 59th meeting of LTE RAN1, calculates the path loss that can be used in formula (1), (2), (3) by backoff algorithm.In addition, although the LTE-A system has the ability that inserts a plurality of DL CC, but when downlink traffic has in limited time, only one or several just can satisfy the demand of downlink transfer traffic carrying capacity among the whole descending CC of needs access, therefore, down link must adopt DL CC dispatching technique, promptly selects one or several in a plurality of DL CC and is used for downlink transfer.Up to the present, in supporting the LTE-A system that carrier wave is assembled, can be divided into two kinds: with carrier dispatching with stride carrier dispatching about the carrier dispatching mode of LTE-A system.The former be meant a PDCCH scheduling on the descending carrier with the PDSCH on the carrier wave or with the up-link carrier of this carrier wave pairing on PUSCH; The latter be meant on PDCCH scheduling on descending carrier descending carrier different with this PDCCH place carrier wave PDSCH or with the up-link carrier of this PDCCH place carrier wave non-matching on PUSCH.For striding carrier dispatching, when the PCFICH on the carrier wave of PDSCH place (physical format indicating channel) occurs detecting mistake, subscriber equipment can't obtain correct PDSCH starting position, thereby cause subscriber equipment to store wrong data in the HARQ buffer memory and feed back NACK.This PCFICH flase drop problem can't itself be solved by HARQ mechanism, can only solve by wireless chain control layer.With also there being this problem in the carrier dispatching, still owing to PDCCH and PCFICH are in same descending carrier at this moment, the parsing of PDCCH will offer the error detection that PCFICH detects many one decks, so the likelihood ratio that PCFICH flase drop problem takes place is less.PCFICH probability of false detection when striding carrier dispatching in the LTE-A system in order to make be consistent with carrier dispatching, need research to reduce the method for the PCFICH probability of false detection when striding carrier dispatching.
The present invention finds report (PHR, power headroom reporting) and carrier dispatching mode at the power rising space of cellular system by investigation and analysis to the prior art document, and existing method is as follows:
(1) the PHR mechanism of LTE Release-8.0
In LTE Release-8.0 system, the purpose of report PH is that the difference of the estimating power of nominal maximum transmission power of UE and PUSCH channel is offered BS.The PH of UE defines as shown in Equation (4),
PH(i)=P CMAX-
(4)
{10log 10(M PUSCH(i))+P O_PUSCH(j)+α(j)·PL+Δ TF(i)+f(i)}
Wherein, i represents the call number of subframe, P CMAX, M PUSCH(i), P O_PUSCH(j), α (j), PL, Δ TF(i) identical with the definition in the formula (1) with the definition of f (i), the value of the power rising space should drop in the interval of [40 ,-23] dB, and PH should transmit to high-rise (higher layer) from physical (L1).Rrc layer is by configuration (configure) two timers, i.e. PHR timer (periodicPHR-Timer) and forbid PHR timer (prohibitPHR-Timer) periodically, control PHR, and rrc layer also can trigger timer by change (DL-PathlossChange) value that the downlink path loss is set.PHR can be by following Event triggered:
1. prohibitPHR-Timer then or then, the change of path loss surpasses DL-PathlossChange value (dB), and when UE had new ascending resource to send, UE carried out PHR; Perhaps
2. periodicPHR-Timer then.
Upper strata (upper layer) disposes (configure) or reconfigures (reconfigure) controls PHR.Referring to document 3GPP TS 36.213 V8.8.0, in September, 2009; 3GPP TS36.321 V8.8.0, in December, 2009.
But, as mentioned above, the PHR mechanism of LTE Release-8.0 system does not consider that same UE transmits data and the situation of controlling signaling at PUSCH and PUCCH respectively simultaneously in same subframe, UE sends the control signaling of PUCCH simultaneously and needs the situation of the transmitted power of a plurality of CC of distribution at (CC) of a plurality of up-link carrier frequency ranges when also considering the transmit power limited as UE, though these situations do not occur in LTE Release-8.0 system, can in the LTE-A system, occur.
(2) the PHR mechanism of CATT
Datang Telecom (CATT) and some other company not only exist PUSCH to send data conditions separately at the system of LTE-A, and may exist the while to send the situation of data and signaling respectively at PUSCH channel and PUCCH channel, propose LTE-A and need define two kinds of PHR mechanism: one, when having only PUSCH to send data, define a kind of PHR mechanism, as shown in Equation (5); Its two, respectively when PUSCH channel and PUCCH channel send data and signaling, define another kind of PHR mechanism, as shown in Equation (6) simultaneously.
PH(i)=P CMAX-P PUSCH(i) (5)
PH(i)=P CMAX-P PUSCH(i)-P PUCCH(i) (6)
Wherein, i, P CMAXDefinition can be referring to formula (1)~(4), P PUSCH(i) definition can be referring to formula (1), P PUCCH(i) definition can be referring to formula (2).Referring to document: 3GPP LTE motion R1-100071, CATT, " Considerations on uplink power control inLTE-Advanced ", 3GPP TSG RAN WG1 meeting #59bis, Valencia, Spain, 18 Th-22 NdJanuary 2010.
But this scheme needs UE to send 1 bit signalling to inform that BS distinguishes UE and adopts any in above-mentioned two kinds of PHR mechanism; This scheme can't solve situation about sending control signaling simultaneously on the PUCCH of a plurality of up CC, promptly when the power limited system of UE, UE can't carry out the transmit power assignment of each CC at a plurality of up CC.Therefore, the PHR method of CATT can not satisfy the demand of LTE-A to PHR fully.
(3) the PHR mechanism of Ericsson
Ericsson (Ericsson) and some other company proposed in the characteristics of transmitting on the PUSCH/PUCCH at the many UL CC and the while of LTE-A system: under the situation of UE power limited system, if the LTE-A system allows UE to send data and control signaling simultaneously respectively on PUSCH and PUCCH, so, the LTE-A system should possess the ability of PUSCH channel and PUCCH Channel Sharing transmitted power separately of allowing, since PUCCH has independently power control mechanism, if BS do not know PUCCH consume/will consume how much power, so, BS also can't know the transmission of the PUSCH also remaining how much power of UE can be used for being scheduled, therefore, PH should definition respectively in the power control process of PUCCH and PUSCH.Referring to document: 3GPP LTE motion R1-100045, Ericsson, ST-Ericsson, " Uplink Power Control for Carrier Aggregation ", 3GPP TSG RAN WG1 meeting #59bis, Valencia, Spain, 18 Th-22 NdJanuary2010.
But, this method does not point out that there be Reporting a Problem of PH too in the LTE-A system when existing a plurality of up CC to be used for the PUCCH transmission, it is the power limited of UE, but UE must send the control signaling of PUCCH simultaneously on a plurality of up CC, so, how UE distributes the transmitted power on up a plurality of CC to remain the problem that a needs solves.
(4) scheduling mechanism of a plurality of descending carriers
Just as mentioned before, the PCFICH probability of false detection when striding carrier dispatching in the LTE-A system in order to make be consistent with carrier dispatching, need research to reduce the method for the PCFICH probability of false detection when striding carrier dispatching.(application number: the embodiment 2 200910177191.8) has proposed a kind of control format indicating means of striding the cyclic redundancy check (CRC) based on PDCCH (the Cyclic Redundancy Check) mask under the carrier dispatching as Fig. 1 in the Chinese invention patent application.Concrete grammar is: in the CRC that strides the pairing Downlink Control Information DCI of PDCCH (Downlink ControlInformation) form that carrier dispatching uses, add with the carrier wave that carries PDSCH on the relevant mask (mask) of control format.Subscriber equipment just can be in blind Detecting PDCCH, by checking different CRC masks, impliedly obtains to carry the control format information on the carrier wave of PDSCH.Similar idea (Views on Solution to PCFICH DetectionError, R1-094237, RAN1 #58bis, NTT DOCOMO, October, 2009) also on the books in open source literature.
Adopt the problem of this method to be: owing to introduced the CRC mask, for each subscriber equipment, the number of times of CRC check can increase, and may bring the increase of PDCCH false alarm probability thus.
In view of the PHR method of the present existing in the world PUCCH at the LTE-A system not comprehensively and concrete, therefore, be necessary to seek PHR method, base station and the subscriber equipment of a kind of comprehensive, efficient and simple and practical PUCCH.And, the present invention is directed in the control format indicating means based on the CRC mask of PDCCH of striding in the LTE-A system under the carrier dispatching and exist false alarm probability to increase this problem, flexibly simple solution has been proposed.Therefore, the method, base station and the subscriber equipment that propose of the present invention can be used for the LTE-A system and following the 4th generation cell mobile communication systems or other communication systems.
Summary of the invention
As mentioned above, determined that at 3GPP LTE-A support uplink and down link all adopt a plurality of carrier wave frequency range (CC of unit, component carrier) carrier wave aggregation technique, (for example attempts to introduce mechanism that UE transmits data and signaling respectively simultaneously at PUSCH and PUCCH, related motion in the above background technology part), the deficiency of the PHR technology of the PHR of PUSCH and PUCCH has been proposed, the object of the present invention is to provide PHR method, base station and the subscriber equipment of a kind of PUCCH.By designing new PHR method to obtain more science and rational up PH information at PUCCH, thereby make the scheduling mechanism of up PUCCH and PUSCH and power control mechanism efficient more and flexible, than traditional method, the method and system that the present invention proposes has comprehensively, efficient, simply, the characteristics that are easy to realize.
According to first scheme of the present invention, a kind of subscriber equipment has been proposed, comprising: the scheduling request signal transmitting element is used for sending scheduling request signal to the base station when the trigger event of the power headroom reporting of arbitrary Physical Uplink Control Channel takes place; Power rising space computing unit is used for receiving ascending resource when giving signal, the power rising space value of Computational Physics ascending control channel; The power headroom reporting unit is used for by Physical Uplink Shared Channel, reports the power rising space value of the Physical Uplink Control Channel that described power rising space computing unit calculates to the base station; And the power headroom reporting timer is provided with the unit, when being used for finishing power headroom reporting in described power headroom reporting unit, triggers or replacement power headroom reporting timer.
Preferably, the trigger event of the power headroom reporting of described Physical Uplink Control Channel comprises: the long-time downlink path loss value of not measuring to base station report, subscriber equipment of the power rising space changes goes the transmitting power of control channel physically greater than predetermined variance threshold, subscriber equipment and receives that near maximum transmission power, subscriber equipment the number of times of power control instruction of closed loop Physical Uplink Control Channel is greater than setting in advance number of times.
Preferably, described scheduling request signal transmitting element sends scheduling request signal to the base station, need not to wait for the generation of the upstream data that need send to the base station.
Preferably, described power rising space computing unit also is used for the power rising space value of Computational Physics Uplink Shared Channel, described subscriber equipment also comprises: power rising space processing unit, be used for the power rising space value of Physical Uplink Control Channel that described power rising space computing unit is calculated and the power rising space value of Physical Uplink Shared Channel and carry out combined coding, merge and/or difference processing, and described power headroom reporting unit is by Physical Uplink Shared Channel, to the power rising space value of the Physical Uplink Control Channel of base station report after described power rising space processing unit processes and the power rising space value of Physical Uplink Shared Channel.
Preferably, described subscriber equipment also comprises: power rising space processing unit, be used for producing need be to upstream data that the base station sends the time, power rising space value and upstream data to Physical Uplink Control Channel merge processing, and described power headroom reporting unit sends the power rising space value and the upstream data of the Physical Uplink Control Channel after merging by Physical Uplink Shared Channel to the base station.
Preferably, producing need be to upstream data that the base station sends the time, described power rising space processing unit also is used for the power rising space value of the Physical Uplink Control Channel after handling and the power rising space value and the upstream data of Physical Uplink Shared Channel are merged processing, and described power headroom reporting unit sends the power rising space value of the Physical Uplink Control Channel after merging, the power rising space value and the upstream data of Physical Uplink Shared Channel by Physical Uplink Shared Channel to the base station.
Preferably, the power rising space value of described Physical Uplink Control Channel is the difference of the nominal maximum transmission power and the Physical Uplink Control Channel estimating power of subscriber equipment.
According to alternative plan of the present invention, a kind of base station has been proposed, comprising: the ascending resource scheduling unit, be used for when receiving scheduling request signal, carry out ascending resource scheduling, determine that subscriber equipment carries out the required schedule information of uplink; Ascending resource is given signal transmitting unit, is used for by Physical Downlink Control Channel, sends ascending resource to subscriber equipment and gives signal; And power rising space detecting unit, be used to detect the power rising space value of the Physical Uplink Control Channel of subscriber equipment report.
Preferably, described base station also comprises: the carrier dispatching unit is used for when subscriber equipment transmission ascending resource is given signal, if produced the data service of down link simultaneously, then carrying out carrier dispatching by Physical Downlink Control Channel.
Preferably, described schedule information comprises at least one in the following information: the size of position in sub-frame of uplink of the number of ascending resource piece, ascending resource piece, up modulation system, up coded system, uplink transmission block.
Preferably, the power rising space value of described Physical Uplink Control Channel is the difference of the nominal maximum transmission power and the Physical Uplink Control Channel estimating power of subscriber equipment.
According to third party's case of the present invention, a kind of subscriber equipment has been proposed, comprise: the power headroom reporting unit, be used for when the trigger event of the power headroom reporting of arbitrary Physical Uplink Control Channel takes place, utilize the L1 signal resource on the Physical Uplink Control Channel, to the power rising space value of base station report Physical Uplink Control Channel; And the power headroom reporting timer is provided with the unit, when being used for finishing power headroom reporting in described power headroom reporting unit, triggers or replacement power headroom reporting timer.
Preferably, the trigger event of the power headroom reporting of described Physical Uplink Control Channel comprises: the long-time downlink path loss value of not measuring to base station report, subscriber equipment of the power rising space changes goes the transmitting power of control channel physically greater than predetermined variance threshold, subscriber equipment and receives that near maximum transmission power, subscriber equipment the number of times of power control instruction of closed loop Physical Uplink Control Channel is greater than setting in advance number of times.
Preferably, described L1 signaling comprises at least one in the following signaling: CQI signaling, PMI (pre-coding matrix index number, precoding matrix index) signaling, RI (order indication, rankindicator) signaling, SR (dispatch request, scheduling request) signaling and ACK/NACK (positive acknowledgement/Negative Acknowledgement, acknowledge/negative acknowledge) signaling.
Preferably, described L1 signaling is by the power rising space value of time division multiplexing (TDM, time divisionmultiplexing) the multiplexing Physical Uplink Control Channel of mode.
Preferably, the power rising space value of described Physical Uplink Control Channel is the difference of the nominal maximum transmission power and the Physical Uplink Control Channel estimating power of subscriber equipment.
According to cubic case of the present invention, a kind of base station has been proposed, comprising: probability of acceptance determining unit, be used for state according to subscriber equipment, the correct probability that predictive user equipment receives the physical format indicating channel is lower than/is higher than the first/the second predetermined probability threshold value; And method enables/stops using indicating member, is used for sending radio resource control signaling to subscriber equipment, enables/stop using control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel with notifying user equipment; And method enables/deactivated cell, is used for striding in the carrier dispatching descending after receiving the affirmation signaling that subscriber equipment sends, and enables/stop using the control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
According to the 5th scheme of the present invention, a kind of subscriber equipment has been proposed, comprising: confirmation unit is enabled/stopped using to method, is used for after receiving the radio resource control signaling that the base station sends, and sends to the base station and confirm signaling; And method is enabled/deactivated cell, be used for after sending described affirmation signaling, stride in the carrier dispatching descending, according to/no longer according to control format indicating means, carry out the detection of the control format of cyclic redundancy check (CRC) mask based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
According to the 6th scheme of the present invention, a kind of base station has been proposed, comprising: signal transmitting unit, be used for by Physical Downlink Control Channel, send ascending resource to subscriber equipment and give signal and/or descending distributing signal; Confirmation unit is enabled/stopped using to method, is used for after receiving the radio resource control signaling that subscriber equipment sends, and sends to subscriber equipment and confirm signaling; And method enables/deactivated cell, is used for striding in the carrier dispatching descending after sending described affirmation signaling, enables/stop using the control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
According to the 7th scheme of the present invention, a kind of subscriber equipment has been proposed, comprise: probability of acceptance determining unit, be used for state according to subscriber equipment self, the correct probability that predictive user equipment receives the physical format indicating channel is lower than/is higher than the 3rd/the 4th predetermined probability threshold value; Indicating member is enabled/stopped using to method, is used for sending radio resource control signaling to the base station, enables/stop using control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel with informing base station; Method is enabled/deactivated cell, be used for after receiving the affirmation signaling that the base station sends, stride in the carrier dispatching descending, according to/no longer according to control format indicating means, carry out the detection of the control format of cyclic redundancy check (CRC) mask based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
Preferably, described radio resource control signaling comprises and is used to indicate the parameter of enabling/stopping using based on the control format indicating means of the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
Preferably, comprise the parameter that is used to indicate the control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel to be activated/to stop using in the described affirmation signaling.
Preferably, when striding carrier dispatching, indicating member is enabled/stopped using to described method by selecting different cyclic redundancy check (CRC) masks, indicates current cyclic redundancy check (CRC) mask of striding the Physical Downlink Control Channel of carrier dispatching whether to comprise control format information.
Preferably, the state of subscriber equipment comprises at least one item in the following information: the re-transmission frequency that the re-transmission frequency of channel conditions, disturbance regime, the automatic repeat requests of mixing, Radio Link are controlled automatic repeat requests.
According to of the present invention the case from all directions, a kind of power headroom reporting method has been proposed, comprising: when the trigger event of the power headroom reporting of arbitrary Physical Uplink Control Channel took place, subscriber equipment sent scheduling request signal to the base station; When receiving scheduling request signal, ascending resource scheduling is carried out in the base station, determines that subscriber equipment carries out the required schedule information of uplink; The base station sends ascending resource to subscriber equipment and gives signal by Physical Downlink Control Channel; When receiving ascending resource when giving signal, the power rising space value of subscriber devices compute Physical Uplink Control Channel; And subscriber equipment is by Physical Uplink Shared Channel, the power rising space value of the Physical Uplink Control Channel that is calculated to the base station report, and triggering or replacement power headroom reporting timer.
Preferably, described power headroom reporting method also comprises: the power rising space value of the Physical Uplink Control Channel of subscriber equipment report is detected in the base station.
Preferably, the trigger event of the power headroom reporting of described Physical Uplink Control Channel comprises: the long-time downlink path loss value of not measuring to base station report, subscriber equipment of the power rising space changes goes the transmitting power of control channel physically greater than predetermined variance threshold, subscriber equipment and receives that near maximum transmission power, subscriber equipment the number of times of power control instruction of closed loop Physical Uplink Control Channel is greater than setting in advance number of times.
Preferably, subscriber equipment sends scheduling request signal to the base station, need not to wait for the generation of the upstream data that need send to the base station.
Preferably, described power headroom reporting method also comprises: the power rising space value of subscriber devices compute Physical Uplink Shared Channel; Subscriber equipment carries out combined coding, merging and/or difference processing to the power rising space value of Physical Uplink Control Channel and the power rising space value of Physical Uplink Shared Channel; And subscriber equipment is reported the power rising space value of the Physical Uplink Control Channel after handling and the power rising space value of Physical Uplink Shared Channel by Physical Uplink Shared Channel to the base station.
Preferably, described power headroom reporting method also comprises: when producing need be to upstream data that the base station sends the time, subscriber equipment merges processing to the power rising space value and the upstream data of Physical Uplink Control Channel; And subscriber equipment sends the power rising space value and the upstream data of the Physical Uplink Control Channel after merging by Physical Uplink Shared Channel to the base station.
Preferably, described power headroom reporting method also comprises: when producing need be to upstream data that the base station sends the time, subscriber equipment merges processing to the power rising space value of the Physical Uplink Control Channel after handling and the power rising space value and the upstream data of Physical Uplink Shared Channel; And subscriber equipment sends the power rising space value of the Physical Uplink Control Channel after merging, the power rising space value and the upstream data of Physical Uplink Shared Channel by Physical Uplink Shared Channel to the base station.
Preferably, by Physical Downlink Control Channel, when subscriber equipment transmission ascending resource was given signal, if the base station has produced the data service of down link simultaneously, then carrier dispatching was carried out in the base station in the base station.
Preferably, described schedule information comprises at least one in the following information: the size of position in sub-frame of uplink of the number of ascending resource piece, ascending resource piece, up modulation system, up coded system, uplink transmission block.
Preferably, the power rising space value of described Physical Uplink Control Channel is the difference of the nominal maximum transmission power and the Physical Uplink Control Channel estimating power of subscriber equipment.
According to the 9th scheme of the present invention, a kind of power headroom reporting method has been proposed, comprise: when the trigger event of the power headroom reporting of arbitrary Physical Uplink Control Channel takes place, subscriber equipment utilizes the L1 signal resource on the Physical Uplink Control Channel, power rising space value to base station report Physical Uplink Control Channel, and when finishing power headroom reporting, trigger or replacement power headroom reporting timer.
Preferably, the trigger event of the power headroom reporting of described Physical Uplink Control Channel comprises: the long-time downlink path loss value of not measuring to base station report, subscriber equipment of the power rising space changes goes the transmitting power of control channel physically greater than predetermined variance threshold, subscriber equipment and receives that near maximum transmission power, subscriber equipment the number of times of power control instruction of closed loop Physical Uplink Control Channel is greater than setting in advance number of times.
Preferably, described L1 signaling comprises at least one in the following signaling: CQI signaling, PMI signaling, RI signaling, SR signaling and ACK/NACK signaling.
Preferably, described L1 signaling is by the power rising space value of the multiplexing Physical Uplink Control Channel of TDM mode.
Preferably, the power rising space value of described Physical Uplink Control Channel is the difference of the nominal maximum transmission power and the Physical Uplink Control Channel estimating power of subscriber equipment.
According to the tenth scheme of the present invention, a kind of method that the control format indicating means of cyclic redundancy check (CRC) mask is controlled has been proposed, comprise: the base station is according to the state of subscriber equipment, and the correct probability that predictive user equipment receives the physical format indicating channel is lower than/is higher than the first/the second predetermined probability threshold value; The base station sends radio resource control signaling to subscriber equipment, enables/stop using control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel with notifying user equipment; Subscriber equipment sends to the base station and to confirm signaling after receiving the radio resource control signaling that the base station sends; Stride in the carrier dispatching descending after receiving the affirmation signaling that subscriber equipment sends the base station, enable/stop using based on Physical Downlink Control Channel the control format indicating means of cyclic redundancy check (CRC) mask; Subscriber equipment is striden in the carrier dispatching descending after sending described affirmation signaling, according to/no longer according to control format indicating means, carry out the detection of the control format of cyclic redundancy check (CRC) mask based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
According to the 11 scheme of the present invention, a kind of method that the control format indicating means of cyclic redundancy check (CRC) mask is controlled has been proposed, comprise: the base station sends ascending resource to subscriber equipment and gives signal and/or descending distributing signal by Physical Downlink Control Channel; Subscriber equipment predicts that according to the state of himself its correct probability that receives the physical format indicating channel is lower than/is higher than the 3rd/the 4th predetermined probability threshold value; Subscriber equipment sends radio resource control signaling to the base station, enables/stop using control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel with informing base station; The base station sends to subscriber equipment and to confirm signaling, and stride in the carrier dispatching descending after receiving the radio resource control signaling that subscriber equipment sends, and enables/stop using the control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel; Subscriber equipment is after receiving the affirmation signaling that the base station sends, stride in the carrier dispatching descending, according to/no longer according to control format indicating means, carry out the detection of the control format of cyclic redundancy check (CRC) mask based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
Preferably, described radio resource control signaling comprises and is used to indicate the parameter of enabling/stopping using based on the control format indicating means of the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
Preferably, comprise the parameter that is used to indicate the control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel to be activated/to stop using in the described affirmation signaling.
Preferably, when striding carrier dispatching, the base station indicates current cyclic redundancy check (CRC) mask of striding the Physical Downlink Control Channel of carrier dispatching whether to comprise control format information by selecting different cyclic redundancy check (CRC) masks.
Preferably, the state of subscriber equipment comprises at least one item in the following information: the re-transmission frequency that the re-transmission frequency of channel conditions, disturbance regime, the automatic repeat requests of mixing, Radio Link are controlled automatic repeat requests.
Preferably, described radio resource control signaling is handled by the Radio Resource controlled entity.
Thus, a kind of power headroom reporting method, base station and subscriber equipment that the present invention proposes, comprise UE and trigger that PH reporting process, UE report pH value, BS detect pH value, BS carries out contents such as ascending resource scheduling, have simple, efficient is high, applied widely, be easy to advantage such as realization.
Description of drawings
From the detailed description below in conjunction with accompanying drawing, above-mentioned feature and advantage of the present invention will be more obvious, wherein:
Fig. 1 shows the schematic diagram of the multicarrier lens system of LTE-A;
Fig. 2 shows the schematic diagram of the uplink power control of multicarrier lens system;
Fig. 3 shows the PUCCH of multicarrier lens system and the schematic diagram that PUSCH transmits simultaneously;
Fig. 4 show LTE Release-8.0 PHR mechanism schematic diagram;
Fig. 5 shows the schematic diagram of the PHR mechanism based on SR of the present invention;
Fig. 6 shows the schematic diagram of the PHR mechanism based on the L1/L2 signaling of the present invention;
Fig. 7 shows the schematic diagram of trigger mechanism of PHR of the PUSCH of LTE Release-8.0;
Fig. 8 shows the schematic diagram of trigger mechanism of the PHR of PUCCH of the present invention;
Fig. 9 shows the schematic diagram according to the PHR method of the PUCCH of first embodiment of the invention;
Figure 10 shows the flow chart according to the PHR method of the PUCCH of first embodiment of the invention;
Figure 11 shows the schematic diagram based on the control format indicating means of the CRC mask of PDCCH of striding under the carrier dispatching;
Figure 12 shows the control that realizes by radio resource control signaling and enables the signalling diagram based on the control format indicating means of the CRC mask of PDCCH of striding under the carrier dispatching;
Figure 13 shows the control that realizes by radio resource control signaling and stops using and stride the signalling diagram based on the control format indicating means of the CRC mask of PDCCH under the carrier dispatching;
Figure 14 shows the control that realizes by extra CRC mask and strides the subscriber equipment flow chart based on the control format indicating means of the CRC mask of PDCCH under the carrier dispatching;
Figure 15 shows the schematic diagram according to the PHR method of the PUCCH of second embodiment of the invention;
Figure 16 shows the flow chart according to the PHR method of the PUCCH of second embodiment of the invention;
Figure 17 shows according to the call number of a plurality of UL CC of second embodiment of the invention and the pH value schematic diagram at the mapping method of MAC layer;
Figure 18 shows the schematic diagram according to the PHR method of the PUCCH of third embodiment of the invention;
Figure 19 shows the schematic diagram at one of PUSCH mapping method according to the PHR of third embodiment of the invention;
Figure 20 shows two the schematic diagram at the PUSCH mapping method according to the PHR of third embodiment of the invention;
Figure 21 shows three the schematic diagram at the PUSCH mapping method according to the PHR of third embodiment of the invention;
Figure 22 shows four the schematic diagram at the PUSCH mapping method according to the PHR of third embodiment of the invention;
Figure 23 shows the schematic diagram according to the PHR method of the PUCCH of fourth embodiment of the invention;
Figure 24 shows the schematic diagram according to the PHR method of the PUCCH of fifth embodiment of the invention;
Figure 25 shows the schematic diagram according to the PHR method of the PUCCH of sixth embodiment of the invention;
Figure 26 shows the schematic diagram according to the PHR method of the PUCCH of seventh embodiment of the invention;
Figure 27 shows the schematic diagram according to the PHR method of the PUCCH of eighth embodiment of the invention;
Figure 28 shows the hardware capability block diagram according to a kind of subscriber equipment 2800 of the present invention;
Figure 29 shows the hardware capability block diagram according to a kind of base station 2900 of the present invention;
Figure 30 shows the hardware capability block diagram according to another kind of subscriber equipment 3000 of the present invention;
Figure 31 shows the hardware capability block diagram according to another kind of base station 3100 of the present invention;
Figure 32 shows the hardware capability block diagram according to another kind of subscriber equipment 3200 of the present invention;
Figure 33 shows the hardware capability block diagram according to another kind of base station 3300 of the present invention;
Figure 34 shows the hardware capability block diagram according to another kind of subscriber equipment 3400 of the present invention;
Figure 35 shows according to the hardware of base station of the present invention and specifically implements schematic diagram; And
Figure 36 shows according to the hardware of subscriber equipment of the present invention and specifically implements schematic diagram.
Embodiment
To a preferred embodiment of the present invention will be described in detail, having omitted in the description process is unnecessary details and function for the present invention with reference to the accompanying drawings, obscures to prevent that the understanding of the present invention from causing.At length set forth performing step of the present invention for clear, provide some specific embodiments of the invention below, be applicable to LTE, LTE-A, 4G cellular communication system.Need to prove, the invention is not restricted to the application described in the embodiment, but applicable to other wireless communication systems.
Fig. 1 shows the schematic diagram according to the multicarrier lens system of LTE-A of the present invention.In the LTE-A system, the down link of base station BS-100 comprises 5 continuous or discrete unit carrier wave frequency ranges (CC, component carrier), promptly descending CC1, CC2, CC3, CC4, CC5, as shown in Figure 1.In whole wireless area, a plurality of user equipment (UE)s-100, UE-101, UE-102 can transmit on one or more up CC respectively, the set of up link CC comprises 5 continuous or discrete CC, promptly up CC1, CC2, CC3, CC4, CC5, as shown in Figure 1.BS-100 can adopt one or more downlink or uplink CC respectively according to the size of the data traffic of down link or up link at a plurality of subscriber equipmenies: as Fig. 1, in the communicating by letter of BS-100 and UE-100, down link adopts 5 CC (DL CC1, CC2, CC3, CC4, CC5), and up link adopts 3 CC (UL CC1, CC2, CC3); And for example in the communicating by letter of BS-100 and UE-101, down link adopts 3 CC (DL CC2, CC4, CC5), and up link adopts 3 CC (UL CC4, CC5); In the communicating by letter of BS-100 and UE-102, down link adopts 2 CC (DL CC1, CC2) for another example, and up link adopts 1 CC (UL CC1).Down link between BS-100 and a plurality of subscriber equipment or the transmission of the signaling of up link then are the problems of more complicated, the principle of signaling transmission is to have the try one's best few link overhead and the low implementation complexity of trying one's best under the prerequisite of the system of assurance operate as normal, therefore, up signaling or downlink signaling can transmit on one or more up CC or descending CC respectively, but must have simply and realization mechanism efficiently.
Fig. 2 shows the schematic diagram of the uplink power control of multicarrier lens system.In the LTERelease-8.0 system, uplink power control comprises the power control of PUSCH, the power control of PUCCH, the power control of SRS, as shown in Figure 2, represent that respectively UE is in the power division and the adjustment that send upstream data, upstream control signaling, SRS, shown in formula as mentioned in the above (1), (2), (3).
Fig. 3 shows the PUCCH of multicarrier lens system and the schematic diagram that PUSCH transmits simultaneously.In LTE Release-8.0 system, for fear of peak-to-average force ratio (PAPR, peak-to-averagepower ratio) improves and systematic function is descended, same UE can not send data and control signaling simultaneously, promptly same UE or only send data in any subframe perhaps only sends upstream control signaling.It is to be noted, same UE in a subframe only the two ends in transmission bandwidth send PUCCH, and only some is available not mean that frequency resource in this subframe, in fact, these frequency resources still can send the data of other UE, that is to say, in any subframe, can use all frequency resources to send data and control signaling simultaneously, only these data must come from different UE with the control signaling.PUCCH that LTE Release-8.0 finally determines and the distribution of PUSCH in subframe be as shown in Figure 3: in previous subframe, the height two ends of UE-300 and the UE-301 frequency in the subframe of 1ms take the time slot (slot) of a 0.5ms respectively, and UE-300 and UE-301 all do not transmit the data of PUSCH when the control signaling of same subframe transmission PUCCH; In a back subframe, UE-300 only transmits the data of PUSCH and does not transmit the control signaling of PUCCH, and UE-301 only transmits the control signaling of PUCCH and do not transmit the data of PUSCH.The LTE-A system has then relaxed the constraint to UE, same UE can transmit data and control signaling simultaneously respectively on PUSCH and PUCCH in same subframe, as the UE-302 among Fig. 3, at this moment, in same subframe, other subscriber equipmenies still can transmit the control signaling of PUCCH, as UE-303.Here, it should be noted that: under the unrestricted situation of UE transmitted power, UE can freely distribute total transmitted power on PUSCH and PUCCH, and the ability of use PUSCH and PUCCH was not subjected to the restriction of power when UE had; But when UE is in the wireless area edge, and the transmitted power of UE is not enough to support UE when carrying out the Uplink MIMO transmission of high order (Rank>2) smoothly, the UE transmitted power is restricted, though UE has the ability of using PUSCH and PUCCH simultaneously, but UE can not freely distribute total transmitted power on PUSCH and PUCCH, therefore, UE must report the transmitted power that consumes respectively on PUSCH and/or PUCCH to BS, so that BS carries out scheduling of resource flexibly, adjust the modulation system of uplink, coded system, the transmitted power of PUSCH, the transmitted power of PUCCH, thus carrying out smoothly of PUSCH uplink power control process and PUCCH uplink power control process guaranteed.Here, UE is power headroom reporting (PHR, power headroomreporting) problem to the transmitted power of BS report consumption at PUSCH and/or PUCCH.
Fig. 4 show LTE Release-8.0 PHR mechanism schematic diagram.The Objective of Report of PH is that the difference of the maximum transmission power of UE nominal and Physical Uplink Control Channel (PUCCH, physicaluplink control channel) estimating power is offered BS, and the PH definition of UE as shown in Equation (4).The process of PH report may further comprise the steps as shown in Figure 4 in the LTE Release-8.0 system: when the trigger event of the PHR of PUSCH takes place, trigger the PHR process (step 1) of UE-400; When if UE-400 does not have upstream data to send, UE-400 does not send dispatch request (SR, scheduling request) signal and gives BS-400, if when UE-400 has data to send, send dispatch request (SR, scheduling request) signal and give BS-400 (step 2); After BS-400 receives the SR signal that UE-400 sends, carry out ascending resource scheduling (step 3), the needed schedule information of uplink of ascending resource scheduling decision UE, schedule information comprises size of position in sub-frame of uplink of the number of up RB and these RB, up MCS mode (comprising modulation system, coded system), uplink transmission block (TB, tranmission block) or the like; BS-400 by PDCCH send UL Grant signal to UE-400 (step 4), UL Grant comprises the needed schedule information of the uplink of UE-400; UE-400 calculates pH value (step 5), the i.e. difference of nominal maximum transmission power of UE and Physical Uplink Shared Channel estimating power of PUSCH; UE-400 sends data and pH value to BS-400 by PUSCH, and triggering or replacement PHR timer (step 6).
Fig. 5 shows the schematic diagram of the PHR mechanism based on SR of the present invention.Purpose of the present invention is different from the PHR mechanism of the PUSCH of LTE Release-8.0, the present invention is intended to seek the PHR mechanism of a kind of PUCCH, as shown in Figure 5, PHR process based on SR of the present invention may further comprise the steps: when the PHR of PUCCH trigger event takes place, trigger the PH reporting process (step 1) of UE-500; UE-500 sends SR to BS-500 (step 2), here SR is that UE-500 initiatively is sent to BS-500, upstream data need not transmit on PUSCH, and therefore, the SR signal forwarding step (step 2) among this step and the LTERelease-8.0 (Fig. 4) is essentially different; After BS-500 receives the SR signal that UE-500 sends, carry out ascending resource scheduling (step 3), the needed schedule information of uplink of ascending resource scheduling decision UE, schedule information comprises number and position, up MCS mode (comprise modulation system, coded system), the uplink transmission block (TB of these RB in sub-frame of uplink of up RB, tranmission block) size or the like, the resource of all uplink schedulings here all are used to transmit the upstream data of PHR information rather than LTE Release8.0; BS-500 by PDCCH send UL Grant signal to UE-500 (step 4), UL Grant comprises the needed schedule information of uplink PHR information of UE-500; UE-500 calculates pH value (step 5), the i.e. difference of nominal maximum transmission power of UE and Physical Uplink Control Channel estimating power of PUSCH; UE-500 sends data and pH value to BS-500 by PUSCH, and triggering or replacement PHR timer (step 6).
Fig. 6 shows the schematic diagram of the PHR mechanism based on the L1 signaling of the present invention.As shown in Figure 6, the PHR process based on the L1 signaling may further comprise the steps: when the trigger event of PUCCH takes place, trigger the PHR process (step 1) of UE-600; UE calculates the pH value (step 2) of PUCCH; UE-600 sends pH value to BS-600 by the L1 signaling of PUCCH, and triggering or replacement PHR timer (step 3).
Fig. 7 shows the schematic diagram of trigger mechanism of PHR of the PUSCH of LTE Release-8.0.
The trigger mechanism of the PHR of PUSCH is realized by three kinds of trigger mechanisms, as shown in Figure 7, comprise and forbid PHR timer (prohibitPHR-Timer), periodically PHR timer (periodicPHR-Timer), upper-layer configured (configure) or reconfigure (reconfigure).The upper strata is by configuration (configure) two timers, i.e. PHR timer (periodicPHR-Timer) and forbid PHR timer (prohibitPHR-Timer) periodically, control PHR, and RRC also can trigger timer by change (DL-PathlossChange) value that the downlink path loss is set.PHR can be by following Event triggered: prohibitPHR-Timer then or then, and the change of path loss surpasses DL-PathlossChange dB value, and when UE had ascending resource to carry out new transmission, UE carried out PHR; PeriodicPHR-Timer then.In addition, also can dispose or reconfigure and control PHR by upper strata (upper layer).
Fig. 8 shows the schematic diagram of trigger mechanism of the PHR of PUCCH of the present invention.Consider the PHR mechanism of the PUCCH that is based on initiative SR that the present invention proposes and based on the PHR mechanism of the PUCCH of L1, therefore, trigger mechanism for the PHR of the PUSCH that is different from LTE Release-8.0, the present invention can define the process that a kind of new timer (being PUCCH-PHR-Timer) is controlled PHR, as Fig. 8 (a) with (b).In Fig. 8 (a), (for example: 1. not to the BS report, promptly timer PUCCH-PHR-Timer then for a long time for the PHR of PUCCH when the PHR of PUCCH trigger event takes place; Perhaps 2. the DL path loss values of PUCCH changes greater than predetermined variance threshold; Perhaps 3. the downlink path loss value of subscriber equipment measurement changes greater than predetermined variance threshold; Perhaps 4. subscriber equipment is gone the transmitting power of control channel physically near maximum transmission power; Perhaps 5. subscriber equipment receives that the number of times of power control instruction of closed loop Physical Uplink Control Channel is greater than setting in advance number of times) time, the PUCCH-PH reporting process is triggered, UE initiatively sends the SR signal and gives BS, BS carries out ascending resource scheduling and passes through UL Grant the information notification UE after dispatching after receiving the SR signal, UE calculates the pH value of PUCCH and sends PH information by PUSCH to BS, triggers afterwards or replacement PHR timer PUCCH-PHR-Timer; In Fig. 8 (b), (for example: 1. not to the BS report, promptly timer PUCCH-PHR-Timer then for a long time for the PHR of PUCCH when the PHR of PUCCH trigger event takes place; Perhaps 2. the DL path loss values of PUCCH changes greater than predetermined variance threshold; Perhaps 3. the downlink path loss value of subscriber equipment measurement changes greater than predetermined variance threshold; Perhaps 4. subscriber equipment is gone the transmitting power of control channel physically near maximum transmission power; Perhaps 5. subscriber equipment receives that the number of times of power control instruction of closed loop Physical Uplink Control Channel is greater than setting in advance number of times) time, the PUCCH-PH reporting process is triggered, UE by the L1 signaling (for example calculates behind the pH value of PUCCH, the CQI signaling) sends PH information to BS, trigger afterwards or replacement PHR timer PUCCH-PHR-Timer, make PHR timer PUCCH-PHR-Timer effective.It is to be noted in the present invention: though the present invention has defined the generation that the PHR timer PUCCH-PHR-Timer of a kind of PUCCH represents the PHR trigger event, but the present invention do not get rid of with existing two timers of PHR (for example, prohibitPHR-Timer and periodicPHR-Timer) and/or the upper-layer configured (configure) of PUSCH in the LTE Release-8.0 system and/or reconfigure that (reconfigure) realize that the present invention proposes as indicated above based on SR with based on PHR method, base station and the subscriber equipment of the PUCCH of L1.
[first embodiment]
According to the first embodiment of the present invention, the method for the power headroom reporting (PHR) of a kind of PUCCH has been proposed, as shown in Figure 9, show schematic diagram according to the PHR method of the PUCCH of first embodiment of the invention.Whole wireless area comprises base station BS-700 and UE-700, carrier wave frequency range (the CC of unit of down link, component carrier) set comprises DL CC1, DL CC2, DL CC3, DL CC4, DL CC5 totally 5 unit carrier wave frequency ranges, and up link is got 1 UL CC, as UL CC1.The number of wherein concrete descending DL CC can be selected by the method for carrier dispatching mentioned above, and present embodiment will further describe out concrete implementation method.Flow chart according to the PHR method of the PUCCH of first embodiment of the invention as shown in figure 10, may further comprise the steps:
Step 1:UE-700 judges whether the PHR trigger event of PUCCH (for example takes place, whether the PHR timer lost efficacy, be timer whether then, perhaps whether the DL path loss values of PUCCH changes greater than predetermined variance threshold, or other trigger events mentioned above)? if the PHR trigger event takes place, then enter S101, if the PHR trigger event does not take place, then enter S104, shown in S100;
(for example, not to the BS-700 report, promptly the PHR timer then for a long time for the pH value of the PUCCH of UE-700) takes place in step 2:PHR trigger event, and then UE-700 triggers the PH reporting process, shown in S101;
The present invention is with the long-time a kind of trigger event that also is not defined as the PHR of PUCCH to the BS report of the pH value of PUCCH in the LTE-A system, and the triggering of the PH reporting process of PUCCH and the concrete setting of PUCCH-PHR-Timer can be with reference to figure 8 (a).
Step 3:UE-700 initiatively sends dispatch request (SR) signal to BS-700 after the PH of PUCCH reporting process is triggered, the SR signal sends to BS-700 by the PUCCH channel, shown in S102;
After step 4:BS-700 receives the SR signal, carry out ascending resource scheduling, the needed schedule information of uplink of ascending resource scheduling decision UE, schedule information comprises number and position, up MCS mode (comprise modulation system, coded system), the uplink transmission block (TB of these RB in sub-frame of uplink of up RB, tranmission block) size or the like is shown in S103;
Does step 5:BS-700 judge that PDSCH has the downstream data traffic request? if BS-700 has downlink data to need to send, enter S105; If BS-700 does not have downlink data to need to send, enter S106, shown in S104;
Step 6: if BS-700 has downlink data to need to send, BS-700 carries out carrier dispatching, shown in S105.
Just as mentioned before, because the LTE-A system is the multicarrier lens system and has 5 continuous or discrete descending CC, and BS carries out downlink data transmission by PDSCH and may not need simultaneously with full 5 descending CC, therefore, BS is necessary to carry out the scheduling of descending CC, and the purpose of descending CC scheduling is to satisfy the transmission of downlink data under the prerequisite that guarantees transmission quality with few CC that tries one's best.Figure 11 shows the schematic diagram based on the control format indicating means of the CRC mask of PDCCH of striding under carrier wave (CC) scheduling.
The embodiment 1 of carrier dispatching:
In the LTE-A radio resource control signaling, as shown in figure 12, add one group and enable the signaling based on the control format indicating means of the CRC mask of PDCCH of striding under the carrier dispatching in order to control.This high-level signaling is made up of CRCMaskingActivationRequest (being called for short Request-A) and two signalings of CRCMaskingActivationComplete (being called for short Complete-A), transmits as the RRC signaling among the LTE-A.The Request-A signaling can be triggered the transmission of this signaling by base station or subscriber equipment, promptly when base station dispatcher or subscriber equipment according to channel conditions, disturbance regime, the HARQ of subscriber equipment retransmit frequency, RLC ARQ retransmits factors such as frequency, predictive user equipment receives the correct probability of PCFICH.When this correct probability is lower than some predetermined thresholdings, trigger the transmission of above-mentioned Request-A signaling.The parameter of this signaling can be included in any original LTERRC signaling (as RRCConnectionReconfiguration etc.) or the newly-increased LTE-A RRC signaling (for example, can be as shown in table 1) to be transmitted.The Complete-A signaling is the affirmation signaling after subscriber equipment or base station receive the Request-A signaling, the parameter of this signaling can be included in any original LTE RRC signaling (as RRCConnectionReconfigurationComplete etc.) or the newly-increased LTE-A RRC signaling (for example, can be as shown in table 2) to be transmitted.Table 1 and table 2 have provided an example of parameter in Request-A and the Complete-A signaling respectively.
Table 1CRCMaskingActivationRequest signaling parameter
Information Type Semantic
CRC?masking?activation request Boolean Show whether the control format indicating means based on the CRC mask of PDCCH needs to be activated
Table 2CRCMaskingActivationComplete signaling parameter
Information Type Semantic
CRC?masking?activation complete Boolean Show whether CRC is activated based on the control format indicating means of the CRC mask of PDCCH
Subscriber equipment will transmit the Complete-A signaling by RRC and give the base station after receiving the Request-A signaling.After subscriber equipment receives the Complete-A signaling from the base station, detect control format striding among the carrier dispatching PDCCH of all base stations according to control format indicating means based on the CRC mask of PDCCH.
Subscriber equipment detects control format striding among the carrier dispatching PDCCH according to the control format indicating means based on the CRC mask of PDCCH of all base stations after receiving the Complete-A signaling.
The base station will be transmitted the Complete-A signaling by RRC and give subscriber equipment after being received the Request-A signaling.The control format indicating means of enabling in the carrier dispatching based on the CRC mask of PDCCH is striden at all after receiving the Complete-A signaling from subscriber equipment in the base station.
The control format indicating means of enabling in the carrier dispatching based on the CRC mask of PDCCH is striden at all in the base station after receiving the Complete-A signaling.
As shown in figure 13, in the LTE-A radio resource control signaling, add one group and stride signaling under the carrier dispatching based on the control format indicating means of the CRC mask of PDCCH in order to control to stop using.This high-level signaling is made up of CRCMaskingDeactivationRequest (being called for short Request-D) and two signalings of CRCMaskingDeactivationComplete (being called for short Complete-D), transmits as the RRC signaling among the LTE-A.The Request-D signaling can be triggered the transmission of this signaling by base station or subscriber equipment, promptly when base station dispatcher or subscriber equipment according to channel conditions, disturbance regime, the HARQ of subscriber equipment retransmit frequency, RLC ARQ retransmits factors such as frequency, predictive user equipment receives the correct probability of PCFICH.When this correct probability is higher than some predetermined thresholdings, trigger the transmission of above-mentioned Request-D signaling.The parameter of this signaling can be included in any original LTE RRC signaling (as RRCConnectionReconfiguration etc.) or the newly-increased LTE-ARRC signaling (for example, can be as shown in table 3) to be transmitted.The Complete-D signaling is the affirmation signaling after subscriber equipment or base station receive the Request-D signaling, the parameter of this signaling can be included in any original LTE RRC signaling (as RRCConnectionReconfigurationComplete etc.) or the newly-increased LTE-A RRC signaling (for example, can be as shown in table 4) to be transmitted.Table 3 and table 4 have provided an example of parameter in Request-D and the Complete-D signaling respectively.
Table 3CRCMaskingDeactivationRequest signaling parameter
Information Type Semantic
CRC?masking?deactivation request Boolean Show whether the control format indicating means based on the CRC mask of PDCCH needs to be deactivated
Table 4CRCMaskingDeactivationComplete signaling parameter
Information Type Semantic
CRC?masking?deactivation complete Boolean Show whether the control format indicating means based on the CRC mask of PDCCH is deactivated
Subscriber equipment will transmit the Complete-D signaling by RRC and give the base station after receiving the Request-D signaling.After subscriber equipment receives the Complete-D signaling from the base station, stop among the carrier dispatching PDCCH detecting control format striding of all base stations, but directly detect PCFICH on the carrier wave of carrying PDSCH with acquisition control format information according to control format indicating means based on the CRC mask of PDCCH.
Subscriber equipment is after receiving the Complete-D signaling, stop among the carrier dispatching PDCCH detecting control format striding of all base stations, but directly detect PCFICH on the carrier wave of carrying PDSCH with acquisition control format information according to control format indicating means based on the CRC mask of PDCCH.
The base station will be transmitted the Complete-D signaling by RRC and give subscriber equipment after being received the Request-D signaling.The control format indicating means of stopping using in the carrier dispatching based on the CRC mask of PDCCH is striden at all after receiving the Complete-D signaling from subscriber equipment in the base station.
The control format indicating means of stopping using in the carrier dispatching based on the CRC mask of PDCCH is striden at all in the base station after receiving the Complete-D signaling.
Can define a Radio Resource controlled entity in base station in the LTE-A system and the subscriber equipment, be specifically designed to the triggering of handling the above radio resource control signaling, send and the process that receives.
The embodiment 2 of carrier dispatching:
As Figure 11 is the control format indicating means based on the CRC mask of PDCCH of striding under the carrier dispatching, present embodiment increases a mask in the CRC mask that this method relates to, be used to control the control format indicating means based on the CRC mask of PDCCH of striding under the carrier dispatching.
For example, can be as shown in table 5, numbering 2,3,4 pairing CRC masks can be used to refer to control format respectively and be respectively for 2,3,4 (downlink bandwidth is less than or equal to 10 Resource Block); Perhaps can be used to refer to control format respectively and be respectively 1,2,3 (all the other situations).
Number 1 pairing CRC mask and be newly-increased control mask, be used for indicating the CRC that strides carrier wave indication PDCCH this moment not comprise the control format indication information, the control format indication information that promptly carries this moment on the carrier wave of PDSCH still needs to obtain by the PCFICH that reads on this carrier wave.
Table 5 is based on control format indication CRC mask
Numbering The control format indication CRC mask<x AS,0,x AS,1,...,x AS,15
1 PCFICH <0,0,0,0,0,0,0,0,0,0,0,0,0, 0,0,0>
2 1(2) <0,0,0,0,0,0,0,0,0,0,0,0,0, 0,0,1>
3 2(3) <0,0,0,0,0,0,0,0,0,0,0,0,0, 0,1,0>
4 3(4) <0,0,0,0,0,0,0,0,0,0,0,0,0, 0,1,1>
Based on this for stride under the carrier dispatching based on the improving one's methods of the control format indicating means of the CRC mask of PDCCH, the particular flow sheet of subscriber equipment as shown in figure 14:
1401: subscriber equipment detects the physical format indicating channel PCFICH on the carrier wave that carries PDCCH in the current subframe, obtains the control format on this carrier wave in this subframe;
1402: in the control information zone on this carrier wave of this subframe that is obtained, by Radio Network Temporary Identifier symbol RNTI and CRC mask 1, blind Detecting PDCCH;
If detect, turn to step 404, if do not detect, turn to step 403;
1403: in the control information zone on this carrier wave of this subframe that is obtained, by Radio Network Temporary Identifier symbol RNTI and CRC mask 2-4, blind Detecting PDCCH;
If detect, turn to step 405;
1404: the indicated carrier wave of carrier wave indication territory CIF (Carrier IndicatorField) that detects descending distribution PDCCH;
If this carrier wave, promptly carry the carrier wave of PDCCH, turn to step 407, otherwise turn to 406;
1405: determine the control format of the carrier wave of the carrying PDSCH that CIF is indicated to turn to step 407 according to the CRC mask;
1406: detect the PCFICH of the carrier wave of the indicated carrying PDSCH of CIF, obtain control format;
1407: subscriber equipment obtains the resource block assignments information of PDSCH from this PDCCH;
1408: subscriber equipment is according to the control format information on the carrier frequency of the resource block assignments information of the PDSCH that is obtained and the carrying PDSCH that obtained, and next OFDM sign-on in the control information zone from this carrier frequency of current subframe takes out PDSCH.
Step 7:BS-700 by PDCCH send UL Grant signal and/or descending distributing signal to UE to UE, UL Grant comprises the needed schedule information of the uplink of UE, descending distributing signal comprises that the control format of CRC mask indicates to UE shown in S106;
Here, if BS-700 does not carry out carrier dispatching, then BS-700 does not need to send by PDCCH to UE-700 the descending distributing signal of the control format indication information that comprises the CRC mask in this step; If BS-700 carries out carrier dispatching, then BS-700 need send the descending distributing signal of the control format indication information comprise the CRC mask to UE-700 by PDCCH, the data that BS-700 also need send to UE-700 by PDSCH on behind the selected carrier dispatching or descending CC.
Step 8:UE-700 receive on the PDCCH UL Grant signal and down/or descending distributing signal, UE-700 receives the data-signal on the PDSCH, then, UE-700 calculates the pH value of PUCCH shown in S107;
Wherein the pH value of PUCCH is the difference that nominal maximum transmission power of UE and PUCCH go up estimating power.Here, the present invention does not specify the pH value that whether calculates PUSCH, but the present invention does not limit the pH value that whether needs to report PUSCH on the PUSCH, if report, the pH value of PUSCH can adopt with LTE Release-8.0 and similarly define, and promptly nominal maximum transmission power of UE and PUSCH go up the difference of estimating power.Because up link and down link all can adopt many CC technology, therefore, the estimating power of the PUSCH that calculates respectively according to formula (1) and (2) and the estimating power of PUCCH all are based on each carrier wave (CC specific) in the LTE-A system.
Step 9:UE-700 triggers or replacement PHR timer PUCCH-PHR-Timer afterwards by the pH value of PUSCH report PUCCH, makes PHR timer PUCCH-PHR-Timer effective, shown in S108;
Here, the present invention it is to be noted: though the present invention has defined the generation that the PHR timer PUCCH-PHR-Timer of a kind of PUCCH represents the PHR trigger event, but the present invention do not get rid of with existing two timers of PHR (for example, prohibitPHR-Timer and periodicPHR-Timer) and/or the upper-layer configured (configure) of PUSCH in the LTE Release-8.0 system and/or reconfigure that (reconfigure) realize that the present invention proposes as indicated above based on SR with based on PHR method, base station and the subscriber equipment of the PUCCH of L1.
The PH method for reporting based on the PUCCH of SR that the present invention proposes is to allow UE-700 that pH value is used as upstream data. signals in essence, therefore, must use the pH value of PUSCH channel to BS-700 report PUCCH.Here, the present invention does not point out whether UE-700 needs the pH value of BS-700 report PUSCH, but must see: the PHR of PUSCH and the PHR of PUCCH are processes independently mutually, and the variation of the pH value of the pH value of PUSCH and PUCCH all is processes at a slow speed, therefore, BS-700 does not consider the influence of ascending resource scheduling when doing up PUSCH power control and the control of up PUCCH power, do not need to consider the influence of the PHR of PUSCH when therefore, UE-700 carries out the PHR of PUCCH.
Step 10:BS detects pH value, shown in S109;
Though the present invention considers the PHR process of PUCCH and the PHR process of PUSCH separately, but consider it is that PHR or the process of the PHR of PUSCH itself of PUCCH is not very frequent process, that is to say that the pH value of PUCCH and the pH value of PUSCH are the values that changes at a slow speed, therefore, the pH value of the pH value of PUCCH and PUSCH can adopt the mode of reports such as combined coding, Combined Treatment, difference processing to report to BS-700.In addition, because the introducing of a plurality of CC of up link, BS must detect the call number of a plurality of UL CC when detecting pH value.
[second embodiment]
According to a second embodiment of the present invention, the method of a kind of UE while at the power headroom reporting (PHR) that transmits PUCCH under data and the signaling situation on PUSCH and the PUCCH respectively proposed, as shown in figure 15, show schematic diagram according to the PHR method of the PUCCH of second embodiment of the invention.Whole wireless area comprises base station BS-800 and UE-800, and the CC set of down link comprises DL CC1, DL CC2, DL CC3, DL CC4, DL CC5 totally 5 unit carrier wave frequency ranges, and up link is got 1 UL CC, as UL CC1.Number and the call number of wherein concrete descending DL CC are selected by carrier scheduling method mentioned above, are respectively DL CC1, DL CC2, DLCC3.Flow chart according to the PHR method of the PUCCH of second embodiment of the invention as shown in figure 16, may further comprise the steps:
Step 1:UE-800 judges whether the PHR trigger event of PUCCH (for example takes place, then whether the PHR timer, perhaps whether the DL path loss values of PUCCH changes greater than predetermined variance threshold, perhaps other trigger events)? if the PHR trigger event takes place, then enter step S201,, then still return this step if the PHR trigger event does not take place, cycle criterion is shown in S200;
(for example, not to the BS-800 report, promptly the PHR timer then for a long time for the pH value of the PUCCH of UE-800) takes place in step 2:PHR trigger event, and then UE-800 triggers the PH reporting process, shown in S201;
Step 3:UE-800 initiatively sends dispatch request (SR) signal to BS-800 after the PH reporting process is triggered, the SR signal sends to BS-800 by the PUCCH channel, shown in S202;
After step 4:BS-800 receives the SR signal, carry out ascending resource scheduling, shown in S203;
The needed schedule information of uplink of ascending resource scheduling decision UE, schedule information comprises size of position in sub-frame of uplink of the number of up RB and these RB, up MCS mode (comprising modulation system, coded system), uplink transmission block (TB, tranmission block) or the like.
Step 5:BS-800 judges whether UE-800 is scheduled for simultaneously respectively at PUSCH and PUCCH transmitting data and upstream control signaling, shown in S204;
If UE-800 needs to transmit simultaneously, enter S206 so on PUSCH and PUCCH; If UE-800 does not need to transmit simultaneously, enter S205 so on PUSCH and PUCCH.
Step 6:BS-800 sends UL Grant signal to UE-800, shown in S205 by PDCCH;
Step 7:BS-800 sends UL Grant signal to UE-800, shown in S206 by PDCCH;
After step 8:UE-800 receives UL Grant signal, calculate the pH value of PUCCH and the pH value of PUSCH respectively, shown in S207;
Step 9:UE-800 reports the pH value of PUCCH and the pH value of PUSCH by PUSCH to BS-800,, trigger afterwards or replacement PHR timer PUCCH-PHR-Timer, make PHR timer PUCCH-PHR-Timer effective, shown in S208;
After step 10:UE-800 receives UL Grant signal, calculate the pH value of PUCCH, shown in S209;
Step 11:UE-800 is by the pH value of PUSCH to BS-800 report PUCCH,, trigger afterwards or replacement PHR timer PUCCH-PHR-Timer, make PHR timer PUCCH-PHR-Timer effective, shown in S210;
Step 12:BS-800 detects the pH value (pH value of PUCCH and the pH value of PUSCH or have only the pH value of PUCCH) of UE-800, shown in S211;
Consider it is that the PHR of PUCCH or the process of the PHR of PUSCH itself are not processes fast, that is to say that the pH value of PUCCH and the pH value of PUSCH are the values that changes at a slow speed, therefore, the pH value of the pH value of PUCCH and PUSCH can adopt the mode of reports such as combined coding, Combined Treatment, difference processing to report to BS-800.In addition, because the introducing of a plurality of CC of up link, BS must detect the call number of a plurality of UL CC when detecting pH value.Present embodiment has provided the call number of a plurality of UL CC and the mapping method at medium access control (MAC, mediaaccess control) layer of pH value, for example, and can be as shown in figure 17.
With reference to Figure 17, the PH of the PUSCH of each CC needs 6 bits to represent, 5 CC need 3 bit index to be distinguished, so the PH of the PUSCH of each CC needs 9 bits to represent; Similarly, the PH of the PUCCH of each CC needs 6 bits to represent, 5 CC need 3 bit index to be distinguished, so the PH of the PUCCH of each CC needs 9 bits to represent.Therefore, as not carrying out any processing, the PH that then will represent the PH of PUSCH of each CC and PUCCH is needs 18 bits just.Because the two can shared CC index 3 bits, therefore, when the PH of the PH of the PUSCH of each CC of associating and PUCCH, only need 15 bits to represent.Help to reduce the report expense of the PH of the report expense of PH of PUSCH and PUCCH.
[the 3rd embodiment]
A third embodiment in accordance with the invention, a kind of method that has the power headroom reporting (PHR) of PUCCH under the PUCCH situation on a plurality of up CC has been proposed, as shown in figure 18, show schematic diagram according to the PHR method of the PUCCH of third embodiment of the invention, whole wireless area comprises base station BS-900 and UE-900, the CC set of down link comprises DL CC1, DL CC2, DL CC3, DL CC4, DL CC5 is totally 5 unit carrier wave frequency ranges, and the CC set of up link comprises UL CC1, UL CC2, UL CC3, UL CC4, UL CC5 is totally 5 unit carrier wave frequency ranges.Wherein, number and the call number of the descending DL CC of present embodiment are selected by carrier scheduling method mentioned above, need whole DL CC1, DL CC2, DL CC3, DL CC4, DL CC5 totally 5 descending CC, up link needs UL CC1, UL CC2, UL CC3, UL CC4, UL CC5 totally 5 up CC, and descending 5 CC and up 5 CC adopt one to one method to shine upon, as shown in figure 19, the specific implementation method may further comprise the steps:
Step 1:UE-900 judges whether the PHR trigger event of PUCCH (for example takes place, then whether the PHR timer, perhaps whether the DL path loss values of PUCCH changes greater than predetermined variance threshold, perhaps other PHR trigger events)? if the PHR trigger event takes place, then execution in step 2, if the PHR trigger event does not take place, then still return this step 1, cycle criterion;
(for example, not to the BS-900 report, promptly the PHR timer then for a long time for the pH value of the PUCCH of UE-900) takes place in step 2:PHR trigger event, and then UE-900 triggers the PH reporting process;
Step 3:UE-900 is after the PH reporting process is triggered, initiatively send the SR signal to BS-900, the SR signal sends to BS-900 by the PUCCH channel, as shown in figure 18,5 up CC, (being UL CC1, UL CC2, UL CC3, UL CC4, UL CC5) gone up at separately PUCCH (PUCCH1, PUCCH2, PUCCH3, PUCCH4, PUCCH5) respectively and sent ack/nack signal, but these 5 up CC all go up at up main CC (grappling CC, anchor CC) and send the SR signal;
After step 4:BS-900 receives the SR signal, carry out ascending resource scheduling;
The needed schedule information of uplink of ascending resource scheduling decision UE-900, schedule information comprises size of position in sub-frame of uplink of the number of up RB and these RB, up MCS mode (comprising modulation system, coded system), uplink transmission block (TB, tranmission block) or the like.
Step 5:BS-900 sends UL Grant signal to UE-900 by PDCCH;
After step 6:UE-900 receives UL Grant signal, calculate UL CC1, UL CC2, UL CC3, UL CC4, UL CC5 respectively respectively at the pH value of separately PUCCH (PUCCH1, PUCCH2, PUCCH3, PUCCH4, PUCCH5);
Step 7:UE-900 is by UL CC1, UL CC2, UL CC3, UL CC4, UL CC5 PUSCH (PUSCH1, PUSCH2, PUSCH3, PUSCH4, PUSCH5) the separately pH value to BS-900 report PUCCH (PUCCH1, PUCCH2, PUCCH3, PUCCH4, PUCCH5) separately, as shown in figure 19;
After step 8:UE-900 receives UL Grant signal, calculate the pH value of PUCCH1, PUCCH2, PUCCH3, PUCCH4, PUCCH5, trigger afterwards or replacement PHR timer PUCCH-PHR-Timer, make PHR timer PUCCH-PHR-Timer effective;
The pH value of PUCCH1, the PUCCH2 of step 9:BS-900 detection UE-900 report, PUCCH3, PUCCH4, PUCCH5;
Consider the introducing of a plurality of CC of up link, BS must detect the call number of a plurality of UL CC when detecting pH value.Figure 19 is a kind of descending CC and up CC mapped mode one to one for present embodiment has designed.
But the LTE-A system also may adopt the mapped mode of other descending CC and up CC, as Figure 20, Figure 21, shown in Figure 22.
In Figure 20, though UL CC1, UL CC2, UL CC3, UL CC4, UL CC5 all have separately PUCCH channel and even separately the pH value of PUCCH1, PUCCH2, PUCCH3, PUCCH4, PUCCH5, but PUCCH1, PUCCH2, PUCCH3, PUCCH4, the PUCCH5 evenly PUSCH that all is specified on the up Anchor CC of separately pH value send, when UE-900 transmits these 5 pH values, need to specify the call number of UL CC.
In Figure 21, though 5 UL CC all have separately PUCCH channel and even separately the pH value of PUCCH1, PUCCH2, PUCCH3, PUCCH4, PUCCH5, but the PUSCH that this pH value need not to be specified on the up Anchor CC sends, the pH value of 5 PUCCH of UE-900 can be specified on any one UL CC that up PUSCH was arranged at that time and send, as the CC2 among Figure 21, but when UE-900 transmits these 5 pH values, the call number that also need specify UL CC.
In Figure 22, what adopt is the method that a kind of channel of PUSCH more flexibly transmits the PHR of a plurality of PUCCH, the PUSCH of a up CC can transmit the pH value of the PUCCH of one or more up CC, but the call number that UE-900 need specify corresponding UL CC when transmitting a plurality of pH value.
[the 4th embodiment]
A fourth embodiment in accordance with the invention, proposed a kind ofly have PUCCH and a plurality of PUCCH method of the power headroom reporting (PHR) of PUCCH under the situation of command transmitting simultaneously on a plurality of up CC, as shown in figure 23, show schematic diagram according to the PHR method of the PUCCH of fourth embodiment of the invention, wherein, number and the call number of the descending DL CC of present embodiment are selected by carrier scheduling method mentioned above, need whole DL CC1, DL CC2, DL CC4 is totally 3 descending CC, up link needs UL CC1, UL CC2 is totally 2 up CC, and the specific implementation method comprises the steps:
The trigger event of the PHR of the PUCCH of step 1:UE-1000 takes place, and triggers the PH reporting process of PUCCH;
Step 2:UE-1000 initiatively sends the SR signal to BS-1000;
Step 3:BS-1000 carries out ascending resource scheduling after receiving the SR signal;
Step 4:BS-1000 sends UL Grant signal to UE-1000 by PDCCH;
Step 5:UE-1000 receives the pH value that calculates PUCCH behind the UL Grant signal;
Step 6:UE-1000 triggers or replacement PHR timer PUCCH-PHR-Timer afterwards by the pH value of PUSCH report PUCCH, makes PHR timer PUCCH-PHR-Timer effective;
Step 7:BS-1000 detects the PUCCH1 of UE-1000 report, the pH value of PUCCH2.
[the 5th embodiment]
According to a fifth embodiment of the invention, proposed a kind of in the method that has PUCCH and the SR power headroom reporting (PHR) of PUCCH under situation about transmitting on the up CC separately on a plurality of up CC, Figure 24 shows the schematic diagram according to the PHR method of the PUCCH of fifth embodiment of the invention, wherein, number and the call number of the descending DL CC of present embodiment are selected by carrier scheduling method mentioned above, need whole DL CC1, DL CC2, DL CC3, DL CC4, DLCC5 is totally 5 descending CC, up link needs UL CC1, UL CC2, UL CC3, UL CC4, UL CC5 is totally 5 up CC, and the specific implementation method comprises the steps:
Step 1: when the trigger event of the PHR of PUCCH took place, UE-1100 triggered the PH reporting process;
Consider that 5 UL CC all have PUCCH (PUCCH1, PUCCH2, PUCCH3, PUCCH4, PUCCH5) channel separately, and each PUCCH all has PHR trigger event separately and triggers timer, therefore, when the trigger event on the PUCCH of certain CC took place, UE-1100 sent the PH reporting process that triggering signal triggers each PUCCH.
Step 2:UE-1100 initiatively sends the SR signal to BS-1100 after triggering the PH reporting process;
Consider that 5 UL CC all have SR (SR1, SR2, SR3, SR4, SR5) signal, therefore, UE-1100 initiatively sends the SR signal of this PUCCH to BS-1100 after triggering the PH reporting process on some PUCCH.At synchronization, UE-1100 can be to sending a plurality of SR signals that a plurality of trigger events cause to BS-1100 on a plurality of PUCCH, for example, and can be as shown in figure 24.
Step 3:BS-1100 carries out ascending resource scheduling after receiving UL SR signal;
The needed schedule information of uplink of ascending resource scheduling decision UE-1100, schedule information comprises size of position in sub-frame of uplink of the number of up RB and these RB, up MCS mode (comprising modulation system, coded system), uplink transmission block (TB, tranmission block) or the like.
Step 4:BS-1100 sends UL Grant signal to UE-1100 by PDCCH, and UL Grant comprises the needed schedule information of the uplink of UE;
BS-1100 sends PDCCH1, PDCCH2, PDCCH3, PDCCH4, PDCCH5 respectively on 5 DL CC, respectively the last UL Grant of transmission indication UL CC1, UL CC2, UL CC3, UL CC4, UL CC5.
Step 5:UE-1100 receives the pH value that calculates PUCCH behind the UL Grant signal, the i.e. difference of estimating power on nominal maximum transmission power of UE-1100 and the PUCCH channel;
Step 6:UE-1100 triggers or replacement PHR timer PUCCH-PHR-Timer afterwards by the pH value of PUSCH report PUCCH, makes PHR timer PUCCH-PHR-Timer effective.
UE-1100 reports the pH value of PUCCH separately to BS-1100 respectively on a plurality of UL CC.
Step 7:BS-1100 detects the PUCCH1 of UE-1100 report, the pH value of PUCCH2.
[the 6th embodiment]
According to a sixth embodiment of the invention, proposed a kind ofly on a plurality of up CC, to have PUCCH, SR is transmitting on the up CC separately, the method of the power headroom reporting (PHR) of PUCCH under the situation of a plurality of PUCCH while command transmittings, Figure 25 shows the schematic diagram according to the PHR method of the PUCCH of sixth embodiment of the invention, wherein, number and the call number of the descending DL CC of present embodiment are selected by carrier scheduling method mentioned above, need whole DL CC1, DLCC2, DL CC3, DL CC4, DL CC5 is totally 5 descending CC, up link needs UL CC1, UL CC3 is totally 2 up CC, and the specific implementation method comprises the steps:
Step 1: when the trigger event of the PHR of PUCCH took place, UE-1200 triggered the PH reporting process;
Consider that 5 UL CC all have PUCCH (PUCCH1, PUCCH2, PUCCH3, PUCCH4, PUCCH5) channel separately, and each PUCCH all has PHR trigger event separately and triggers timer, therefore, when the trigger event on the PUCCH of certain CC took place, UE-1200 sent the PH reporting process that triggering signal triggers each PUCCH.
Step 2:UE-1200 initiatively sends the SR signal to BS-1200 after triggering the PH reporting process;
Consider that 5 UL CC all have SR (SR1, SR2, SR3, SR4, SR5) signal, therefore, UE-1200 initiatively sends the SR signal of this PUCCH to BS-1200 after triggering the PH reporting process on some PUCCH.At synchronization, UE-1200 can be to sending a plurality of SR signals that a plurality of trigger events cause to BS-1200, as shown in figure 25 on a plurality of PUCCH.
Step 3:BS-1200 carries out ascending resource scheduling after receiving UL SR signal;
The needed schedule information of uplink of ascending resource scheduling decision UE-1200, schedule information comprises size of position in sub-frame of uplink of the number of up RB and these RB, up MCS mode (comprising modulation system, coded system), uplink transmission block (TB, tranmission block) or the like.
Step 4:BS-1200 sends UL Grant signal to UE-1200 by PDCCH, and UL Grant comprises the needed schedule information of the uplink of UE;
BS-1200 sends PDCCH1, PDCCH2, PDCCH3, PDCCH4, PDCCH5 respectively on 5 DL CC, respectively the last UL Grant of transmission indication UL CC1, UL CC2, UL CC3, UL CC4, UL CC5.
Step 5:UE-1200 receives the pH value that calculates PUCCH behind the UL Grant signal, the i.e. difference of estimating power on nominal maximum transmission power of UE-1200 and the PUCCH channel;
Step 6:UE-1200 triggers or replacement PHR timer PUCCH-PHR-Timer afterwards by the pH value of PUSCH report PUCCH, makes PHR timer PUCCH-PHR-Timer effective.
UE-1200 reports the pH value of PUCCH separately to BS-1200 respectively on a plurality of UL CC.
Step 7:BS-1200 detects the PUCCH1 of UE-1200 report, the pH value of PUCCH2.
[the 7th embodiment]
According to a seventh embodiment of the invention, a kind of method that realizes the power headroom reporting (PHR) of PUCCH with the L1 signaling has been proposed, Figure 26 shows the schematic diagram according to the PHR method of the PUCCH of seventh embodiment of the invention, wherein, number and the call number of the descending DL CC of present embodiment are selected by carrier scheduling method mentioned above, need whole DL CC1, DLCC2, DL CC3, DL CC4, DL CC5 totally 5 descending CC, up link only needs an AnchorCC, be UL CC1, comprise the steps:
The timer of step 1:BS-1300 picks up counting, and UE-1300 periodically feeds back CQI information and gives BS-1300;
The trigger event of the PHR of the PUCCH of step 2:UE-1300 takes place, and triggers the PH reporting process of PUCCH;
Step 3:UE-1300 reports the pH value of PUCCH when the feedback of CQI, the CQI feedback of this moment constantly is the CQI feedback moment nearest behind the PHR of PUCCH trigger event;
When step 4:BS-1300 receives the pH value of PUCCH, restart timing.
[the 8th embodiment]
According to the eighth embodiment of the present invention, the another kind of method that realizes the power headroom reporting (PHR) of PUCCH with the L1 signaling has been proposed, Figure 27 shows the schematic diagram according to the PHR method of the PUCCH of eighth embodiment of the invention, wherein, number and the call number of the descending DL CC of present embodiment are selected by carrier scheduling method mentioned above, need whole DL CC1, DLCC2, DL CC3, DL CC4, DL CC5 totally 5 descending CC, up link only needs an AnchorCC, be UL CC1, comprise the steps:
The timer of step 1:BS-1400 picks up counting, and UE-1400 periodically feeds back CQI information and gives BS.
The trigger event of the PHR of the PUCCH of step 2:UE-1400 takes place, and triggers the PH reporting process of PUCCH.
The pH value of step 3:UE-1400 report PUCCH when the feedback of subsequently CQI, UE-1400 are by time-multiplexed mode (TDM, time division multiplex) feedback CQI value and report that pH value is to BS-1400.
When step 4:BS-1400 is received the pH value of PUCCH, restart timing.
[hardware capability realization]
Figure 28 shows the hardware capability block diagram according to a kind of subscriber equipment 2800 of the present invention.As shown in figure 28, UE 2800 comprises: SR request signal transmitting element 2810 is used for sending the SR request signal to BS when the trigger event of the PH of arbitrary PUCCH report takes place; PH computing unit 2820 is used for when receiving UL Grant signal by receiving element 2890, calculates the pH value of the PUCCH of UE 2800; PH reports unit 2830, is used for by PUSCH, reports the pH value of the PUCCH that PH computing unit 2820 calculates to BS; And the PHR timer is provided with unit 2840, when being used for finishing the PH report in described PH report unit, triggers or replacement PHR timer PUCCH-PHR-Timer.
The trigger event of the PH of PUCCH report can comprise at least: the downlink path loss value that PH does not measure to BS report, UE for a long time changes greater than predetermined variance threshold, UE receives that near maximum transmission power, UE the number of times of power control instruction of closed loop PUCCH is greater than setting in advance number of times in the transmitting power of PUCCH.
SR request signal transmitting element 2810 sends the SR request signal to BS, need not to wait for the generation of the upstream data that need send to BS.
PH computing unit 2820 can also be used to calculate the pH value of PUSCH.At this moment, UE 2800 can also comprise: PH processing unit 2850 (shown in broken lines among Figure 28) is used for the pH value of PUCCH that PH computing unit 2820 is calculated and the pH value of PUSCH and carries out combined coding, merging and/or difference processing.In this case, PH report unit 2830 is by PUSCH, to the pH value of the PUCCH of BS report after PH processing unit 2850 is handled and the pH value of PUSCH.
In addition, PH processing unit 2850 can also be used for producing need be to upstream data that BS sends the time, and pH value and the upstream data of PUCCH merged processing.At this moment, PH report unit 2830 sends pH value and the upstream data of the PUCCH after merging by PUSCH to BS.
In addition, producing need be to upstream data that BS sends the time, PH processing unit 2850 can also be used for the pH value of the PUCCH after handling and pH value and the upstream data of PUSCH are merged processing.In this case, PH report unit 2830 sends the pH value of the PUCCH after merging, pH value and the upstream data of PUSCH by PUSCH to BS.
As mentioned above, the pH value of PUCCH is the difference of nominal maximum transmission power and the PUCCH estimating power of UE 2800.
Figure 29 shows the hardware capability block diagram according to a kind of base station 2900 of the present invention, and BS 2900 shown in Figure 29 can communicate with UE 2800 shown in Figure 28.As shown in figure 29, BS 2900 comprises: UL scheduling of resource unit 2910, be used for when receiving the SR request signal, carrying out the UL scheduling of resource by receiving element 2990, and determine that UE carries out the required schedule information of uplink; UL Grant signal transmitting unit 2920 is used for by PDCCH, sends the ULGrant signal to UE; And PH detecting unit 2930, be used for pH value by the PUCCH of receiving element 2990 detection UE reports.
BS can also comprise: carrier dispatching unit 2940 (shown in broken lines among Figure 29) is used for when UE sends UL Grant signal, if produced the DL data service simultaneously, then carrying out carrier dispatching by PDCCH.
As mentioned above, schedule information comprises at least one in the following information: the size of position in the UL subframe of the number of UL RB, UL RB, up MCS mode (comprising modulation system, coded system), up TB.
As mentioned above, the pH value of PUCCH is the difference of nominal maximum transmission power and the PUCCH estimating power of UE.
Figure 30 shows the hardware capability block diagram according to another kind of subscriber equipment 3000 of the present invention.As shown in figure 30, UE 3000 comprises: PH reports unit 3030, is used for utilizing the L1 signal resource on the PUCCH, to the pH value of BS report PUCCH when the trigger event of the PH of arbitrary PUCCH report takes place; And the PHR timer is provided with unit 3040, when being used for finishing the PH report in PH report unit 3030, triggers or replacement PHR timer PUCCH-PHR-Timer.
The trigger event of the PH of PUCCH report can comprise at least: the downlink path loss value that PH does not measure to BS report, UE for a long time changes greater than predetermined variance threshold, UE receives that near maximum transmission power, UE the number of times of power control instruction of closed loop PUCCH is greater than setting in advance number of times in the transmitting power of PUCCH.
The L1 signaling can comprise following signaling: CQI signaling, PMI signaling, RI signaling, SR signaling and ACK/NACK signaling etc.
In addition, the L1 signaling can be by the pH value of the multiplexing PUCCH of TDM mode.
As mentioned above, the pH value of PUCCH is the difference of nominal maximum transmission power and the PUCCH estimating power of UE 3000.
Figure 31 shows the hardware capability block diagram according to another kind of base station 3100 of the present invention.As shown in figure 31, BS 3100 comprises: probability of acceptance determining unit 3110, be used for state according to UE, and the correct probability that prediction UE receives the physical format indicating channel is lower than/is higher than the first/the second predetermined probability threshold value; Indicating member 3120 is enabled/stopped using to method, is used for sending radio resource control signaling to UE, enables/stop using control format indicating means based on the CRC mask of PUCCCH with notice UE; And method enables/deactivated cell 3130, is used for striding in the carrier dispatching descending after receiving the affirmation signaling that UE sends, and enables/stop using the control format indicating means based on the CRC mask of PUCCCH.
Figure 32 shows the hardware capability block diagram according to another kind of subscriber equipment 3200 of the present invention, and UE 3200 shown in Figure 32 can communicate with BS 3100 shown in Figure 31.Shown in figure 32, UE 3200 comprises: confirmation unit 3210 is enabled/stopped using to method, is used for after receiving the radio resource control signaling that BS sends, and sends to BS and confirm signaling; And method enables/deactivated cell 3220, be used for after sending described affirmation signaling, striding in the carrier dispatching descending, according to/no longer according to control format indicating means, carry out the detection of the control format of cyclic redundancy check (CRC) mask based on the CRC mask of PUCCCH.
Figure 33 shows the hardware capability block diagram according to another kind of base station 3300 of the present invention.As shown in figure 33, BS 3300 comprises: signal transmitting unit 3310, be used for by Physical Downlink Control Channel, and send UL Grant signal and/or descending distributing signal to UE; Confirmation unit 3320 is enabled/stopped using to method, is used for after receiving the radio resource control signaling that UE sends, and sends to UE and confirm signaling; And method enables/deactivated cell 3330, is used for striding in the carrier dispatching descending after sending described affirmation signaling, enables/stop using the control format indicating means based on the CRC mask of PUCCCH.
Figure 34 shows the hardware capability block diagram according to another kind of subscriber equipment 3400 of the present invention, and UE 3400 shown in Figure 34 can communicate with BS 3300 shown in Figure 33.As shown in figure 34, UE 3400 comprises: probability of acceptance determining unit 3410, be used for state according to UE self, and the correct probability that prediction UE receives the physical format indicating channel is lower than/is higher than the 3rd/the 4th predetermined probability threshold value; Indicating member 3420 is enabled/stopped using to method, is used for sending radio resource control signaling to BS, enables/stop using control format indicating means based on the CRC mask of PUCCCH with notice BS; Method is enabled/deactivated cell 3430, is used for after receiving the affirmation signaling that BS sends, striding in the carrier dispatching descending, according to/no longer according to control format indicating means based on the CRC mask of PUCCCH.
In the communicating by letter of the base station shown in Figure 31~34 and subscriber equipment, radio resource control signaling can comprise and is used to indicate the parameter of enabling/stopping using based on the control format indicating means of the CRC mask of PUCCCH.Confirm that signaling can comprise the parameter that is used to indicate the control format indicating means based on the CRC mask of PUCCCH to be activated/to stop using.
When striding carrier dispatching, method is enabled/is stopped using indicating member 3120 and 3420 and passes through the different cyclic redundancy check (CRC) mask of selection, indicates current cyclic redundancy check (CRC) mask of striding the Physical Downlink Control Channel of carrier dispatching whether to comprise control format information.
As mentioned above, the state of UE can comprise at least one item in the following information: the re-transmission frequency of channel conditions, disturbance regime, HARQ request, the re-transmission frequency of RLC ARQ request etc.
[hardware is specifically implemented]
Figure 35 shows according to the hardware of base station of the present invention and specifically implements schematic diagram.
As shown in figure 35, base station of the present invention comprises: RF processing unit 20, Transmit-Receive Unit 21, data processing unit 22, Signaling Processing Unit 23, PH detecting unit 24, TPC decision unit 25, scheduling of resource unit 26, Δ TFDecision unit 27, P 0Decision unit 28, path compensation coefficient decision unit 29.
Can realize the function of base station of the present invention according to the base station of present embodiment,, only describe for example that the concrete operations flow process can be referring to the various embodiments described above here for fear of giving unnecessary details.The said units structure can form single by the mode of combination or other cellular construction in addition.
RF processing unit 20, reception is from the radiofrequency signal of antenna and radiofrequency signal is converted into baseband signal is transferred to Transmit-Receive Unit 21, and receive from the baseband signal of Transmit-Receive Unit and baseband signal is converted into radiofrequency signal and give antenna and be transmitted to subscriber equipment, in being converted into the process of radiofrequency signal, baseband signal needs to adopt power amplifier (PA, power amplifier), the single PA of the PHR trigger mechanism that proposes of the present invention and the method frequency lens system that is adapted to LTE-A and the application scenarios of a plurality of PA.
Transmit-Receive Unit 21 receives data and/or signaling from RF processing unit 20, and sends data and send signaling to Signaling Processing Unit 23 to data processing unit 22.
Data processing unit 22 receives the data from Transmit-Receive Unit 21, sends data to PH detecting unit 24 and scheduling of resource unit 26, receives from scheduling of resource unit 26, Δ TFDecision unit 27, P 0The signal of decision unit 28, path compensation coefficient decision unit 29.
Signaling Processing Unit 23 receives from the signaling of Transmit-Receive Unit 21 and the signaling of TPC decision unit 25, sends signaling to PH detecting unit 24 and scheduling of resource unit 26.
PH detecting unit 24 receives the data that data processing unit 22 sends, and therefrom detects the pH value of the PUSCH channel of subscriber equipment, and receives the signaling that Signaling Processing Unit 23 sends, and therefrom detects the pH value of the PUCCH channel of subscriber equipment.
TPC determines unit 25, sends the TPC instruction to Signaling Processing Unit 23, and the TPC instruction is transferred to the uplink power control that subscriber equipment is used for PUSCH and PUCCH by PDCCH.
Scheduling of resource unit 26, after receiving the SR signal of Signaling Processing Unit 23 transmission, carry out ascending resource scheduling, the needed schedule information of uplink of ascending resource scheduling decision subscriber equipment, schedule information comprises number and position, up MCS mode (comprise modulation system, coded system), the uplink transmission block (TB of these RB in sub-frame of uplink of up RB, tranmissionblock) size or the like, and schedule information is transferred to Δ TFDecision unit 27, P 0Decision unit 28, path compensation coefficient decision unit 29 are used for the uplink power control of PUSCH and/or PUCCH.
Δ TFDecision unit 27 receives the schedule information from scheduling of resource unit 26, the power coefficient relevant with MCS of decision PUSCH, and the power coefficient of the decision PUCCH relevant with the PUCCH transformat.
P 0Decision unit 28, reception is from the schedule information of scheduling of resource unit 26, decision is based on (the Cell specific) of wireless area and/or based on parameters such as the target Signal to Interference plus Noise Ratio (Target SINR, taget signal interference noise ratio) of (the UE specific) of subscriber equipment, interference levels.
Path compensation coefficient decision unit 29 receives the schedule information from scheduling of resource unit 26, the path compensation coefficient of decision PUSCH and/or PUCCH.
Figure 36 shows according to the hardware of subscriber equipment of the present invention and specifically implements schematic diagram.
As shown in figure 36, subscriber equipment of the present invention comprises: RF processing unit 30, Transmit-Receive Unit 31, data processing unit 32, Signaling Processing Unit 33, feedback information processing unit 34, schedule information acquiring unit 35, PHR trigger element 36, PH computing unit 37, PHR performance element 38, P MAXReading unit 39, path loss measuring unit 40, transmitted power comparing unit 41.
Can realize the function of subscriber equipment of the present invention according to the subscriber equipment of present embodiment,, only describe for example that the concrete operations flow process can be referring to the various embodiments described above here for fear of giving unnecessary details.The said units structure can form single by the mode of combination or other cellular construction in addition.
RF processing unit 30 receives from the radiofrequency signal of the base station that antenna transmission is come, and radiofrequency signal is converted into baseband signal is transferred to Transmit-Receive Unit 31.
Transmit-Receive Unit 31, the baseband signal that reception transforms from radio-frequency module 30, and baseband signal is divided into data and signaling is transferred to data processing unit 32 and Signaling Processing Unit 33 respectively, and can receive signal from data processing unit 32, Signaling Processing Unit 33, transmitted power comparing unit 41.
Data processing unit 32 receives the data-signal from Transmit-Receive Unit 31, and gives schedule information acquiring unit 35, PHR trigger element, P data MAXReading unit 39, path loss measuring unit 40, transmitted power comparing unit 41.
Signaling Processing Unit 33 receives the signaling-information from Transmit-Receive Unit 31, and signaling-information is transferred to PHR trigger element, P MAXReading unit 39, path loss measuring unit 40, transmitted power comparing unit 41.
Whether feedback information processing unit 34 receives the pH value from PHR performance element 38, consider pH value to be incorporated in the feedback information to handle, and handles if pH value and feedback information merge, and then the value after merging is transferred to the feedback that Signaling Processing Unit carries out PUCCH.
Schedule information acquiring unit 35 reads the ULGrant information from the PUCCH of Signaling Processing Unit 33, and receives the data message from the PDSCH of data processing unit 32, and gives PHR trigger element 36 schedule information that reads and data.
PHR trigger element 36 receives from the data-signal of data processing unit 32 and/or the signaling-information of Signaling Processing Unit 33, has judged whether that the PHR trigger event takes place, if trigger event takes place, then triggers the PHR timer.
PH computing unit 37, reception is from the data-signal of PHR trigger element 36 and/or the signaling-information of Signaling Processing Unit 33, calculate the transmission power value of PUSCH data-signal and/or the transmission power value of PUCCH signaling-information, and calculate the pH value of PUCCH according to the transmission power value of PUSCH data-signal, be the difference that nominal maximum transmission power of UE and PUSCH go up estimating power, and calculate the pH value of PUCCH according to the transmission power value of PUCCH data-signal, promptly nominal maximum transmission power of UE and PUCCH go up the difference of estimating power.
PHR performance element 38, reception is from the PUSCH of PH computing unit 37 and/or the pH value of PUCCH, pH value is handled, for example unit carrier wave frequency range (CC) call number of pH value is indicated, CC call number and pH value are carried out combined coding or other processing, and the information that comprises pH value after handling is sent to data processing unit 32.
P MAXReading unit 39, receive the data-signal of data processing unit 32 and/or the signaling-information of Signaling Processing Unit 33, read the maximum transmission power of subscriber equipment, especially under the situation that the transmitting power of subscriber equipment is restricted, the report of pH value is directly connected to the distribution of maximum transmission power on PUSCH and/or PUCCH of subscriber equipment.
Path loss measuring unit 40 receives from the data-signal of data processing unit 32 and/or the signaling-information of Signaling Processing Unit 33, calculates the downlink path loss, carries out the power control of up PUSCH and/or PUCCH according to the downlink path loss.
Transmitted power comparing unit 41, relatively P MAXThe size of the transmitted power that calculates with uplink power control formula according to PUCCH and/or PUSCH, and get both minimum value, minimum value is sent to Transmit-Receive Unit 31 send.
As mentioned above, the embodiment of the invention has provided power headroom reporting method, base station and subscriber equipment, has simplicity of design, comprehensive, efficient, flexible characteristic.Therefore, the power headroom reporting method that is used for radio transmission technical field that the present invention proposes, base station and subscriber equipment, can comprise third generation cellular mobile network (3G) for various wireless or mobile networks, super three generations's cellular mobile network (S3G, B3G), the 4th generation cellular mobile network (4G), single-frequency radio network (SFN), wireless lan (wlan), wireless wide area network (WWAN), multimedia broadcast-multicast service net (MBMS), self-organization network (Mesh, Ad Hoc, Censor Network), the network cooperation problem of digital home network systems such as (e-Home) provides important theory foundation and concrete implementation method.
In above description, at each step, enumerated a plurality of examples, though the inventor indicates example associated with each other as much as possible, this does not also mean that must there be corresponding relation in these examples according to corresponding label.As long as selected example do not have contradiction between given condition, can in different steps, select the not corresponding example of label to constitute the corresponding techniques scheme, such technical scheme also should be considered as within the scope of the invention involved.
Should be noted in the discussion above that in above description,, show technical scheme of the present invention, but be not intended that the invention be limited to above-mentioned steps and cellular construction only in the mode of example.Under possible situation, can adjust and accept or reject step and cellular construction as required.Therefore, some step and unit are not to implement the necessary element of overall invention thought of the present invention.Therefore, technical characterictic essential to the invention only is subject to the minimum requirements that can realize overall invention thought of the present invention, and is not subjected to the restriction of above instantiation.
So far invention has been described in conjunction with the preferred embodiments.Should be appreciated that those skilled in the art can carry out various other change, replacement and interpolations under the situation that does not break away from the spirit and scope of the present invention.Therefore, scope of the present invention is not limited to above-mentioned specific embodiment, and should be limited by claims.

Claims (45)

1. subscriber equipment comprises:
The scheduling request signal transmitting element is used for sending scheduling request signal to the base station when the trigger event of the power headroom reporting of arbitrary Physical Uplink Control Channel takes place;
Power rising space computing unit is used for receiving ascending resource when giving signal, the power rising space value of Computational Physics ascending control channel;
The power headroom reporting unit is used for by Physical Uplink Shared Channel, reports the power rising space value of the Physical Uplink Control Channel that described power rising space computing unit calculates to the base station; And
The power headroom reporting timer is provided with the unit, when being used for finishing power headroom reporting in described power headroom reporting unit, triggers or replacement power headroom reporting timer.
2. subscriber equipment according to claim 1 is characterized in that
The trigger event of the power headroom reporting of described Physical Uplink Control Channel comprises: the long-time downlink path loss value of not measuring to base station report, subscriber equipment of the power rising space changes goes the transmitting power of control channel physically greater than predetermined variance threshold, subscriber equipment and receives that near maximum transmission power, subscriber equipment the number of times of power control instruction of closed loop Physical Uplink Control Channel is greater than setting in advance number of times.
3. subscriber equipment according to claim 1 is characterized in that
Described scheduling request signal transmitting element sends scheduling request signal to the base station, need not to wait for the generation of the upstream data that need send to the base station.
4. subscriber equipment according to claim 1 is characterized in that
Described power rising space computing unit also is used for the power rising space value of Computational Physics Uplink Shared Channel,
Described subscriber equipment also comprises: power rising space processing unit, be used for the power rising space value of Physical Uplink Control Channel that described power rising space computing unit is calculated and the power rising space value of Physical Uplink Shared Channel and carry out combined coding, merging and/or difference processing, and
Described power headroom reporting unit is by Physical Uplink Shared Channel, to the power rising space value of the Physical Uplink Control Channel of base station report after described power rising space processing unit processes and the power rising space value of Physical Uplink Shared Channel.
5. subscriber equipment according to claim 3 is characterized in that
Described subscriber equipment also comprises: power rising space processing unit, be used for producing need be to upstream data that the base station sends the time, and the power rising space value and the upstream data of Physical Uplink Control Channel merged processing, and
Described power headroom reporting unit sends the power rising space value and the upstream data of the Physical Uplink Control Channel after merging by Physical Uplink Shared Channel to the base station.
6. subscriber equipment according to claim 4 is characterized in that
Producing need be to upstream data that the base station sends the time, described power rising space processing unit also is used for the power rising space value of the Physical Uplink Control Channel after handling and the power rising space value and the upstream data of Physical Uplink Shared Channel are merged processing, and
Described power headroom reporting unit sends the power rising space value of the Physical Uplink Control Channel after merging, the power rising space value and the upstream data of Physical Uplink Shared Channel by Physical Uplink Shared Channel to the base station.
7. subscriber equipment according to claim 1 is characterized in that
The power rising space value of described Physical Uplink Control Channel is the difference of the nominal maximum transmission power and the Physical Uplink Control Channel estimating power of subscriber equipment.
8. base station comprises:
The ascending resource scheduling unit is used for when receiving scheduling request signal, carries out ascending resource scheduling, determines that subscriber equipment carries out the required schedule information of uplink;
Ascending resource is given signal transmitting unit, is used for by Physical Downlink Control Channel, sends ascending resource to subscriber equipment and gives signal; And
Power rising space detecting unit is used to detect the power rising space value of the Physical Uplink Control Channel of subscriber equipment report.
9. base station according to claim 8 also comprises:
The carrier dispatching unit is used for when subscriber equipment transmission ascending resource is given signal, if produced the data service of down link simultaneously, then carrying out carrier dispatching by Physical Downlink Control Channel.
10. base station according to claim 8 is characterized in that
Described schedule information comprises at least one in the following information: the size of position in sub-frame of uplink of the number of ascending resource piece, ascending resource piece, up modulation system, up coded system, uplink transmission block.
11. base station according to claim 8 is characterized in that
The power rising space value of described Physical Uplink Control Channel is the difference of the nominal maximum transmission power and the Physical Uplink Control Channel estimating power of subscriber equipment.
12. a subscriber equipment comprises:
The power headroom reporting unit, be used for when the trigger event of the power headroom reporting of arbitrary Physical Uplink Control Channel takes place, utilize the L1 signal resource on the Physical Uplink Control Channel, to the power rising space value of base station report Physical Uplink Control Channel; And
The power headroom reporting timer is provided with the unit, when being used for finishing power headroom reporting in described power headroom reporting unit, triggers or replacement power headroom reporting timer.
13. subscriber equipment according to claim 12 is characterized in that
The trigger event of the power headroom reporting of described Physical Uplink Control Channel comprises: the long-time downlink path loss value of not measuring to base station report, subscriber equipment of the power rising space changes goes the transmitting power of control channel physically greater than predetermined variance threshold, subscriber equipment and receives that near maximum transmission power, subscriber equipment the number of times of power control instruction of closed loop Physical Uplink Control Channel is greater than setting in advance number of times.
14. subscriber equipment according to claim 12 is characterized in that
Described L1 signaling comprises at least one in the following signaling: CQI signaling, PMI signaling, RI signaling, SR signaling and ACK/NACK signaling.
15. subscriber equipment according to claim 14 is characterized in that
Described L1 signaling is by the power rising space value of the multiplexing Physical Uplink Control Channel of time-multiplexed mode.
16. subscriber equipment according to claim 12 is characterized in that
The power rising space value of described Physical Uplink Control Channel is the difference of the nominal maximum transmission power and the Physical Uplink Control Channel estimating power of subscriber equipment.
17. a base station comprises:
Probability of acceptance determining unit is used for the state according to subscriber equipment, and the correct probability that predictive user equipment receives the physical format indicating channel is lower than/is higher than the first/the second predetermined probability threshold value; And
Indicating member is enabled/stopped using to method, is used for sending radio resource control signaling to subscriber equipment, enables/stop using control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel with notifying user equipment; And
Method is enabled/deactivated cell, is used for striding in the carrier dispatching descending after receiving the affirmation signaling that subscriber equipment sends, and enables/stop using the control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
18. a subscriber equipment comprises:
Confirmation unit is enabled/stopped using to method, is used for after receiving the radio resource control signaling that the base station sends, and sends to the base station and confirm signaling; And
Method is enabled/deactivated cell, be used for after sending described affirmation signaling, stride in the carrier dispatching descending, according to/no longer according to control format indicating means, carry out the detection of the control format of cyclic redundancy check (CRC) mask based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
19. a base station comprises:
Signal transmitting unit is used for by Physical Downlink Control Channel, sends ascending resource to subscriber equipment and gives signal and/or descending distributing signal;
Confirmation unit is enabled/stopped using to method, is used for after receiving the radio resource control signaling that subscriber equipment sends, and sends to subscriber equipment and confirm signaling; And
Method is enabled/deactivated cell, is used for striding in the carrier dispatching descending after sending described affirmation signaling, enables/stop using the control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
20. a subscriber equipment comprises:
Probability of acceptance determining unit is used for the state according to subscriber equipment self, and the correct probability that predictive user equipment receives the physical format indicating channel is lower than/is higher than the 3rd/the 4th predetermined probability threshold value;
Indicating member is enabled/stopped using to method, is used for sending radio resource control signaling to the base station, enables/stop using control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel with informing base station;
Method is enabled/deactivated cell, be used for after receiving the affirmation signaling that the base station sends, stride in the carrier dispatching descending, according to/no longer according to control format indicating means, carry out the detection of the control format of cyclic redundancy check (CRC) mask based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
21., it is characterized in that according to the described base station/user equipment of one of claim 17~20
Described radio resource control signaling comprises and is used to indicate the parameter of enabling/stopping using based on the control format indicating means of the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
22., it is characterized in that according to the described base station/user equipment of one of claim 17~20
Comprise the parameter that is used to indicate the control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel to be activated/to stop using in the described affirmation signaling.
23., it is characterized in that according to the described base station of one of claim 17~22
When striding carrier dispatching, indicating member is enabled/stopped using to described method by selecting different cyclic redundancy check (CRC) masks, indicates current cyclic redundancy check (CRC) mask of striding the Physical Downlink Control Channel of carrier dispatching whether to comprise control format information.
24., it is characterized in that according to the described base station/user equipment of one of claim 17~23
The state of subscriber equipment comprises at least one in the following information: the re-transmission frequency that the re-transmission frequency of channel conditions, disturbance regime, the automatic repeat requests of mixing, Radio Link are controlled automatic repeat requests.
25. a power headroom reporting method comprises:
When the trigger event of the power headroom reporting of arbitrary Physical Uplink Control Channel took place, subscriber equipment sent scheduling request signal to the base station;
When receiving scheduling request signal, ascending resource scheduling is carried out in the base station, determines that subscriber equipment carries out the required schedule information of uplink;
The base station sends ascending resource to subscriber equipment and gives signal by Physical Downlink Control Channel;
When receiving ascending resource when giving signal, the power rising space value of subscriber devices compute Physical Uplink Control Channel; And
Subscriber equipment is by Physical Uplink Shared Channel, the power rising space value of the Physical Uplink Control Channel that is calculated to the base station report, and triggering or replacement power headroom reporting timer.
26. power headroom reporting method according to claim 25 also comprises:
The power rising space value of the Physical Uplink Control Channel of subscriber equipment report is detected in the base station.
27. power headroom reporting method according to claim 25 is characterized in that
The trigger event of the power headroom reporting of described Physical Uplink Control Channel comprises: the long-time downlink path loss value of not measuring to base station report, subscriber equipment of the power rising space changes goes the transmitting power of control channel physically greater than predetermined variance threshold, subscriber equipment and receives that near maximum transmission power, subscriber equipment the number of times of power control instruction of closed loop Physical Uplink Control Channel is greater than setting in advance number of times.
28. power headroom reporting method according to claim 25 is characterized in that
Subscriber equipment sends scheduling request signal to the base station, need not to wait for the generation of the upstream data that need send to the base station.
29. power headroom reporting method according to claim 25 also comprises:
The power rising space value of subscriber devices compute Physical Uplink Shared Channel;
Subscriber equipment carries out combined coding, merging and/or difference processing to the power rising space value of Physical Uplink Control Channel and the power rising space value of Physical Uplink Shared Channel; And
Subscriber equipment is reported the power rising space value of the Physical Uplink Control Channel after handling and the power rising space value of Physical Uplink Shared Channel by Physical Uplink Shared Channel to the base station.
30. power headroom reporting method according to claim 28 also comprises:
When producing need be to upstream data that the base station sends the time, subscriber equipment merges processing to the power rising space value and the upstream data of Physical Uplink Control Channel; And
Subscriber equipment sends the power rising space value and the upstream data of the Physical Uplink Control Channel after merging by Physical Uplink Shared Channel to the base station.
31. power headroom reporting method according to claim 29 also comprises:
When producing need be to upstream data that the base station sends the time, subscriber equipment merges processing to the power rising space value of the Physical Uplink Control Channel after handling and the power rising space value and the upstream data of Physical Uplink Shared Channel; And
Subscriber equipment sends the power rising space value of the Physical Uplink Control Channel after merging, the power rising space value and the upstream data of Physical Uplink Shared Channel by Physical Uplink Shared Channel to the base station.
32. power headroom reporting method according to claim 25 is characterized in that
Described schedule information comprises at least one in the following information: the size of position in sub-frame of uplink of the number of ascending resource piece, ascending resource piece, up modulation system, up coded system, uplink transmission block.
33. power headroom reporting method according to claim 25 is characterized in that
The power rising space value of described Physical Uplink Control Channel is the difference of the nominal maximum transmission power and the Physical Uplink Control Channel estimating power of subscriber equipment.
34. a power headroom reporting method comprises:
When the trigger event of the power headroom reporting of arbitrary Physical Uplink Control Channel takes place, subscriber equipment utilizes the L1 signal resource on the Physical Uplink Control Channel, power rising space value to base station report Physical Uplink Control Channel, and when finishing power headroom reporting, trigger or replacement power headroom reporting timer.
35. power headroom reporting method according to claim 34 is characterized in that
The trigger event of the power headroom reporting of described Physical Uplink Control Channel comprises: the long-time downlink path loss value of not measuring to base station report, subscriber equipment of the power rising space changes goes the transmitting power of control channel physically greater than predetermined variance threshold, subscriber equipment and receives that near maximum transmission power, subscriber equipment the number of times of power control instruction of closed loop Physical Uplink Control Channel is greater than setting in advance number of times.
36. power headroom reporting method according to claim 34 is characterized in that
Described L1 signaling comprises at least one in the following signaling: CQI signaling, PMI signaling, RI signaling, SR signaling and ACK/NACK signaling.
37. power headroom reporting method according to claim 36 is characterized in that
Described L1 signaling is by the power rising space value of the multiplexing Physical Uplink Control Channel of time-multiplexed mode.
38. power headroom reporting method according to claim 34 is characterized in that
The power rising space value of described Physical Uplink Control Channel is the difference of the nominal maximum transmission power and the Physical Uplink Control Channel estimating power of subscriber equipment.
39. the method that the control format indicating means of cyclic redundancy check (CRC) mask is controlled comprises:
The base station is according to the state of subscriber equipment, and the correct probability that predictive user equipment receives the physical format indicating channel is lower than/is higher than the first/the second predetermined probability threshold value;
The base station sends radio resource control signaling to subscriber equipment, enables/stop using control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel with notifying user equipment;
Subscriber equipment sends to the base station and to confirm signaling after receiving the radio resource control signaling that the base station sends;
Stride in the carrier dispatching descending after receiving the affirmation signaling that subscriber equipment sends the base station, enable/stop using based on Physical Downlink Control Channel the control format indicating means of cyclic redundancy check (CRC) mask;
Subscriber equipment is striden in the carrier dispatching descending after sending described affirmation signaling, according to/no longer according to control format indicating means, carry out the detection of the control format of cyclic redundancy check (CRC) mask based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
40. the method that the control format indicating means of cyclic redundancy check (CRC) mask is controlled comprises:
The base station sends ascending resource to subscriber equipment and gives signal and/or descending distributing signal by Physical Downlink Control Channel;
Subscriber equipment predicts that according to the state of himself its correct probability that receives the physical format indicating channel is lower than/is higher than the 3rd/the 4th predetermined probability threshold value;
Subscriber equipment sends radio resource control signaling to the base station, enables/stop using control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel with informing base station;
The base station sends to subscriber equipment and to confirm signaling, and stride in the carrier dispatching descending after receiving the radio resource control signaling that subscriber equipment sends, and enables/stop using the control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel;
Subscriber equipment is after receiving the affirmation signaling that the base station sends, stride in the carrier dispatching descending, according to/no longer according to control format indicating means, carry out the detection of the control format of cyclic redundancy check (CRC) mask based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
41., it is characterized in that according to claim 39 or 40 described methods
Described radio resource control signaling comprises and is used to indicate the parameter of enabling/stopping using based on the control format indicating means of the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel.
42., it is characterized in that according to claim 39 or 40 described methods
Comprise the parameter that is used to indicate the control format indicating means based on the cyclic redundancy check (CRC) mask of Physical Downlink Control Channel to be activated/to stop using in the described affirmation signaling.
43., it is characterized in that according to the described method of one of claim 39~42
When striding carrier dispatching, the base station indicates current cyclic redundancy check (CRC) mask of striding the Physical Downlink Control Channel of carrier dispatching whether to comprise control format information by selecting different cyclic redundancy check (CRC) masks.
44., it is characterized in that according to the described method of one of claim 39~43
The state of subscriber equipment comprises at least one in the following information: the re-transmission frequency that the re-transmission frequency of channel conditions, disturbance regime, the automatic repeat requests of mixing, Radio Link are controlled automatic repeat requests.
45., it is characterized in that according to the described method of one of claim 39~44
Described radio resource control signaling is handled by the Radio Resource controlled entity.
CN2010101202002A 2010-02-12 2010-02-12 Power headroom reporting method, base station and user equipment Pending CN102158894A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101202002A CN102158894A (en) 2010-02-12 2010-02-12 Power headroom reporting method, base station and user equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101202002A CN102158894A (en) 2010-02-12 2010-02-12 Power headroom reporting method, base station and user equipment

Publications (1)

Publication Number Publication Date
CN102158894A true CN102158894A (en) 2011-08-17

Family

ID=44440002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101202002A Pending CN102158894A (en) 2010-02-12 2010-02-12 Power headroom reporting method, base station and user equipment

Country Status (1)

Country Link
CN (1) CN102158894A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103596277A (en) * 2013-11-21 2014-02-19 北京北方烽火科技有限公司 Method, main dispatcher, base band unit and base station for achieving cell combination
CN104105189A (en) * 2013-04-12 2014-10-15 电信科学技术研究院 Power control method of device to device (D2D) transmission, power control system of D2D transmission and device
WO2015018368A1 (en) * 2013-08-08 2015-02-12 Mediatek Inc. Power headroom reporting in adaptive tdd systems
CN105340337A (en) * 2013-07-09 2016-02-17 夏普株式会社 Terminal device, base station device, communication method, and integrated circuit
CN106603213A (en) * 2015-10-20 2017-04-26 三星电子株式会社 Communication device and method of controlling same
CN107592666A (en) * 2017-08-30 2018-01-16 广东欧珀移动通信有限公司 The transmission power increasing method and device of terminal device
CN107889209A (en) * 2016-09-29 2018-04-06 华为技术有限公司 The method and terminal device of a kind of Power Control
CN109246810A (en) * 2018-10-30 2019-01-18 广州海格通信集团股份有限公司 A kind of uplink scheduling modification method and system based on LTE system
CN109391372A (en) * 2017-08-11 2019-02-26 华为技术有限公司 Communication means and equipment
CN110366867A (en) * 2017-03-24 2019-10-22 华为技术有限公司 The system and method for power control for uplink transmission
CN110602778A (en) * 2018-06-13 2019-12-20 大唐移动通信设备有限公司 Power headroom scheduling method and device
CN110719141A (en) * 2017-02-03 2020-01-21 华为技术有限公司 Information transmission method, decoding method and device
US10602463B2 (en) 2013-07-09 2020-03-24 Sharp Kabushiki Kaisha Terminal apparatus, base station apparatus, communication method and integrated circuit
CN111316716A (en) * 2018-09-28 2020-06-19 联发科技股份有限公司 Triggering adaptation mechanisms for UE power saving
US11076420B2 (en) 2016-04-01 2021-07-27 Huawei Technologies Co., Ltd. Resource scheduling method and apparatus using access channel resource period identifier
CN113596902A (en) * 2021-07-30 2021-11-02 西安抱朴通信科技有限公司 Base station side PHR optimization method, storage medium, electronic device and base station
CN113709893A (en) * 2021-09-22 2021-11-26 杭州红岭通信息科技有限公司 Scheduling method of uplink service
CN114189269A (en) * 2021-11-17 2022-03-15 北京科技大学 Uplink and downlink power control method and device of intelligent repeater

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101330313A (en) * 2007-06-19 2008-12-24 中兴通讯股份有限公司 Method for requesting ascending scheduling in an LTE system
WO2008155469A1 (en) * 2007-06-20 2008-12-24 Nokia Siemens Networks Oy Power headroom reporting method
CN101340711A (en) * 2007-07-06 2009-01-07 中兴通讯股份有限公司 Scheduling information uploading method for multi-carrier reinforced uplink access system
US20090175187A1 (en) * 2008-01-07 2009-07-09 Kristina Jersenius Method and Arrangement for Triggering Power Headroom Report Transmissions in a Telecommunications System

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101330313A (en) * 2007-06-19 2008-12-24 中兴通讯股份有限公司 Method for requesting ascending scheduling in an LTE system
WO2008155469A1 (en) * 2007-06-20 2008-12-24 Nokia Siemens Networks Oy Power headroom reporting method
CN101340711A (en) * 2007-07-06 2009-01-07 中兴通讯股份有限公司 Scheduling information uploading method for multi-carrier reinforced uplink access system
US20090175187A1 (en) * 2008-01-07 2009-07-09 Kristina Jersenius Method and Arrangement for Triggering Power Headroom Report Transmissions in a Telecommunications System

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104105189B (en) * 2013-04-12 2018-05-18 电信科学技术研究院 A kind of Poewr control method, system and the equipment of D2D transmission
CN104105189A (en) * 2013-04-12 2014-10-15 电信科学技术研究院 Power control method of device to device (D2D) transmission, power control system of D2D transmission and device
WO2014166416A1 (en) * 2013-04-12 2014-10-16 电信科学技术研究院 Method, system, and device for controlling d2d transmission power
CN105340337A (en) * 2013-07-09 2016-02-17 夏普株式会社 Terminal device, base station device, communication method, and integrated circuit
US10602463B2 (en) 2013-07-09 2020-03-24 Sharp Kabushiki Kaisha Terminal apparatus, base station apparatus, communication method and integrated circuit
CN105340337B (en) * 2013-07-09 2020-02-04 夏普株式会社 Terminal device, base station device, and communication method
WO2015018368A1 (en) * 2013-08-08 2015-02-12 Mediatek Inc. Power headroom reporting in adaptive tdd systems
CN103596277B (en) * 2013-11-21 2016-11-16 北京北方烽火科技有限公司 A kind of realize the method for cell combining, master scheduler, Base Band Unit and base station
CN103596277A (en) * 2013-11-21 2014-02-19 北京北方烽火科技有限公司 Method, main dispatcher, base band unit and base station for achieving cell combination
CN106603213A (en) * 2015-10-20 2017-04-26 三星电子株式会社 Communication device and method of controlling same
CN106603213B (en) * 2015-10-20 2021-06-25 三星电子株式会社 Communication apparatus and control method thereof
US11190959B2 (en) 2015-10-20 2021-11-30 Samsung Electronics Co., Ltd Communication device and method of controlling same
US11076420B2 (en) 2016-04-01 2021-07-27 Huawei Technologies Co., Ltd. Resource scheduling method and apparatus using access channel resource period identifier
US11678366B2 (en) 2016-04-01 2023-06-13 Huawei Technologies Co., Ltd. Method and apparatus for resource scheduling using an access identifier
CN107889209B (en) * 2016-09-29 2023-09-22 华为技术有限公司 Power control method and terminal equipment
CN107889209A (en) * 2016-09-29 2018-04-06 华为技术有限公司 The method and terminal device of a kind of Power Control
CN110719141B (en) * 2017-02-03 2020-08-21 华为技术有限公司 Information transmission method, decoding method and device
CN110719141A (en) * 2017-02-03 2020-01-21 华为技术有限公司 Information transmission method, decoding method and device
US11133894B2 (en) 2017-02-03 2021-09-28 Huawei Technologies Co., Ltd. Information transmission method, and decoding method and apparatus
US11838872B2 (en) 2017-03-24 2023-12-05 Huawei Technologies Co., Ltd. Systems and method of power control for uplink transmissions
CN110366867A (en) * 2017-03-24 2019-10-22 华为技术有限公司 The system and method for power control for uplink transmission
US11489631B2 (en) 2017-08-11 2022-11-01 Huawei Technologies Co., Ltd. Communication method and communications device
CN109391372B (en) * 2017-08-11 2021-08-13 华为技术有限公司 Communication method and device
CN109391372A (en) * 2017-08-11 2019-02-26 华为技术有限公司 Communication means and equipment
CN107592666B (en) * 2017-08-30 2020-07-10 Oppo广东移动通信有限公司 Method and device for increasing transmission power of terminal equipment
CN107592666A (en) * 2017-08-30 2018-01-16 广东欧珀移动通信有限公司 The transmission power increasing method and device of terminal device
CN110602778B (en) * 2018-06-13 2021-06-25 大唐移动通信设备有限公司 Power headroom scheduling method and device
CN110602778A (en) * 2018-06-13 2019-12-20 大唐移动通信设备有限公司 Power headroom scheduling method and device
CN111316716A (en) * 2018-09-28 2020-06-19 联发科技股份有限公司 Triggering adaptation mechanisms for UE power saving
CN111316716B (en) * 2018-09-28 2023-11-24 联发科技股份有限公司 Wireless communication method, wireless communication device, and computer-readable medium thereof
CN109246810B (en) * 2018-10-30 2021-03-30 广州海格通信集团股份有限公司 Uplink scheduling correction method and system based on LTE system
CN109246810A (en) * 2018-10-30 2019-01-18 广州海格通信集团股份有限公司 A kind of uplink scheduling modification method and system based on LTE system
CN113596902A (en) * 2021-07-30 2021-11-02 西安抱朴通信科技有限公司 Base station side PHR optimization method, storage medium, electronic device and base station
CN113709893A (en) * 2021-09-22 2021-11-26 杭州红岭通信息科技有限公司 Scheduling method of uplink service
CN113709893B (en) * 2021-09-22 2023-10-31 杭州红岭通信息科技有限公司 Scheduling method of uplink service
CN114189269A (en) * 2021-11-17 2022-03-15 北京科技大学 Uplink and downlink power control method and device of intelligent repeater

Similar Documents

Publication Publication Date Title
CN102158894A (en) Power headroom reporting method, base station and user equipment
US10327231B2 (en) Base station apparatus, user equipment and communication method
KR101291851B1 (en) Uplink scheduling support in multi-carrier wireless communication systems
US20200045639A1 (en) Method and apparatus for transmitting uplink signals in wireless communication system
US8437798B2 (en) Uplink scheduling support in multi-carrier wireless communication systems
US8958841B2 (en) Method and apparatus for controlling uplink transmission power in a multi-carrier wireless communication system
CN102238610A (en) Uplink power headroom reporting (PHR) method, base station (BS) and user equipment (UE)
JP6640718B2 (en) Method and apparatus for controlling transmission power of sounding reference signal in wireless communication system
KR101471312B1 (en) Method and apparatus for power headroom reporting during multi-carrier operation
TWI516157B (en) Method and apparatus for small cell enhancements in a wireless communication system
CN102742331B (en) The method and apparatus of ascending power is controlled in wireless access system
US9008000B2 (en) Power headroom reporting in wireless communication system for supporting a plurality of serving cells
CN106797248A (en) The method and its equipment of data are sent and received in a wireless communication system
CN102893679A (en) Power headroom reporting for non-scheduled uplink component carriers
CN107431507A (en) User terminal, wireless base station and wireless communications method
US9055564B2 (en) Apparatus and method for transmitting information on power headroom in multiple component carrier system
WO2014208951A1 (en) Method for controlling transmission power of sounding reference signal and apparatus for same
US20130090146A1 (en) Apparatus and method for transmitting information regarding power coordination in multi-component carrier system
US20220377566A1 (en) Communications devices, and methods
KR20120050878A (en) Apparatus and method for transmitting power information of component carrier in multiple component carrier system
KR20120015879A (en) Apparatus and method for transmitting information on power coordination in multiple component carrier system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110817