CN102156242A - 一种变压器绝缘组合试验方法 - Google Patents

一种变压器绝缘组合试验方法 Download PDF

Info

Publication number
CN102156242A
CN102156242A CN2011100735470A CN201110073547A CN102156242A CN 102156242 A CN102156242 A CN 102156242A CN 2011100735470 A CN2011100735470 A CN 2011100735470A CN 201110073547 A CN201110073547 A CN 201110073547A CN 102156242 A CN102156242 A CN 102156242A
Authority
CN
China
Prior art keywords
voltage
terminal
transformer
wiring area
terminals
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100735470A
Other languages
English (en)
Other versions
CN102156242B (zh
Inventor
李璠
陈志勇
张志刚
苏红梅
侯双林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Hebei Electric Power Construction Adjustment Test Institute
Original Assignee
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Priority to CN201110073547.0A priority Critical patent/CN102156242B/zh
Publication of CN102156242A publication Critical patent/CN102156242A/zh
Application granted granted Critical
Publication of CN102156242B publication Critical patent/CN102156242B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

本发明涉及一种变压器绝缘组合试验方法,首先用引线将变压器高、中、低压侧端子分别接至变压器组合接线装置的对应接线端子上;其次用引线将变压器高、中压套管的末屏端子分别接至变压器组合接线装置对应的末屏端子上;最后将测试仪器直接从组合接线装置接线来完成各项测试工作;所述变压器组合接线装置设置为三个接线区,分别为高压、中、低压侧接线区,每个接线区之间以及接线区与外壳之间均设置有绝缘隔板,在高、中压侧接线区分别设置有电流I端子、电压U端子、末屏端子各4个,接地端子1个;在低压侧接线区设有电流I端子电压U端子各3个和1个接地端子。本发明实现试验人员进行一次变压器上引线工作即可完成全部试验项目,提高了作业安全性并缩短试验的停电时间。

Description

一种变压器绝缘组合试验方法
技术领域
本发明涉及变压器技术领域,具体涉及一种应用于电力系统判断高电压等级的变压器内部故障性质及缺陷程度的绝缘组合试验方法。
背景技术
目前,国内电力系统对变压器检测进行的例行试验项目包括变压器绝缘电阻、绕组电阻、绕组介质损耗因数和电容量,对这四个试验项目进行综合分析来判断变压器有无内部缺陷及缺陷程度;判断套管好坏的主要试验项目包括套管介质损耗因数和电容量以及末屏试验。特别是近年来电力系统开展状态检修工作中,这些试验项目对变压器运行状态的诊断和评估起着至关重要的作用。但目前进行这些变压器试验项目时,需要人员反复攀爬变压器、频繁倒换试验接线,这些重复的工作必将增大工人的劳动强度并延长停电的时间。这成为实际生产中亟待解决的一个问题。
发明内容
本发明的目的是提供一种变压器绝缘组合试验方法,该方法简单易行、操作方便、安全性好,不仅能实现变压器上一次引线即可完成六个试验项目,而且能及时准确地判断变压器绝缘状态,保证变压器的正常安全运行,其特别适用用于110kV及以上电压等级的变压器绝缘试验项目的测试。
本发明的技术方案如下:
本发明变压器绝缘组合试验方法,其特征在于:
首先用引线将变压器高压侧端子、中压侧端子、低压侧端子分别接至变压器组合接线装置的对应接线端子上:其中,引线的电缆芯线接至组合接线装置的电流I端子上,引线的内屏蔽线接至组合接线装置的电压U端子上,所述连接变压器与变压器组合接线装置之间电流I端子和电压U端子的引线采用双屏蔽高压试验电缆,电流:10A,电压10kV;
其次用引线将变压器高压套管的末屏端子、中压套管的末屏端子分别接至变压器组合接线装置对应的末屏端子上,所述连接变压器与变压器组合接线装置之间末屏端子的引线采用单屏蔽高压试验电缆,电流:1A,电压:3kV;
最后将测试仪器直接从组合接线装置接线来完成各项测试工作;测试时通过变压器组合接线装置插拔线输出进行短接和接地操作,来实现变压器各项绝缘试验项目之间的转换;
所述变压器组合接线装置包括外壳,其设置为三个接线区,分别为高压侧接线区、中压侧接线区、低压侧接线区,每个接线区之间以及接线区与外壳之间均设置有绝缘隔板,在高压侧接线区和中压侧接线区分别设置有4个电流I端子、4个电压U端子、4个末屏端子、1个接地端子;在低压侧接线区设有3个电流I端子、3个电压U端子和1个接地端子;
所述述变压器组合接线装置中设置的电流I端子和电压U端子共计22个,以满足绕组绝缘电阻、绕组直流电阻、绕组介质损耗因数、电容量等所有绕组试验项目,每个端子间及对地的耐压值为12~15kV,大于变压器绕组试验所施加的最高电压10千伏;设置的末屏端子共计8个,来满足所有套管及末屏的试验项目,每个端子间及对地的耐压值大于变压器套管末屏试验所施加的最高电压3千伏;设置的接地端子共计3个,来满足试验项目的接地要求;上述各端子间做有良好的绝缘设置,所有端子均采用插拔线输出,插拔线接线柱底部采用环氧树脂全部密封。
本发明的有益效果为:
本发明方法,其通过特制引线和变压器组合试验装置,实现试验人员进行一次变压器上引线工作完成不同绕组、不同相别的全部变压器绝缘试验项目;而且能及时准确地判断变压器绝缘状态,保证变压器的正常安全运行,其特别适用用于110kV及以上电压等级的变压器绝缘试验项目的测试;
本发明方法改变了一次变压器试验需要检修人员反复攀爬变压器十余次的现状,在保证试验结果准确的前提下,既提高了作业的安全性,又显著提高工作效率,可以缩短停电时间近一半,在电力行业中有较好的应用前景。
附图说明
图1为本发明实施例中所述的变压器组合接线装置的结构示意图。
具体实施方式
如附图所示本发明实施例中所用到的变压器组合接线装置,包括外壳7,其设置为三个接线区,分别为高压侧接线区、中压侧接线区、低压侧接线区,每个接线区之间以及接线区与外壳7之间均设置有绝缘隔板9、12,在高压侧接线区和中压侧接线区分别设置有4个电流I端子1、3,  4个电压U端子2、4,  4个末屏端子13、10,  1个接地端子14、11; 在低压侧接线区设有3个电流I端子5、3个电压U端子6和1个接地端子8;所述分别设置在高、中、低压侧接线区的电流I端子和电压U端子的其每个端子间及对地的耐压值设为12~15kV,所述分别设置在高、中压侧接线区的末屏端子其每个端子间及对地的耐压值设置为大于3千伏,上述各端子间设置有良好的绝缘设置,所有端子均采用插拔线输出,插拔线接线柱底部采用环氧树脂全部密封。
本发明所述方法实施例1,以测试高压绕组绝缘电阻为例:首先用引线将变压器高压侧端子、中压侧端子、低压侧端子分别接至变压器组合接线装置的对应接线端子上:其中,引线的电缆芯线接至组合接线装置的电流I端子上,引线的内屏蔽线接至组合接线装置的电压U端子上,所述连接变压器与变压器组合接线装置之间电流I端子和电压U端子的引线采用双屏蔽高压试验电缆,电流:10A,电压10kV;
其次用引线将变压器高压套管的末屏端子、中压套管的末屏端子分别接至变压器组合接线装置对应的末屏端子上,所述连接变压器与变压器组合接线装置之间末屏端子的引线采用单屏蔽高压试验电缆,电流:1A,电压:3kV;
最后将测试仪器直接从组合接线装置接线,其只需在变压器组合试验装置上将中压侧接线区、低压侧接线区的电流I端子和电压U端子分别进行插拔线短接并接地,高压侧接线区和中压侧接线区的末屏端子分别短接并接地,高压侧接线区的电流I端子和电压U端子短接后与绝缘电阻测试仪HV引线相连,即可完成高压绕组绝缘电阻的测量。
本发明所述方法实施例2 ,以测试高压绕组A相直流电阻为例:
首先用引线将变压器高压侧端子、中压侧端子、低压侧端子分别接至变压器组合接线装置的对应接线端子上:其中,引线的电缆芯线接至组合接线装置的电流I端子上,引线的内屏蔽线接至组合接线装置的电压U端子上,所述连接变压器与变压器组合接线装置之间电流I端子和电压U端子的引线采用双屏蔽高压试验电缆,电流:10A,电压10kV;
其次用引线将变压器高压套管的末屏端子、中压套管的末屏端子分别接至变压器组合接线装置对应的末屏端子上,所述连接变压器与变压器组合接线装置之间末屏端子的引线采用单屏蔽高压试验电缆,电流:1A,电压:3kV;
最后将测试仪器直接从组合接线装置接线,其只需在组合接线装置上将非被试绕组和非被试相进行接地操作,直流电阻测试仪的电流测试线分别接至高压侧接线区A相和O相的I端子上,电压测试线分别接至高压侧接线区A相和O相的U端子上,即可完成高压A相绕组直流电阻的测量。
本发明所述方法实施例3, 以测试高压绕组介质损耗因数和电容量为例:首先用引线将变压器高压侧端子、中压侧端子、低压侧端子分别接至变压器组合接线装置的对应接线端子上:其中,引线的电缆芯线接至组合接线装置的电流I端子上,引线的内屏蔽线接至组合接线装置的电压U端子上,所述连接变压器与变压器组合接线装置之间电流I端子和电压U端子的引线采用双屏蔽高压试验电缆,电流:10A,电压10kV;
其次用引线将变压器高压套管的末屏端子、中压套管的末屏端子分别接至变压器组合接线装置对应的末屏端子上,所述连接变压器与变压器组合接线装置之间末屏端子的引线采用单屏蔽高压试验电缆,电流:1A,电压:3kV;
最后将测试仪器直接从组合接线装置接线,其只需在组合接线装置上将非被试绕组进行接地操作,高压侧接线区电流I端子、U端子短接与介损测试仪高压测试线芯线相连,即可完成高压绕组介质损耗因数和电容量的侧量。
其它试验项目均与上述实例相似,只需在组合试验装置上操作,即可完成不同绕组、不同相别的全部绝缘试验项目。
本发明方法改变了一次变压器试验需要检修人员反复攀爬变压器十余次的现状,在保证试验结果准确的前提下,既提高了作业的安全性,又显著提高工作效率,可以缩短停电时间近一半,在电力行业中有较好的应用前景。

Claims (1)

1.一种变压器绝缘组合试验方法,其特征在于:
首先用引线将变压器高压侧端子、中压侧端子、低压侧端子分别接至变压器组合接线装置的对应接线端子上:其中,引线的电缆芯线接至组合接线装置的电流I端子上,引线的内屏蔽线接至组合接线装置的电压U端子上,所述连接变压器与变压器组合接线装置之间电流I端子和电压U端子的引线采用双屏蔽高压试验电缆,电流:10A,电压10kV;
其次用引线将变压器高压套管的末屏端子、中压套管的末屏端子分别接至变压器组合接线装置对应的末屏端子上,所述连接变压器与变压器组合接线装置之间末屏端子的引线采用单屏蔽高压试验电缆,电流:1A,电压:3kV;
最后将测试仪器直接从组合接线装置接线来完成各项测试工作;测试时通过变压器组合接线装置插拔线输出进行短接和接地操作,来实现变压器各项绝缘试验项目之间的转换;
所述变压器组合接线装置设置为三个接线区,分别为高压侧接线区、中压侧接线区、低压侧接线区,每个接线区之间以及接线区与外壳之间均设置有绝缘隔板,在高压侧接线区和中压侧接线区分别设置有4个电流I端子、4个电压U端子、4个末屏端子、1个接地端子;在低压侧接线区设有3个电流I端子、3个电压U端子和1个接地端子;所述分别设置在高、中、低压侧接线区的电流I端子和电压U端子的其每个端子间及对地的耐压值设为12~15kV,所述分别设置在高、中压侧接线区的末屏端子其每个端子间及对地的耐压值设置为大于3千伏,上述各端子间设置有良好的绝缘设置,所有端子均采用插拔线输出,插拔线接线柱底部采用环氧树脂全部密封。
CN201110073547.0A 2011-03-25 2011-03-25 一种变压器绝缘组合试验方法 Active CN102156242B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110073547.0A CN102156242B (zh) 2011-03-25 2011-03-25 一种变压器绝缘组合试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110073547.0A CN102156242B (zh) 2011-03-25 2011-03-25 一种变压器绝缘组合试验方法

Publications (2)

Publication Number Publication Date
CN102156242A true CN102156242A (zh) 2011-08-17
CN102156242B CN102156242B (zh) 2014-01-01

Family

ID=44437809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110073547.0A Active CN102156242B (zh) 2011-03-25 2011-03-25 一种变压器绝缘组合试验方法

Country Status (1)

Country Link
CN (1) CN102156242B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102568775A (zh) * 2011-12-29 2012-07-11 保定天威集团(江苏)五洲变压器有限公司 一种可变式试验中间变压器装置
CN102749535A (zh) * 2012-06-05 2012-10-24 辽宁省电力有限公司葫芦岛供电公司 一种220kv输电主变电设备电性能测试方法
CN103983814A (zh) * 2014-06-07 2014-08-13 国家电网公司 变压器综合测试箱
CN104181343A (zh) * 2014-09-03 2014-12-03 国家电网公司 变压器试验通用集线装置
CN105911356A (zh) * 2016-06-24 2016-08-31 中车唐山机车车辆有限公司 主变压器绝缘电阻的测试装置
CN106706970A (zh) * 2017-01-16 2017-05-24 国家电网公司 变压器直流电阻试验接线转换盒
CN106771406A (zh) * 2017-01-20 2017-05-31 国网山东省电力公司滨州供电公司 一种主变压器试验集线装置
CN107807258A (zh) * 2017-09-26 2018-03-16 杭州西湖电子研究所 一种具有双屏蔽功能的线缆接头

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5276402A (en) * 1992-02-28 1994-01-04 Hipotronics, Inc. Three-phase transformer testing method and system
CN201402305Y (zh) * 2009-04-24 2010-02-10 上海久隆电气设备试验有限公司 干式变压器局部放电试验的接线结构
CN101769961A (zh) * 2008-12-30 2010-07-07 上海金炫建设工程有限公司 一种不拆引线测大型变压器直流电阻的方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5276402A (en) * 1992-02-28 1994-01-04 Hipotronics, Inc. Three-phase transformer testing method and system
CN101769961A (zh) * 2008-12-30 2010-07-07 上海金炫建设工程有限公司 一种不拆引线测大型变压器直流电阻的方法
CN201402305Y (zh) * 2009-04-24 2010-02-10 上海久隆电气设备试验有限公司 干式变压器局部放电试验的接线结构

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102568775A (zh) * 2011-12-29 2012-07-11 保定天威集团(江苏)五洲变压器有限公司 一种可变式试验中间变压器装置
CN102749535A (zh) * 2012-06-05 2012-10-24 辽宁省电力有限公司葫芦岛供电公司 一种220kv输电主变电设备电性能测试方法
CN102749535B (zh) * 2012-06-05 2014-09-24 辽宁省电力有限公司葫芦岛供电公司 一种220kv输电主变电设备电性能测试方法
CN103983814A (zh) * 2014-06-07 2014-08-13 国家电网公司 变压器综合测试箱
CN103983814B (zh) * 2014-06-07 2017-01-25 国家电网公司 变压器综合测试箱
CN104181343A (zh) * 2014-09-03 2014-12-03 国家电网公司 变压器试验通用集线装置
CN105911356A (zh) * 2016-06-24 2016-08-31 中车唐山机车车辆有限公司 主变压器绝缘电阻的测试装置
CN106706970A (zh) * 2017-01-16 2017-05-24 国家电网公司 变压器直流电阻试验接线转换盒
CN106706970B (zh) * 2017-01-16 2023-11-24 国家电网公司 变压器直流电阻试验接线转换盒
CN106771406A (zh) * 2017-01-20 2017-05-31 国网山东省电力公司滨州供电公司 一种主变压器试验集线装置
CN107807258A (zh) * 2017-09-26 2018-03-16 杭州西湖电子研究所 一种具有双屏蔽功能的线缆接头
CN107807258B (zh) * 2017-09-26 2023-04-28 杭州西湖电子研究所 一种具有双屏蔽功能的线缆接头

Also Published As

Publication number Publication date
CN102156242B (zh) 2014-01-01

Similar Documents

Publication Publication Date Title
CN102156242B (zh) 一种变压器绝缘组合试验方法
CN101354418B (zh) 一种电力变压器不拆线试验方法
CN103018576B (zh) 一种测量电力变压器介质损耗因数和绝缘电阻的方法
CN106324444B (zh) 一种变压器试验平台
CN104215835A (zh) 一种主变自动化测量系统
CN103308832A (zh) 一种高压电缆绝缘中间接头局部放电测试装置及使用方法
CN111123050B (zh) 变压器与gis以gil连接方式的变压器局部放电试验装置
Su Case study: lessons learned from the failure of a new 230-kV transformer-cable termination
CN204129166U (zh) 一种可移相交流耐压试验装置
CN202693622U (zh) 电力变压器测试连接装置
CN205450042U (zh) 电力变压器试验转接操作平台
CN104808022A (zh) 一种三相三绕组变压器三侧联合运行温升试验接线方法
CN110890201B (zh) 一种三相并联电抗器引线连接结构
CN103605101B (zh) 工频分段升压试验仪
CN202041553U (zh) 一种变压器试验组合接线装置
CN104360175A (zh) 一种油油套管变压器不拆头变比试验的测量方法
CN113514669B (zh) 一种牵引变电所设备检测的接线方法
CN106932613A (zh) 一种35kV及110kV变压器例行试验接线转换箱
CN111751678A (zh) 变压器预防性试验方法
CN103454536A (zh) 一种电力变压器试验方法
Priambodo et al. Root cause analysis of transformer and generator stator failure on hydropower plant in indonesia
ElFaraskoury Experiences of Sweep Frequency Response Analyser for the Diagnosis of Transformer Winding Damage
CN106291296B (zh) 一种变压器局部放电缺陷模拟装置及方法
CN210742394U (zh) 一种变压器绕组机械故障模拟系统
CN203630330U (zh) 工频分段升压试验仪

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HEBEI ELECTRIC POWER CORPORATION ELECTRIC POWER RE

Free format text: FORMER OWNER: HEBEI ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20121220

Owner name: STATE GRID CORPORATION OF CHINA HEBEI ELECTRIC POW

Effective date: 20121220

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121220

Address after: 050021 No. 238 South Sports street, Yuhua Road, Hebei, Shijiazhuang

Applicant after: Electric Power Research Institute of Hebei Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Hebei Electric Power Construction & Adjustment Research Institute

Address before: 050021 No. 238 South Sports street, Hebei, Shijiazhuang

Applicant before: Hebei Electric Power Research Institute

C14 Grant of patent or utility model
GR01 Patent grant