CN102152481A - Integrated molding and pouring process for semi-enclosed glass fiber reinforced plastic products with infolded flanges - Google Patents

Integrated molding and pouring process for semi-enclosed glass fiber reinforced plastic products with infolded flanges Download PDF

Info

Publication number
CN102152481A
CN102152481A CN2010106025790A CN201010602579A CN102152481A CN 102152481 A CN102152481 A CN 102152481A CN 2010106025790 A CN2010106025790 A CN 2010106025790A CN 201010602579 A CN201010602579 A CN 201010602579A CN 102152481 A CN102152481 A CN 102152481A
Authority
CN
China
Prior art keywords
mould
main body
flange
fiber reinforced
glass fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010106025790A
Other languages
Chinese (zh)
Other versions
CN102152481B (en
Inventor
罗杰
钟连兵
吴崇海
杨超平
周文华
余成杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan East Tree New Material Co Ltd
Original Assignee
DEC Dongfang Turbine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DEC Dongfang Turbine Co Ltd filed Critical DEC Dongfang Turbine Co Ltd
Priority to CN201010602579.0A priority Critical patent/CN102152481B/en
Publication of CN102152481A publication Critical patent/CN102152481A/en
Application granted granted Critical
Publication of CN102152481B publication Critical patent/CN102152481B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • External Artificial Organs (AREA)

Abstract

The invention relates to an integrated molding and pouring process for semi-enclosed glass fiber reinforced plastic products with infolded flanges. The process comprises the steps of: first, producing a mould, wherein the mould consists of a main body part and a flange part, a positioning and locking part is embedded at the side of the main body part in advance; the flange part is provided with a locking structure corresponding to the position of the positioning and locking part, and is fixed on the main body part by the positioning and locking part; second, paving a product framework on the inner wall of the mould; third, paving one sealing film layer on the surface of the framework, wherein the edge of the sealing film extends out of the cavity of the main body part of the mould, rounds the flange part, and is adhered on the peripheral face of the edge of the main body part of the mould with sealing adhesive tape, on the part fixedly provided the flange part, then, a hermetical space is formed between the main body part of the mould and the sealing film, the product framework and the flange part of the mould are encapsulated in the hermetical space, and the clearance between the mating faces of the main body part and the flange part is not communicated with the atmosphere; fourth, processing a suction port and a pouring port, which are respectively connected with a vacuum pump and a pouring device, on the sealing film; fifth, vaccumizing and pouring resin; and sixth, demoulding.

Description

The one-body molded instillation process of semiclosed glass fiber reinforced plastics product of band invagination flange
Technical field
The present invention relates to the instillation process in the industrial production, specifically relate to a kind of one-body molded instillation process of semiclosed glass fiber reinforced plastics product with the invagination flange.It can be widely used in the semiclosed large-scale composite material production with the invagination flange, for example wind-driven generator case product and blade of wind-driven generator or the like.
Background technology
Priming by vacuum is a kind of technology of utilizing vacuum pressure to make moulding, its notion is directly to be laid in fibre reinforced materials and foamed material etc. on the mould, form the goods skeleton, coat with the vacuum seal film then, sealed mold, then be pumped to negative pressure state with vavuum pump, last resin pours into the entire die system by the glue inlet tube on the diaphragm seal, soaks into each gap of goods skeleton shop layer.Whole filling process needs mould to have good sealing, to guarantee the condition of high vacuum degree in the mould.Vacuum perfusion process and hand are stuck with paste technology and are compared, and its advantage mainly is: 1. health; Safety; 2. consumables cost is low; Flow velocity is fast; Work period is short; Die sinking technology cost is low; 3. fiber reinforcement cloth content is significantly increased; Intensity is higher, and size is more stable; Air bubble content seldom; Reduce man's activity, the stability of improving the quality of products.Thereby vacuum perfusion process is adopted by a lot of manufacturing enterprises.
Yet, the goods that present vacuum perfusion process is fit to can only be Open architecture, that is to say, the goods made from priming by vacuum (are primarily aimed at the galss fiber reinforced resin base composite-material product, be glass fiber reinforced plastics product) must not have the face (being the invagination flange arrangement) of inside turnover, if during, will cause the moulded products can't the demoulding with the goods of vacuum perfusion process one-body molded band invagination flange.Therefore, in common industrial production, the method for generally taking main body and flange to pour into respectively to the goods of band invagination flange, after treating main body and flange form, adopt hand to stick with paste technology the two and bond together, the goods total quality that the method is produced is poor, intensity is low, and is firm inadequately; In addition, the manufacturing process trouble, the work period is long, and labor strength is big.In order to improve time method, shorten the work period, some manufacturing enterprise adopts the goods of the detachable one-body molded band invagination of mould flange, as depicted in figs. 1 and 2: make and the suitable mould of goods that will pour into, this mould comprises main part 1 and flange section 6, main part 1 is the branch body structure with flange section 6, when perfusion, adopt Screw arbor with nut at both-ends 8 that flange section 6 is fixed on the main part 1, form the mould of band invagination flange, in mould, lay reinforcing fiber materials, form goods skeleton 2, lay the water conservancy diversion net on skeleton 2 surfaces, glue inlet tube road 7 and exhaust pipe 3, lay vacuum seal film 4 at last, the limit mouth of sealing film 4 is bonded on the land area of flange mould 6 with sealant tape 5, and then forms the sealing to mould, has bleeding point and perfusing hole on the diaphragm seal 4.Though it can carry out one-body molded to the goods of band invagination flange, simplify manufacturing process, reduce labor strength, but also there is following main deficiency in it: 1. diaphragm seal fails the mating surface gap of die main body part and flange section is sealed, and makes the mating surface gap of die main body part and flange section form main gas leakage point, the sealing of mould is poor, the vacuum that forms in the mould is low, and then influences quality of item, and scrappage is high, production efficiency is low, and production cost is big; 2. the Screw arbor with nut at both-ends hole that is provided with on die main body part and the flange section has formed less important gas leakage point, further reduces the sealing of mould, influences quality of item and ordinary production.
Summary of the invention
The objective of the invention is to: at above-mentioned the deficiencies in the prior art, a kind of vacuum perfusion process of efficient quick is provided, specifically be the one-body molded instillation process of semiclosed glass fiber reinforced plastics product of band invagination flange, the goods that make with it have reduced production cost when ensuring the quality of products.
The technical solution used in the present invention is:
A kind of one-body molded instillation process of semiclosed glass fiber reinforced plastics product with the invagination flange may further comprise the steps:
1.. make a kind of mould that pours into semiclosed glass fiber reinforced plastics product, this mould comprises main part and flange section, main part is extended and is used for the limit that is connected with flange section, is embedded with positioning and locking spare on this limit, and this positioning and locking spare is an overall structure with main part; Flange section is provided with and the corresponding closing component structure in positioning and locking spare position, by positioning and locking spare flange section is fixed on the main part;
2.. the inwall at mould is laid multilayer woven glass fabric, forms the skeleton of semiclosed glass fiber reinforced plastics product; Lay water conservancy diversion net and priming line on the skeleton surface;
3.. at shop, skeleton surface one deck diaphragm seal, the limit mouth of sealing film is routed up the die cavity of die main body part, walk around the mould flange section, stick on sealant tape on the peripheral surface on limit of die main body partial fixing flange section, at this moment, form a confined space between die main body part and the diaphragm seal, the skeleton of semiclosed glass fiber reinforced plastics product, water conservancy diversion net, priming line and mould flange section all are wrapped in this confined space, the obstructed atmosphere in mating surface gap of die main body part and flange section;
4.. leave resin perfusing hole and bleeding point on diaphragm seal, perfusing hole and bleeding point connect with corresponding priming line respectively, and the vavuum pump exhaust tube is connected with bleeding point on the diaphragm seal, and the joint portion seals with sealant tape; The resin intrusion pipe is connected with perfusing hole on the diaphragm seal, and the joint portion seals with sealant tape;
5.. start vavuum pump, confined space is vacuumized, start perfusion equipment, perfusion resin in confined space, resin infilter the gap of glass fabric;
6.. treat the demoulding behind resin solidification, the product molding.
Step 1. described in positioning and locking spare be bolt arrangement, hook lock structure or the locating pin structure that has locking function.
Step 1. described in closing component structure be through hole or breach.
Step 2. described in priming line comprise glue inlet tube road and exhaust pipe.
The invention has the beneficial effects as follows: above-mentioned simple, easy to operate instillation process has very strong specific aim to the glass fiber reinforced plastics product of being with the invagination flange, when perfusion, mould is carried out thorough seal, guarantee the vacuum in the mould, and then guarantee product quality, speed production efficient, reduce even stop scrappage, reduce production costs.
Description of drawings
Fig. 1 is the structural representation of the wherein a kind of goods that the present invention is directed to.
Fig. 2 is the filling process schematic diagram of existing instillation process.
Fig. 3 is a kind of filling process schematic diagram of the present invention.
Fig. 4 is the mould structure schematic diagram that is applied to filling process shown in Figure 3.
The specific embodiment
Referring to Fig. 1, Fig. 3 and Fig. 4: the present invention includes following sequential steps:
1.. mfg. moulding die, this mould is suitable with the semiclosed glass fiber reinforced plastics product that will pour into, mould comprises main part 1 and flange section 6, main part 1 is extended and is used for the limit that is connected with flange section 6, on this limit, be embedded with bolt 9, the bottom of bolt 9 and main part 1 are overall structure, the top projection of bolt 9.Flange section 6 is drilled with and the corresponding bolt hole in bolt 9 positions, by bolt 9 flange section 6 is fixed on the main part 1, leaves the adequate space of pasting sealant tape 5 on the peripheral surface on the limit of main part 1 mounting flange part 6.
2.. a series of conventional treatment that the main part 1 and the flange section 6 of mould were cleared up, beaten demoulding wax or smear demoulding water respectively.After waiting to handle, lay multilayer woven glass fabric at the inwall of mould, these glass fabrics form the skeleton 2 of semiclosed glass fiber reinforced plastics product, lay water conservancy diversion net, glue inlet tube road 7 and exhaust pipe 3 on the surface of skeleton 2.
3.. at the shop, surface of skeleton 2 one deck diaphragm seal 4, the limit mouth of sealing film 4 is routed up the die cavity of die main body part 1, walk around mould flange section 6, stick on sealant tape 5 on the peripheral surface on limit of die main body part 1 mounting flange part 6, at this moment, form a confined space between die main body part 1 and the diaphragm seal 4, the skeleton 2 of semiclosed glass fiber reinforced plastics product, the water conservancy diversion net, glue inlet tube road 7, exhaust pipe 3 and mould flange section 6 all are wrapped in this confined space, the obstructed atmosphere in mating surface gap of die main body part 1 and flange section 6 makes mould be in complete sealing state.
4.. leave resin perfusing hole and bleeding point on diaphragm seal 4, perfusing hole connects with glue inlet tube road 7, and bleeding point connects with exhaust pipe 3.The exhaust tube of vavuum pump is connected with bleeding point on the diaphragm seal 4, and the joint portion seals with sealant tape, and the resin intrusion pipe is connected with perfusing hole on the diaphragm seal 4, and the joint portion seals with sealant tape.
5.. start vavuum pump, confined space is vacuumized, start perfusion equipment, perfusion resin in confined space, resin infilter the gap of glass fabric;
6.. treat that epoxy-resin systems gel solidification in the mould to a certain degree afterwards (assurance meets design requirement), carries out the demoulding.The concrete demoulding is to throw off vacuum seal film 4, and the bolt 9 that connects mould main part 1 and flange section 6 is unclamped, and takes die main body part 1 and flange section 6 apart, takes out moulded products; Change goods over to subsequent processing, carry out post processing.
The positioning and locking spare of above-mentioned bolt arrangement also can adopt other locking mechanism to replace, and for example has the alignment pin of locking function or hook lock etc.When positioning and locking spare adopted bolt arrangement, the closing component structure of flange section was through hole or breach; When the employing of positioning and locking spare had the alignment pin of locking function, the closing component structure of flange section was a through hole; When positioning and locking spare adopted the hook lock structure, the closing component structure of flange section can be through hole, also can be breach, can also not establish any closing component structure, directly carries out sealed.The closing component structure that these positioning and locking spares and positioning and locking spare cooperated is existing public technology.

Claims (4)

1. one-body molded instillation process of semiclosed glass fiber reinforced plastics product with the invagination flange may further comprise the steps:
1.. make a kind of mould that pours into semiclosed glass fiber reinforced plastics product, this mould comprises main part and flange section, main part is extended and is used for the limit that is connected with flange section, is embedded with positioning and locking spare on this limit, and this positioning and locking spare is an overall structure with main part; Flange section is provided with and the corresponding closing component structure in positioning and locking spare position, by positioning and locking spare flange section is fixed on the main part;
2.. the inwall at mould is laid multilayer woven glass fabric, forms the skeleton of semiclosed glass fiber reinforced plastics product; Lay water conservancy diversion net and priming line on the skeleton surface;
3.. at shop, skeleton surface one deck diaphragm seal, the limit mouth of sealing film is routed up the die cavity of die main body part, walk around the mould flange section, stick on sealant tape on the peripheral surface on limit of die main body partial fixing flange section, at this moment, form a confined space between die main body part and the diaphragm seal, the skeleton of semiclosed glass fiber reinforced plastics product, water conservancy diversion net, priming line and mould flange section all are wrapped in this confined space, the obstructed atmosphere in mating surface gap of die main body part and flange section;
4.. leave resin perfusing hole and bleeding point on diaphragm seal, perfusing hole and bleeding point connect with corresponding priming line respectively, and the vavuum pump exhaust tube is connected with bleeding point on the diaphragm seal, and the joint portion seals with sealant tape; The resin intrusion pipe is connected with perfusing hole on the diaphragm seal, and the joint portion seals with sealant tape;
5.. start vavuum pump, confined space is vacuumized, start perfusion equipment, perfusion resin in confined space, resin infilter the gap of glass fabric;
6.. treat the demoulding behind resin solidification, the product molding.
2. according to the one-body molded instillation process of semiclosed glass fiber reinforced plastics product of the described band invagination of claim 1 flange, it is characterized in that: step 1. described in positioning and locking spare be bolt arrangement, hook lock structure or the locating pin structure that has locking function.
3. according to the one-body molded instillation process of semiclosed glass fiber reinforced plastics product of the described band invagination of claim 1 flange, it is characterized in that: step 1. described in closing component structure be through hole or breach.
4. according to the one-body molded instillation process of semiclosed glass fiber reinforced plastics product of the described band invagination of claim 1 flange, it is characterized in that: step 2. described in priming line comprise glue inlet tube road and exhaust pipe.
CN201010602579.0A 2010-12-23 2010-12-23 Integrated molding and pouring process for semi-enclosed glass fiber reinforced plastic products with infolded flanges Active CN102152481B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010602579.0A CN102152481B (en) 2010-12-23 2010-12-23 Integrated molding and pouring process for semi-enclosed glass fiber reinforced plastic products with infolded flanges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010602579.0A CN102152481B (en) 2010-12-23 2010-12-23 Integrated molding and pouring process for semi-enclosed glass fiber reinforced plastic products with infolded flanges

Publications (2)

Publication Number Publication Date
CN102152481A true CN102152481A (en) 2011-08-17
CN102152481B CN102152481B (en) 2014-04-02

Family

ID=44434300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010602579.0A Active CN102152481B (en) 2010-12-23 2010-12-23 Integrated molding and pouring process for semi-enclosed glass fiber reinforced plastic products with infolded flanges

Country Status (1)

Country Link
CN (1) CN102152481B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102873881A (en) * 2012-10-18 2013-01-16 山东双一集团有限公司 Method for connecting glass reinforced plastic slope and horizontal fixed point boss
WO2015136157A1 (en) * 2014-03-14 2015-09-17 Sironen Antti Vacuum assisted resin infusion moulding method and mould
CN105881930A (en) * 2016-04-01 2016-08-24 中航飞机股份有限公司西安飞机分公司 Forming device and forming method of I-shaped part
CN109369038A (en) * 2018-11-02 2019-02-22 北京航玻新材料技术有限公司 A kind of edge seal mode of laminated glass
CN110435183A (en) * 2019-08-14 2019-11-12 山东双一科技股份有限公司 A kind of two layers of flange integral formation method of glass reinforced plastic
CN112591036A (en) * 2020-12-22 2021-04-02 海阳市凌波造船科技有限公司 Manufacturing method and manufacturing system of glass fiber reinforced plastic bottom hull
CN112893042A (en) * 2021-02-03 2021-06-04 山西汾西重工有限责任公司 Method for encapsulating circuit board of detonating device and vacuum system
CN114986767A (en) * 2022-07-21 2022-09-02 中汽研汽车检验中心(天津)有限公司 Method, device and storage medium for filling skin layer of automobile crash dummy

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0491650A2 (en) * 1990-12-19 1992-06-24 United Technologies Corporation Conformal composite molding
CN2578328Y (en) * 2003-03-17 2003-10-08 成都泓奇实业股份有限公司 GFRP methane tank
CN101007624A (en) * 2007-01-22 2007-08-01 华东师范大学 Method for synthesizing metal oxide mesoporous material by one-step vacuum perfusion
US20090039566A1 (en) * 2007-08-07 2009-02-12 Rodman William L Composite structures and methods of making same
CN101585238A (en) * 2009-07-02 2009-11-25 中国人民解放军国防科学技术大学 Integral molding technique and molding system for supersized composite material member

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0491650A2 (en) * 1990-12-19 1992-06-24 United Technologies Corporation Conformal composite molding
CN2578328Y (en) * 2003-03-17 2003-10-08 成都泓奇实业股份有限公司 GFRP methane tank
CN101007624A (en) * 2007-01-22 2007-08-01 华东师范大学 Method for synthesizing metal oxide mesoporous material by one-step vacuum perfusion
US20090039566A1 (en) * 2007-08-07 2009-02-12 Rodman William L Composite structures and methods of making same
CN101585238A (en) * 2009-07-02 2009-11-25 中国人民解放军国防科学技术大学 Integral molding technique and molding system for supersized composite material member

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102873881A (en) * 2012-10-18 2013-01-16 山东双一集团有限公司 Method for connecting glass reinforced plastic slope and horizontal fixed point boss
WO2015136157A1 (en) * 2014-03-14 2015-09-17 Sironen Antti Vacuum assisted resin infusion moulding method and mould
CN105881930A (en) * 2016-04-01 2016-08-24 中航飞机股份有限公司西安飞机分公司 Forming device and forming method of I-shaped part
CN109369038A (en) * 2018-11-02 2019-02-22 北京航玻新材料技术有限公司 A kind of edge seal mode of laminated glass
CN110435183A (en) * 2019-08-14 2019-11-12 山东双一科技股份有限公司 A kind of two layers of flange integral formation method of glass reinforced plastic
CN110435183B (en) * 2019-08-14 2021-09-28 山东双一科技股份有限公司 Integral forming method for glass fiber reinforced plastic double-layer flange
CN112591036A (en) * 2020-12-22 2021-04-02 海阳市凌波造船科技有限公司 Manufacturing method and manufacturing system of glass fiber reinforced plastic bottom hull
CN112591036B (en) * 2020-12-22 2021-09-24 海阳市凌波造船科技有限公司 Manufacturing method and manufacturing system of glass fiber reinforced plastic bottom hull
CN112893042A (en) * 2021-02-03 2021-06-04 山西汾西重工有限责任公司 Method for encapsulating circuit board of detonating device and vacuum system
CN114986767A (en) * 2022-07-21 2022-09-02 中汽研汽车检验中心(天津)有限公司 Method, device and storage medium for filling skin layer of automobile crash dummy
CN114986767B (en) * 2022-07-21 2022-10-14 中汽研汽车检验中心(天津)有限公司 Method, device and storage medium for filling skin layer of automobile crash dummy

Also Published As

Publication number Publication date
CN102152481B (en) 2014-04-02

Similar Documents

Publication Publication Date Title
CN102152481B (en) Integrated molding and pouring process for semi-enclosed glass fiber reinforced plastic products with infolded flanges
CN103042700B (en) Integrated forming method and device for segmented blade
CN103496178B (en) A kind of vacuum of foam reinforced composite material structure injects integral forming method altogether
CN105508131B (en) A kind of sectionally assembled blade of wind-driven generator and its manufacture method
CN101905538B (en) Process for integrally manufacturing megawatt wind turbine blade
CN104786521B (en) A kind of shaped device of polymer matrix composite and forming method
EP3188895B1 (en) Improvements relating to wind turbine blade manufacture
CN105881932A (en) Method for forming large-sized composite material box
CN104325577B (en) Flanging die, assembling die, into the laying method of mold materialss and into mould method
CN103057126A (en) Large-scale composite material integral molding blade and molding process thereof
CN105128358A (en) Manufacturing method for wind power blade
CN103042701A (en) Integrated formation device and method for wind power blade
CN102922622B (en) Production method of fiber reinforced composite material rear automobile case cover
CN104626607B (en) A kind of integral forming technique in light-duty carbon fiber compartment
CN104742382A (en) Pressure-assisted VARI (vacuum assisted resin infusion) forming device and method
CN104386129A (en) Automobile radiator crossbeam made of fiber reinforced composite material and manufacturing method thereof
CN103538715A (en) Composite material pi-type lug interface and integral co-curing forming method
CN108688195A (en) Carbon fiber composite material trapezoidal framework structure and forming method thereof
CN105415706A (en) Vacuum infusion one-time forming method for composite sandwich structure
CN109203516B (en) Manufacturing method of wind power blade
CN102745307B (en) Manufacturing method of ship
CN111890709A (en) Integrated molding method for special-shaped hollow composite material sealing frame and special soft and hard combined die thereof
CN110435187A (en) A kind of LRTM mold and preparation method thereof
CN207140394U (en) The integrally formed closing hexahedron shelter of vacuum diversion
CN205553264U (en) Low cost production device of thin wall combined material skin structure spare

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170316

Address after: Mount Lu road 618000 Deyang city Sichuan province Jingyang District No. 36 three

Patentee after: Sichuan East tree new material Co., Ltd.

Address before: 618000 Jiangxi hi tech Industrial Park, Sichuan, Jinsha Road, No. 666, No.

Patentee before: Dongfang Turbine Co., Ltd., Dongfang Electric Group

TR01 Transfer of patent right