CN102152067A - Gas tube joint of gas meter and machining process of gas tube joint - Google Patents
Gas tube joint of gas meter and machining process of gas tube joint Download PDFInfo
- Publication number
- CN102152067A CN102152067A CN2010106036032A CN201010603603A CN102152067A CN 102152067 A CN102152067 A CN 102152067A CN 2010106036032 A CN2010106036032 A CN 2010106036032A CN 201010603603 A CN201010603603 A CN 201010603603A CN 102152067 A CN102152067 A CN 102152067A
- Authority
- CN
- China
- Prior art keywords
- gas
- gas meter
- tube joint
- product
- gas tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Forging (AREA)
Abstract
The invention provides a gas tube joint of a gas meter and a machining process of the gas tube joint. The joint comprises a head end, a middle section and a tail part which are connected sequentially; and an outward turnup edge is arranged on the outer surface of the tail part. The machining process comprises the following steps of: heating a 20# material at a middle frequency; manufacturing a blank by using a 100-ton punching machine; punching by using a 35-ton punching machine; turning a rough blank of the tube joint; rolling screw threads; performing finish-machining by using a numerically controlled lathe; performing surface treatment (coating colored zinc) so as to obtain the finished gas tube joint of the gas meter; and pressing the gas tube joint into a gas meter shell. The gas tube joint of the gas meter is easy to assemble and the machining process is easy to implement; and by the machining process, the material is saved, the machining time is short, and the machined gas tube joint is firm and durable.
Description
Technical field
The present invention relates to field of mechanical technique, particularly multiple gas meter gas-tpe fitting and processing technology thereof.
Background technology
The gas meter gas-tpe fitting processed complex that original technology provides, shaky is not durable, and its processing technology that adopts is: round steel blanking, boring, Vehicle Processing.About 5 days consuming time of this processing step, 0.3 kilogram of consumption raw material
Summary of the invention
The invention provides a kind of easy assembling, materials economize, process time is short, durable gas meter gas-tpe fitting and processing technology thereof.
To achieve these goals, the invention provides following technical scheme:
A kind of gas meter gas-tpe fitting, it comprises: the head end of Lian Jieing, interlude and afterbody successively, the outer surface of described afterbody is provided with to the flange that turns up.
Preferably, the outward-dipping angle of described flange is 10 °.
Preferably, described head end, interlude and afterbody are one-body molded.
A kind of processing technology of gas meter gas-tpe fitting, it comprises step:
A, adopt the 20# material, carry out heating in medium frequency, and then behind the 100T punch press base, moulding, obtain the product of crude green body joint again with the punching of 35T punch press;
B, the product that steps A is obtained with lathe carry out crude green body processing;
C, the product that step B obtains is rolled out screw thread with screw-rolling machine;
D, the product that above-mentioned steps C obtains is carried out fine finishining with numerically controlled lathe;
E, the product that step D is obtained with plating carry out surface treatment;
F, the product that step e is obtained are press fit on the readymade coal gas meter.
By implementing above technical scheme, has following technique effect: the invention provides that gas meter gas-tpe fitting and processing technology thereof are assembled easily, materials are economized, process time is short, durable.
Description of drawings
The structural representation of the gas meter gas-tpe fitting that Fig. 1 provides for the embodiment of the invention;
Fig. 2 is the A-A cutaway view of Fig. 1.
The specific embodiment
Technical scheme is for a better understanding of the present invention described embodiment provided by the invention in detail below in conjunction with accompanying drawing.
The embodiment of the invention provides multiple gas meter gas-tpe fitting, and as depicted in figs. 1 and 2, it comprises: the head end 130 of Lian Jieing, interlude 120 and afterbody 110 successively, the outer surface of described afterbody 110 is provided with to the flange 111 that turns up.On the outer surface of described head end 130 screw thread is set, be used for being installed in gas piping, the diameter of interlude 120 is greater than the diameter of afterbody 110 and head end 130, be used to turn on and assemble, when afterbody 110 is installed in the gas meter, by flange 111 this afterbody 110 and the interface of gas meter and the watchcase of gas meter can be closely cooperated, prevent that coal gas from leaking.Running through head end 130, interlude 120 and afterbody 110 centers is air flue holes 140.
In the foregoing description, preferably, the outward-dipping angle of described flange is 10 °.
In the foregoing description, preferably, described head end, interlude and afterbody are one-body molded.
This gas meter gas-tpe fitting assembles easily, materials are economized, process time is short, durable.
The embodiment of the invention also provides a kind of processing technology of gas meter gas-tpe fitting, and it comprises step:
A, adopt the 20# material, carry out heating in medium frequency, and then behind the 100T punch press base, moulding, obtain the product of crude green body joint again with the punching of 35T punch press;
B, the product that steps A is obtained with lathe carry out crude green body processing;
C, the product that step B obtains is rolled out screw thread with screw-rolling machine;
D, the product that above-mentioned steps C obtains is carried out fine finishining with numerically controlled lathe;
E, the product that step D is obtained with plating carry out surface treatment;
F, the product that step e is obtained are press fit on the readymade coal gas meter.
This technology obtains the gas meter gas-tpe fitting by tight forging and pressing, and about 2 days process times, steel (round steel) consume 0.15 kilogram.
More than a kind of gas meter gas-tpe fitting and processing technology thereof that the embodiment of the invention provided are described in detail, for one of ordinary skill in the art, thought according to the embodiment of the invention, part in specific embodiments and applications all can change, in sum, this description should not be construed as limitation of the present invention.
Claims (4)
1. a gas meter gas-tpe fitting is characterized in that, comprising: the head end of Lian Jieing, interlude and afterbody successively, the outer surface of described afterbody is provided with to the flange that turns up.
2. gas meter gas-tpe fitting according to claim 1 is characterized in that the outward-dipping angle of described flange is 10 °.
3. as gas meter gas-tpe fitting as described in the claim 2, it is characterized in that described head end, interlude and afterbody are one-body molded.
4. the processing technology of a gas meter gas-tpe fitting is characterized in that, comprises step:
A, adopt the 20# material, carry out heating in medium frequency, and then behind the 100T punch press base, moulding, obtain the product of crude green body joint again with the punching of 35T punch press;
B, the product that steps A is obtained with lathe carry out crude green body processing;
C, the product that step B obtains is rolled out screw thread with screw-rolling machine;
D, the product that above-mentioned steps C obtains is carried out fine finishining with numerically controlled lathe;
E, the product that step D is obtained with plating carry out surface treatment;
F, the product that step e is obtained are press fit on the readymade coal gas meter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010106036032A CN102152067A (en) | 2010-12-21 | 2010-12-21 | Gas tube joint of gas meter and machining process of gas tube joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010106036032A CN102152067A (en) | 2010-12-21 | 2010-12-21 | Gas tube joint of gas meter and machining process of gas tube joint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102152067A true CN102152067A (en) | 2011-08-17 |
Family
ID=44433914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010106036032A Pending CN102152067A (en) | 2010-12-21 | 2010-12-21 | Gas tube joint of gas meter and machining process of gas tube joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102152067A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103028905A (en) * | 2012-11-30 | 2013-04-10 | 苏州市意可机电有限公司 | Copper pipe joint machining process |
CN103464979A (en) * | 2013-09-11 | 2013-12-25 | 遵义市节庆机电有限责任公司 | Pipe joint machining process |
CN103909386A (en) * | 2014-03-31 | 2014-07-09 | 攀钢集团成都钢钒有限公司 | Processing method for titanium alloy fuel pipe joints |
CN104384828A (en) * | 2014-08-29 | 2015-03-04 | 温州市阳泰紧固件有限公司 | Production process of gas meter pipe joint |
CN112207512A (en) * | 2020-09-19 | 2021-01-12 | 上海文秀实业有限公司 | Processing technology of contact seat |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2110764U (en) * | 1991-12-05 | 1992-07-22 | 抚顺市煤气公司科学技术协会 | Fast plastic joint sleeve |
CN2328847Y (en) * | 1997-10-17 | 1999-07-14 | 汪惠生 | Pipeline joint |
CN2596157Y (en) * | 2002-10-28 | 2003-12-31 | 上海煤气表具股份有限公司 | Backing-stop non-reverse connector between gas meter and pipeline |
EP1398558A1 (en) * | 2002-09-13 | 2004-03-17 | Illinois Tool Works Inc. | Pipe nipple and method of manufacturing the same |
CN201107073Y (en) * | 2007-09-30 | 2008-08-27 | 重庆前卫仪表厂 | Electronic type gas meter |
-
2010
- 2010-12-21 CN CN2010106036032A patent/CN102152067A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2110764U (en) * | 1991-12-05 | 1992-07-22 | 抚顺市煤气公司科学技术协会 | Fast plastic joint sleeve |
CN2328847Y (en) * | 1997-10-17 | 1999-07-14 | 汪惠生 | Pipeline joint |
EP1398558A1 (en) * | 2002-09-13 | 2004-03-17 | Illinois Tool Works Inc. | Pipe nipple and method of manufacturing the same |
CN2596157Y (en) * | 2002-10-28 | 2003-12-31 | 上海煤气表具股份有限公司 | Backing-stop non-reverse connector between gas meter and pipeline |
CN201107073Y (en) * | 2007-09-30 | 2008-08-27 | 重庆前卫仪表厂 | Electronic type gas meter |
Non-Patent Citations (1)
Title |
---|
机械工程手册电机工程手册 编辑委员会: "《机械工程手册 机械设备制造工艺及设备卷》", 31 December 1996, 机械工业出版社 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103028905A (en) * | 2012-11-30 | 2013-04-10 | 苏州市意可机电有限公司 | Copper pipe joint machining process |
CN103464979A (en) * | 2013-09-11 | 2013-12-25 | 遵义市节庆机电有限责任公司 | Pipe joint machining process |
CN103909386A (en) * | 2014-03-31 | 2014-07-09 | 攀钢集团成都钢钒有限公司 | Processing method for titanium alloy fuel pipe joints |
CN104384828A (en) * | 2014-08-29 | 2015-03-04 | 温州市阳泰紧固件有限公司 | Production process of gas meter pipe joint |
CN104384828B (en) * | 2014-08-29 | 2017-01-25 | 温州市阳泰紧固件有限公司 | Gas meter pipe joint and production process thereof |
CN112207512A (en) * | 2020-09-19 | 2021-01-12 | 上海文秀实业有限公司 | Processing technology of contact seat |
CN112207512B (en) * | 2020-09-19 | 2022-06-28 | 上海文秀实业有限公司 | Processing technology of contact seat |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102152067A (en) | Gas tube joint of gas meter and machining process of gas tube joint | |
CN203857193U (en) | Rubber plug for connecting pipe | |
CN202097351U (en) | Blind hole riveting structure for aluminum plate fastening stud | |
CN208764152U (en) | Rapid-assembling/disassembling formula bearing assembly | |
CN107009103A (en) | A kind of production technology of sprocket wheel or ring gear | |
CN204187177U (en) | Easy mount type automobile-used flange outer ring forging | |
CN203641223U (en) | Screw with spring | |
CN201396369Y (en) | Bearing | |
CN201230247Y (en) | Magnetic motor fly wheel | |
CN207464351U (en) | A kind of general gear-hobbing clamp | |
CN104384828B (en) | Gas meter pipe joint and production process thereof | |
CN202239226U (en) | High precision combined mould for neck-spinning of pipes | |
CN207093748U (en) | A kind of combined type scraper oil cylinder axle | |
CN101934326A (en) | Method for manufacturing automobile wheel spokes by utilizing steel tubes | |
CN102537178A (en) | Oil cylinder closing-up structure of shock absorber | |
CN203926539U (en) | Spring bushing | |
CN202883682U (en) | Powder metallurgy eccentric ring | |
CN204088716U (en) | A kind of low cost radio frequency coaxial cable connector housing | |
CN209425234U (en) | A kind of feeding manipulator | |
CN203948824U (en) | Novel automobile flange forge piece | |
CN201934500U (en) | Bearing bush assembling structure of Thordon bearing | |
CN203858850U (en) | Huqin cylinder | |
CN102861926A (en) | Turning process of conical bearing | |
CN102513428A (en) | Flexible supporting structure for robot to complete edge covering | |
CN204828364U (en) | Passenger train air conditioner electromagnetic clutch coil skeleton |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110817 |