CN102147480A - 一种三维观测系统测试方法 - Google Patents

一种三维观测系统测试方法 Download PDF

Info

Publication number
CN102147480A
CN102147480A CN 201110005026 CN201110005026A CN102147480A CN 102147480 A CN102147480 A CN 102147480A CN 201110005026 CN201110005026 CN 201110005026 CN 201110005026 A CN201110005026 A CN 201110005026A CN 102147480 A CN102147480 A CN 102147480A
Authority
CN
China
Prior art keywords
model
stereo observing
observing system
dimensional geological
geological model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110005026
Other languages
English (en)
Inventor
管敏
文中平
张孟
李正佳
王雪梅
刘维
王扶国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN 201110005026 priority Critical patent/CN102147480A/zh
Publication of CN102147480A publication Critical patent/CN102147480A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明公开了一种三维观测系统测试方法,涉及地震勘探采集、处理、解释技术领域,步骤包括:1)建立三维地质模型;2)利用所建立的三维地质模型设计任意的三维观测系统;3)通过三维地质模型正演对所述三维观测系统进行测试,具有成本较低、测试结果可靠、耗时较短的特点,适合于普遍推广。

Description

一种三维观测系统测试方法
 
技术领域
本发明涉及地震勘探采集、处理、解释技术领域,确切地说涉及一种三维观测系统的测试方法。
背景技术
三维地震勘探与二维地震勘探相比,由于需要投入更多的设备和更多的人力,勘探成本高,三维观测系统的选择风险较大,观测系统选择不合适,将会造成较大的损失,因此需要对三维观测系统进行测试,保证设计出的三维观测系统性价比最高。
目前采用的三维观测系统测试的方法主要是通过实际资料进行测试,即在施工前,在拟进行三维勘探的工区内采集一小块高参数的三维资料,然后室内进行各种观测系统组合,进行处理、解释分析,最终选择最佳的观测系统,完成观测系统的测试。该方法可以完成一些观测系统参数的测试,效果也较好,但测试的参数有限,同时成本较高,耗时长。
如公开号为1337583,公开日为2002年2月27日的中国专利文献公开了一种基于地质地球物理模型的三维地震观测系统优化设计方法,包括以下步骤:A)建立先验的地质地球物理模型;B)设计两种或多种三维地震数据采集的观测系统;C)采用虚谱法三维波动方程数值模拟与三维地震物理模型模拟两种方法联合正演来完成数据采集工作;D)以共反射点为基础,对采集的数据进行叠前深度偏移处理,得到地震处理几种成像结果;E)对所述地震处理几种成像结果进行成像质量的综合对比评价,经过对比,确定其中一个最佳地震成像结果。本方法适用范围广泛,应用效果良好,对指导石油天然气地震勘探实际生产、提高油气勘探成功率具有现实意义。
但上述现有技术仍然存在“测试的参数有限,同时成本较高,耗时长”的技术问题。
发明内容
为解决上述技术问题,本发明提出了一种能降低三维观测系统测试成本,提高三维观测系统测试效率,增加三维观测系统测试准确性的三维观测系统测试方法。本方法具有成本较低、测试结果可靠、耗时较短的特点,适合于普遍推广。
本发明是通过采用下述技术方案实现的:
一种三维观测系统测试方法,其特征在于步骤包括:
1)建立三维地质模型;
2)利用所建立的三维地质模型设计任意的三维观测系统;
3)通过三维地质模型正演对所述三维观测系统进行测试。
所述步骤1)中:以地理信息系统数据库为基础,应用近表层结构调查、构造解释和构造建模方法,建立三维地质模型,其中,以地理信息系统数据得到真地表模型建立,以表层结构调查得到近地表模型建立,以构造解释和构造建模得到地腹模型建立,所述真地表模型、近地表模型和地腹模型形成综合模型,即形成三维地质模型。
所述步骤2)中,利用所建立的三维地质模型,依据射线追踪、波动方程和照明度分析手段,设计出任意的三维观测系统。
所述步骤3)中,针对所建立的三维地质模型,作基于CRP(共反射点)、CMP(共中心点)理论的正演分析,模拟单炮记录,然后室内对单炮进行处理、解释,对比不同三维观测系统的参数,优选最佳的三维观测系统,从而达到三维观测系统的测试。
与现有技术相比,本发明所达到的有益效果如下:
采用本发明所述的三个步骤对三维观测系统进行测试,不需要在实际拟进行的三维勘探工区内采集参数进行测试,而以三维地质模型正演进行测试,降低了三维观测系统测试的成本,提了高三维观测系统测试的效率,增加了三维观测系统测试的准确性,具有成本较低、测试结果可靠、耗时较短的特点,适合于普遍推广。
附图说明
下面将结合说明书附图和具体实施方式对本发明作进一步的详细说明,其中:
图1为三维观测系统测试流程图。
具体实施方式
实施例1
本发明公开了一种三维观测系统测试方法,其步骤包括:
1)采用本领域的现有技术,建立三维地质模型;
2)采用本领域的现有技术,利用所建立的三维地质模型设计任意的三维观测系统;
3)采用本领域的现有技术,通过三维地质模型正演对所述三维观测系统进行测试。
实施例2
本发明的最佳实施方式为:采用区别于现有技术的如下方法建立三维地质模型:以地理信息系统数据库为基础,应用近表层结构调查、构造解释和构造建模方法,建立三维地质模型,其中,以地理信息系统数据得到真地表模型建立,以表层结构调查得到近地表模型建立,以构造解释和构造建模得到地腹模型建立,所述真地表模型、近地表模型和地腹模型形成综合模型,即形成三维地质模型。采用区别于现有技术的如下方法设计任意的三维观测系统:利用所建立的三维地质模型,依据射线追踪、波动方程和照明度分析手段,设计出任意的三维观测系统。采用区别于现有技术的如下方法对所述三维观测系统进行测试:针对所建立的三维地质模型,作基于CRP(共反射点)、CMP(共中心点)理论的正演分析,模拟单炮记录,然后室内对单炮进行处理、解释,对比不同三维观测系统的参数,优选最佳的三维观测系统,从而达到三维观测系统的测试。

Claims (4)

1.一种三维观测系统测试方法,其特征在于步骤包括:
1)建立三维地质模型;
2)利用所建立的三维地质模型设计任意的三维观测系统;
3)通过三维地质模型正演对所述三维观测系统进行测试。
2.根据权利要求1所述的一种三维观测系统测试方法,其特征在于:所述步骤1)中:以地理信息系统数据库为基础,应用近表层结构调查、构造解释和构造建模方法,建立三维地质模型,其中,以地理信息系统数据得到真地表模型建立,以表层结构调查得到近地表模型建立,以构造解释和构造建模得到地腹模型建立,所述真地表模型、近地表模型和地腹模型形成综合模型,即形成三维地质模型。
3.根据权利要求1或2所述的一种三维观测系统测试方法,其特征在于:所述步骤2)中,利用所建立的三维地质模型,依据射线追踪、波动方程和照明度分析手段,设计出任意的三维观测系统。
4.根据权利要求3所述的一种三维观测系统测试方法,其特征在于:所述步骤3)中,针对所建立的三维地质模型,作基于共反射点、共中心点理论的正演分析,模拟单炮记录,然后室内对单炮进行处理、解释,对比不同三维观测系统的参数,优选最佳的三维观测系统,从而达到三维观测系统的测试。
CN 201110005026 2011-01-12 2011-01-12 一种三维观测系统测试方法 Pending CN102147480A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110005026 CN102147480A (zh) 2011-01-12 2011-01-12 一种三维观测系统测试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110005026 CN102147480A (zh) 2011-01-12 2011-01-12 一种三维观测系统测试方法

Publications (1)

Publication Number Publication Date
CN102147480A true CN102147480A (zh) 2011-08-10

Family

ID=44421846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110005026 Pending CN102147480A (zh) 2011-01-12 2011-01-12 一种三维观测系统测试方法

Country Status (1)

Country Link
CN (1) CN102147480A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105223630A (zh) * 2014-06-26 2016-01-06 中石化石油工程地球物理有限公司胜利分公司 基于地质模型的全方位观测系统参数论证方法
CN108732642A (zh) * 2017-04-18 2018-11-02 中石化石油工程技术服务有限公司 基于相似度分析的观测系统评价方法
CN112379424A (zh) * 2020-11-02 2021-02-19 中国石油天然气集团有限公司 山地二维地震测线观测系统图示方法及装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6665618B1 (en) * 2002-08-14 2003-12-16 Conocophillips Company Seismic survey design technique
CN1158539C (zh) * 2001-07-13 2004-07-21 石油大学(北京) 基于地质地球物理模型的三维地震观测系统优化设计方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1158539C (zh) * 2001-07-13 2004-07-21 石油大学(北京) 基于地质地球物理模型的三维地震观测系统优化设计方法
US6665618B1 (en) * 2002-08-14 2003-12-16 Conocophillips Company Seismic survey design technique

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《石油物探》 20070531 唐建明等 宽方位三维三分量地震资料采集观测系统设计-以新场气田三维三分量勘探为例 310-318 1-4 第46卷, 第3期 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105223630A (zh) * 2014-06-26 2016-01-06 中石化石油工程地球物理有限公司胜利分公司 基于地质模型的全方位观测系统参数论证方法
CN108732642A (zh) * 2017-04-18 2018-11-02 中石化石油工程技术服务有限公司 基于相似度分析的观测系统评价方法
CN112379424A (zh) * 2020-11-02 2021-02-19 中国石油天然气集团有限公司 山地二维地震测线观测系统图示方法及装置

Similar Documents

Publication Publication Date Title
AU2009215000B2 (en) Method for determining geological information related to a subsurface volume of interest
CN102967883B (zh) 通过页岩气叠前弹性参数反演预测岩石脆性概率的方法
CN106873033B (zh) 一种基于神经网络的多属性地震信息融合裂缝预测的方法
CN106772579B (zh) 一种薄煤层中地震叠前反演方法和装置
CN102645670B (zh) 一种基于叠加响应分析的观测系统优化设计方法
CN105629308B (zh) 相控非均质力学参数地应力方法
AU2015280679B2 (en) Instantaneous isochron attribute-based geobody identification for reservoir modeling
CN103454686A (zh) 基于地层切片的小尺度沉积相进行储层预测的方法及系统
EP1787143A2 (en) Method and apparatus for imaging permeability pathways of geologic fluid reservoirs using seismic emission tomography
CN102759745A (zh) 一种基于数字地质露头模型正演的碳酸盐岩储层预测方法
US20140058713A1 (en) Seismic modeling system and method
CN105487117B (zh) 一种三维地震观测系统优化方法及装置
EP3374596B1 (en) Fracture network triangle mesh adjustment
CN1337583A (zh) 基于地质地球物理模型的三维地震观测系统优化设计方法
CN105986819B (zh) 用于测井资料自动处理与综合解释的方法和装置
CN108646292A (zh) 裂缝密度预测方法、装置及计算机存储介质
CN102147480A (zh) 一种三维观测系统测试方法
CN102540254A (zh) 一种基于照明分析确定有效激发区域的方法
CN103823238A (zh) 提高储层勘探精度的拟全三维地震采集方法
US20180276886A1 (en) Target object simulation using undulating surfaces
CN104375187A (zh) 一种基于微测井和非地震资料设计大炮井深的方法
WO2018224607A1 (en) Method for acquiring a seismic dataset over a region of interest and related system
CN113514884A (zh) 一种致密砂岩储层预测方法
CN107085236B (zh) 最大炮检距的确定方法和装置
EP3374804B1 (en) Target object simulation using orbit propagation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110810