CN102116023A - 预制砼压旋桩及施工方法 - Google Patents
预制砼压旋桩及施工方法 Download PDFInfo
- Publication number
- CN102116023A CN102116023A CN 201010590353 CN201010590353A CN102116023A CN 102116023 A CN102116023 A CN 102116023A CN 201010590353 CN201010590353 CN 201010590353 CN 201010590353 A CN201010590353 A CN 201010590353A CN 102116023 A CN102116023 A CN 102116023A
- Authority
- CN
- China
- Prior art keywords
- pile body
- stake
- pile
- pressed
- revolved
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
预制砼压旋桩及施工方法,属于建筑技术领域,压旋桩采用桩体、桩尖和螺纹构成,桩体为圆柱状,桩芯开有非圆形旋钮孔,桩尖在桩体的底部,与桩体呈一体,在桩体和桩尖的外壁上有螺纹。施工方法是将压旋桩悬吊在施工位置,桩尖向下;采用钻机进行施工,将钻机的钻杆插入桩体的旋钮孔内,钻进速度为0.15-0.25米/秒。本发明单桩承载力大,无噪音,施工现场卫生清洁,施工质量超过现行标准,易操作,工程造价低。
Description
技术领域
本发明属于建筑技术领域,涉及一种建筑物的桩基础,本发明还同时涉及将这种桩基置入地下的施工方法。
背景技术
目前,建筑领域的桩基础的施工方法一般采用预制砼打桩法和灌注桩法。预制砼打桩法是将利用汽锤将预制砼打入地下,预制砼为表面平整的实心柱状体,存在噪音大问题,并产生废石;灌注桩法是将混凝土注入预先设置的垂直孔洞中,存在施工难度大,工程质量难以保证等到问题。
发明内容
本发明要解决的技术问题是公开一种预制砼压旋桩。
本发明同时还公开了将预制砼压旋桩置入地下的施工方法。
本发明压旋桩解决技术问题的方案采用桩体、桩尖和螺纹构成,桩体为圆柱状,桩芯开有非圆形旋钮孔,桩尖在桩体的底部,与桩体呈一体,在桩体和桩尖的外壁上有螺纹。
所述的桩体、桩尖和螺纹由混凝土材料制成。
桩体上螺纹的螺距为150-250毫米。
螺纹的尺角为20-30度。
根据需要可以增加桩体的长度,采用的措施是在桩体的端口处固定有连接体,施工过程中将两根桩体通过连接体连接。
为了增加桩体和桩尖的强度,在桩体和桩尖内置入加强筋。
在遇有土质坚硬的施工场地时,为了使桩尖能够顺利进入地下,桩尖的外部装有钢板。
旋钮孔可以是正方形孔。
将预制砼压旋桩置入地下的施工方法是:
将压旋桩悬吊在施工位置,桩尖向下;采用钻机进行施工,将钻机的钻杆插入桩体的旋钮孔内,钻进速度为0.15-0.25米/秒,下压力为11-15吨。
根据施工要求选择桩体压旋入地下的长度,如果一根压旋桩的长度不够,在压旋桩的顶部进入土层之前暂停作业,将钻机的钻杆拉出,再悬吊另一根桩体,将压旋入地下的压旋桩顶部与悬吊的桩体底部对齐,通过连接体将二者固定连接。
如果施工处的土质干燥,可以在施工的过程中向桩体与地面的接触位置注水,进行润滑。
本发明单桩承载力大,土壤与桩体接触面增大,无噪音,施工现场卫生清洁,旋进行12米深度,检测抗压190吨,旋进行24米深度,检测抗压320吨,施工质量超过现行标准,易操作,工程造价低。
附图说明
图1为本发明压旋桩示意图;
图2为图1的A-A视图。
具体实施方式
例1、压旋桩采用桩体1、桩尖2和螺纹3构成,桩体1为圆柱状,桩芯开有正方形旋钮孔4,桩尖2在桩体1的底部,与桩体1呈一体,在桩体1和桩尖2的外壁上有螺纹3,桩体1、桩尖2和螺纹3由混凝土材料制成,桩体1直径370毫米,螺展直径440毫米,桩体1上螺纹3的螺距为200毫米,螺纹3的尺角为25度,桩体1和桩尖2内置入加强筋5,加强筋5为网状钢筋,在桩体1的端口处固定有连接体6,体连接6为钢板,与加强筋呈一体,桩尖2的外部装有钢板,钢板厚度为10毫米。
例2、压旋桩采用桩体1、桩尖2和螺纹3构成,桩体1为圆柱状,桩芯开有正三角开旋钮孔4,桩尖2在桩体1的底部,与桩体1呈一体,在桩体1和桩尖2的外壁上有螺纹3,桩体1、桩尖2和螺纹3由混凝土材料制成,桩体1直径350毫米,螺展直径420毫米,桩体1上螺纹2的螺距为150毫米,螺纹3的尺角为20度,桩体1和桩尖2内置入加强筋5,加强筋5为网状钢筋,在桩体1的端口处固定有连接体6,体连接6为钢板,与加强筋5呈一体,桩尖2的外部装有钢板,钢板厚度为8毫米。
例3、压旋桩采用桩体1、桩尖2和螺纹3构成,桩体1为圆柱状,桩芯开有长方形旋钮孔4,桩尖2在桩体1的底部,与桩体1呈一体,在桩体1和桩尖2的外壁上有螺纹3,桩体1、桩尖2和螺纹3由混凝土材料制成,桩体1直径410毫米,螺展直径460毫米,桩体1上螺纹3的螺距为250毫米,螺纹3的尺角为30度,桩体1和桩尖2内置入加强筋5,加强筋5为网状钢筋,在桩体1的端口处固定有连接体6,体连接6为钢板,与加强筋5呈一体,桩尖2的外部装有钢板,钢板厚度为12毫米。
例4、将压旋桩悬吊在施工位置,桩尖向下,采用60千瓦油田钻机进行施工,将钻机的钻杆插入桩体的旋钮孔内,钻进速度为0.2米/秒,下压力为13吨。
例5、将压旋桩悬吊在施工位置,桩尖向下,采用50千瓦钻机进行施工,将钻机的钻杆插入桩体的旋钮孔内,钻进速度为0.15米/秒,下压力为11吨,在压旋桩的顶部进入土层之前暂停作业,将钻机的钻杆拉出,再悬吊另一根桩体,将压旋入地下的压旋桩顶部与悬吊的桩体底部对齐,通过连接体将二者固定连接。
例6、将压旋桩悬吊在施工位置,桩尖向下,采用70千瓦钻机进行施工,将钻机的钻杆插入桩体的旋钮孔内,钻进速度为0.25米/秒,下压力为15吨,在施工的过程中向桩体与地面的接触位置注水。
Claims (8)
1.一种预制砼压旋桩,其特征在于:它由桩体、桩尖和螺纹构成,桩体为圆柱状,桩芯开有非圆形旋钮孔,桩尖在桩体的底部,与桩体呈一体,在桩体和桩尖的外壁上有螺纹。
2.根据权利要求1所述的预制砼压旋桩,其特征在于:桩体上螺纹的螺距为150-250毫米。
3.根据权利要求1或2所述的预制砼压旋桩,其特征在于:螺纹的尺角为20-30度。
4.根据权利要求1所述的预制砼压旋桩,其特征在于:桩体和桩尖内置入加强筋。
5.根据权利要求1所述的预制砼压旋桩,其特征在于:桩体的端口处固定有连接体。
6.根据权利要求1所述的预制砼压旋桩,其特征在于:旋钮孔是正方形孔。
7.根据权利要求1所述的预制砼压旋桩置入地下的施工方法是:将压旋桩悬吊在施工位置,桩尖向下;采用钻机进行施工,将钻机的钻杆插入桩体的旋钮孔内,钻进速度为0.15-0.25米/秒,下压力为11-15吨。
8.根据权利要求7所述的预制砼压旋桩置入地下的施工方法是:在压旋桩的顶部进入土层之前暂停作业,将钻机的钻杆拉出,再悬吊另一根桩体,将压旋入地下的压旋桩顶部与悬吊的桩体底部对齐,通过连接体将二者固定连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010590353 CN102116023A (zh) | 2010-12-16 | 2010-12-16 | 预制砼压旋桩及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010590353 CN102116023A (zh) | 2010-12-16 | 2010-12-16 | 预制砼压旋桩及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102116023A true CN102116023A (zh) | 2011-07-06 |
Family
ID=44214936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010590353 Pending CN102116023A (zh) | 2010-12-16 | 2010-12-16 | 预制砼压旋桩及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102116023A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104499481A (zh) * | 2014-12-03 | 2015-04-08 | 重庆大学 | 一种预应力螺钉桩及其制作方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4708530A (en) * | 1983-05-03 | 1987-11-24 | Pieter Faber | Concrete foundation pile and device for driving the same into the ground |
CN2141434Y (zh) * | 1992-12-04 | 1993-09-01 | 张平潮 | 钢筋混凝土旋冲桩 |
CN2389924Y (zh) * | 1999-08-24 | 2000-08-02 | 陈日宏 | 混凝土螺旋预制桩 |
CN2816131Y (zh) * | 2005-09-07 | 2006-09-13 | 中冶沈勘工程技术有限公司 | 锥型予制砼螺旋桩 |
CN101117802A (zh) * | 2007-09-03 | 2008-02-06 | 中冶沈勘工程技术有限公司 | 一种防扭断混凝土预制螺旋桩施工方法 |
-
2010
- 2010-12-16 CN CN 201010590353 patent/CN102116023A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4708530A (en) * | 1983-05-03 | 1987-11-24 | Pieter Faber | Concrete foundation pile and device for driving the same into the ground |
CN2141434Y (zh) * | 1992-12-04 | 1993-09-01 | 张平潮 | 钢筋混凝土旋冲桩 |
CN2389924Y (zh) * | 1999-08-24 | 2000-08-02 | 陈日宏 | 混凝土螺旋预制桩 |
CN2816131Y (zh) * | 2005-09-07 | 2006-09-13 | 中冶沈勘工程技术有限公司 | 锥型予制砼螺旋桩 |
CN101117802A (zh) * | 2007-09-03 | 2008-02-06 | 中冶沈勘工程技术有限公司 | 一种防扭断混凝土预制螺旋桩施工方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104499481A (zh) * | 2014-12-03 | 2015-04-08 | 重庆大学 | 一种预应力螺钉桩及其制作方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101812976B (zh) | 可调式多级螺旋挤扩钻具 | |
CN101812843B (zh) | 中心灌注后压浆桩施工方法及其使用的灌注器和注浆器 | |
CN104863131A (zh) | 多角水泥土搅拌桩及其成形方法 | |
CN109072575A (zh) | 微型桩的波形注浆体及其形成方法 | |
CN104863132A (zh) | 三角梅花形水泥土搅拌桩及其成形方法 | |
CN103089170A (zh) | 长螺旋钻孔压灌桩机伸缩钻杆及其施工方法 | |
CN205502024U (zh) | 一种可部分回收的拱形组合围护结构 | |
CN101173515B (zh) | 栽植钢棒建造的钢管桩基础及其建造方法 | |
CN102535452A (zh) | 一种新型工程桩 | |
CN202688987U (zh) | 一种螺旋桩机 | |
CN111749231A (zh) | 一种双套管双驱动全回转式成桩装置及成桩工艺 | |
CN102116023A (zh) | 预制砼压旋桩及施工方法 | |
CN203878590U (zh) | 一种灌注桩后加固结构 | |
CN2926477Y (zh) | 一种多轴钻孔机 | |
CN201650154U (zh) | 可调式多级螺旋挤扩钻具 | |
CN201679450U (zh) | 具有导土槽的双向螺旋挤扩钻头 | |
CN201250397Y (zh) | 具有质检取芯管的混凝土防渗墙 | |
CN201679003U (zh) | 一种螺杆桩机 | |
CN106836228A (zh) | 灌注式桩用空心钻杆 | |
CN203285349U (zh) | 长螺旋钻孔压灌桩机伸缩钻杆 | |
CN205975582U (zh) | 一种提高空心桩承载力的装置 | |
CN2511782Y (zh) | 螺旋桩桩机钻杆 | |
CN105603996A (zh) | V形插接方圆组合桩成桩机 | |
CN206190234U (zh) | 一种长螺旋成孔钻具及压灌水泥浆或砂浆桩 | |
CN206599784U (zh) | 灌注式桩用空心钻杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Yuejin Inventor after: Zhu Defu Inventor after: Wang Jinming Inventor after: Guan Yali Inventor before: Li Yuejin Inventor before: Zhu Defu Inventor before: Wang Jinming Inventor before: Guan Yali |
|
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110706 |