CN102116015B - 单向透水复合土工膜片 - Google Patents

单向透水复合土工膜片 Download PDF

Info

Publication number
CN102116015B
CN102116015B CN2011100574801A CN201110057480A CN102116015B CN 102116015 B CN102116015 B CN 102116015B CN 2011100574801 A CN2011100574801 A CN 2011100574801A CN 201110057480 A CN201110057480 A CN 201110057480A CN 102116015 B CN102116015 B CN 102116015B
Authority
CN
China
Prior art keywords
geomembrane
woven fabrics
fine needle
needle punched
punched non
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100574801A
Other languages
English (en)
Other versions
CN102116015A (zh
Inventor
高亚平
高晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gao Yaping
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011100574801A priority Critical patent/CN102116015B/zh
Publication of CN102116015A publication Critical patent/CN102116015A/zh
Application granted granted Critical
Publication of CN102116015B publication Critical patent/CN102116015B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laminated Bodies (AREA)

Abstract

本发明属于防渗渠道上安装的渠道防止浮托损坏的装置,特别是一种单向透水复合土工膜片,上层长纤针刺无纺布,中层为中部设置有均布通孔的PE土工膜和下层长纤针刺无纺布其三者的周边密封固结为一体,在其内部构成封闭的空腔,在上层长纤针刺无纺布和中层PE土工膜之间的缝隙空腔中自上而下依次层叠设置着与缝隙空腔面积相适应的上层网架和高密度聚乙烯膜,在中层PE土工膜与下层长纤针刺无纺布之间的缝隙空腔内设置着与该缝隙空腔面积相适应的下层网架。本发明结构合理,性能可靠,可以有效的降低渠道外部的水位,使渠道防渗结构不会出现浮托损坏的现象,保证渠道的输水安全,安装方便,造价低,使用寿命长。

Description

单向透水复合土工膜片
技术领域
 本发明属于防渗渠道上安装的渠道防止浮托损坏的安全装置,特别是一种单向透水复合土工膜片。
背景技术
 目前,随着国民经济的发展,各行各业对水资源的需求和合理配置提出了更高的标准,长距离大流量输水成为水资源合理配置的必然选择。如我国正在实施中的南水北调东线、中线工程,新疆已建成的引额济克、沙漠渠道,南岸干渠工程等,明渠输水距离都在百公里以上。由于输水距离长,沿途的工程地质条件差异很大,工程安全,输水安全是一个非常重要的问题。长距离输水渠道,为减少水量渗漏损失,大多数采用工程化防渗。当渠道内外水位出现差异时,渠外地下水高于渠内水位时,地下水经常对渠道防渗结构造成破坏,(浮托破坏)这类工程问题在现有的渠道工程中经常发生,目前还没有很理想的解决方案。
发明内容
本发明的目的在于提供一种单向透水复合土工膜片,其结构简单,性能可靠,可以有效的降低渠道外部的水位,使渠道防渗结构不会出现浮托损坏的现象,保证渠道的输水安全,安装方便,造价低廉,使用寿命长。
本发明的目的是这样实现的:一种单向透水复合土工膜片,上层长纤针刺无纺布,中层为设置有均布通孔的PE土工膜和下层长纤针刺无纺布其三者的周边密封固结为一体,在其内部构成封闭的空腔,在上层长纤针刺无纺布和中层PE土工膜之间的缝隙空腔中自上而下依次层叠设置着与缝隙空腔面积相适应的上层网架和高密度聚乙烯膜,在中层PE土工膜与下层长纤针刺无纺布之间的缝隙空腔内设置着与该缝隙空腔面积相适应的下层网架。
使用本发明时,将本发明安装在渠道防渗结构的预留的通孔上,或者在已建好的防渗渠道的混凝土板上开通孔,并且将混凝土垫层打穿,在混凝土板的通孔上安装本发明,用粘结剂将本发明的膜片的边缘与预留通孔的周边或后开通孔内的渠道防渗膜粘接,膜片上部放置绿豆砂,在绿豆砂上浇筑无砂混凝土。当渠内水位高于地下水位时,防渗结构正常工作,可有效减少渠内水量的渗漏损失,当渠外地下水高于渠内水位时,地下水透过下层长纤针刺无纺布和PE土工膜上的通孔将高密度聚乙烯膜顶起,地下水透过上层长纤针刺无纺布渗出渠道表面。保证渠外地下水与渠内水位保持一致,确保渠道防渗结构不会出现浮托破坏。当地下水位低于渠道内水位时,渠道内水透过上层长纤针刺无纺布将高密度聚乙烯膜压紧,贴合在PE土工膜上,使膜上的通孔封闭。在我国北方地区,气候比较寒冷,渠道被冻胀破坏时有发生,渠道防渗结构安装单向透水膜片后,能有效降低渠外地下水位,可防止和减缓渠道的冻胀破坏。随着这项技术的推广应用,渠道的输水安全将得到进一步的提高。输水安全的提高,各业的供水保证率必然提高,一定能给国家和社会带来客观的经济效益和社会效益。
本发明结构简单,性能可靠,有效的降低了渠道外部的水位,使渠道防渗结构不会出现浮托损坏的现象,保证了渠道的输水安全,安装方便,造价低廉,使用寿命长。
附图说明
下面将结合附图对本发明作进一步的描述,
图1为本发明的主视结构示意图;
图2为图1的A—A剖视结构示意图。
具体实施方式
一种单向透水复合土工膜片,如图1、图2所示,上层长纤针刺无纺布1,中层为中部设置有均布通孔7的PE土工膜4和下层长纤针刺无纺布6其三者的周边密封固结为一体,在其内部构成封闭的空腔,在上层长纤针刺无纺布1和中层PE土工膜4之间的缝隙空腔中自上而下依次层叠设置着与缝隙空腔面积相适应的上层网架2和高密度聚乙烯膜3,在中层PE土工膜4与下层长纤针刺无纺布6之间的缝隙空腔内设置着与该缝隙空腔面积相适应的下层网架5。上、下层长纤针刺无纺布1、6由300g/㎡的长纤针刺无纺布构成。PE土工膜4由二层层叠在一起的0.008mm厚的高密度聚乙烯膜构成。上层、下层网架2、5由20×20mm的土工格栅构成。上层长纤针刺无纺布1、上层网架2、高密度聚乙烯膜3、PE土工膜4、下层网架5和下层长纤针刺无纺布6在中心点8处相互固接在一起。上、下层长纤针刺无纺布1、6的外形形状为圆形或多边形。

Claims (6)

1.一种单向透水复合土工膜片,其特征是:上层长纤针刺无纺布(1),中层为中部设置有均布通孔(7)的PE土工膜(4),下层长纤针刺无纺布(6),其中上层长纤针刺无纺布(1)、中层PE土工膜(4)和下层长纤针刺无纺布(6)三者的周边密封固结为一体,在三者周边密封圈固结为一体的内部构成封闭的空腔,在上层长纤针刺无纺布(1)和中层PE土工膜(4)之间的缝隙空腔中自上而下依次层叠设置着与缝隙空腔面积相适应的上层网架(2)和高密度聚乙烯膜(3),在中层PE土工膜(4)与下层长纤针刺无纺布(6)之间的缝隙空腔内设置着与该缝隙空腔面积相适应的下层网架(5)。
2.根据权利要求1所述的单向透水复合土工膜片,其特征是:上、下层长纤针刺无纺布(1、6)由300g/㎡的长纤针刺无纺布构成。
3.根据权利要求1所述的单向透水复合土工膜片,其特征是:PE土工膜(4)由二层层叠在一起的0.008mm厚的高密度聚乙烯膜构成。
4.根据权利要求1所述的单向透水复合土工膜片,其特征是:上层、下层网架(2、5)由20×20mm的土工格栅构成。
5.根据权利要求1所述的单向透水复合土工膜片,其特征是:上层长纤针刺无纺布(1)、上层网架(2)、高密度聚乙烯膜(3)、PE土工膜(4)、下层网架(5)和下层长纤针刺无纺布(6)在中心点(8)处相互固接在一起。
6.根据权利要求1所述的单向透水复合土工膜片,其特征是:上、下层长纤针刺无纺布(1、6)的外形形状为圆形或多边形。
CN2011100574801A 2011-03-10 2011-03-10 单向透水复合土工膜片 Expired - Fee Related CN102116015B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100574801A CN102116015B (zh) 2011-03-10 2011-03-10 单向透水复合土工膜片

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100574801A CN102116015B (zh) 2011-03-10 2011-03-10 单向透水复合土工膜片

Publications (2)

Publication Number Publication Date
CN102116015A CN102116015A (zh) 2011-07-06
CN102116015B true CN102116015B (zh) 2012-07-04

Family

ID=44214928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100574801A Expired - Fee Related CN102116015B (zh) 2011-03-10 2011-03-10 单向透水复合土工膜片

Country Status (1)

Country Link
CN (1) CN102116015B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213572A (zh) * 2014-09-05 2014-12-17 山东省水利科学研究院 复合土工膜密封接头及制作方法
CN104727341B (zh) * 2015-03-20 2017-06-27 重庆文理学院 一种单向透水沿河路基挡墙

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1126649A1 (ru) * 1982-05-04 1984-11-30 Zotsenko Aleksej F Канал
CN201428145Y (zh) * 2009-06-18 2010-03-24 河南康喜科技有限公司 一种经编格栅增强复合土工膜

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1126649A1 (ru) * 1982-05-04 1984-11-30 Zotsenko Aleksej F Канал
CN201428145Y (zh) * 2009-06-18 2010-03-24 河南康喜科技有限公司 一种经编格栅增强复合土工膜

Also Published As

Publication number Publication date
CN102116015A (zh) 2011-07-06

Similar Documents

Publication Publication Date Title
CN201883547U (zh) 可排水的复合型防水板
CN204023501U (zh) 一种用于土石坝的除险加固防渗处理结构
CN103526724B (zh) 一种水库库底土工膜与库周排水廊道周边缝连接的锚固防渗结构
CN102108712B (zh) 一种可控沉降的基础体系
CN207452824U (zh) 一种水利工程河道的直立式挡墙
CN204703179U (zh) 一种复合土工膜斜墙围堰
CN102116015B (zh) 单向透水复合土工膜片
CN201041248Y (zh) 水利渠道用防渗逆止排水阀
CN212958756U (zh) 富水隧道智能排水减压装置
CN207597377U (zh) 水利水电建筑衬砌排水结构
CN110130980A (zh) 一种隧道排水装置、系统及其施工方法
CN203531023U (zh) 一种防排水一体化卷材
CN214993917U (zh) 适用于全风化泥质砂岩的装配式防护面层
CN204626465U (zh) 一种室外地下室沉降缝防水填充结构
CN204736512U (zh) 高密度聚乙烯、低密度聚乙烯防水防渗板
CN204753299U (zh) 一种沥青道路
CN202483592U (zh) 隧道专用防水板
CN209891243U (zh) 一种地下管廊预制管廊缝隙之间的止水结构
CN109629372B (zh) 一种用于海绵城市建设的透水道路结构
CN208219606U (zh) 高耐压渗排水网垫
CN202175957U (zh) 复合材料防水井盖
CN205206015U (zh) 一种防渗结构和蒸发塘
CN205745476U (zh) 鱼嘴式排气排水装置及设有该装置的水体防渗系统
CN219118205U (zh) 一种用于筏板基础降水井封堵的止水套管
CN204677213U (zh) 一种分水区防水层结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: GAO YAPING

Free format text: FORMER OWNER: CHANGJI JINGYU WATER SAVING CO., LTD.

Effective date: 20120221

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120221

Address after: 831100, two floor, building 18, Jianshe Road, Changji, Changji Hui Autonomous Prefecture, the Xinjiang Uygur Autonomous Region

Applicant after: Gao Yaping

Address before: 831100, two floor, building 18, Jianshe Road, Changji, Changji Hui Autonomous Prefecture, the Xinjiang Uygur Autonomous Region

Applicant before: Changyu Jingyu Water Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20160310