CN102107466A CN2009102565509A CN200910256550A CN102107466A CN 102107466 A CN102107466 A CN 102107466A CN 2009102565509 A CN2009102565509 A CN 2009102565509A CN 200910256550 A CN200910256550 A CN 200910256550A CN 102107466 A CN102107466 A CN 102107466A
Authority
CN
China
Prior art keywords
mixing
mill
sizing material
banbury
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009102565509A
Other languages
Chinese (zh)
Other versions
CN102107466B (en
Inventor
许广森
杜广华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sailun Jinyu Group Co Ltd
Original Assignee
SAILUN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SAILUN CO Ltd filed Critical SAILUN CO Ltd
Priority to CN200910256550.9A priority Critical patent/CN102107466B/en
Publication of CN102107466A publication Critical patent/CN102107466A/en
Application granted granted Critical
Publication of CN102107466B publication Critical patent/CN102107466B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)

Abstract

A production method for mixing rubber material at a low temperature adopts a novel rubber mixing method improved on the basis of a low-temperature mixing principle so as to realize the high-quality and high-efficiency novel technology of mixed rubber production. An internal mixer is utilized and low-temperature mixing and low-temperature material discharge are taken as the objective function, a plurality of full automatic open mills are configured at the lower part of the internal mixer, supplementation mixing is carried out under low-temperature conditions so as to achieve automatic curing temperature, and the low-temperature mixing is ensured during the integral rubber material manufacturing process, and the purpose of high-quality and high-efficiency mixed rubber production can be achieved. The rubber material is put in the internal mixer so as to be mixed, the rubber material is discharged to an open mill number 1 after reaching the temperature reuquired by the technology and then rubber smashing and temperature reduction are carried out, then rubber material is conveyed to one of the open mills in an open mill set through a conveying device and the supplementation mixing is carried out, and the rubber material that is processed through the supplementation mixing is conveyed to an open mill number 8 and the piece unloading process can be carried out.

Description

The production method of low temperature glue stuff compounding
Technical field
The present invention is a kind of mixing production method of low temperature that improves the elastomeric compound quality, belongs to the rubber tyre production field.
Background technology
Along with constantly bringing forth new ideas of rubber tyre manufacturing technology, adopt high efficiency, high-quality compounding process can improve tire production quality and safety in utilization effectively at multiple sizing compound formula.
The sizing material compounding process mainly is conceived to following 2 aspects at present, and the one, on the basis that guarantees rubber physical mechanical property, how to improve the whole uniformity of auxiliary agent dispersiveness and sizing material; The 2nd, how to enhance productivity and reduce labour cost.By improve raw material, rubber mixing technique and rubber preparing device promote melting efficiency and quality accomplish implemented at large.Improve automaticity, the minimizing amount of labour and the manual intervention of the mixing production of sizing material simultaneously, also can further improve sizing material stability and cut down finished cost.
The compounding process that existing home and abroad tyre production enterprise is taked is mainly mixing based on multisection type, rubber mixing technique of this method (shown in the accompanying drawing 1 of back) and configuration device mainly are, the rubber master batch sizing material carries out multisection type in the subsidiary engine on banbury mixing, and banbury is discharge under 150-165 ℃ of situation.1 screw extruder of subsidiary engine configuration or 1 to 2 mill replenish mixingly under the banbury, and each section mixing cycle needs lasting about 1.5 to 3.5 minutes because of the difference of rotor speed.
The multisection type compounding process of this quasi-tradition, its shortcoming is that sizing material is mixing under higher temperature conditions, be easy to reduce the quality of elastomeric compound, particularly the finished composition uniformity is relatively poor, thereby directly causes the investment of lower, the whole banburying equipment of efficient that the rubber tyre sizing material produces higher.
Formerly apply for a patent and for example, application number 200610171068.1, the title parallel auxiliaries type technique of one step for refining rubber, its scheme is only to adopt a banbury, sizing material is through the process mixing and the compressing tablet cooling that once heats up.Following subsidiary engine is equipped with at least 4 mills, except first mill connects glue cooling and last mill slice, remaining mill is that relation in parallel is as adding the mixing usefulness of sulphur, sizing material is delivered on the batch off unit by last mill compressing tablet and is cooled off after replenishing mixing end, thereby finishes whole mixing process.
Above-mentioned formerly applying for a patent exists following subject matter and deficiency:
1, the masterbatch dump temperature is higher, and carbon black is difficult for disperseing when mill is additional mixing, and is easy to oxidation under hot conditions;
2, lack temperature subregion in the banbury variable-speed calendering process, can't accurately control dump temperature at different formulations as the sizing material that whether is added with white carbon and silane coupler, be easy to form the oxidative cleavage of rubber molecule, branching reaction is more, and low-molecular material produces also morely;
3, the mixing cycle of per car sizing material is longer, is unfavorable for the raising of production efficiency;
Dispersion of materials speed such as the Sulfur that 4, adds in mill, promoter, uniformity are lower.
Summary of the invention
The production method of low temperature glue stuff compounding of the present invention is to address the above problem and takes according to the improved new type rubber compounding process of low temperature melting principle high-quality to realize, high efficiency elastomeric compound production new technique.
Goal of the invention is, use that banbury is mixing with low temperature, the low temperature discharge is core, below banbury, dispose many full-automatic mills and under cryogenic conditions, replenish mixing to add sulphur automatically, the low temperature that guarantees whole sizing material production process is mixing, realizes improving elastomeric compound and produces high-quality, high efficiency purpose.
For achieving the above object, the production method of described low temperature glue stuff compounding, only be provided with a banbury that is used for the mixing and discharge of low temperature, below banbury, be connected with one in turn and be used to connect glue cooling and mixing 1# mill, at least 2 to be connected in parallel, to be used for to replenish low temperature mixing and add the mixing mill group of sulphur, and a 8# mill that connects follow-up film cooling production line.
Sizing material is thrown glue in banbury mixing, reach and be discharged to the 1# mill after the technological requirement temperature and smash the glue cooling, be transported to through conveying device again and replenish mixingly in 1 mill in the mill group, replenish sizing material after mixing and be transported to the 8# mill and descend the sheet processing.
After other mills in the mill group receive the sizing material that the 1# mill transports, adopt identical additional mixing and be pooled to the 8# mill successively and descend the sheet processing.
The difference with the prior art part is, in described banbury, load weighted carbon black and other compounding ingredient, rubber except that the finished composition medicine is added in the lump, and is disposable mixing to carry out.
For the sizing material that does not contain white carbon and silane coupler in the prescription, the dump temperature of control banbury is between 130 to 135 ℃; For the sizing material that contains white carbon and silane coupler in the prescription, the dump temperature of control banbury is between 140 to 145 ℃.
As above-mentioned basic scheme, different formulations masterbatch dump temperature is controlled between 125~145 ℃, replenishes in follow-up mill when mixing, and the carbon black that adds in the masterbatch is easy to disperse, avoid taking place high-temperature oxydation, and elastomeric compound intensity is higher.
In addition, such scheme helps shortening the production cycle, only produces rubber master batch and adopt variable-speed calendering and the contrary method of mixing in banbury, and the little medicine of solids such as rubber and little medicine and carbon black adds earlier banbury together.When banbury internal sizes temperature changes, adopt different rotating speeds and the calendering process of time.
Control melting temperature for further enhancing productivity, being convenient to, can take following improvement project:
In described banbury, for containing the sizing material of white carbon and silane coupler in the prescription, after dropping into white carbon and silane coupler, the duration between 140 to 145 ℃ of the control sizing material melting temperatures is 3 minutes.
Distribute for reducing rubber molecule oxidative cleavage problem, branching reaction and molecular weight rubber, with physical properties such as the breaking strength that improves sizing material, wear-resisting and endurances, in described banbury, when melting temperature below 120 ℃ the time, rotor adopts 45rpm above rotating speed, floating weight pressure to be controlled at 0.5Mpa;
When melting temperature reached more than 120 ℃, rotating speed, the floating weight pressure of rotor employing 30 to 35rpm were controlled at 0.3Mpa.
For optimizing the integrated artistic flow process and enhancing productivity, rationally arrange follow-up additional mixing from banbury row different train number sizing materials down, in described 1# mill, adopt the roller of frequency control, the automatic roll adjustment of hydraulic pressure that sizing material is carried out mechanical shearing and cooling processing, and the control processing cycle is within 3 minutes.
Content to sum up, the production method of low temperature glue stuff compounding of the present invention has the following advantages and beneficial effect:
1, realized a kind of low temperature production process for milling of refinement, according to the low temperature melting principle traditional multisection type and one-stage process rubber mixing technique are improved, improved elastomeric compound quality and production efficiency,, directly improved the tire workmanship, reduced cost by reducing the amount of labour and manual intervention.
2, the present invention can be applicable to the production of various tyre stocks, comprises oblique tire, half steel tire, all steel tire and engineering tire.
3, at different sizing compound formulas, it is mixing to have realized that elastomeric compound carries out under cryogenic conditions, and the rubber molecule oxidative cleavage is less, and branching reaction is less, and low-molecular material produces less, the molecular weight rubber narrow distribution.
4, by improving the low temperature mechanical shearing, avoid effectively producing carbon gel in the sizing material mixing process, make the compounding ingredient dispersing uniformity higher, carbon black dispension degree is better.
5, take many parallel mills to distribute, replenish the mixing quantity that can improve reversible machine shearing strand effectively, kept the high-intensity performance of sizing material, improved the breaking strength of sizing material, wear-resisting and fatigue performance.
6, production efficiency is higher, carry out mixing and the low temperature discharge at the high speed banbury, following subsidiary engine configuration many mills in parallel all realize automation, and additional mixing latter stage automatic sulphurization, promoter, the mixing production cycle of whole once-through method is about 18-21 minute.
Description of drawings
Now the present invention is described further in conjunction with the accompanying drawings
Fig. 1 is the schematic flow sheet of existing multisection type production process for milling;
Fig. 2 is the configuration of production method equipment and the process chart of low temperature glue stuff compounding of the present invention.
The specific embodiment
Embodiment 1, and as shown in Figure 2, the production method of described low temperature glue stuff compounding only is provided with a banbury that is used for the mixing and discharge of low temperature, is connected with in turn below banbury:
One is used to connect glue cooling and mixing 1# mill,
6 to be connected in parallel, to be used for to replenish low temperature mixing and add mixing 2# to the 7# mill of sulphur,
A 8# mill that connects follow-up film cooling production line,
Sizing material is thrown glue in banbury mixing, reach and be discharged to the 1# mill after the technological requirement temperature and smash the glue cooling, be transported to through conveying device again and replenish mixingly in the 2# mill in the mill group, replenish sizing material after mixing and be transported to the 8# mill and descend the sheet processing
3# to 7# mill in the mill group receives other train number sizing materials that the 1# mill transports successively, and adopts identical additional calendering process, after 3# to 7# mill is additional mixing also is to be transported to the 8# mill in turn, separately to descend sheet to handle.
The process characteristic of the described production method of present embodiment is:
1, the masterbatch dump temperature is 125~145 ℃, rubber master batch is replenished mixingly in special mill, promotes the dispersion of carbon black, strengthens mechanical shearing, avoids high-temperature oxydation;
2, in banbury, carry out variable-speed calendering, in mill, carry out the additional mixing of displacement, speed change and add vulcanizing system.
3, medicines such as the Sulfur of the adding in mill, promoter adopt the mode of rubber master batch granulations, prevent from that medicine from spilling to disperse, and improve speed and the uniformity that medicine disperses.
4, automaticity height, production line are realized full-automatic production.Carbon black and softening oil are prewired automatically, and automatic charging, is opened the automatically operation etc. of refining, cooling pendulum at banburying, only needs 2 people operation completely.
5, with short production cycle, the efficient height.Be the shortening cycle, banbury is only produced rubber master batch, is used variable-speed calendering and the contrary method of mixing; The little medicine of solids such as rubber and little medicine and carbon black adds banbury earlier together, uses high rotating speed mixing when temperature of charge is not high in banbury, treats temperature rising back variable-speed calendering, is convenient to control melting temperature.Simultaneously, the sizing material dump temperature is lower than traditional rubber mixing technique, within the banbury cycle 3 minutes.In mill, replenish mixing to 95 to 100 ℃ and add the vulcanizing system masterbatch.Open refining and finish the back temperature and reach 50~60 ℃, cooling afterwards pendulum temperature is about 30 ℃.
In the described banbury of present embodiment, load weighted carbon black, oil plant and other compounding ingredient, rubber except that the finished composition medicine are added in the lump, contrary mixing mixing to carry out.
For containing the sizing material of white carbon and silane coupler in the prescription, after dropping into white carbon and silane coupler, the duration between 140 to 145 ℃ of the control sizing material melting temperatures is 3 minutes.
In described banbury, when melting temperature below 120 ℃ the time, rotor adopts 45rpm above rotating speed, floating weight pressure to be controlled at 0.5Mpa;
When melting temperature reached more than 120 ℃, rotating speed, the floating weight pressure of rotor employing 30 to 35rpm were controlled at 0.3Mpa.
The mixing production technology of described low temperature has following steps:
The 1st the step, with load weighted carbon black, oil plant and other compounding ingredient except that the finished composition medicine, rubber add together carry out in the subsidiary engine on the banbury mixing; The variable-speed calendering mode is selected 4 rib NST rotors for use, and rotor speed is controlled between the 6-60rpm; Control floating weight pressure also can be regulated according to sizing compound formula and calendering process below 0.6Mpa; After above-mentioned solid powder is knocked down in the banbury, when melting temperature below 120 ℃ the time, rotor adopts 45rpm above rotating speed, floating weight pressure to be controlled at 0.5Mpa; When melting temperature reached more than 120 ℃, rotating speed, the floating weight pressure of rotor employing 30 to 35rpm were controlled at 0.3Mpa; The softening wet goods oil plant of control is put in the banbury after powder;
For the sizing material that does not contain white carbon and silane coupler in the prescription, the dump temperature of control banbury is between 130 to 135 ℃; For the sizing material that contains white carbon and silane coupler in the prescription, the dump temperature of control banbury is between 140 to 145 ℃;
The 2nd goes on foot, and the sizing material under arranging from banbury is drained into the 1# mill and descends sheet to handle, and is mixing to replenish; Smash glue 3-5 and make sizing material reduce temperature as far as possible back and forth, sizing material is controlled within 3 minutes at the mixing time of 1# mill;
In the 1# mill, adopt the roller of frequency control, the automatic roll adjustment of hydraulic pressure that sizing material is carried out mechanical shearing and handle with cooling, the roller speed ratio is that 1: 1.09 and forward and backward roller are the boring plain-barreled roll;
Be ground into sheet as soon as possible for making, when beginning, adopt fast, big roll spacing refines gluey attitude from banbury row block sizing material down, when whole sizing materials by behind 1-2 mill roll gap, reduction roller rotating speed and roll spacing;
In the 3rd step, sizing material is transported to the 2# mill of mill group from the 1# mill,
Sizing material continues to replenish mixing in this mill, when temperature is reduced to below 100 ℃, replenishes mixing and the cooling procedure end, begins to add the vulcanizing system masterbatch, and the roller speed ratio of this mill is 1: 1.14, and other various technological parameters are identical with the 1# mill; Whole process all need adopt smashes the glue device and smashes glue, and sizing material is controlled between 16-18 minute at the mixing cycle of this mill;
Roll spacing transferred to about 3mm when sizing material was additional mixing, and when beginning to add sulphur, roll spacing transfers to about 3.5mm;
Add the sulphur time (masterbatch begins to contact sizing material and all sneaks in the sizing material to little medicine) after about 1 minute, increase roll spacing again and carry out mixing to about 4.0mm;
After mixing about 7 to 9 minutes, about 6mm is transferred in roll spacing, and sizing material is drained into sheet mill under the 8#.
In the 4th step, sizing material is transported to the 8# mill and descends sheet to handle, and it is mixing to continue cooling in the 8# mill; Adopt forward and backward roller to be the roller of hollow cooling structure, preliminary roller linear velocity 3-30m/min, DC speed regulation 1: 1.09.
The roll adjustment mode is manual roll adjustment, and the roll adjustment scope is 0.5-12mm.
Earlier roll spacing is adjusted between the 5-6mm, after treating that whole sizing materials are all logical and going over roll gap, roll spacing is transferred to carry out mixing operation between the 3-4mm again, roll spacing is adjusted to about 6mm after experiencing 1.5-2.0 minute approximately.
Interleaving agent tank cooling is advanced in the binder removal flow, subsequently film be transported to that film cooling production line is lowered the temperature, air-dry, pendulum and finally be delivered to the storage area, so far refine eventually and finish from a banbury row car sizing material down.
From the sizing material of banbury row other train numbers down, sequentially be delivered in 3# to the 7# mill in parallel by the 1# mill respectively, these 6 mills are proceeded to replenish mixing separately, and sizing material finally is transported to the 8# mill separately and descends the sheet processing.
Because 3# to 7# mill is in parallel with the 2# mill, the equipment configuration of 3# to 7# mill and mixing process and 2# are in full accord.

Claims (5)

1. the production method of a low temperature glue stuff compounding is provided with a banbury that is used for the mixing and discharge of low temperature, below banbury, is connected with in turn,
One is used to connect glue cooling and mixing 1# mill,
At least 2 to be connected in parallel, to be used for to replenish low temperature mixing and add the mixing mill group of sulphur, and,
A 8# mill that connects follow-up film cooling production line,
Sizing material is thrown glue in banbury mixing, reach and be discharged to the 1# mill after the technological requirement temperature and smash the glue cooling, be transported to through conveying device again and replenish mixingly in 1 mill in the mill group, replenish sizing material after mixing and be transported to the 8# mill and descend the sheet processing
After other mills in the mill group receive the sizing material that the 1# mill transports, adopts identical additional mixing and be pooled to the 8# mill successively and descend the sheet processing,
It is characterized in that: in described banbury, load weighted carbon black, oil plant and other compounding ingredient, rubber except that the finished composition medicine are added in the lump, contrary mixing mixing to carry out;
For the sizing material that does not contain white carbon and silane coupler in the prescription, the dump temperature of control banbury is between 130 to 135 ℃;
For the sizing material that contains white carbon and silane coupler in the prescription, the dump temperature of control banbury is between 140 to 145 ℃.
2. the production method of low temperature glue stuff compounding according to claim 1, it is characterized in that: in described banbury, for the sizing material that contains white carbon and silane coupler in the prescription, after dropping into white carbon and silane coupler, the duration between 140 to 145 ℃ of the control sizing material melting temperatures is 3 minutes.
3. the production method of low temperature glue stuff compounding according to claim 1 and 2 is characterized in that: in described banbury, when melting temperature below 120 ℃ the time, rotor adopts 45rpm above rotating speed, floating weight pressure to be controlled at 0.5Mpa;
When melting temperature reached more than 120 ℃, rotating speed, the floating weight pressure of rotor employing 30 to 35rpm were controlled at 0.3Mpa.
4. the production method of low temperature glue stuff compounding according to claim 3, it is characterized in that: in described 1# mill, adopt the roller of frequency control, the automatic roll adjustment of hydraulic pressure that sizing material is carried out mechanical shearing and cooling processing, and the control processing cycle is within 3 minutes.
5. the production method of low temperature glue stuff compounding according to claim 4 is characterized in that: the mixing production technology of described low temperature has following steps,
The 1st the step, with load weighted carbon black, oil plant and other compounding ingredient except that the finished composition medicine, rubber add together carry out in the subsidiary engine on the banbury mixing; The variable-speed calendering mode is selected 4 rib NST rotors for use, and rotor speed is controlled between the 6-60rpm; Control floating weight pressure also can be regulated according to sizing compound formula and calendering process below 0.6Mpa; After above-mentioned solid powder is knocked down in the banbury, when melting temperature below 120 ℃ the time, rotor adopts 45rpm above rotating speed, floating weight pressure to be controlled at 0.5Mpa; When melting temperature reached more than 120 ℃, rotating speed, the floating weight pressure of rotor employing 30 to 35rpm were controlled at 0.3Mpa; The softening wet goods oil plant of control is put in the banbury after powder;
For the sizing material that does not contain white carbon and silane coupler in the prescription, the dump temperature of control banbury is between 130 to 135 ℃; For the sizing material that contains white carbon and silane coupler in the prescription, the dump temperature of control banbury is between 140 to 145 ℃;
The 2nd goes on foot, and the sizing material under arranging from banbury is drained into the 1# mill and descends sheet to handle, and is mixing to replenish; Smash glue 3-5 and make sizing material reduce temperature as far as possible back and forth, sizing material is controlled within 3 minutes at the mixing time of 1# mill;
In the 1# mill, adopt the roller of frequency control, the automatic roll adjustment of hydraulic pressure that sizing material is carried out mechanical shearing and handle with cooling, the roller speed ratio is that 1: 1.09 and forward and backward roller are the boring plain-barreled roll;
Be ground into sheet as soon as possible for making, when beginning, adopt fast, big roll spacing refines gluey attitude from banbury row block sizing material down, when whole sizing materials by behind 1-2 mill roll gap, reduction roller rotating speed and roll spacing;
In the 3rd step, sizing material is transported to the 1st mill of mill group from the 1# mill,
Sizing material continues to replenish mixing in this mill, when temperature is reduced to below 100 ℃, replenishes mixing and the cooling procedure end, begins to add the vulcanizing system masterbatch, and the roller speed ratio of this mill is 1: 1.14, and other various technological parameters are identical with the 1# mill; Whole process all need adopt smashes the glue device and smashes glue, and sizing material is controlled between 16-18 minute at the mixing cycle of this mill;
In the 4th step, sizing material is transported to the 8# mill and descends sheet to handle, and it is mixing to continue cooling in the 8# mill; Adopt forward and backward roller to be the roller of hollow cooling structure, earlier roll spacing is adjusted between the 5-6mm, after treating that whole sizing materials are all logical and going over roll gap, roll spacing is transferred to carry out mixing operation between the 3-4mm again, roll spacing is adjusted to about 6mm after experiencing 1.5-2.0 minute approximately;
Interleaving agent tank cooling is advanced in the binder removal flow, subsequently film be transported to that film cooling production line is lowered the temperature, air-dry, pendulum and finally be delivered to the storage area, so far refine eventually and finish from a banbury row car sizing material down.
The sizing material of other train numbers under the banbury row, sequentially be delivered in other mills in parallel by the 1# mill respectively, mill in parallel is proceeded to replenish mixing separately, and the sizing material of different train numbers finally is transported to the 8# mill separately and descends sheet to handle.
CN200910256550.9A 2009-12-24 2009-12-24 Production method for mixing rubber material at low temperature Active CN102107466B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910256550.9A CN102107466B (en) 2009-12-24 2009-12-24 Production method for mixing rubber material at low temperature

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910256550.9A CN102107466B (en) 2009-12-24 2009-12-24 Production method for mixing rubber material at low temperature

Publications (2)

Publication Number Publication Date
CN102107466A true CN102107466A (en) 2011-06-29
CN102107466B CN102107466B (en) 2014-08-13

Family

ID=44171803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910256550.9A Active CN102107466B (en) 2009-12-24 2009-12-24 Production method for mixing rubber material at low temperature

Country Status (1)

Country Link
CN (1) CN102107466B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102555098A (en) * 2011-12-20 2012-07-11 山东八一轮胎制造有限公司 Process for performing section reduction mixing production by using banburying mixing production line with rapid cooling device
CN102873778A (en) * 2011-07-12 2013-01-16 东洋橡胶工业株式会社 Apparatus for processing rubber and processing method therefor
CN103112095A (en) * 2013-02-25 2013-05-22 杭州中策橡胶有限公司 Rubber mixing production line by virtue of series-connection once-through method and rubber mixing method
CN103331888A (en) * 2013-06-28 2013-10-02 青岛道安工贸有限公司 Method for reducing bubbles of butyl rubber inner tube body
CN104275752A (en) * 2014-10-20 2015-01-14 正新橡胶(中国)有限公司 Open mill, rubber mixing production line and rubber mixing process
CN106738424A (en) * 2016-12-30 2017-05-31 赛轮金宇集团股份有限公司 Series connection banbury once-through method low temperature mixing production line and rubber mixing technique
CN107672081A (en) * 2017-09-08 2018-02-09 特拓(青岛)轮胎技术有限公司 High filling white carbon black tyre surface finished composition mixing system and technique based on automatic mill
CN108145879A (en) * 2017-12-26 2018-06-12 合肥万力轮胎有限公司 A kind of small medicine transport system and carrying method
CN108858849A (en) * 2018-08-01 2018-11-23 浦林成山(山东)轮胎有限公司 A kind of mixing refining gluing method and equipment
CN109648725A (en) * 2019-01-24 2019-04-19 山西新华化工有限责任公司 Rubber compound manufacturing method
CN110669265A (en) * 2019-10-28 2020-01-10 安徽佳通乘用子午线轮胎有限公司 High-performance rubber composition for tire side and preparation method thereof
CN111195994A (en) * 2020-01-09 2020-05-26 浦林成山(青岛)工业研究设计有限公司 Final mixing series connection homogenizing rubber mixing process and system
CN112265330A (en) * 2020-11-05 2021-01-26 杭州盛得新材料有限公司 Fabric laminate with recycled modified PVB and preparation method thereof
CN115008628A (en) * 2022-04-29 2022-09-06 山东玲珑轮胎股份有限公司 Rubber mixing production system and production process adopting low-temperature one-step method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6864310B2 (en) * 1999-04-01 2005-03-08 Pirelli Pneumatici S.P.A. Process for manufacturing a tire compound
CN1861355A (en) * 2006-05-26 2006-11-15 刘树炯 Banbury variable-speed calendering technique
CN101003157A (en) * 2006-12-25 2007-07-25 三角轮胎股份有限公司 Parallel auxiliaries type technique of one step for refining rubber
CN101381482A (en) * 2008-10-09 2009-03-11 江苏通用科技股份有限公司 All-steel radial ply tyre tread base and preparation method thereof
CN101602868A (en) * 2008-06-11 2009-12-16 比亚迪股份有限公司 A kind of rubber combination and rubber and preparation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6864310B2 (en) * 1999-04-01 2005-03-08 Pirelli Pneumatici S.P.A. Process for manufacturing a tire compound
CN1861355A (en) * 2006-05-26 2006-11-15 刘树炯 Banbury variable-speed calendering technique
CN101003157A (en) * 2006-12-25 2007-07-25 三角轮胎股份有限公司 Parallel auxiliaries type technique of one step for refining rubber
CN101602868A (en) * 2008-06-11 2009-12-16 比亚迪股份有限公司 A kind of rubber combination and rubber and preparation method thereof
CN101381482A (en) * 2008-10-09 2009-03-11 江苏通用科技股份有限公司 All-steel radial ply tyre tread base and preparation method thereof

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102873778A (en) * 2011-07-12 2013-01-16 东洋橡胶工业株式会社 Apparatus for processing rubber and processing method therefor
CN102873778B (en) * 2011-07-12 2015-10-28 东洋橡胶工业株式会社 Device for the treatment of rubber and the processing method for the treatment of rubber
US9259856B2 (en) 2011-07-12 2016-02-16 Toyo Tire & Rubber Co., Ltd. Methods for controlling the mixing process of processing rubber
CN102555098A (en) * 2011-12-20 2012-07-11 山东八一轮胎制造有限公司 Process for performing section reduction mixing production by using banburying mixing production line with rapid cooling device
CN103112095A (en) * 2013-02-25 2013-05-22 杭州中策橡胶有限公司 Rubber mixing production line by virtue of series-connection once-through method and rubber mixing method
CN103331888A (en) * 2013-06-28 2013-10-02 青岛道安工贸有限公司 Method for reducing bubbles of butyl rubber inner tube body
CN103331888B (en) * 2013-06-28 2015-04-01 青岛道安工贸有限公司 Method for reducing bubbles of butyl rubber inner tube body
CN104275752A (en) * 2014-10-20 2015-01-14 正新橡胶(中国)有限公司 Open mill, rubber mixing production line and rubber mixing process
CN106738424A (en) * 2016-12-30 2017-05-31 赛轮金宇集团股份有限公司 Series connection banbury once-through method low temperature mixing production line and rubber mixing technique
CN107672081A (en) * 2017-09-08 2018-02-09 特拓(青岛)轮胎技术有限公司 High filling white carbon black tyre surface finished composition mixing system and technique based on automatic mill
CN108145879A (en) * 2017-12-26 2018-06-12 合肥万力轮胎有限公司 A kind of small medicine transport system and carrying method
CN108858849A (en) * 2018-08-01 2018-11-23 浦林成山(山东)轮胎有限公司 A kind of mixing refining gluing method and equipment
CN109648725A (en) * 2019-01-24 2019-04-19 山西新华化工有限责任公司 Rubber compound manufacturing method
CN110669265A (en) * 2019-10-28 2020-01-10 安徽佳通乘用子午线轮胎有限公司 High-performance rubber composition for tire side and preparation method thereof
CN111195994A (en) * 2020-01-09 2020-05-26 浦林成山(青岛)工业研究设计有限公司 Final mixing series connection homogenizing rubber mixing process and system
CN112265330A (en) * 2020-11-05 2021-01-26 杭州盛得新材料有限公司 Fabric laminate with recycled modified PVB and preparation method thereof
CN112265330B (en) * 2020-11-05 2021-06-25 杭州盛得新材料有限公司 Fabric laminate with recycled modified PVB and preparation method thereof
CN115008628A (en) * 2022-04-29 2022-09-06 山东玲珑轮胎股份有限公司 Rubber mixing production system and production process adopting low-temperature one-step method

Also Published As

Publication number Publication date
CN102107466B (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN102107466B (en) Production method for mixing rubber material at low temperature
CN102019649B (en) Central flow dividing type one-step rubber fining process and system
CN102092104B (en) Multi-group parallel glue stock blending production system and method thereof
CN100398287C (en) Parallel auxiliaries type technique of one step for refining rubber
CN1754904A (en) High-temperature continuous reproduction process of butyl rubber
CN102030934A (en) Heat regeneration method for waste rubber
CN102816343A (en) Method for preparing reclaimed rubber by continuous low-temperature high shear
CN103726126A (en) Method for producing flat filament by using PET (Polyethylene Terephthalate)
CN103421221A (en) Reclaimed rubber material and manufacturing technique thereof
CN110396227A (en) The preparation method of fatigue-resisting rubber
CN201587047U (en) Multi-group parallel sizing material mixing production system
CN102268151B (en) Chloroprene mixing rubber preparation method through backward feeding and one-step mixing
CN105256162B (en) The preparation method of cermet complex
CN104526904A (en) Waste GMT material recycling granulation method for vehicle and special device thereof
CN102501335A (en) Novel process for reducing and regenerating waster rubber continuously
CN108858849A (en) A kind of mixing refining gluing method and equipment
CN103756337A (en) Production method and device of rubber powder modified asphalt
CN203715283U (en) System of producing graphite electrode
CN104004222A (en) Waste rubber low-temperature continuous regeneration device and process method
CN100542763C (en) Banbury variable-speed calendering technique
CN102030916B (en) Integrated device for heat regeneration of scrap rubber
CN209224302U (en) A kind of mixing rubber mixing equipment
CN107446605A (en) With addition of the coking mixed coal and coke making and coal blending method of reworked material
CN101941252B (en) A kind of compounding process strengthening Mixer Down-stream Eqiupment
CN203236616U (en) Series-connection and single-stage type mixing line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 266500 west side of Jiangshan Middle Road (Shandong hi tech Industrial Zone), Qingdao economic and Technological Development Zone

Applicant after: Sailun Group Co., Ltd.

Address before: 266500 west side of Jiangshan Middle Road (Shandong hi tech Industrial Zone), Qingdao economic and Technological Development Zone

Applicant before: Sailun Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SAILUN CO., LTD. TO: SAILUN GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SAILUN JINYU GROUP CO., LTD.

Free format text: FORMER NAME: SAILUN GROUP CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 266500 west side of Jiangshan Middle Road (Shandong hi tech Industrial Zone), Qingdao economic and Technological Development Zone

Patentee after: Sai Lun Jinyu Group incorporated company

Address before: 266500 west side of Jiangshan Middle Road (Shandong hi tech Industrial Zone), Qingdao economic and Technological Development Zone

Patentee before: Sailun Group Co., Ltd.

CP03 Change of name, title or address

Address after: 266500 Maoshan Road 588, Huangdao District, Qingdao City, Shandong Province

Patentee after: Sailun Group Co., Ltd.

Address before: 266500 West of Jiangshan Middle Road, Qingdao Economic and Technological Development Zone, Shandong Province (High-tech Industrial Park)

Patentee before: Sai Lun Jinyu Group incorporated company

CP03 Change of name, title or address