CN102102490A - 一种基于下定向的分叉三通机构送入及膨胀方法 - Google Patents
一种基于下定向的分叉三通机构送入及膨胀方法 Download PDFInfo
- Publication number
- CN102102490A CN102102490A CN2010105934476A CN201010593447A CN102102490A CN 102102490 A CN102102490 A CN 102102490A CN 2010105934476 A CN2010105934476 A CN 2010105934476A CN 201010593447 A CN201010593447 A CN 201010593447A CN 102102490 A CN102102490 A CN 102102490A
- Authority
- CN
- China
- Prior art keywords
- bifurcated
- sealing device
- pipe
- tube
- predeformation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000007789 sealing Methods 0.000 claims abstract description 29
- 238000005553 drilling Methods 0.000 claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 8
- 239000010959 steel Substances 0.000 claims abstract description 8
- 239000007788 liquid Substances 0.000 claims abstract description 5
- 239000000725 suspension Substances 0.000 claims description 9
- 239000011440 grout Substances 0.000 claims description 7
- 230000000694 effects Effects 0.000 claims description 5
- 210000002445 nipple Anatomy 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 2
- 238000005086 pumping Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 6
- 210000000664 rectum Anatomy 0.000 description 4
- 101100293261 Mus musculus Naa15 gene Proteins 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 210000003746 feather Anatomy 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
本发明涉及一种油(气、水)井的三通分叉补贴技术,特别涉及一种基于下定向的分叉三通机构送入及膨胀方法。该方法是将下定向筒首先与内置下定向基准配合,定向后使内管与导向机构固定件脱开,使在导向机构以上的部分送入及膨胀装置在导向槽作用下定向滑动下移,使预变形分叉密封装置的各分支管体进入相应管筒,座挂筒下移到预置在井下的预置悬挂支撑筒上;从井口投入座封钢球,通过内管向预变形分叉密封装置的封闭空间泵入高压液体,使预变形分叉密封装置基本恢复变形前的形状,下压钻具或利用液压驱动短节使内管及胀锥下行,迫使预变形分叉密封装置管体产生一定的径向膨胀。本发明实现了使分叉窗口具有较好的机械强度和增大完井窗口通径。
Description
技术领域:
本发明涉及一种油(气、水)井的三通分叉补贴技术,特别涉及一种基于下定向的分叉三通机构送入及膨胀方法。
背景技术:
随着石油进入中后期的开采,多分支井技术越来越多的受到人们的重视。四级以下完井方式由于窗口处水力密封性差,限制了该技术在多层系压力体系地层中的应用,六级分支井技术已成为未来最大储层接触技术(MRC)发展的重点。
以Baker公司为代表的国外六级分支井技术已经在现场进行了试验应用,国内该项技术领域尚属空白。国外六级分支井技术基本都是在分支井窗口处预先下入预制分叉装置,固井后钻具穿过分叉管内部进行分支井眼钻进,完井时下入管柱悬挂完井。该种完井方式分叉窗口易在分支井眼钻进时受到破坏,整体强度较低,且分支井眼通径较小。
发明内容:
本发明要解决的技术问题是提供一种基于下定向的分叉三通机构送入及膨胀方法,该方法应用于分支井窗口机构,实现了使分叉窗口具有较好的机械强度和增大完井窗口通径。克服了现有完井方式分叉窗口易在分支井眼钻进时受到破坏,整体强度较低,且分支井眼通径较小的不足。
本发明所采取的技术方案是:一种基于下定向的分叉三通机构送入及膨胀方法,分叉三通机构的送入和膨胀由送入及膨胀装置实现,送入及膨胀装置由送入接头、内管、上喇叭口、锚定及锁紧机构、上部外密封体、座挂筒、预变形分叉密封装置、分支管外密封体、下部管外密封体、下部管内密封体、球座、导向机构、下定向筒、引头、上部管内密封体、胀锥、灌浆孔和泄压孔组成;在主分支井眼完钻后,将预置悬挂支撑筒预先下入井内作为送入及膨胀装置的支撑悬挂基准,再下入送入及膨胀装置,下定向筒首先与内置下定向基准配合,实现送入及膨胀装置定向及初步轴向定位,定向后通过下压钻具或液压方式使内管与导向机构固定件脱开,使在导向机构以上的部分送入及膨胀装置在导向槽作用下定向滑动下移,使预变形分叉密封装置的各分支管体进入相应管筒,座挂筒下移到预置在井下的预置悬挂支撑筒上,此时完成了分叉三通机构的送入和定向悬挂过程;从井口投入座封钢球,座封钢球坐落到球座后封堵内管的下端,通过内管上的灌浆孔向预变形分叉密封装置的封闭空间内泵入高压液体,使预变形分叉密封装置基本恢复变形前的形状,下压钻具或利用液压驱动短节使内管及胀锥下行,迫使预变形分叉密封装置管体产生一定的径向膨胀,使下部管外密封体与预先下入的管体形成管间环空密封,下压钻具过程结束时,上部外密封体膨胀,封堵上部外环空,锚定及锁紧机构锚定外管壁并锁紧,此时完成了分叉三通机构主井眼的膨胀过程。
本发明的有益效果是:本发明提出了一种基于下定向的分叉三通机构送入及膨胀方法,具有较高的定向定位精度,送入及膨胀过程一次完成,施工简便。利用本发明进行六级分支井完井时,减少了国外分支井技术需要预先扩眼的辅助工序,施工后的窗口机构具有较高的机械强度和水力密封性。同时利用本发明实现的六级完井系统,完井通径大,有利于修井及作业。
附图说明:
下面结合附图和具体实施方式对本发明做进一步详细的说明。
附图为实现分叉三通装置送入及膨胀方法的示意图。
具体实施方式:
如附图所示,分叉三通机构的送入和膨胀由送入及膨胀装置实现,送入及膨胀装置由送入接头1、内管2、上喇叭口3、锚定及锁紧机构4、上部外密封体5、座挂筒6、预变形分叉密封装置8、分支管外密封体9、下部管外密封体10、下部管内密封体11、球座13、导向机构14、下定向筒15、引头16、上部管内密封体17、胀锥18、灌浆孔19和泄压孔20组成。送入接头1与上部送入管柱螺纹连接,与内管2可螺纹连接或加工为一个整体。上喇叭口3与锚定及锁紧机构4、座挂筒6之间均采用螺纹连接或通过基管环状套装结构连接。上部外密封体5可位于锚定及锁紧机构4上部或下部,二者为套装紧配合。座挂筒6下部有一定位斜面用于定向支撑悬挂。预变形分叉密封装置8为采用高塑性材料制成的有一定角度的三通机构,经过预变形处理后可在单井筒内下入。预变形分叉密封装置8上端与座挂筒6采用螺纹或焊接结构连接,三通末端分别硫化分支管外密封体9、下部管外密封体10,施工后实现外管壁与预置外管体的环空密封。下部管内密封体11与内管2螺纹连接,可为定径或变径膨胀结构,作业时与三通下部内壁紧密配合实现封堵,并可承受一定的液压载荷。座封钢球12在作业过程中投放,坐落于球座13后实现憋压封堵。球座13与内管2由剪钉连接,施工憋压后剪断销钉下行利用泄压孔20泄压。导向机构14与内管2之间由导向键和导向槽连接,二者可以轴向滑动,而周向方位保持不变。导向机构14下部与下定向筒15之间采用螺纹或焊接结构连接。引头16与内管2螺纹连接,且内有通孔,流体可进入内管2,具有引导内管2和提拉下定位筒15的作用。上部管内密封体17安装在胀锥18上,封堵上部内管壁。胀锥18外径大于预变形分叉密封装置8初始完整圆截面内径,胀锥18在内管2作用下实现塑性管体径向膨胀,完成管壁内衬密封。灌浆孔19沟通内管2内腔与预变形分叉密封装置8之间的封闭空间,实现下钻过程中内外压力平衡,并在液压初胀时向预变形分叉密封装置8的封闭空间内泵入高压液体。
在主分支井眼完钻后,将预置悬挂支撑筒7预先下入井内作为送入及膨胀装置的支撑悬挂基准,再下入送入及膨胀装置,下定向筒15首先与内置下定向基准配合,实现送入及膨胀装置定向及初步轴向定位,定向后通过下压钻具或液压方式使内管2与导向机构14固定件脱开,使在导向机构14以上的部分送入及膨胀装置在导向槽作用下定向滑动下移,使预变形分叉密封装置8的各分支管体进入相应管筒,座挂筒6下移到预置在井下的预置悬挂支撑筒7上,此时完成了分叉三通机构的送入和定向悬挂过程;从井口投入座封钢球12,座封钢球12坐落到球座13后封堵内管2的下端,通过内管2上的灌浆孔19向预变形分叉密封装置8的封闭空间内泵入高压液体,使预变形分叉密封装置8基本恢复变形前的形状,下压钻具或利用液压驱动短节使内管2及胀锥18下行,迫使预变形分叉密封装置8管体产生一定的径向膨胀,使下部管外密封体10与预先下入的管体形成管间环空密封,下压钻具过程结束时,上部外密封体5膨胀,封堵上部外环空,锚定及锁紧机构4锚定外管壁并锁紧,此时完成了分叉三通机构主井眼的膨胀过程。
施工后内管2及下定向筒15、胀锥18等工具随送入管柱取出,分支管体可另行膨胀。
Claims (1)
1.一种基于下定向的分叉三通机构送入及膨胀方法,分叉三通机构的送入和膨胀由送入及膨胀装置实现,送入及膨胀装置由送入接头(1)、内管(2)、上喇叭口(3)、锚定及锁紧机构(4)、上部外密封体(5)、座挂筒(6)、预变形分叉密封装置(8)、分支管外密封体(9)、下部管外密封体(10)、下部管内密封体(11)、球座(13)、导向机构(14)、下定向筒(15)、引头(16)、上部管内密封体(17)、胀锥(18)、灌浆孔(19)和泄压孔(20)组成;其特征在于:在主分支井眼完钻后,将预置悬挂支撑筒(7)预先下入井内作为送入及膨胀装置的支撑悬挂基准,再下入送入及膨胀装置,下定向筒(15)首先与内置下定向基准配合,实现送入及膨胀装置定向及初步轴向定位,定向后通过下压钻具或液压方式使内管(2)与导向机构(14)固定件脱开,使在导向机构(14)以上的部分送入及膨胀装置在导向槽作用下定向滑动下移,使预变形分叉密封装置(8)的各分支管体进入相应管筒,座挂筒(6)下移到预置在井下的预置悬挂支撑筒(7)上,此时完成了分叉三通机构的送入和定向悬挂过程;从井口投入座封钢球(12),座封钢球(12)坐落到球座(13)后封堵内管(2)的下端,通过内管(2)上的灌浆孔(19)向预变形分叉密封装置(8)的封闭空间内泵入高压液体,使预变形分叉密封装置(8)基本恢复变形前的形状,下压钻具或利用液压驱动短节使内管(2)及胀锥(18)下行,迫使预变形分叉密封装置(8)管体产生一定的径向膨胀,使下部管外密封体(10)与预先下入的管体形成管间环空密封,下压钻具过程结束时,上部外密封体(5)膨胀,封堵上部外环空,锚定及锁紧机构(4)锚定外管壁并锁紧,此时完成了分叉三通机构主井眼的膨胀过程。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010593447 CN102102490B (zh) | 2010-12-17 | 2010-12-17 | 一种基于下定向的分叉三通机构送入及膨胀方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010593447 CN102102490B (zh) | 2010-12-17 | 2010-12-17 | 一种基于下定向的分叉三通机构送入及膨胀方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102102490A true CN102102490A (zh) | 2011-06-22 |
CN102102490B CN102102490B (zh) | 2013-05-22 |
Family
ID=44155527
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010593447 Expired - Fee Related CN102102490B (zh) | 2010-12-17 | 2010-12-17 | 一种基于下定向的分叉三通机构送入及膨胀方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102102490B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115478798A (zh) * | 2021-06-15 | 2022-12-16 | 中国石油天然气股份有限公司 | 基于动力锚贯入的多锚管海洋水合物钻采井口支撑装置 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6283216B1 (en) * | 1996-03-11 | 2001-09-04 | Schlumberger Technology Corporation | Apparatus and method for establishing branch wells from a parent well |
US20050115713A1 (en) * | 2003-12-01 | 2005-06-02 | Restarick Henry L. | Multilateral completion system utilizing an alternate passage |
CN2811548Y (zh) * | 2005-03-04 | 2006-08-30 | 中国石油集团科学技术研究院 | 一种膨胀管井下定位装置 |
CN2864079Y (zh) * | 2005-11-29 | 2007-01-31 | 新疆石油管理局钻井工艺研究院 | 祼眼分支井斜向器定位装置 |
CN101413384A (zh) * | 2008-11-24 | 2009-04-22 | 中国石油集团长城钻探工程有限公司 | 一种用金属膨胀管实现分支井窗口密封的方法 |
CN201273142Y (zh) * | 2008-10-08 | 2009-07-15 | 中国石油天然气股份有限公司 | 水平分支井井下作业钻具自动定向导入工具 |
CN101718170A (zh) * | 2009-11-17 | 2010-06-02 | 中国石油集团长城钻探工程有限公司 | 预成型六级分支井系统工具 |
CN101718169A (zh) * | 2009-11-17 | 2010-06-02 | 中国石油集团长城钻探工程有限公司 | 一种后下三通分叉机构实现六级分支井完井的方法 |
CN101748989A (zh) * | 2009-12-15 | 2010-06-23 | 中国石油集团长城钻探工程有限公司 | 一种分支井窗口密封方法 |
-
2010
- 2010-12-17 CN CN 201010593447 patent/CN102102490B/zh not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6283216B1 (en) * | 1996-03-11 | 2001-09-04 | Schlumberger Technology Corporation | Apparatus and method for establishing branch wells from a parent well |
US20050115713A1 (en) * | 2003-12-01 | 2005-06-02 | Restarick Henry L. | Multilateral completion system utilizing an alternate passage |
CN2811548Y (zh) * | 2005-03-04 | 2006-08-30 | 中国石油集团科学技术研究院 | 一种膨胀管井下定位装置 |
CN2864079Y (zh) * | 2005-11-29 | 2007-01-31 | 新疆石油管理局钻井工艺研究院 | 祼眼分支井斜向器定位装置 |
CN201273142Y (zh) * | 2008-10-08 | 2009-07-15 | 中国石油天然气股份有限公司 | 水平分支井井下作业钻具自动定向导入工具 |
CN101413384A (zh) * | 2008-11-24 | 2009-04-22 | 中国石油集团长城钻探工程有限公司 | 一种用金属膨胀管实现分支井窗口密封的方法 |
CN101718170A (zh) * | 2009-11-17 | 2010-06-02 | 中国石油集团长城钻探工程有限公司 | 预成型六级分支井系统工具 |
CN101718169A (zh) * | 2009-11-17 | 2010-06-02 | 中国石油集团长城钻探工程有限公司 | 一种后下三通分叉机构实现六级分支井完井的方法 |
CN101748989A (zh) * | 2009-12-15 | 2010-06-23 | 中国石油集团长城钻探工程有限公司 | 一种分支井窗口密封方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115478798A (zh) * | 2021-06-15 | 2022-12-16 | 中国石油天然气股份有限公司 | 基于动力锚贯入的多锚管海洋水合物钻采井口支撑装置 |
CN115478798B (zh) * | 2021-06-15 | 2024-03-22 | 中国石油天然气股份有限公司 | 基于动力锚贯入的多锚管海洋水合物钻采井口支撑装置 |
Also Published As
Publication number | Publication date |
---|---|
CN102102490B (zh) | 2013-05-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102575512B (zh) | 可膨胀衬管牵拉连接 | |
CN101343991B (zh) | 单一内径完井井身结构的井完井方法 | |
CN102777123B (zh) | 一种高膨胀率裸眼悬空补贴系统及方法 | |
NO333764B1 (no) | Ettlops borehull og fremgangsmate for komplettering av det samme | |
WO2012059574A1 (en) | System and method for radially expanding a tubular element | |
CN103573210A (zh) | 一种快钻复合插管桥塞 | |
CN110374570A (zh) | 一种双分支水平井裸眼分段压裂施工方法 | |
CN103670324B (zh) | 爪套式液压封隔器 | |
CN106761538A (zh) | 一种油田隔采用长胶筒封隔器 | |
CN102635322A (zh) | 裸眼井段膨胀套管的工具 | |
CN201386510Y (zh) | 液压自封自锁开窗一体化斜向器 | |
CN102434192A (zh) | 增加煤层致裂效果的装置及增加煤层致裂效果的方法 | |
CN108119107B (zh) | 衬管吊架设置工具及其使用方法 | |
CN101883909A (zh) | 径向膨胀管状元件的方法 | |
CN103089193A (zh) | 一种筛管顶部膨胀套管封堵的尾管完井的方法 | |
CN101871332A (zh) | 多途径丢手装置 | |
CN101748989A (zh) | 一种分支井窗口密封方法 | |
CN102102490B (zh) | 一种基于下定向的分叉三通机构送入及膨胀方法 | |
CN206376810U (zh) | 一种油田隔采用长胶筒封隔器 | |
CN101818619B (zh) | 暂封口开孔套管分支井固井完井结构及工艺 | |
CN202596633U (zh) | 裸眼井段膨胀套管的工具 | |
CN101718169B (zh) | 一种后下三通分叉机构实现六级分支井完井的方法 | |
CN101718170B (zh) | 预成型六级分支井系统工具 | |
CN115538971A (zh) | 一种尾管头漏失井二次完井管串及完井方法 | |
CN106567687A (zh) | 一种深井用自上而下的膨胀套管膨胀方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130522 Termination date: 20131217 |