CN102094677A - Emergency equipment for adverse-slope tracking water drainage and silt discharging in tunnel construction - Google Patents
Emergency equipment for adverse-slope tracking water drainage and silt discharging in tunnel construction Download PDFInfo
- Publication number
- CN102094677A CN102094677A CN2009102585682A CN200910258568A CN102094677A CN 102094677 A CN102094677 A CN 102094677A CN 2009102585682 A CN2009102585682 A CN 2009102585682A CN 200910258568 A CN200910258568 A CN 200910258568A CN 102094677 A CN102094677 A CN 102094677A
- Authority
- CN
- China
- Prior art keywords
- slope
- car
- water
- counter
- trail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention relates to emergency equipment for adverse-slope tracking water drainage and silt discharging in tunnel construction. The emergency equipment is characterized in that: by the equipment, a train is formed by dismountable vehicle bodies and functional units arranged on the vehicle bodies; and a water drainage system (2), a power supply system (4), a traction system (6) and a logistic guarantee system (7) are arranged from the front side to the rear side sequentially. By the emergency equipment, a large amount of ponding water can be fast and flexibly drained, and silt deposited at the bottom of a tunnel can be diluted and made into slurry by using high pressure wind and is efficiently discharged out of holes by using a pipeline system, so that the working efficiency is greatly improved; and the emergency equipment plays an important role in rescue construction.
Description
Technical field
The present invention relates to tunnel construction equipment, is to draw water fast after a kind of construction of tunnel is flooded by sudden water burst in the process of building and discharge mud by pipeline, in order to the emergency set of rescue specifically.
Background technology
Should ten thousand railway red deer mountain valley with clumps of trees and bamboo tunnels be tunnels that China and even world's railway tunnel are built the water yield maximum of moment on the history.On January 21st, 2006, especially big gushing water accident takes place in tunnel exit.The tunnel space that water burst will excavate in 15 minutes all is full of, and goes out outside the hole.140 minutes gushing water duration, total amount is about 110 * 10
4m
3This time the routed water of karst has caused great casualties, and all devices is submerged in the tunnel, and facility is destroyed by rush of water outside the part hole.The tunnel exit direction is a counter-slope, and positive hole has been constructed 2341 meters when bursting water, and flat leading constructed 3152 meters, and after the tunnel portal water burst stopped, waterline was positioned at tunnel portal, and water is about 18 * 10 in the estimation tunnel
4m
3In order to drain the ponding in the tunnel, search wrecked personnel, to recover construction and produce, unit in charge of construction organizes flat lead and the operation of high-intensity pump drainage water is carried out in positive hole simultaneously from the tunnel immediately.
But the engineering properties plumbing work of counter-slope draining brings very big puzzlement, mainly contains following technical barrier:
1. the gradient in red deer mountain valley with clumps of trees and bamboo tunnel is 15.3 ‰, and the water surface whenever moves back 40m (the about 60cm of drawdown) in the hole, just must move forward pumping equipment, otherwise the water intake of water pumper just surfaces.Can't continue operation.Each telephone-moving comprises and cut off the electricity supply, artificial telephone-moving, connect operation such as electricity again that pump drainage water conservancy project skill is in counter-slope the tunnel in: the installation water pump → water pipe that the runs in → water pump that draws water → remove moves forward to next position of drawing water → prolongation discharge pipe line → draw water once more.Under the very skilled situation of personnel, take about 2 hours, have a strong impact on the efficient of drawing water.
2. artificial telephone-moving is owing to the reason of weight can not be used high powered water pump
3. tear electricity repeatedly open and connect electric operation under the environment of humidity, potential safety hazard is bigger.
4. the power of pumping equipment is bigger, needs in the high-tension electricity incoming tunnel, and heavy power supply facilitiess such as transformer need along with pumping equipment constantly moves forward.
5. when drawing water, also must discharge alluvial and reach mud about 1m, otherwise equipment just can not move forward at tunnel bottom thickness.And these mud are in stream and mould state (semi liquid state semisolid), use the equipment such as loader can't entrucking, have only the artificial barreled car of using, and in transportation, a part flow back in the tunnel again.If with the vehicle shipment, the efficient by at that time takes 2 years.
6. after the water disaster generation is burst in the tunnel,, still there is prominent water burst risk between drainage period in the hole though taked engineering measure.Adopt the in case of emergency very difficult assurance personnel of conventional pumping method, equipment to withdraw fast.
In order to address the above problem, a whole set of emergency set that collection is powered, drawn water, moves forward is automatically designed in the middle iron personnel of 11 innings of organizational technologies of group research of technique first.
Summary of the invention
Technical problem to be solved by this invention provides a kind of counter-slope that is used for and follows the trail of that water level draining row becomes silted up, the collection pulping, draw water, power supply and power drive, stringing etc. are the emergency set of one, thereby solve the technical problem that counter-slope tunnel drainage row is become silted up.Equipment such as pumping equipment, power supply unit, dilution pulping are integrated on the train that draws water, can rapidly and efficiently follow the trail of the drawdown reach.
Be used for counter-slope in the described constructing tunnel and follow the trail of the emergency set that draining row is become silted up, it is characterized in that: this equipment constitutes train by each detachable car body and the functional unit that is mounted thereon, and described functional unit is followed successively by drainage system, electric power system, tractive power supply system, logistics support system after by forward direction.
The present invention can have following prioritization scheme: described drainage system, electric power system, lay respectively in turn on the platform truck that draws water that connects, the electrical source of power car, and logistics support system is positioned on the logistics service car, and described trailer system adopts the traction power car.
Be provided with pipe distribution system between described drainage system and electric power system, pipe distribution system is located on the stringing car.
The wheel of the described platform truck that draws water is a standard rule steel wheel, and body framing is a shaped steel, and the front end of body framing and both sides are established the water pump suspension bracket respectively.
Many foul water pumps of described water pump suspension bracket lifting, the delivery port of foul water pump adopts flexible pipe to be connected with the steel pipe front end that is distributed in the platform truck rear portion of drawing water, and the rear end of steel pipe adopts flexible pipe to extend to the stringing car.
On the described platform truck that draws water high-pressure hydraulic pump, water tank and air compressor machine are installed, the delivery outlet of described air compressor machine connects thankss for your hospitality hydraulic giant, and described water tank is connected with giant through high-pressure hydraulic pump.
The described hydraulic giant leading portion of disturbing is provided with the Steel Tube Special that is drilled with plum blossom shape aperture, and Steel Tube Special is connected with the outlet of air compressor machine by flexible pipe.
On the front end vehicle frame of the described platform truck that draws water searchlight and television camera are installed.
Described electrical source of power car employing flat car is equipped with box type transformer on it and armored cable stirs dish.
Described traction power car adopts mining battery truck.
The present invention can be fast, in a large number, drain the water away flexibly, the mud of tunnel bottom alluvial can be used high-pressure blast dilution pulping simultaneously, adopt pipe-line system efficiently to get rid of outside the hole, improved operating efficiency greatly, in the construction of rescue, play a significant role.
Description of drawings
Fig. 1 is a structural representation of the present invention,
Fig. 2 is a working platform car enlarged drawing,
Fig. 3 be among Fig. 2 I-I to schematic cross-section,
Fig. 4 disturbs the hydraulic giant structural representation.
Among the figure: 1-flexible pipe, 2-drainage system, 3-pipe distribution system, the 4-electric power system, the 5-armored cable stirs dish, the 6-trailer system, the 7-logistics support system, 8-foul water pump, 9-searchlight, the 10-television camera, 11-Chain block, 12-high-pressure hydraulic pump, the 13-water tank, 14-air compressor machine, 15-steel pipe, the 16-power distribution cabinet, 17-plum blossom shape aperture, 18-Steel Tube Special, the 19-wheel, 20-body framing, 21-water pump suspension bracket, the 22-platform truck that draws water, 23-stringing car, 24-electrical source of power car, 25-traction power car, 26-logistics service car.
The specific embodiment
The present invention is further described below in conjunction with accompanying drawing: be used for counter-slope as shown in fig. 1 in the constructing tunnel and follow the trail of the emergency set that draining row is become silted up, constitute train by each detachable car body and the functional unit that is mounted thereon, described functional unit is followed successively by drainage system 2, electric power system 4, tractive power supply system 6, logistics support system 7 after by forward direction.
Described drainage system 2, electric power system 4 lay respectively in turn on the platform truck 22 that draws water that connects, the electrical source of power car 24, and logistics support system 7 is positioned on the logistics service car 26, and described trailer system 6 adopts traction power cars 25.
Be provided with pipe distribution system 3 between described drainage system 2 and electric power system 4, pipe distribution system 3 is located on the stringing car 23.
First classifies the platform truck 22 that draws water as, and its effect is to draw water and pulping, and its wheel 19 is a standard rule steel wheel, and body framing 20 is a shaped steel, and the front end of body framing 20 and both sides are established water pump suspension bracket 21 respectively.
Many foul water pumps 8 of described water pump suspension bracket 21 liftings, the delivery port of foul water pump 8 adopts flexible pipe 1 to be connected with steel pipe 15 front ends that are distributed in platform truck 22 rear portions of drawing water, and the rear end of steel pipe 15 adopts flexible pipe 1 to extend to stringing car 23.Water pump suspension bracket 21 lifts 8 foul water pumps 8 in an embodiment, and the quantity of foul water pump 8 can be with the size of working space, the size increase and decrease of tunnel cross-section or drainage works amount.Rear end draining steel pipe 15 adopts flexible pipe 1 to be connected with stringing car 23 according to the width of the carbody layered arrangement.
On the described platform truck 22 that draws water high-pressure hydraulic pump 12, water tank 13 and air compressor machine 14 are installed, the delivery outlet of described air compressor machine 14 connects thankss for your hospitality hydraulic giant, the described hydraulic giant leading portion of disturbing is provided with the Steel Tube Special 18 that is drilled with plum blossom shape aperture 17, and Steel Tube Special 18 is connected with the outlet of air compressor machine 14 by flexible pipe 1.The steel pipe of disturbing hydraulic giant is inserted in the mud, utilize high-pressure blast disturbance mud and water mixed, can utilize foul water pump 8 suction pipelines to discharge the tunnel then.
Described water tank 13 is connected with giant through high-pressure hydraulic pump 12.Be used for jetting cleaning tunnel and be submerged part.Small-sized water pumper also is installed on the car is used to water tank 13 supplementing water.
Draw water and searchlight 9 and television camera 10 are installed on platform truck 22 its front end vehicle frames.Be used for illumination, dangerous situation observation and record.
Second classifies stringing car 23 as, and it mainly acts on is to connect draw water platform truck 22 and the drainage pipe that is arranged in hole, tunnel wall; Increase the length of device systems simultaneously in addition, thereby increase the draft of the platform truck 22 that draws water, avoid 25 entry of traction power car dark excessively, increase the effect of every circulation drainage distance.Steel pipe 15 layered arrangement on demand on the stringing car 23 is connected with the drainage pipe that draws water platform truck 22 and be arranged in hole, tunnel wall of the high-pressure hose of band steel wire and front end.Both sides adopt wire rope to hang power cable and communication cable.
The 3rd classifies electrical source of power car 24 as adopts flat car, box type transformer and armored cable is installed on it stirs dish 5.
The 4th classifies traction power car 25 as adopts mining battery truck.
The 5th classifies logistics service car 26 as, available flat car or shuttle car.Transport pipeline, instrument, personnel etc.
Each adjacent both sides, car junction, unit is provided with cable bearer, is used to hang power line.
The connecting rod pin joint is adopted in the connection of each unit car.
Gutter on the tunnel side wall can adopt large-diameter steel pipe or engineering plastics pipe.
Operating process is as follows:
The draw water obstruction in platform truck 22 the place aheads of cleaning is checked and is safeguarded track condition, and the platform truck 22 that draws water is carried out to certain draft, and the gutter on the train is connected with gutter on being arranged in tunnel side wall.Start dredge pump, draw water.Start the high-pressure blast pulping simultaneously.
Work as drawdown, when exposing mud, start the water jetting at high pressure rifle pulping dilution on the car.
When drawdown when dredge pump can not be worked, shut down.Blanked-off pipe head valve door.Remove being connected of train pipeline and abutment wall pipeline.
Starting traction power car 25 carries out drawing water platform truck 22 to certain draft, connecting pipe.So cycle operation.
When drawing water operation, traction power car 25 can be removed with the vehicle of front end and be connected, and orbits and carries out hauling operation.Or return outside the tunnel and charge.
When pushing operation,, can use two-shipper to push when a traction power car 25 is short of power.
When taking place water yield, can remove the connection of the tunnel side wall gutter of stringing car 23 greater than the emergency of displacement.Close the high voltage power power supply, remove electrical source of power car 24 and be connected with cable on the tunnel side wall.Start traction power car 25, with machine system and personnel's general evacuation to the tunnel.
Run into the particularly urgent situation, remove being connected of traction power car 25 and front end.Utilize traction power car 25 and logistics service car 26 with personnel's emergency escape.
Claims (10)
1. be used for the emergency set that counter-slope is followed the trail of draining row silt in a constructing tunnel, it is characterized in that: this equipment constitutes train by each detachable car body and the functional unit that is mounted thereon, and described functional unit is followed successively by drainage system (2), electric power system (4), trailer system (6), logistics support system (7) after by forward direction.
2. be used for counter-slope in the constructing tunnel according to claim 1 and follow the trail of the emergency set that draining row is become silted up, it is characterized in that: described drainage system (2), electric power system (4), lay respectively in turn on the platform truck that draws water (22) that connects, the electrical source of power car (24), logistics support system (7) is positioned on the logistics service car (26), and described trailer system (6) adopts traction power car (25).
3. be used for counter-slope in the constructing tunnel according to claim 1 and 2 and follow the trail of the emergency set that draining row is become silted up, it is characterized in that: be provided with pipe distribution system (3) between described drainage system (2) and electric power system (4), pipe distribution system (3) is located on the stringing car (23).
4. be used for counter-slope in the constructing tunnel according to claim 2 and follow the trail of the emergency set that draining row is become silted up, it is characterized in that: the wheel (19) of the described platform truck that draws water (22) is standard rule steel wheel, body framing (20) is a shaped steel, and the front end of body framing (20) and both sides are established water pump suspension bracket (21) respectively.
5. be used for counter-slope in the constructing tunnel according to claim 4 and follow the trail of the emergency set that draining row is become silted up, it is characterized in that: described water pump suspension bracket (21) lifting many foul water pumps (8), the delivery port of foul water pump (8) adopts flexible pipe (1) to be connected with steel pipe (15) front end that is distributed in the platform truck that draws water (22) rear portion, and the rear end of steel pipe (15) adopts flexible pipe (1) to extend to stringing car (23).
6. follow the trail of the emergency set that draining row is become silted up according to being used for counter-slope in claim 2, the 4 or 5 described constructing tunnels, it is characterized in that: high-pressure hydraulic pump (12), water tank (13) and air compressor machine (14) are installed on the described platform truck that draws water (22), the delivery outlet of described air compressor machine (14) connects thankss for your hospitality hydraulic giant, and described water tank (13) is connected with giant through high-pressure hydraulic pump (12).
7. be used for counter-slope in the constructing tunnel according to claim 6 and follow the trail of the emergency set that draining row is become silted up, it is characterized in that: the described hydraulic giant leading portion of disturbing is provided with the Steel Tube Special (18) that is drilled with plum blossom shape aperture (17), and Steel Tube Special (18) is connected with the outlet of air compressor machine (14) by flexible pipe (1).
8. follow the trail of the emergency set that draining row is become silted up according to being used for counter-slope in claim 2, the 4 or 5 described constructing tunnels, it is characterized in that: searchlight (9) and television camera (10) are installed on the front end vehicle frame of the described platform truck that draws water (22).
9. be used for counter-slope in the constructing tunnel according to claim 2 and follow the trail of the emergency set that draining row is become silted up, it is characterized in that: described electrical source of power car (24) adopts flat car, box type transformer and armored cable is installed on it stirs dish (5).
10. be used for counter-slope in the constructing tunnel according to claim 2 and follow the trail of the emergency set that draining row is become silted up, it is characterized in that: described traction power car (25) adopts mining battery truck.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910258568A CN102094677B (en) | 2009-12-11 | 2009-12-11 | Emergency equipment for adverse-slope tracking water drainage and silt discharging in tunnel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910258568A CN102094677B (en) | 2009-12-11 | 2009-12-11 | Emergency equipment for adverse-slope tracking water drainage and silt discharging in tunnel construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102094677A true CN102094677A (en) | 2011-06-15 |
CN102094677B CN102094677B (en) | 2012-10-24 |
Family
ID=44127925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910258568A Active CN102094677B (en) | 2009-12-11 | 2009-12-11 | Emergency equipment for adverse-slope tracking water drainage and silt discharging in tunnel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102094677B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102619560A (en) * | 2012-04-17 | 2012-08-01 | 中铁十六局集团有限公司 | Drainage and drainage method for long-distance reverse-slope tunnels |
CN104120783A (en) * | 2013-11-11 | 2014-10-29 | 成都科创佳思科技有限公司 | Water and sludge discharging device |
CN104875759A (en) * | 2015-05-26 | 2015-09-02 | 中铁十四局集团第五工程有限公司 | Water pump moving device used for tunnel adverse slope draining |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1158938A (en) * | 1996-08-02 | 1997-09-10 | 北京市地下铁道建设公司 | Drainage and construction method for building subway |
KR100438794B1 (en) * | 2002-11-22 | 2004-07-07 | (주)현이앤씨 | Construction method for three arch excavation tunnel |
CN101285397B (en) * | 2008-05-29 | 2010-06-09 | 中交第二公路勘察设计研究院有限公司 | Submarine tunnel transverse water collecting tank |
CN101435342B (en) * | 2008-12-22 | 2011-04-20 | 长安大学 | Tunnel ring direction drainpipe equipped with strip heat-insulating layer |
CN201554497U (en) * | 2009-12-11 | 2010-08-18 | 中铁十一局集团有限公司 | Emergency equipment for counter-slope tracking drainage and dredging in tunnel construction |
-
2009
- 2009-12-11 CN CN200910258568A patent/CN102094677B/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102619560A (en) * | 2012-04-17 | 2012-08-01 | 中铁十六局集团有限公司 | Drainage and drainage method for long-distance reverse-slope tunnels |
CN102619560B (en) * | 2012-04-17 | 2014-01-08 | 中铁十六局集团有限公司 | Drainage and drainage method for long-distance reverse-slope tunnels |
CN104120783A (en) * | 2013-11-11 | 2014-10-29 | 成都科创佳思科技有限公司 | Water and sludge discharging device |
CN104875759A (en) * | 2015-05-26 | 2015-09-02 | 中铁十四局集团第五工程有限公司 | Water pump moving device used for tunnel adverse slope draining |
Also Published As
Publication number | Publication date |
---|---|
CN102094677B (en) | 2012-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201297181Y (en) | Water discharge device moved with pipe in coal mine gas extraction pipeline | |
CN201554497U (en) | Emergency equipment for counter-slope tracking drainage and dredging in tunnel construction | |
CN110410143A (en) | A kind of reverse-slope tunnel construction drainage system | |
CN112681375A (en) | Utility tunnel with rainwater regulation function | |
CN207550031U (en) | Drainage car | |
CN102094677B (en) | Emergency equipment for adverse-slope tracking water drainage and silt discharging in tunnel construction | |
CN111119210A (en) | Drainage system of piping lane | |
CN113417650A (en) | Slurry shield split starting construction method under deep foundation pit high water pressure small operation space | |
CN204024704U (en) | A kind of mine emergency dewatering system | |
CN109381830B (en) | Ultra-long highway tunnel partition water supply fire-fighting system and water supply fire-fighting method | |
CN103321612B (en) | Water salvaging type drainage and gas production machine | |
CN209596464U (en) | A kind of overlength vcehicular tunnel water rationing fire-fighting system | |
CN113089384A (en) | Urban rail transit turnout switch machine foundation pit drainage system | |
KR102608791B1 (en) | Unmanned automatic dredging system of power plant intake | |
CN110374124B (en) | Subway construction drainage system | |
CN112228152A (en) | Adverse slope drainage structure suitable for construction of large steep slope tunnel with small section | |
CN107187369A (en) | A kind of flood control and drainage car of speedily carrying out rescue work with automatic control function | |
CN205654523U (en) | Fire pump and fire engine | |
CN113417358A (en) | Railway tunnel sludge cleaning vehicle | |
CN211849714U (en) | Circulating flushing and emergency fire-fighting water supply device for construction site | |
CN209687542U (en) | Tunnel water plug | |
CN208024400U (en) | A kind of five-part form chilling spray tunnel | |
CN207671050U (en) | A kind of oil gas transport storage tank | |
CN103397681B (en) | A kind of high sediment seawater joint pump house in nuclear power plant method for arranging | |
CN107952760B (en) | Mud pipeline sediment pulse cleaning system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |