CN102087343A CN2009102272601A CN200910227260A CN102087343A CN 102087343 A CN102087343 A CN 102087343A CN 2009102272601 A CN2009102272601 A CN 2009102272601A CN 200910227260 A CN200910227260 A CN 200910227260A CN 102087343 A CN102087343 A CN 102087343A
Authority
CN
China
Prior art keywords
fault
sampling device
power
power grid
sampling apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009102272601A
Other languages
Chinese (zh)
Other versions
CN102087343B (en
Inventor
宋耐超
贾占领
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuchang Power Supply Co of Henan Electric Power Co
Original Assignee
Xuchang Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuchang Power Supply Co of Henan Electric Power Co filed Critical Xuchang Power Supply Co of Henan Electric Power Co
Priority to CN 200910227260 priority Critical patent/CN102087343B/en
Publication of CN102087343A publication Critical patent/CN102087343A/en
Application granted granted Critical
Publication of CN102087343B publication Critical patent/CN102087343B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for rapidly monitoring a fault of a sampling device. When that values of adjacent two power grid voltage signals are the same or the difference of adjacent two power grid signals exceeds standard difference in a time interval is detected, and a communication system is not failed, so that the sampling device is determined to have a fault, and the fault of the sampling device is monitored. The method can make scheduling personnel and automatic maintenance personnel know the fault of the sampling device and perform related maintenance, influence on power grid load prediction and power generation and supply balance estimation is avoided, and a power grid accident due to error judgment of the scheduling personnel on the power grid operating conditions can be avoided.

Description

A kind of fast monitored is to the method for sampling apparatus fault
Technical field
The present invention relates to power dispatching automation field in the electric system, relate in particular to the method for a kind of fast monitored to the sampling apparatus fault.
Background technology
At present, development along with automatic technology, the remote signalling of transformer station, telesignalisation get more and more, even reach up to ten thousand, electric network composition becomes increasingly complex simultaneously, transformer station is more and more, the information that the dispatching automation main website accepts becomes geometric growth, it is exhaustive to cause the automatic operating maintainer can not accomplish when scheduling automatic main station is maked an inspection tour, the management and running personnel are because the various and more consideration to power grid security and economical operation of despatching work, can not relate to all the supervision of operation of power networks state.Sampling apparatus is mainly gathered electric current, the information of voltage of the operating electrical network relevant device of real-time power network, and calculate the active power and the reactive power information of electrical network, offer the dispatching of power netwoks personnel timely, be the safe and stable operation establish a firm foundation of its Real-Time Scheduling and electrical network.And size of current in the electrical network, voltage height are along with the variation of power system operating mode, Changes in weather and real-time change.General when the sampling apparatus fault, telesignalisation will occur stagnating or reduce to zero, and automatic operating maintainer or yardman may monitor less than this signal in several hours even several days.The long-time fault of sampling apparatus is not only estimated to impact to a network load prediction and a power supply balance, and the dispatcher is disconnected to the erroneous judgement of operation of power networks situation in serious also may causing, and then causes power grid accident.
Summary of the invention
The purpose of this invention is to provide a kind of can fast monitored to the method for sampling apparatus fault, avoid judging by accident broken hair is made trouble so.
The present invention adopts following technical proposals: a kind of fast monitored is to the method for sampling apparatus fault, by the value that detects adjacent two power network signals in a time interval equate or the difference of adjacent two power network monitoring signals when the above numerical value of standard difference, and during the communication system non-fault, promptly be judged as the sampling apparatus fault, realize monitoring the sampling apparatus fault.
Described power network signal is curtage or power signal, perhaps any combination of electric current, voltage and power signal.
The described time interval is five minutes.
The characteristics that fast monitored of the present invention changes by the operation of telesignalisations such as detection of grid electric current, voltage, power to the method for sampling apparatus fault are judged whether fault of sampling apparatus, recognize sampling apparatus fault and the maintenance job of being correlated with in the time of can making dispatcher and automated maintenance personnel, can and not send out the power supply balance and estimate to impact, and can avoid the dispatcher to judge by accident disconnected and power grid accident that cause the operation of power networks situation to the network load prediction.
Description of drawings
Fig. 1 is a principle flow chart of the present invention;
Embodiment
A kind of fast monitored of the present invention is by the dispatching automation main website characteristics that operation changes according to line voltage to the method for sampling apparatus fault, comes fast monitored to arrive the fault of sampling apparatus by fast detecting power network current, voltage, variable power situation.As shown in Figure 1: method of the present invention may further comprise the steps:
(1) detector switch, disconnecting link disconnected closed position signalling and voltage, current value, if switch, disconnecting link at closing position and voltage or current value non-zero, then carry out next step, if switch, disconnecting link are zero at open position and voltage or current value, stops monitoring;
(2) gather this signal and be stored in the storer, and carry out next step as initialize signal;
(2) time-delay is five minutes, carries out next step;
(3) the disconnected position signalling that closes of detector switch, disconnecting link if disconnect, then stops monitoring; If closed, then carry out next step;
(4) detect electric current, voltage, power signal, carry out next step;
(5) judge collect whether electric current, voltage, power signal equate with storage signal or the difference of signal value whether more than 30%: if not, then this acquired signal is stored to storer and covers original signal, be back to the five minutes sections of delaying time; If then carry out next step;
(6) judge whether fault of communication system: if then check communication port; If not, then be judged as the sampling apparatus fault, carry out next step;
(7) by the dispatching automation main website telesignalisation is pushed out to main website screen foreground, realizes this monitoring.
In addition, the power network signal of detection can also be the combination in any of electric current, voltage, power signal, for example detects electric current and voltage signal, or electric current and power signal etc.

Claims (3)

1. a fast monitored is to the method for sampling apparatus fault, it is characterized in that: by the value that detects adjacent two power network signals in a time interval equate or the difference of adjacent two power network signals when the above numerical value of standard difference, and during the communication system non-fault, promptly be judged as the sampling apparatus fault, realize monitoring the sampling apparatus fault.
2. fast monitored according to claim 1 is to the method for sampling apparatus fault, and it is characterized in that: described power network signal is curtage or power signal, perhaps any combination of electric current, voltage and power signal.
3. fast monitored according to claim 1 and 2 is to the method for sampling apparatus fault, and it is characterized in that: the described time interval is five minutes.
CN 200910227260 2009-12-02 2009-12-02 Method for rapidly monitoring fault of sampling device Expired - Fee Related CN102087343B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910227260 CN102087343B (en) 2009-12-02 2009-12-02 Method for rapidly monitoring fault of sampling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910227260 CN102087343B (en) 2009-12-02 2009-12-02 Method for rapidly monitoring fault of sampling device

Publications (2)

Publication Number Publication Date
CN102087343A true CN102087343A (en) 2011-06-08
CN102087343B CN102087343B (en) 2013-04-17

Family

ID=44099236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910227260 Expired - Fee Related CN102087343B (en) 2009-12-02 2009-12-02 Method for rapidly monitoring fault of sampling device

Country Status (1)

Country Link
CN (1) CN102087343B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1480739A (en) * 2002-09-03 2004-03-10 朱思一 Equipment for detecting and arlarming fault of distribution network in low voltage of electric power
CN2758789Y (en) * 2004-12-28 2006-02-15 中达电通股份有限公司 Fault monitoring circuit for Hall current sensor
CN101295177A (en) * 2007-04-23 2008-10-29 三菱电机株式会社 Method and system for detecting changes in sensor sample streams
US7519506B2 (en) * 2002-11-06 2009-04-14 Antonio Trias System and method for monitoring and managing electrical power transmission and distribution networks

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1480739A (en) * 2002-09-03 2004-03-10 朱思一 Equipment for detecting and arlarming fault of distribution network in low voltage of electric power
US7519506B2 (en) * 2002-11-06 2009-04-14 Antonio Trias System and method for monitoring and managing electrical power transmission and distribution networks
CN2758789Y (en) * 2004-12-28 2006-02-15 中达电通股份有限公司 Fault monitoring circuit for Hall current sensor
CN101295177A (en) * 2007-04-23 2008-10-29 三菱电机株式会社 Method and system for detecting changes in sensor sample streams

Also Published As

Publication number Publication date
CN102087343B (en) 2013-04-17

Similar Documents

Publication Publication Date Title
CN105891680B (en) 10kV distribution line multiphase disconnection fault determination method based on three-phase voltage current
KR102035351B1 (en) Electric installation maintenance method and device
CN102064612B (en) System and method for maintaining condition of relay protection
CN103616579B (en) Fault diagnosis method used for intelligent substation secondary system
CN103490511B (en) A kind of power distribution network communication terminal detection system and method
CN110048507B (en) Automatic inspection method and system for power distribution automation system
US7881888B2 (en) Logical scheme for severe fault detection
CN101478154A (en) Measure for solving AC, DC earthing and short circuit and novel design of DC system
CN203084097U (en) On-line zinc oxide lightning arrester state monitoring device
CN204243896U (en) For the on off state monitoring device of power distribution network
CN101718813B (en) Method for monitoring voltage acquisition circuit of electric power secondary system
CN110930669B (en) Monitoring and early warning system and method for tripping and closing loop of transformer substation
CN101699306A (en) Method for monitoring current acquisition circuit of electric power secondary system
CN106168638A (en) A kind of method utilizing protective relaying device to realize high-voltage parallel capacitor on-line monitoring
CN103995172A (en) Method for on-line monitoring of load current of GIS bus of substation
CN109001593A (en) A kind of distribution network failure recording control method
CN204497849U (en) A kind ofly take into account measure and control device that is centralized, formula feeder automation on the spot
Kanabar et al. Grid innovations and digital transformation: grid innovations and digital transformation of power substations are accelerating the energy transition for global utilities
EP2765679B1 (en) Intelligent electrical power network device
CN102005819A (en) Fault isolation method of electric distribution network
CN103346617A (en) Error logical judgment prevention system and judgment method considering multiple constraint conditions
CN109713788A (en) A kind of remote failure monitoring method for power equipment
CN202503362U (en) Distribution terminal unit integrating measurement, control and protection for intelligent distribution network
CN102087343B (en) Method for rapidly monitoring fault of sampling device
CN206132904U (en) Novel wisdom fault indication system of 10kv circuit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: XUCHANG POWER SUPPLY COMPANY, STATE GRID HUNAN ELECTRIC POWER COMPANY

Effective date: 20131203

Owner name: XUCHANG POWER SUPPLY COMPANY, STATE GRID HUNAN ELE

Effective date: 20131203

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: XUCHANG POWER SUPPLY COMPANY, STATE GRID HUNAN ELE

Free format text: FORMER NAME: XUCHANG POWER SUPPLY COMPANY OF HENAN ELECTRIC POWER COMPANY;XJ ELECTRIC CO., LTD.

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 461000 XUCHANG, HENAN PROVINCE TO: 100031 XICHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: No. 288 Xuchang City, Henan province 461000 City Road

Patentee after: XUCHANG POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

Address before: No. 288 Xuchang City, Henan province 461000 City Road

Patentee before: Xuchang Power Supply Company of Henan Electric Power Co.

TR01 Transfer of patent right

Effective date of registration: 20131203

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: XUCHANG POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

Address before: No. 288 Xuchang City, Henan province 461000 City Road

Patentee before: XUCHANG POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130417

Termination date: 20211202