CN102081563A - Test method of power supply resetting mechanism - Google Patents
Test method of power supply resetting mechanism Download PDFInfo
- Publication number
- CN102081563A CN102081563A CN2009102261005A CN200910226100A CN102081563A CN 102081563 A CN102081563 A CN 102081563A CN 2009102261005 A CN2009102261005 A CN 2009102261005A CN 200910226100 A CN200910226100 A CN 200910226100A CN 102081563 A CN102081563 A CN 102081563A
- Authority
- CN
- China
- Prior art keywords
- server
- power supply
- test
- closing
- reset mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Power Sources (AREA)
Abstract
The invention discloses a test method of a power supply resetting mechanism, applied to a server. The test method of the power supply resetting mechanism comprises the following steps of: setting a power supply resetting mechanism of the server to switch on and off the server through a base plate management controller of the server; firstly switching off and then switching on the power supply of the server by a remote power supply control module; judging whether the server is switched on; if the server is switched off, concluding that the server fails to pass the test, and firstly switching off and then switching on the power supply of the server by the remote power supply control module; judging whether the server is switched on; and concluding that the server passes the test if the server is switched on and the server fails to pass the test if the server is switched off.
Description
Technical field
The disclosure of invention is relevant for a kind of method of testing of electronic installation, and particularly relevant for a kind of power supply reset mechanism method of testing.
Background technology
Server is widely used in the information industry, to comprise the mainboard of a greater number or the computer system of hard disk unit is controlled and managed to various.Therefore, in the infotech in modern times, become one of popular knowledge of information industry at the research and development of server.
The power supply reset mechanism is that if be connected with power supply again, which kind of state server will be in after the power supply for server is cut off.But test the power supply reset mechanism of server, action that certainly will will plug the power lead that it connected could be understood and cut off the power supply fully and after powering once more, whether server can operate according to the power supply reset mechanism.Like this manual mode, time and effort consuming not only, the waste of manpower cost, easier because tester forgets the order of being tested or should measure which state, and tests this completed testing process repeatedly.
Therefore, how designing a new power supply reset mechanism method of testing, to solve the inconvenience in the manpower test, is an industry problem demanding prompt solution for this reason.
Summary of the invention
The purpose of this invention is to provide a kind of power supply reset mechanism method of testing, to solve the inconvenience in the manpower test.
Therefore, the one side of the disclosure of invention is that a kind of power supply reset mechanism method of testing is being provided, be applied in the server, the power supply reset mechanism that this power supply reset mechanism method of testing comprises the following steps: to set server is for opening and by baseboard management controller (the Baseboard ManagementController of server; BMC) make server closing; Cut off the power supply of back Connection Service device earlier by the remote power supply control module; Judge whether server is unlatching; For closing, server for opening, cuts off the power supply of back Connection Service device as server earlier not by test by the remote power supply control module as server; Judge whether server is unlatching; And as server for opening, server is by test; For closing, server is not by test as server.
According to the disclosure of invention one embodiment, for after opening and making the step of server closing, also comprise: judge whether server is unlatching by the baseboard management controller of server in the power supply reset mechanism of setting server; And as the state of server for opening, server is by test.
According to another embodiment of the disclosure of invention, when server does not pass through test, transmit returning error information to monitoring host computer by baseboard management controller.
The disclosure of invention provide a kind of power supply reset mechanism method of testing on the other hand, be applied in the server, the power supply reset mechanism that this power supply reset mechanism method of testing comprises the following steps: to set server is to close and by the baseboard management controller of server server is opened; Cut off the power supply of back Connection Service device earlier by the remote power supply control module; Judge that whether server is for closing; For opening, server for closing, cuts off the power supply of back Connection Service device as server earlier not by test by the remote power supply control module as server; Judge that whether server is for closing; And as server for closing, server is by test; For opening, server is not by test as server.
Openly show content one embodiment according to the present invention, after the power supply reset mechanism of setting server is for the step of opening, also comprise: judge that whether server is for closing; And as the state of server for closing, server is by test.
According to another embodiment of the disclosure of invention, when server does not pass through test, transmit returning error information to monitoring host computer by baseboard management controller.
The another aspect of the disclosure of invention provides a kind of power supply reset mechanism method of testing, be applied in the server, the power supply reset mechanism that this power supply reset mechanism method of testing comprises the following steps: to set server for according to final state decision and the final state of judging server for closing; Cut off the power supply of back Connection Service device earlier by the remote power supply control module; Judge that whether server is for closing; As server is to open, and server for closing, is opened server by the baseboard management controller of server and reached the power supply that cuts off back Connection Service device by the remote power supply control module earlier as server by test; Judge whether server is unlatching; And as server for opening, server is by test; For closing, server is not by test as server.
According to the disclosure of invention one embodiment, after opening the step of server, also comprise: judge that whether server is for closing by the baseboard management controller of server; And as the state of server for closing, server is by test.
The another aspect of the disclosure of invention provides a kind of power supply reset mechanism method of testing, be applied in the server, power supply reset mechanism method of testing comprises the following steps: that the power supply reset mechanism of setting server is unlatching for the final state according to final state decision and judgement server; Cut off the power supply of back Connection Service device earlier by the remote power supply control module; Judge whether server is unlatching; For closing, server is to open not by test as server as server, the power supply of Connection Service device after cutting off earlier by the baseboard management controller closing server of server and by the remote power supply control module; Judge that whether server is for closing; And as server for closing, server is by test; For opening, server is not by test as server.
According to the disclosure of invention one embodiment, after step, also comprise: judge whether server is unlatching by the baseboard management controller closing server of server; And as the state of server for opening, server is by test.
The advantage of using the disclosure of invention is not need manually to plug the attaching plug of server, and can carry out the test of power supply reset mechanism in full automation ground by the remote power supply control module, achieves the above object easily.
Description of drawings
For the above-mentioned of the disclosure of invention and other purpose, feature, advantage and embodiment can be become apparent, appended the description of the drawings is as follows:
Fig. 1 is in the embodiment of one of disclosure of invention, the calcspar of the applied test macro of power supply reset mechanism method of testing;
Fig. 2 is the process flow diagram of power supply reset mechanism method of testing of an embodiment of the disclosure of invention;
Fig. 3 is the process flow diagram of power supply reset mechanism method of testing of another embodiment of the disclosure of invention;
Fig. 4 is the process flow diagram of power supply reset mechanism method of testing of the another embodiment of the disclosure of invention; And
Fig. 5 is the process flow diagram of power supply reset mechanism method of testing of an embodiment again of the disclosure of invention.
[main description of reference numerals]
1: test macro 10: server
11: returning error information 12: the remote power supply control module
14: monitoring host computer 201-208: step
301-308: step 401-407: step
501-507: step
Embodiment
Please refer to Fig. 1, it is among the embodiment of one of disclosure of invention, the calcspar of the applied test macro 1 of power supply reset mechanism method of testing.Test macro 1 comprises server 10, remote power supply control module 12 and monitoring host computer 14.Server 10, remote power supply control module 12 and 14 of monitoring host computers are connected with network, are LAN (Local Area Network) (Local Area Network in one embodiment; LAN).By the connection of network, remote power supply control module 12 can be cut off or the power supply of Connection Service device 10 from network remote ground.
The power supply reset mechanism is after the power supply of server 10 is cut off, if be connected with power supply again, which kind of state server 10 will be in.The power supply reset mechanism mainly is divided into three kinds, is respectively unlatching, closes and determines according to final state.Wherein open to be meant no matter server 10 is to be cut off power supply under what state, all will be connected the back unlatching again with power supply.Close to be meant no matter server 10 is to be cut off power supply under what state, all will be connected back maintenance closing state again with power supply.And be meant according to final state decision and under the state that server 10 is being opened, be cut off power supply, then again with will open once more after power supply is connected; Under closing state, be cut off power supply and work as server 10, then again with after power supply is connected maintenance closed.That is the state after the state before, server 10 will be cut off according to power supply decides power supply to reconnect.
If above-mentioned power supply reset mechanism is tested, the action that certainly will will plug the power lead that server 10 is connected could be understood and cut off the power supply fully and after powering once more, whether server 10 can operate according to the power supply reset mechanism.Like this manual mode, time and effort consuming not only, the waste of manpower cost, easier because tester forgets the order of being tested or should measure which state, and tests this completed testing process repeatedly.
Please refer to Fig. 2, be the process flow diagram of the power supply reset mechanism method of testing of an embodiment of the disclosure of invention.Power supply reset mechanism method of testing can be applicable in the test macro 1 of Fig. 1.Power supply reset mechanism method of testing comprises the following steps: in step 201, and the power supply reset mechanism of setting server 10 is for opening and by the baseboard management controller 100 of server 10 server 10 being closed.In step 202, baseboard management controller 100 will judge whether the state of server 10 is unlatching after server 10 is closed.If server 10 is in the state of unlatching, represent that then baseboard management controller 100 does not correctly make server 10 close, and enter step 203, judge that server is not by test.
In step 204, cut off the power supply of back Connection Service device 10 earlier by remote power supply control module 12.That is, after remote power supply control module 12 will be cut off the power supply of server 10 earlier from the network move instruction, the power supply of the device of move instruction Connection Service once more 10.Then, judge whether server 10 is unlatching in step 205.For closing, then enter step 203 as server, server is not by test.For opening, then enter step 206 as server, cut off the power supply of back Connection Service device 10 by remote power supply control module 12 earlier.Then, judge whether server 10 is unlatching in step 207.For opening, enter step 208 as server, server 10 is by test.For closing, then enter step 203 as server, server 10 is not by test.
In one embodiment, when server 10 does not pass through test, will returning error information 11 be sent to monitoring host computer 12, so that carry out subsequent analysis by monitoring host computer 12 by baseboard management controller 100.
Please refer to Fig. 3, it is the process flow diagram of power supply reset mechanism method of testing of another embodiment of the disclosure of invention.This power supply reset mechanism method of testing can be applicable in the test macro 1 of Fig. 1.This power supply reset mechanism method of testing comprises the following steps: in step 301, and the power supply reset mechanism of setting server 10 is to close and by the baseboard management controller 100 of server 10 server 10 is opened.In step 302, baseboard management controller 100 will judge that whether the state of server 10 is for closing after opening server 10.If server 10 is in closing state, expression baseboard management controller 100 does not correctly make server 10 close, and enters step 303, judges that server is not by test.
In step 304, cut off the power supply of back Connection Service device 10 earlier by remote power supply control module 12.That is, after remote power supply control module 12 will be cut off the power supply of server 10 earlier from the network move instruction, the power supply of the device of move instruction Connection Service once more 10.Then, judge that whether server 10 is for closing in step 305.For opening, then enter step 303 as server, server is not by test.For closing, then enter step 306 as server, cut off the power supply of back Connection Service device 10 by remote power supply control module 12 earlier.Then, judge that whether server 10 is for closing in step 307.For closing, then enter step 308 as server, server 10 is by test.For opening, then enter step 303 as server, server 10 is not by test.
Please refer to Fig. 4, it is the process flow diagram of the power supply reset mechanism method of testing of the another embodiment of content content of the present invention.This power supply reset mechanism method of testing can be applicable in the test macro 1 of Fig. 1.This power supply reset mechanism method of testing comprises the following steps: in step 401, the power supply reset mechanism of setting server 10 for according to final state decision and the final state of judging server 10 for closing.
In step 402, cut off the power supply of back Connection Service device 10 earlier by remote power supply control module 12.That is, after remote power supply control module 12 will be cut off the power supply of server 10 earlier from the network move instruction, the power supply of the device of move instruction Connection Service once more 10.Then, judge that whether server 10 is for closing in step 403.For opening, then enter step 404 as server, server is not by test.For closing, then enter step 405 as server, the power supply of Connection Service device 10 after cutting off earlier by the baseboard management controller 100 unlatching servers 10 of server and by remote power supply control module 12.Then, judge whether server 10 is unlatching in step 406.For opening, then enter step 407 as server, server 10 is by test.For closing, then enter step 404 as server, server 10 is not by test.
Please refer to Fig. 5, it is the process flow diagram of power supply reset mechanism method of testing of an embodiment again of the disclosure of invention.This power supply reset mechanism method of testing can be applicable in the test macro 1 of Fig. 1.This power supply reset mechanism method of testing comprises the following steps: that in step 501 the power supply reset mechanism of setting server 10 is according to the final state decision and judges that the final state of server 10 is unlatching.
In step 502, cut off the power supply of back Connection Service device 10 earlier by remote power supply control module 12.That is, after remote power supply control module 12 will be cut off the power supply of server 10 earlier from the network move instruction, the power supply of the device of move instruction Connection Service once more 10.Then, judge whether server 10 is unlatching in step 503.For closing, then enter step 504 as server, server is not by test.As server is to open, and then enters step 505, the power supply of Connection Service device 10 after cutting off earlier by the baseboard management controller 100 unlatching servers 10 of server and by remote power supply control module 12.Then, judge that whether server 10 is for closing in step 506.For closing, then enter step 507 as server, server 10 is by test.For opening, then enter step 504 as server, server 10 is not by test.
The advantage of using the disclosure of invention is not need manually to plug the attaching plug of server 10, and can carry out the test of power supply reset mechanism in full automation ground by remote power supply control module 12.
Though the disclosure of invention with embodiment openly as above; so it is not to be used to limit the present invention; any those of ordinary skill of this area; under the premise without departing from the spirit and scope of the present invention; when can making various changes and improvement, so protection scope of the present invention is as the criterion when the qualification with appending claims.
Claims (10)
1. a power supply reset mechanism method of testing is applied in the server, and this power supply reset mechanism method of testing comprises the following steps:
The power supply reset mechanism of setting this server is for opening and making this server closing by a baseboard management controller of this server;
Cut off earlier the power supply that afterwards connects this server by a remote power supply control module;
Judge whether this server is unlatching;
For closing, then this server for opening, earlier cuts off the power supply that afterwards connect this server by this remote power supply control module as this server not by test as this server;
Judge whether this server is unlatching; And
For opening, then this server is by test as this server;
For closing, then this server is not by test as this server.
2. power supply reset mechanism method of testing as claimed in claim 1 wherein,, also comprises for after opening and making the step of this server closing by this baseboard management controller of this server in this power supply reset mechanism of setting this server:
Judge whether this server is unlatching; And
For opening, then this server is not by test as this server.
3. power supply reset mechanism method of testing as claimed in claim 1 wherein, not by test, then transmits returning error information to one monitoring host computer by this baseboard management controller as this server.
4. a power supply reset mechanism method of testing is applied in the server, and this power supply reset mechanism method of testing comprises the following steps:
A power supply reset mechanism of setting this server is to close and by a baseboard management controller of this server this server is opened;
Cut off earlier the power supply that afterwards connects this server by a remote power supply control module;
Judge that whether this server is for closing;
For opening, then this server for closing, earlier cuts off the power supply that afterwards connect this server by this remote power supply control module as this server not by test as this server;
Judge that whether this server is for closing; And
For closing, then this server is by test as this server;
For opening, then this server is not by test as this server.
5. power supply reset mechanism method of testing as claimed in claim 4, wherein, this power supply reset mechanism of setting this server be close and make the step that this server opens by this baseboard management controller of this server after, also comprise:
Judge that whether this server is for closing; And
For closing, then this server is not by test as this server.
6. power supply reset mechanism method of testing as claimed in claim 4 when this server does not pass through test, transmits returning error information to one monitoring host computer by this baseboard management controller.
7. a power supply reset mechanism method of testing is applied in the server, and this power supply reset mechanism method of testing comprises the following steps:
A power supply reset mechanism of setting this server for according to final state decision and the final state of judging this server for closing;
Cut off earlier the power supply that afterwards connects this server by a remote power supply control module;
Judge that whether this server is for closing;
For opening, then this server for closing, is opened this server and is cut off earlier the power supply that afterwards connects this server by a remote power supply control module by a baseboard management controller of this server as this server not by test as this server;
Judge whether this server is unlatching; And
For opening, then this server is by test as this server;
For closing, then this server is not by test as this server.
8. power supply reset mechanism method of testing as claimed in claim 7 wherein, is then opened after the step of this server by this baseboard management controller of this server, also comprises:
Judge that whether this server is for closing; And
For closing, then this server is by test as the state of this server.
9. a power supply reset mechanism method of testing is applied in the server, and this power supply reset mechanism method of testing comprises the following steps:
A power supply reset mechanism of setting this server is for determining according to final state and judging that the final state of this server is unlatching;
Cut off earlier the power supply that afterwards connects this server by a remote power supply control module;
Judge whether this server is unlatching;
For closing, then this server for opening, is closed this server and is cut off earlier the power supply that afterwards connects this server by a remote power supply control module by a baseboard management controller of this server as this server not by test as this server;
Judge that whether this server is for closing; And
For closing, then this server is by test as this server;
For opening, then this server is not by test as this server.
10. power supply reset mechanism method of testing as claimed in claim 9 wherein, after closing the step of this server by this baseboard management controller of this server, also comprises:
Judge whether this server is unlatching; And
State as this server is unlatching, passes through test at this server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009102261005A CN102081563A (en) | 2009-11-30 | 2009-11-30 | Test method of power supply resetting mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009102261005A CN102081563A (en) | 2009-11-30 | 2009-11-30 | Test method of power supply resetting mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102081563A true CN102081563A (en) | 2011-06-01 |
Family
ID=44087536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009102261005A Pending CN102081563A (en) | 2009-11-30 | 2009-11-30 | Test method of power supply resetting mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102081563A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106484599A (en) * | 2015-08-25 | 2017-03-08 | 佛山市顺德区顺达电脑厂有限公司 | Server and electric power reset method for detecting |
-
2009
- 2009-11-30 CN CN2009102261005A patent/CN102081563A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106484599A (en) * | 2015-08-25 | 2017-03-08 | 佛山市顺德区顺达电脑厂有限公司 | Server and electric power reset method for detecting |
CN106484599B (en) * | 2015-08-25 | 2019-08-20 | 佛山市顺德区顺达电脑厂有限公司 | Judge whether server resetting event is method caused by power breakdown |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101369008B (en) | Thermal switching test system and method for redundant power supply | |
CN100492309C (en) | Method and host equipment for implementing virtual hot-swap | |
CN110568284B (en) | Intelligent substation one-key sequential control automatic test verification method, device and system | |
CN103568863A (en) | Real-time monitoring diagnostic system and diagnostic method for electromobile battery management system | |
CN102185895A (en) | Cross-platform remote control method and system of UPSs (uninterruptible power supply) | |
CN101158847B (en) | Electric power substation software emulation platform building method and no power off upgrading improved method | |
CN107608847B (en) | Electronic device, control method and control device thereof | |
CN102087511A (en) | Method for executing remote monitoring of electronic system by utilizing power supply | |
CN103728547A (en) | Testing system used for testing circuit board and leakage current testing method | |
CN105578238A (en) | Automatic test method and system of turn-on and turn-off of electrical appliance device | |
CN112068535A (en) | Platform door intelligence fortune dimension system | |
CN103913728B (en) | A kind of method of testing based on portable radar comprehensive tester | |
CN105158619A (en) | Digital protection automatic test device and test method based on IEC61850 | |
CN102055615A (en) | Server monitoring method | |
CN104734904B (en) | The automatic test approach and system of bypass equipment | |
CN102346704A (en) | System for monitoring server simulation loads and method | |
CN102081563A (en) | Test method of power supply resetting mechanism | |
CN103971430B (en) | A kind of transformer substation grounding wire Real-time Monitor Management method | |
CN116775224A (en) | One-key sequential control testing system and testing method | |
CN103885018A (en) | Method for debugging BMS lower computer by utilizing upper computer | |
CN104571098B (en) | Long-range self-diagnosing method based on Atom platforms | |
CN101339528A (en) | Computer energy supply periodic switch testing status monitoring apparatus | |
CN109685682A (en) | The method of regulator control system inspection operation ticket is intelligently generated based on relational database | |
CN104794812A (en) | Card swiping system and managing method thereof | |
CN111741089B (en) | Intelligent safety operation management and control system and method based on industrial Internet of things |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110601 |