CN102081382A - 电网自动化信息智能整合装置 - Google Patents

电网自动化信息智能整合装置 Download PDF

Info

Publication number
CN102081382A
CN102081382A CN200910217959XA CN200910217959A CN102081382A CN 102081382 A CN102081382 A CN 102081382A CN 200910217959X A CN200910217959X A CN 200910217959XA CN 200910217959 A CN200910217959 A CN 200910217959A CN 102081382 A CN102081382 A CN 102081382A
Authority
CN
China
Prior art keywords
data
model
file
functional module
cim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910217959XA
Other languages
English (en)
Inventor
王书春
张喜林
刘阳
石钰
陈亚芳
孙莉
张鹏宇
刘晓航
王金霞
韩国炜
王宏谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGCHUN POWER SUPPLY Corp OF JILIN ELECTRIC POWER CORPORATION
State Grid Corp of China SGCC
Original Assignee
CHANGCHUN POWER SUPPLY Corp OF JILIN ELECTRIC POWER CORPORATION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGCHUN POWER SUPPLY Corp OF JILIN ELECTRIC POWER CORPORATION filed Critical CHANGCHUN POWER SUPPLY Corp OF JILIN ELECTRIC POWER CORPORATION
Priority to CN200910217959XA priority Critical patent/CN102081382A/zh
Publication of CN102081382A publication Critical patent/CN102081382A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

本发明涉及一种电网自动化信息智能整合装置,其特征在于:集成数据总线接口电路采集全网数据,并通过数据总线下发给模型及数据中心功能模块存储数据后可实时提供基础数据;基础数据再通过数据总线传输到全网分析计算功能模块,在全模型的基础上实现实时分析计算,最后全网分析计算功能模块将计算结果通过数据总线反馈全模型导出功能模块,从而导出设备模型及参数、厂站接线图及潮流图、实时数据;图形导出功能模块将拼接后的模型供第三方系统使用。其基于全网的模型拼接功能,标准的图形导入和导出功能,基于前置模型和SCADA限值数据导出和导入功能,形成一套长春电网自动化信息整合的规范标准。

Description

电网自动化信息智能整合装置
技术领域:
本发明电网自动化信息智能整合装置,属于电力系统自动化领域。
背景技术:
国内电网长期以来形成了“分级管理、分层控制、分布处理”的体系,因此各级调度在电网建模时通常只针对自己管辖的电网部分进行建模,而为了保证互联电网的安全稳定运行,又必须要求各调度中心对系统的认识是全面和准确的,那么各调度中心之间必须通过某种形式的相互沟通和协调,才能及时、准确地掌握整个电力系统的实时运行状态。
发明内容:
本发明目的在于提供一种电网自动化信息智能整合装置,是实现长春电网自动化信息智能整合发布,通过获取长春地调所辖下级调度中心上传的基于IEC 61970标准的分厂站电网模型和厂站接线图形,在长春地调侧与地调EMS系统中的模型进行拼接以形成整个长春地区完整的电网模型,较好地解决长春地调EMS应用软件的精度问题
本发明的技术方案是这样实现的:电网自动化信息智能整合装置,其特征在于:由集成控制总线接口电路、模型及数据中心功能模块、全网分析计算功能模块、全模型导出功能模块和图形导出功能模块组成,其中集成数据总线接口电路采集全网数据,并通过数据总线下发给模型及数据中心功能模块存储数据后可实时提供基础数据;基础数据再通过数据总线传输到全网分析计算功能模块,在全模型的基础上实现实时分析计算,最后全网分析计算功能模块将计算结果通过数据总线反馈全模型导出功能模块,从而导出设备模型及参数、厂站接线图及潮流图、实时数据;图形导出功能模块将拼接后的模型供第三方系统使用。
所述的全网数据,是将2个或多个有关联的CIM XML文件合并成1个CIM XML文件,导入到应用系统中;或直接将2个或多个有关联的CIM/XMI文件按一定的规则导入到应用系统中;导入的顺序与单个模型文件的大小无关。
所述的图形导入和导出涉及图形对象SVG和CIM对象(CIM XML)两份数据文件,SVG文件带有图形信息,CIM文件带有模型信息,同时建立两份数据文件之间的映射关系,并保持图形文件和模型文件的同步。
本发明的积极效果是基于全网的模型拼接功能,标准的图形导入和导出功能,基于前置模型和SCADA限值数据导出和导入功能,形成一套长春电网自动化信息整合的规范标准;为长春地区电网调度中心的数据整合打下坚实基础;其优点如下:1、模型及数据中心,除了为EMS服务外,将可以为构建长春地区电网安全协调防御体系、在线安全评估和稳定控制预决策系统、吉林省网和长春地调以及下辖县调的联合反事故演习等系统或项目提供基础数据。
2、全网分析计算,在全模型的基础上实现实时分析计算,提高全网分析计算的准确性。由于具备了长春地区电网66kV及以下的全部模型和实时断面数据,因此具备条件完成全网同步仿真计算,实现集中统一模式下的省、地调和各县调的联合反事故演习。
3、全模型导出功能,提供遵循IEC61970标准的全网模型的导出功能,可以提供给各县调。也可以提供给外网调度作更大范围的在线稳定分析计算。这里的模型是广义的,可以包括设备模型及参数、厂站接线图及潮流图、实时数据等。
4、图形导出功能。可以将拼接后的EMS中,包括长春地调和各县调的厂站图和潮流图,按照SVG格式导出,供第三方系统使用。
附图说明:
图1为本发明的原理图;
具体实施方式:
下面结合附图对本发明做进一步的描述:如图1所示,电网自动化信息智能整合装置,其特征在于:由集成控制总线接口电路、模型及数据中心功能模块、全网分析计算功能模块、全模型导出功能模块和图形导出功能模块组成,其中集成数据总线接口电路采集全网数据,并通过数据总线下发给模型及数据中心功能模块存储数据后可实时提供基础数据;基础数据再通过数据总线传输到全网分析计算功能模块,在全模型的基础上实现实时分析计算,最后全网分析计算功能模块将计算结果通过数据总线反馈全模型导出功能模块,从而导出设备模型及参数、厂站接线图及潮流图、实时数据;图形导出功能模块将拼接后的模型供第三方系统使用。
基于全网的模型拼接功能
将2个或多个有关联的CIM XML文件合并成1个CIM XML文件,导入到应用系统中;或直接将2个或多个有关联的CIM/XMI文件按一定的规则导入到应用系统中。导入的顺序与单个模型文件的大小无关。合并的正确与否应当通过有效性校验。基于CIM的模型合并时应注意,对重复的数据应当删除,所有重叠的信息合并后只保留1份。
标准的图形导入和导出功能
将来自于各县调(集控站)系统的基于SVG的厂站接线图形导入到EMS系统,并提供导出工具将图形导出为SVG格式供第三方使用。图形导入和导出涉及图形对象(SVG)和CIM对象(CIM XML)两份数据文件。SVG文件带有图形信息,CIM文件带有模型信息,同时建立两份数据文件之间的映射关系,从而将图形对象和模型对象关联起来。为了保持图形文件和模型文件的同步,源系统的模型文件必须先于图形文件传送,或者和图形文件同步传送。
提供校验工具,校验SVG文件自身的合理性以及与CIM模型文件之间映射的正确性。
基于前置模型和SCADA限值数据导出和导入功能
通过在分厂站模型文件中扩展前置模型数据和SCADA限值,可以实现将分厂站模型文件所包含的前置模型数据和SCADA限值数据导入到EMS系统,实现厂站模型中与SCADA和前置相关数据的交换。

Claims (3)

1.电网自动化信息智能整合装置,其特征在于:由集成控制总线接口电路、模型及数据中心功能模块、全网分析计算功能模块、全模型导出功能模块和图形导出功能模块组成,其中集成数据总线接口电路采集全网数据,并通过数据总线下发给模型及数据中心功能模块存储数据后可实时提供基础数据;基础数据再通过数据总线传输到全网分析计算功能模块,在全模型的基础上实现实时分析计算,最后全网分析计算功能模块将计算结果通过数据总线反馈全模型导出功能模块,从而导出设备模型及参数、厂站接线图及潮流图、实时数据;图形导出功能模块将拼接后的模型供第三方系统使用。
2.根据权利要求1所述的电网自动化信息智能整合装置,其特征在于所述的全网数据,是将2个或多个有关联的CIM XML文件合并成1个CIM XML文件,导入到应用系统中;或直接将2个或多个有关联的CIM/XMI文件按一定的规则导入到应用系统中;导入的顺序与单个模型文件的大小无关。
3.根据权利要求1所述的电网自动化信息智能整合装置,其特征在于所述的图形导入和导出涉及图形对象SVG和CIM对象(CIM XML)两份数据文件,SVG文件带有图形信息,CIM文件带有模型信息,同时建立两份数据文件之间的映射关系,并保持图形文件和模型文件的同步。
CN200910217959XA 2009-11-30 2009-11-30 电网自动化信息智能整合装置 Pending CN102081382A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910217959XA CN102081382A (zh) 2009-11-30 2009-11-30 电网自动化信息智能整合装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910217959XA CN102081382A (zh) 2009-11-30 2009-11-30 电网自动化信息智能整合装置

Publications (1)

Publication Number Publication Date
CN102081382A true CN102081382A (zh) 2011-06-01

Family

ID=44087388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910217959XA Pending CN102081382A (zh) 2009-11-30 2009-11-30 电网自动化信息智能整合装置

Country Status (1)

Country Link
CN (1) CN102081382A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102663217A (zh) * 2012-05-18 2012-09-12 广东电网公司电力科学研究院 Iec61850模型扩展方法
CN103246630A (zh) * 2013-05-07 2013-08-14 国家电网公司 基于模型数据中心的配网一体化平台信息集成方法
CN104503261A (zh) * 2014-12-10 2015-04-08 国家电网公司 一种电网运行方式的控制方法
CN107272615A (zh) * 2017-06-14 2017-10-20 国网上海市电力公司 一种调配一体化系统的厂站模型处理方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6516326B1 (en) * 2000-10-30 2003-02-04 Stone And Webster Consultants, Inc. System and method for integrating electrical power grid and related data from various proprietary raw data formats into a single maintainable electrically connected database
US20070027642A1 (en) * 2005-07-15 2007-02-01 Chang Gung University Method for Calculating Power Flow Solution of a Power Transmission Network that Includes Interline Power Flow Controller (IPFC)
CN101004752A (zh) * 2006-12-26 2007-07-25 国电南瑞科技股份有限公司 电力系统多区域网络模型拼接方法
CN101216984A (zh) * 2008-01-02 2008-07-09 江苏省电力公司 电能信息采集一体化平台
CN101272051A (zh) * 2008-05-06 2008-09-24 江苏省电力公司南京供电公司 电网生产控制大区和管理信息大区的信息系统集成方法
CN101436790A (zh) * 2008-12-26 2009-05-20 北京市电力公司调度通信中心 包含复杂t接线路的电网模型在线拼接与合并方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6516326B1 (en) * 2000-10-30 2003-02-04 Stone And Webster Consultants, Inc. System and method for integrating electrical power grid and related data from various proprietary raw data formats into a single maintainable electrically connected database
US20070027642A1 (en) * 2005-07-15 2007-02-01 Chang Gung University Method for Calculating Power Flow Solution of a Power Transmission Network that Includes Interline Power Flow Controller (IPFC)
CN101004752A (zh) * 2006-12-26 2007-07-25 国电南瑞科技股份有限公司 电力系统多区域网络模型拼接方法
CN101216984A (zh) * 2008-01-02 2008-07-09 江苏省电力公司 电能信息采集一体化平台
CN101272051A (zh) * 2008-05-06 2008-09-24 江苏省电力公司南京供电公司 电网生产控制大区和管理信息大区的信息系统集成方法
CN101436790A (zh) * 2008-12-26 2009-05-20 北京市电力公司调度通信中心 包含复杂t接线路的电网模型在线拼接与合并方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102663217A (zh) * 2012-05-18 2012-09-12 广东电网公司电力科学研究院 Iec61850模型扩展方法
CN102663217B (zh) * 2012-05-18 2014-07-23 广东电网公司电力科学研究院 Iec61850模型扩展方法
CN103246630A (zh) * 2013-05-07 2013-08-14 国家电网公司 基于模型数据中心的配网一体化平台信息集成方法
CN104503261A (zh) * 2014-12-10 2015-04-08 国家电网公司 一种电网运行方式的控制方法
CN107272615A (zh) * 2017-06-14 2017-10-20 国网上海市电力公司 一种调配一体化系统的厂站模型处理方法

Similar Documents

Publication Publication Date Title
CN105095600B (zh) 一种智能变电站和调控中心协调建模方法
CN103955777B (zh) 光伏发电接入配电网方案设计与分析评估辅助系统
CN102521398B (zh) 变电站-调度中心两级分布式电网的建模方法
CN101272051B (zh) 电网生产控制大区和管理信息大区的信息系统集成方法
CN107272615B (zh) 一种调配一体化系统的厂站模型处理方法
CN103150600B (zh) 一种电网安全分析系统
CN102708196B (zh) 一种基于e语言的变电站端与调度端模型协调共享方法
CN101877500B (zh) 面向互联电力系统的分层分解时空协调建模方法
CN102209108A (zh) 实现电网调度主站与变电站之间无缝通信的方法和系统
CN201368904Y (zh) 一种电力系统实时动态监测与记录装置
CN105445546B (zh) 一种具有谐波检测功能的光纤接入式电能表
CN102567603A (zh) 基于实测拓扑和量测数据自动生成bpa计算文件的方法
CN108879667B (zh) 一种电网闭环控制潮流仿真方法
CN103472433B (zh) 智能变电站电能计量二次系统虚负荷误差检测装置及方法
CN101964542A (zh) 一种iec61970调度ems系统接入iec61850数字化变电站的方法
CN102709894A (zh) 继电保护定值的在线校对方法与系统
CN103997125A (zh) 一种多源配电网节能优化调度系统
CN102025151A (zh) 获取电网在线运行状态的潮流断面数据的方法
CN105305438B (zh) 基于变阻抗和受控交流电压源的新能源电站模型验证方法
CN105527858A (zh) 一种智能电网中自动发电控制的硬件在环仿真系统
CN104123427A (zh) 一种基于iec61850标准的区域分布式光伏发电系统建模方法
CN104868596B (zh) 一种智能变电站二次虚回路变更影响范围的快速定位方法
CN102081382A (zh) 电网自动化信息智能整合装置
CN105718656B (zh) 一种智能变电站一二次系统信息关联方法
CN102426623A (zh) 一种用于电力负荷建模的自动故障拟合建模法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121022

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121022

Address after: 130021 No. 4969 Renmin Street, Changchun, Jilin, Chaoyang District

Applicant after: Changchun Power Supply Corporation of Jilin Electric Power Corporation

Applicant after: State Grid Corporation of China

Address before: 130021 No. 4969 Renmin Street, Changchun, Jilin, Chaoyang District

Applicant before: Changchun Power Supply Corporation of Jilin Electric Power Corporation

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110601