CN102080556A - Transitional bracket for mechanized large mining height working face of coal - Google Patents

Transitional bracket for mechanized large mining height working face of coal Download PDF

Info

Publication number
CN102080556A
CN102080556A CN 201110028059 CN201110028059A CN102080556A CN 102080556 A CN102080556 A CN 102080556A CN 201110028059 CN201110028059 CN 201110028059 CN 201110028059 A CN201110028059 A CN 201110028059A CN 102080556 A CN102080556 A CN 102080556A
Authority
CN
China
Prior art keywords
side plate
back timber
hinged
caving shield
top beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110028059
Other languages
Chinese (zh)
Inventor
向家雨
刘付营
龚宇
孙红发
许栋
张建如
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Coal Mining Machinery Group Co Ltd
Original Assignee
Zhengzhou Coal Mining Machinery Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Coal Mining Machinery Group Co Ltd filed Critical Zhengzhou Coal Mining Machinery Group Co Ltd
Priority to CN 201110028059 priority Critical patent/CN102080556A/en
Publication of CN102080556A publication Critical patent/CN102080556A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a transitional bracket for a mechanized large mining height working face of coal. The transitional bracket comprises a pedestal, a bracket shifting mechanism, a hydraulic telescopic upright column, a front connecting rod, a back connecting rod, a top beam which is arranged at the top end of the hydraulic telescopic upright column, a telescopic wall protecting mechanism which is hinged at the front end of the top beam, and a shield beam which is hinged at the back end of the top beam, wherein the lower end of the shield beam is hinged with the front connecting rod and the back connecting rod; a top beam active side plate and a shield beam active side plate are hinged to the same side of the top beam and the shield beam; a top beam side plate and a shield beam side plate which have box structures are welded on the other sides of the top beam and the shield beam respectively; the width of the top beam side plate is more than that of the top beam active side plate; the width of the shield beam side plate is more than that of the shield beam active side plate; a top beam lower side plate is horizontally hinged to the lower end of the top beam side plate; and a support jack is arranged between the top beam side plate and the top beam lower side plate. The invention has the advantages of realizing safety protection in an area in which the intermediate bracket and the end bracket of the working face have large support height difference, and fulfilling the aims of effectively recovering roadway top triangle coal on the two sides of the large mining height working face and improving the coal recovery rate.

Description

Be used for coal and combine the transition bracket of adopting large-mining-height working surface
Technical field
The present invention relates to coal mine fully-mechanized mining large-mining-height working surface work plane, especially relate to mining height and combine the transition bracket of adopting large-mining-height working surface greater than five meters the coal that is used for.
Background technology
Highly maximum 7 meters of the fully-mechanized mining equipment primary recovery that has used in the colliery, and along with combine the technology of adopting the development exploitation highly improve constantly.The roadway workface height is tunneled, the restriction of support apparatus, highly generally about 4 meters, highly again will sharply increase labour intensity and have certain potential safety hazard.Like this, tunnel and work plane just have the difference in height of a 2-3 rice, and existing transient mode is to reduce height gradually to realize the slow transition of tunnel and work plane joining place by several even tens hydraulic supports; This just causes at top, work plane two ends and leaves coal district, triangle top, has caused certain wasting of resources, and along with the raising waste of exploitation height is more and more serious.With 6.8 meters of mining heights, tunnel is example for 4.4 meters, and every propelling one km of work plane is lost 5.77 ten thousand tons in ventral triangle coal.For reducing the wasting of resources, a kind of special transition bracket must be developed,, work plane middle frame and section transition of face end support height change and protection can be realized by the transition of a hydraulic support, thereby safety reclaims the ventral triangle coal, but yet there are no all relevant reports.
Summary of the invention
The object of the invention is to provide a kind of coal that is used for to combine the transition bracket of adopting large-mining-height working surface, to solve the big discrepancy in elevation protection question of transition bracket and face end support.
For achieving the above object, the present invention can take following technical proposals:
The coal that is used for of the present invention is combined the transition bracket of adopting large-mining-height working surface, it comprises base, be arranged on and move frame mechanism, hydraulically extensible column, front-rear linkage on the described base, with the back timber that is arranged on described hydraulically extensible column top, be hinged on the flexible side protecting mechanism of described back timber front end and the caving shield of rear end respectively; Described caving shield lower end and described front-rear linkage upper end are hinged; Be hinged with back timber side plate alive and caving shield side plate alive respectively in the same side of back timber, caving shield; Live between side plate and the back timber at described back timber, caving shield lives and is respectively arranged with the thruster jack between side plate and the caving shield; Be welded with the back timber side plate and the caving shield side plate of box-structure respectively at the opposite side of back timber, caving shield; The width of described back timber side plate, caving shield side plate is respectively greater than the back timber work side plate of correspondence and the width of caving shield side plate alive; The caving shield side plate is anterior to overlap mutually with the back timber side plate; Be hinged with the back timber lower side panel in back timber side plate lower end; Between back timber side plate and back timber lower side panel, be provided with the support jack; Described back timber lower side panel forms by two boards is hinged.
The invention has the advantages that the security protection that realizes the big zone of work plane intermediate support and face end support supporting height drop, reach the purpose of lane, effective recovery large-mining-height working surface both sides ventral triangle coal, raising coal recovery rate.When working face equipment was just installed, it was highly general consistent with head-room to cut eye, and in advance of the face process, the intermediate support mining height increases gradually.Therefore, different according to face end support and intermediate support difference in height during transition bracket of the present invention uses can be installed and used the back timber side plate of box-structure separately, or with the hinged use of back timber lower side panel.When work plane was arranged hydraulic support, transition bracket back timber side plate and adjacent face end support side guard board overlap joint formed between basic frame and the face end support and realize transition, and back timber side plate alive and intermediate support overlap joint get final product.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the left TV structure schematic diagram of Fig. 1.
Fig. 3 is a working state schematic representation of the present invention.
The specific embodiment
As shown in Figure 1, 2, 3, the coal that is used for of the present invention is combined the transition bracket of adopting large-mining-height working surface, it comprises base 1, be arranged on and move frame mechanism, hydraulically extensible column 2, front and rear connecting rods 3,4 on the described base 1, with the back timber that is arranged on described hydraulically extensible column 2 tops, be hinged on the flexible side protecting mechanism 5 of described back timber front end and the caving shield of rear end respectively; Described caving shield lower end and described front and rear connecting rods 3,4 upper ends are hinged; Be hinged with back timber side plate 6 alive and caving shield side plate 7 alive respectively in the same side of back timber, caving shield; Live between side plate 6 and the back timber at described back timber, caving shield lives and is respectively arranged with the thruster jack between side plate 7 and the caving shield; Be welded with the back timber side plate 8 and the caving shield side plate 9 of box-structure respectively at the opposite side of back timber, caving shield; The width of described back timber side plate 8, caving shield side plate 9 is respectively greater than the back timber work side plate 6 of correspondence and the width of caving shield side plate 7 alive; Caving shield side plate 9 front portions overlap mutually with back timber side plate 8; Be hinged with back timber lower side panel 10 in back timber side plate 8 lower ends; Between back timber side plate 8 and back timber lower side panel 10, be provided with and support jack 11; Described back timber lower side panel 10 forms by two boards is hinged.

Claims (1)

1. one kind is used for the comprehensive transition bracket of adopting large-mining-height working surface of coal, it comprises base (1), be arranged on moving frame mechanism, hydraulically extensible column (2), front and rear connecting rods (3,4) and being arranged on the back timber on described hydraulically extensible column (2) top on the described base (1), be hinged on the flexible side protecting mechanism (5) of described back timber front end and the caving shield of rear end respectively; Described caving shield lower end and described front and rear connecting rods (3,4) upper end is hinged; It is characterized in that: be hinged with back timber side plate (6) alive and caving shield side plate (7) alive respectively in the same side of back timber, caving shield; Live between side plate (6) and the back timber at described back timber, caving shield lives and is respectively arranged with the thruster jack between side plate (7) and the caving shield; Be welded with the back timber side plate (8) and the caving shield side plate (9) of box-structure respectively at the opposite side of back timber, caving shield; The width of described back timber side plate (8), caving shield side plate (9) is respectively greater than the back timber work side plate (6) of correspondence and the width of caving shield side plate alive (7); Caving shield side plate (9) is anterior to overlap mutually with back timber side plate (8); Be hinged with back timber lower side panel (10) in back timber side plate (8) lower end; Between back timber side plate (8) and back timber lower side panel (10), be provided with and support jack (11); Described back timber lower side panel (10) forms by two boards is hinged.
CN 201110028059 2011-01-26 2011-01-26 Transitional bracket for mechanized large mining height working face of coal Pending CN102080556A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110028059 CN102080556A (en) 2011-01-26 2011-01-26 Transitional bracket for mechanized large mining height working face of coal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110028059 CN102080556A (en) 2011-01-26 2011-01-26 Transitional bracket for mechanized large mining height working face of coal

Publications (1)

Publication Number Publication Date
CN102080556A true CN102080556A (en) 2011-06-01

Family

ID=44086721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110028059 Pending CN102080556A (en) 2011-01-26 2011-01-26 Transitional bracket for mechanized large mining height working face of coal

Country Status (1)

Country Link
CN (1) CN102080556A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926784A (en) * 2012-11-16 2013-02-13 无锡阳工机械制造有限公司 Hydraulic supporting-shielding bracket structure for coal face
CN103758554A (en) * 2013-12-05 2014-04-30 中煤北京煤矿机械有限责任公司 Reliable support beam structure for hydraulic support, and hydraulic support
CN111894585A (en) * 2020-07-15 2020-11-06 中煤科工开采研究院有限公司 Fully-mechanized coal mining face system for improving mining rate of mining area

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3726562A (en) * 1971-04-07 1973-04-10 G Wharton Mining machine including means for utilizing vacuum at working face and methods of operation thereof
CN1763351A (en) * 2003-12-12 2006-04-26 肖自立 Four-control type comprehensive coal mining method
CN1865657A (en) * 2005-05-19 2006-11-22 兖矿集团有限公司 Comprehensive coal-mining process by using long wall mining method
CN101372891A (en) * 2008-06-10 2009-02-25 沈阳市华祥矿山机械厂 Strip filling integral stoping coal mining method
CN101906982A (en) * 2010-09-02 2010-12-08 郑州煤矿机械集团股份有限公司 Two-stage side guard transition bracket for large height mining face
CN101915107A (en) * 2010-09-02 2010-12-15 郑州煤矿机械集团股份有限公司 Method for arranging coal mine large-mining-height working surface equipment
CN201915981U (en) * 2011-01-26 2011-08-03 郑州煤矿机械集团股份有限公司 Transitional support for large-mining-height working surface for full-mechanized coal mining

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3726562A (en) * 1971-04-07 1973-04-10 G Wharton Mining machine including means for utilizing vacuum at working face and methods of operation thereof
CN1763351A (en) * 2003-12-12 2006-04-26 肖自立 Four-control type comprehensive coal mining method
CN1865657A (en) * 2005-05-19 2006-11-22 兖矿集团有限公司 Comprehensive coal-mining process by using long wall mining method
AU2005203458A1 (en) * 2005-05-19 2006-12-07 Yankuang Group Corporation Limited Fully mechanized mining technique of longwall mining method
CN101372891A (en) * 2008-06-10 2009-02-25 沈阳市华祥矿山机械厂 Strip filling integral stoping coal mining method
CN101906982A (en) * 2010-09-02 2010-12-08 郑州煤矿机械集团股份有限公司 Two-stage side guard transition bracket for large height mining face
CN101915107A (en) * 2010-09-02 2010-12-15 郑州煤矿机械集团股份有限公司 Method for arranging coal mine large-mining-height working surface equipment
CN201915981U (en) * 2011-01-26 2011-08-03 郑州煤矿机械集团股份有限公司 Transitional support for large-mining-height working surface for full-mechanized coal mining

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
20100228 王继明 世界首个7m大采高综采面投产 第15页 , 第2期 2 *
20100330 李根威等 大采高整层综采面开采技术研究 第5-7页 , 第1期 2 *
20100803 张书敬 厚煤层中小煤矿改造技术途径 第12-14页 第15卷, 第4期 2 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926784A (en) * 2012-11-16 2013-02-13 无锡阳工机械制造有限公司 Hydraulic supporting-shielding bracket structure for coal face
CN103758554A (en) * 2013-12-05 2014-04-30 中煤北京煤矿机械有限责任公司 Reliable support beam structure for hydraulic support, and hydraulic support
CN111894585A (en) * 2020-07-15 2020-11-06 中煤科工开采研究院有限公司 Fully-mechanized coal mining face system for improving mining rate of mining area

Similar Documents

Publication Publication Date Title
CN101906982B (en) Two-stage side guard transition bracket for large height mining face
CN203066995U (en) Steep coal seam work face double-lane forepoling hydraulic support side protection device
CN101440711A (en) Large extraction high caving roof coal hydraulic support
CN104047627A (en) Mining roadway frame style advanced support bracket
RU121861U1 (en) TWO-POSITION TWO-POINT HYDRAULIC FASTENERS FOR DESTRUCTION OF A LOW-LOCATED Upper Bundle of a coal seam
CN202483604U (en) Hydraulic support for pitched-roof roadway forepoling
CN101892856A (en) Special hydraulic support for underground filling coal mining of coal mine
CN203905987U (en) Backfill hydraulic bracket
CN102080556A (en) Transitional bracket for mechanized large mining height working face of coal
CN103306696A (en) Self-moving roadway advance support bracket
CN203362199U (en) End-head hydraulic support for fully mechanized mining face
CN102373937B (en) Rhombic hydraulic support for pseudo-inclined down mining working surface of steep coal seam
CN202596763U (en) Fully-mechanized hydraulic support for steep coal face crossing fault
CN201915981U (en) Transitional support for large-mining-height working surface for full-mechanized coal mining
CN102080557A (en) Split type side guard device applicable for transition support of large coal mining height fully-mechanized face
CN110925005B (en) Hydraulic support for retaining waste rock
CN201747391U (en) Two-stage lateral protection transition bracket of large mining height working surface
CN103195458A (en) Underground coal mine large channel end socket suspension hydraulic support
CN102392663A (en) Forward supporting hydraulic support and forward supporting hydraulic support system
CN203130131U (en) Suspension hydraulic support for underground coal mine large channel end
CN203257446U (en) Coal harbor arched supporting shield structure
CN202659267U (en) Integral graded spanning-type walking bracket
CN201908671U (en) Split side protection device suitable for transition bracket between fully mechanized coal mining working surface and large coal mining high working surface
CN102108875A (en) Single-stage side protective device applicable to high working surface transition support in mechanized mining and deep mining of coal
CN201943730U (en) Double-stage side protecting device for comprehensive mechanized coal mining and large mining height working face transition supports

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110601