batch
tasks
task
worker
wbs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010106174704A
Other languages
Chinese (zh)
Inventor
罗涛
陈伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yonyou Software Co Ltd
Original Assignee
Yonyou Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yonyou Software Co Ltd filed Critical Yonyou Software Co Ltd
Priority to CN2010106174704A priority Critical patent/CN102073934A/en
Publication of CN102073934A publication Critical patent/CN102073934A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a batch dispatching method. The method comprises the following steps of: step 102, selecting a plurality of tasks from a work breakdown structure according to preset conditions; and step 104, generating a batch dispatching bill according to the data of the plurality of tasks. The invention also provides a batch dispatching device. The device comprises a task selection module and a batch dispatching module, wherein the task selection module selects the plurality of tasks from the work breakdown structure according to the preset conditions; and the batch dispatching module generates the batch dispatching bill according to the data of the plurality of tasks. The technical scheme adopted by the invention supports a user to select a plurality of project work breakdown structure (WBS) task data required to be dispatched according to needs and to automatically generate the batch dispatching bill creating and executing the tasks, so the working efficiency of an enterprise is improved; the working intensity of dispatchers is reduced; the consistency of a plan and execution information is ensured; and then omission and deviation caused by manual operation are avoided.

Description

Batch work dispatching method and device
Technical field
The present invention relates to ERP, relate in particular to work dispatching method and device in batches.
Background technology
Manufacturing enterprise is in real work, the palnning departments that adopt work out plan more, production department is according to the mode of establishment planning execution, in this mode, the establishment that planning authorities is responsible for planning, coordinate and monitoring, production division is responsible for carrying out according to schedule production task, present ERP (Enterprise ResourcePlanning, ERP) software all is to check task according to production department's scheduling basically, task generation production order or purchase order are carried out and are sent the worker one by one then, this way has increased the dispatcher's of enterprise workload, has reduced the work efficiency of enterprise, and causes easily omitting and deviation.
For these reasons, need a kind of batch work dispatching method and device, support the user to select a plurality of project WBS task datas that need send the worker as required, and the automatic job order certificate of creating the batch of executing the task that generates, improved the work efficiency of enterprise, reduce dispatcher's working strength, guaranteed the consistent of the plan and the information of execution, thus omission and the deviation of having avoided manually-operated to bring.
Summary of the invention
In view of more than, technical matters to be solved by this invention is, a kind of batch work dispatching method and device are provided, support the user to select a plurality of project WBS task datas that need send the worker as required, and the automatic job order certificate of creating the batch of executing the task that generates, improve the work efficiency of enterprise, reduced dispatcher's working strength.
The invention provides a kind of batch work dispatching method, comprising: step 102, according to prerequisite, from work breakdown structure (WBS), select a plurality of tasks; Step 104 according to the data of described a plurality of tasks, generates job order certificate in batches.According to this technical scheme, can select a plurality of tasks for the user is once, according to individual task is generated job order certificate in batches.
In technique scheme, preferably, in described step 104, also be provided with and send worker's parameter, and, fill carrying out data in the described batch job order certificate according to described data of sending worker's parameter and described a plurality of tasks.
In technique scheme, preferably, in described step 102, also manually described a plurality of tasks are screened.Provide the mode of selecting task more flexibly to select for the user.
In technique scheme, preferably, in described step 102, also formulate described prerequisite according to the field in the described work breakdown structure (WBS).
In technique scheme, preferably, described batch job order is according to comprising production instruction order certificate and procurement directive document.It will be appreciated by those skilled in the art that job order also can comprise multiple ERP business paper according to being not limited to above-mentioned two kinds in batches.
Pass through technique scheme, can realize that a kind of batch sends frock to be put, support the user to select a plurality of project WBS task datas that need send the worker as required, and the automatic job order certificate of creating the batch of executing the task that generates, improved the work efficiency of enterprise, reduce dispatcher's working strength, guaranteed the consistent of the plan and the information of execution, thus omission and the deviation of having avoided manually-operated to bring.
The present invention also provides a kind of batch to send frock to be put, and comprising: the task choosing module, according to prerequisite, from work breakdown structure (WBS), select a plurality of tasks; Send worker's module in batches,, generate job order certificate in batches according to the data of described a plurality of tasks.According to this technical scheme, can select a plurality of tasks for the user is once, according to individual task is generated job order certificate in batches.
In technique scheme, preferably, described batch is sent worker's module also to be provided with and is sent worker's parameter, and according to described data of sending worker's parameter and described a plurality of tasks, fills carrying out data in the described batch job order certificate.
In technique scheme, preferably, can also comprise: user's adjusting module, manually screen described a plurality of tasks for the user.Provide the mode of selecting task more flexibly to select for the user.
In technique scheme, preferably, described task choosing module is also formulated described prerequisite according to the field in the described work breakdown structure (WBS).
In technique scheme, preferably, described batch job order is according to comprising production instruction order certificate and procurement directive document.It will be appreciated by those skilled in the art that job order also can comprise multiple ERP business paper according to being not limited to above-mentioned two kinds in batches.
Pass through technique scheme, can realize that a kind of batch sends frock to be put, support the user to select a plurality of project WBS task datas that need send the worker as required, and the automatic job order certificate of creating the batch of executing the task that generates, improved the work efficiency of enterprise, reduce dispatcher's working strength, guaranteed the consistent of the plan and the information of execution, thus omission and the deviation of having avoided manually-operated to bring.
Description of drawings
Fig. 1 shows according to an embodiment of the invention the process flow diagram of work dispatching method in batches;
Fig. 2 shows the block diagram of sending frock to be put in batches according to an embodiment of the invention; And
Fig. 3 shows according to an embodiment of the invention the process flow diagram of work dispatching method in batches.
Embodiment
In order more to be expressly understood above-mentioned purpose of the present invention, feature and advantage, the present invention is further described in detail below in conjunction with the drawings and specific embodiments.
Set forth a lot of details in the following description so that fully understand the present invention, still, the present invention can also adopt other to be different from other modes described here and implement, and therefore, the present invention is not limited to the restriction of following public specific embodiment.
Fig. 1 shows according to an embodiment of the invention the process flow diagram of work dispatching method in batches.
As shown in Figure 1, work dispatching method comprises in batches according to an embodiment of the invention: step 102, according to prerequisite, from work breakdown structure (WBS), select a plurality of tasks; Step 104 according to the data of a plurality of tasks, generates job order certificate in batches.According to this technical scheme, can select a plurality of tasks for the user is once, according to individual task is generated job order certificate in batches.
In technique scheme, preferably, in step 104, also be provided with and send worker's parameter, and, fill carrying out data in the batch job order certificate according to the data of sending worker's parameter and a plurality of tasks.
In technique scheme, preferably, in step 102, also manually a plurality of tasks are screened.Provide the mode of selecting task more flexibly to select for the user.
In technique scheme, preferably, in step 102, also formulate prerequisite according to the field in the work breakdown structure (WBS).
In technique scheme, preferably, job order is according to comprising production instruction order certificate and procurement directive document in batches.It will be appreciated by those skilled in the art that job order also can comprise multiple ERP business paper according to being not limited to above-mentioned two kinds in batches.
Pass through technique scheme, can realize that a kind of batch sends frock to be put, support the user to select a plurality of project WBS task datas that need send the worker as required, and the automatic job order certificate of creating the batch of executing the task that generates, improved the work efficiency of enterprise, reduce dispatcher's working strength, guaranteed the consistent of the plan and the information of execution, thus omission and the deviation of having avoided manually-operated to bring.
Fig. 2 shows the block diagram of sending frock to be put in batches according to an embodiment of the invention.
As shown in Figure 2, send frock to put 200 in batches according to an embodiment of the invention and comprise: task choosing module 202, according to prerequisite, from work breakdown structure (WBS), select a plurality of tasks; Send worker's module 204 in batches,, generate job order certificate in batches according to the data of a plurality of tasks.According to this technical scheme, can select a plurality of tasks for the user is once, according to individual task is generated job order certificate in batches.
In technique scheme, preferably, send worker's module 204 also to be provided with in batches and send worker's parameter, and, fill carrying out data in the batch job order certificate according to the data of sending worker's parameter and a plurality of tasks.
In technique scheme, preferably, can also comprise: user's adjusting module 206, manually screen a plurality of tasks for the user.Provide the mode of selecting task more flexibly to select for the user.
In technique scheme, preferably, task choosing module 202 is also formulated prerequisite according to the field in the work breakdown structure (WBS).
In technique scheme, preferably, job order is according to comprising production instruction order certificate and procurement directive document in batches.It will be appreciated by those skilled in the art that job order also can comprise multiple ERP business paper according to being not limited to above-mentioned two kinds in batches.
Pass through technique scheme, can realize that a kind of batch sends frock to be put, support the user to select a plurality of project WBS task datas that need send the worker as required, and the automatic job order certificate of creating the batch of executing the task that generates, improved the work efficiency of enterprise, reduce dispatcher's working strength, guaranteed the consistent of the plan and the information of execution, thus omission and the deviation of having avoided manually-operated to bring.
Below in conjunction with Fig. 3 another embodiment of the present invention is described.
As shown in Figure 3, in step 302, inquiry WBS (Work Break Structure, work breakdown structure (WBS)) task and output.
Querying condition allows the user to customize by the querying condition editing machine, can extend to all data item of task output and task, the user is the typing querying condition as required, click confirming button, call querying method, the querying condition of user's typing is created WBS inquire about receivable parameter list, call the WBS querying method of standard, and be responsible for Query Result is passed in WBS task and the task output result screen.
In step 304, determine task and the output that to send the worker.Show and select to be used to generate WBS task and the task output of PO or MO, the WBS task and the task output that will satisfy the user inquiring condition with the form of tabulating are shown to the user according to group items, and allow the user that the result is selected, determine to send task and the task output of worker in PO or MO.
In step 306, the user click in batches send the worker after, worker's parameter is sent in the typing of user selection.If not typing, system will select parameter automatically.
In step 308, call the method for sending the worker in batches according to WBS task output.
In step 310, generate the required job order certificate of user.
WBS task and task output with the user selects form according to WBS task output job order according to required parameter list according to form as shown in table 1 below.
Sequence number Title Type
1? Task output ID long?
2? Task is carried out tissue long?
3? Document types long?
4? The demand classification Int?
5? Storage location long?
6? Output supply tissue long?
7? Department long?
8? The task manager long?
9? The output material long?
10? Unit long?
11? Planned quantity decimal?
12? Ps DateTime?
13? The plan output date DateTime?
Table 1
Receive the as above parameter list shown in the table 1, be responsible for creating automatically the data of PO or MO according to task and task output data.The job order certificate is as shown in table 2 with the corresponding relation of the WBS task data that the user selects:
Figure BDA0000042233980000061
Table 2
From last table 2 as can be known, according to the typing parameter that the user selects, the job order of generation is one to one according to the task data with user's selection, and the document of sending the worker in batches can be to produce order or purchase order, and other ERP business papers.
Pass through technique scheme, can send the needs that the user selects worker's the once complete worker that sends of WBS task to go down, staff planners or dispatcher person only need single job can send the worker in batches, the workload that has solved staff planners or dispatcher is bigger, and is easy to generate and should revises and the problem of the deviation of unmodified omission or data.
Further specify technical scheme of the present invention below in conjunction with concrete chart.
Certain machine tool plant's project 001 (ps=2009-07-01) the WBS task data is as shown in table 3 below:
The task coding Title Plan goes into operation Plan is finished Product Quantity The output date
1? Base 2009-7-1? 2009-7-1? Base 1? 2009-7-1?
2? Lower bolster 2009-7-1? 2009-7-1? Lower bolster 1? 2009-7-1?
3? Guide pin bushing 2009-7-1? 2009-7-1? Guide pin bushing 2? 2009-7-1?
4? The guide pillar lining 2009-7-1? 2009-7-1? The guide pillar lining 2? 2009-7-1?
5? Connecting rod 2009-7-1? 2009-7-1? Connecting rod 2? 2009-7-1?
Table 3
The user selects above-mentioned WBS data, and it is as shown in table 4 below according to one-tenth MO to generate the batch job order,
Figure BDA0000042233980000071
Table 4
As shown in table 4, corresponding relation according to table 2: the material that the material of task output will be produced as MO, the planned quantity of task output is as production quantity and the MRP quantity of wanting the job order certificate, output program Start Date and plan output day respectively as plan stream day and scheduled completion day of MO.
Pass through technique scheme, can realize a kind of batch work dispatching method and device, support the user to inquire the project WBS task data that to send the worker as required, automatically generate and create the job order certificate of executing the task, improved the work efficiency of enterprise, reduce dispatcher's working strength, guaranteed the consistent of the plan and the information of execution, thus omission and the deviation of having avoided manually-operated to bring.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a batch work dispatching method is characterized in that, comprising:
Step 102 according to prerequisite, is selected a plurality of tasks from work breakdown structure (WBS);
Step 104 according to the data of described a plurality of tasks, generates job order certificate in batches.
2. batch work dispatching method according to claim 1 is characterized in that, in described step 104, also is provided with and sends worker's parameter, and according to described data of sending worker's parameter and described a plurality of tasks, fill carrying out data in the described batch job order certificate.
3. batch work dispatching method according to claim 1 is characterized in that, in described step 102, also manually described a plurality of tasks is screened.
4. batch work dispatching method according to claim 1 is characterized in that, in described step 102, also formulates described prerequisite according to the field in the described work breakdown structure (WBS).
5. according to each described batch work dispatching method in the claim 1 to 4, it is characterized in that described batch job order is according to comprising production instruction order certificate and procurement directive document.
6. a batch sends frock to be put, and it is characterized in that, comprising:
The task choosing module according to prerequisite, is selected a plurality of tasks from work breakdown structure (WBS);
Send worker's module in batches,, generate job order certificate in batches according to the data of described a plurality of tasks.
7. batch according to claim 6 sends frock to be put, and it is characterized in that, described batch is sent worker's module also to be provided with and sent worker's parameter, and according to described data of sending worker's parameter and described a plurality of tasks, fills carrying out data in the described batch job order certificate.
8. batch according to claim 6 sends frock to be put, and it is characterized in that, also comprises:
User's adjusting module manually screens described a plurality of tasks for the user.
9. batch according to claim 6 sends frock to be put, and it is characterized in that, described task choosing module is also formulated described prerequisite according to the field in the described work breakdown structure (WBS).
10. send frock to be put according to each described batch in the claim 6 to 9, it is characterized in that, described batch job order is according to comprising production instruction order certificate and procurement directive document.
CN2010106174704A 2010-12-31 2010-12-31 Batch dispatching method and device Pending CN102073934A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010106174704A CN102073934A (en) 2010-12-31 2010-12-31 Batch dispatching method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010106174704A CN102073934A (en) 2010-12-31 2010-12-31 Batch dispatching method and device

Publications (1)

Publication Number Publication Date
CN102073934A true CN102073934A (en) 2011-05-25

Family

ID=44032467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106174704A Pending CN102073934A (en) 2010-12-31 2010-12-31 Batch dispatching method and device

Country Status (1)

Country Link
CN (1) CN102073934A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107730388A (en) * 2017-09-25 2018-02-23 平安科技(深圳)有限公司 Declaration form dispatching method for allocating tasks, device, computer equipment and storage medium
CN113837611A (en) * 2021-09-24 2021-12-24 苏州迈艾木软件科技有限公司 Automatic worker dispatching recommendation method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107730388A (en) * 2017-09-25 2018-02-23 平安科技(深圳)有限公司 Declaration form dispatching method for allocating tasks, device, computer equipment and storage medium
CN113837611A (en) * 2021-09-24 2021-12-24 苏州迈艾木软件科技有限公司 Automatic worker dispatching recommendation method and system

Similar Documents

Publication Publication Date Title
CN111027876B (en) Process production planning and scheduling system in distributed production mode
CN107248021B (en) MES system is made to platform-based intelligence
Kilpatrick Lean principles
CN105321042B (en) Genetic algorithm-based advanced plan scheduling system and method
CN111126748A (en) Dynamic production plan scheduling method for discrete manufacturing industry
KR101614908B1 (en) System and method for providing of ERP service
CN105404951A (en) Method for increasing the work performance of a manufacturing executing system (mes) and an enterprise resource planning system (erp)
US6785581B2 (en) Methods and systems for fabricating components
Goryachev et al. “Smart factory”: intelligent system for workshop resource allocation, scheduling, optimization and controlling in real time
CN103926894A (en) Furniture making method and system and control device
CN112070378B (en) Production scheduling management method based on logic priority principle by using computer
CN103926895A (en) Furniture making method and system and control device
CN104392311A (en) Intelligent production scheduling method based on state driving
CN111768072B (en) Printing and dyeing workshop scheduling system
CN111222943A (en) Order scheduling management system and method
CN115700639A (en) Intelligent production scheduling method, device, equipment and storage medium
CN102073934A (en) Batch dispatching method and device
CN114707874A (en) Scheduling method, equipment and storage medium applied to aluminum alloy production
KR101656989B1 (en) Integrated platform management system for collaboration between the manufacturing company
CN111126877B (en) Chemical fiber industry planning and scheduling method and system
Concannon et al. SIMUL8-planner simulation-based planning and scheduling
CN115660261A (en) Production order information processing method, computer device and storage medium
CN102024213A (en) Task formulation method and device
CN103177071A (en) Customizing a graphical user interface of a manufacturing execution system screen
CN102054231A (en) Method and device for generating bill of material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110525